Layered placement mechanism for power monitoring
By designing a layered power monitoring and installation mechanism, and using multiple partitions to divide the cabinet's cavity into multiple meter placement cavity, the problem that the existing meter can only be placed in a single meter is solved, and effective placement and orderly monitoring of meters of different specifications is achieved.
Patent Information
- Application Number
- CN202421347544.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2034-06-13
AI Technical Summary
The existing power monitoring and installation mechanism can only place a single type of electricity meter and cannot meet the installation needs of different specifications of electricity meter.
A layered metering mechanism for power monitoring is designed, including a cabinet body and a placement rack. The inner cavity of the cabinet is divided into a plurality of large meter placement cavity and a small meter placement cavity through the first vertical partition, horizontal partition and second vertical partition, and arranged at layers from top to bottom to meet the installation needs of meters of different specifications.
It realizes effective placement of meters of different specifications, ensures the orderliness of meters, and facilitates staff to conduct layered monitoring.
Smart Images

Figure CN222785641U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of electric power, in particular to a layered placement mechanism for electric power monitoring. Background Art
[0002] In recent years, digital electric meters have also been developed. After being digitized, the electric meters also provide the functions of remote transmission of power consumption data and control of power outages. Its main components generally include a microprocessor, a power converter, a relay unit, an electronic switch and a port. The microprocessor is used to connect a single power line loop to detect its current and voltage, and convert the current and voltage on it into current data and voltage data. The power converter is connected to each power line to obtain the required power, and converts the obtained power into the power required to drive the relay unit. The relay unit is electrically connected to the power converter, and the electronic switch is arranged between the microprocessor and the electrical unit, and the microprocessor controls the switching of the electronic switch. The port is internally connected to the microprocessor and the power converter, and is externally connected to a network connection device, and the power converter can transmit the driving power required by the external network connection device through the port to drive the network connection device to work, so that the microprocessor transmits the current data and voltage data to the external network connection device through the port, and then the network connection device transmits it to a remote server. In this way, power companies or users can obtain power usage data through a remote server to understand the usage status. The power monitoring device needs to be placed using a mounting frame, but the existing mounting frame can only be placed for a single type of meter, which urgently needs to be improved. Utility Model Content
[0003] The utility model aims to provide a hierarchical placement mechanism for power monitoring, which is used to solve the problem that the existing power monitoring placement mechanism can only place a single type of electric meter.
[0004] In order to solve the above problems, the utility model provides a layered placement mechanism for power monitoring, including a cabinet and a placement rack, the placement rack including a first vertical partition, a horizontal partition and a second vertical partition, a plurality of the horizontal partitions are symmetrically fixed on both sides of the first vertical partition, the first vertical partition and the horizontal partition can divide the inner cavity of the cabinet into a plurality of large meter placement cavities, the large meter placement cavities are layeredly arranged with the second vertical partitions from top to bottom, the second vertical partitions can divide the large meter placement cavities of the corresponding layer into small meter cavities.
[0005] The utility model provides a layered placement mechanism for power monitoring, which also has the following technical features:
[0006] Furthermore, the cabinet is made of stainless steel.
[0007] Furthermore, the material of the placement rack is tetrafluoroethylene.
[0008] Furthermore, the thickness of the first vertical partition and the second vertical partition is 2-3 mm.
[0009] Furthermore, the thickness of the horizontal partition is 3-4 mm.
[0010] Furthermore, the spacing distance between two adjacent horizontal partitions is 15-20 cm.
[0011] The utility model has the following beneficial effects: the inner cavity of the cabinet can be divided into a plurality of large meter placement cavities and small meter placement cavities by the first vertical partition, the second vertical partition and the horizontal partition to meet the needs of placing meters of different specifications; at the same time, the small meter placement cavities and the large meter placement cavities are arranged in layers and intervals from top to bottom to ensure the orderliness of the placement of the meters and facilitate layered monitoring by staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of the structure of a layered placement mechanism for power monitoring. DETAILED DESCRIPTION
[0013] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.
[0014] like Figure 1 In the embodiment of a layered placement mechanism for power monitoring of the utility model shown in the figure, it includes a cabinet 1 and a placement rack 2, the placement rack 2 includes a first vertical partition 21, a horizontal partition 22 and a second vertical partition 23, a plurality of horizontal partitions 22 are symmetrically fixed on both sides of the first vertical partition 21, the first vertical partition 21 and the horizontal partition 22 can divide the inner cavity of the cabinet 1 into a plurality of large electric meter placement cavities 101, and the large electric meter placement cavity 101 is layered and spaced from top to bottom with a second vertical partition 23, and the second vertical partition 23 can separate the large meter placement cavity 101 of the corresponding layer into small meter placement cavities 1011. Specifically, the inner cavity of the cabinet 1 can be divided into multiple large meter placement cavities 101 and small meter placement cavities 1011 through the first vertical partition 21, the second vertical partition 23 and the horizontal partition 22 to meet the needs of placing meters of different specifications. At the same time, the small meter placement cavities 1011 and the large meter placement cavities 101 are arranged in layers and intervals from top to bottom to ensure the orderliness of the placement of the meters and facilitate the staff to carry out layered monitoring.
[0015] In one embodiment of the present application, the cabinet 1 is made of stainless steel.
[0016] In one embodiment of the present application, the material of the placement rack 2 is tetrafluoroethylene.
[0017] In one embodiment of the present application, the thickness of the first vertical partition 21 and the second vertical partition 23 is 2-3 mm.
[0018] In one embodiment of the present application, the thickness of the horizontal partition 22 is 3-4 mm.
[0019] In one embodiment of the present application, the spacing distance between two adjacent horizontal partitions 22 is 15-20 cm.
[0020] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.
Claims
1. A layered placement mechanism for power monitoring, characterized in that: It includes a cabinet and a placement rack, the placement rack includes a first vertical partition, a horizontal partition and a second vertical partition, a plurality of the horizontal partitions are symmetrically fixed on both sides of the first vertical partition, the first vertical partition and the horizontal partition can divide the inner cavity of the cabinet into a plurality of large meter placement cavities, the large meter placement cavities are layered and spaced from top to bottom with the second vertical partitions, and the second vertical partitions can separate the large meter placement cavities of the corresponding layers into small meter cavities.
2. The hierarchical placement mechanism for power monitoring according to claim 1 is characterized in that: The cabinet is made of stainless steel.
3. The hierarchical placement mechanism for power monitoring according to claim 1 is characterized in that: The material of the placement rack is tetrafluoroethylene.
4. The hierarchical placement mechanism for power monitoring according to claim 2 is characterized in that: The thickness of the first vertical partition and the second vertical partition is 2-3 mm.
5. The hierarchical placement mechanism for power monitoring according to claim 3 is characterized in that: The thickness of the horizontal partition is 3-4 mm.
6. The hierarchical placement mechanism for power monitoring according to claim 2, characterized in that: The spacing between two adjacent horizontal partitions is 15-20 cm.