Integrated operation platform for binding pier body reinforcing steel bars
By designing an integrated operation platform for pier body steel bar binding, the problems of low efficiency and poor quality of steel bar binding in the existing technology are solved, efficient and accurate steel bar binding is achieved, and construction safety and quality are improved.
Patent Information
- Application Number
- CN202421795548.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2034-07-29
AI Technical Summary
In the prior art, the pier body steel bar binding efficiency is low, and it is difficult to ensure the control of steel bar spacing and verticality, which affects the binding quality.
An integrated working platform for tying the pier body steel bars is designed, including two vertical frames and at least two layers of platform frames at different heights. The upper part of the platform frame is laid with patterned steel plates, and a retractable adjustment rod and steel bar chute are installed to ensure precise positioning and verticality of the steel bars through these structures.
The efficiency of steel bar binding is improved, the precise positioning of steel bar spacing and verticality is ensured, the quality of steel bars is improved, and a safe working environment is provided, avoiding the safety hazards of traditional scaffolding.
Smart Images

Figure CN222809884U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to an integrated working platform for tying steel bars of a pier body, which is an inner working platform for tying steel bars of a pier body and belongs to the technical field of building construction. Background Art
[0002] Most bridge piers are made of reinforced concrete. In the prior art, during the construction of the pier, a scaffolding is usually used to set up a work platform for steel bar tying or a circular construction method is used in which a section of formwork is supported first, steel bars are tied, and then a section of formwork is supported and steel bars are tied. No matter which method is used, there are defects such as low steel bar tying efficiency, and the control of steel bar spacing and verticality cannot be guaranteed, and the quality of steel bar tying cannot be guaranteed. Utility Model Content
[0003] In view of the above-mentioned defects existing in the prior art, the utility model provides an integrated working platform for tying steel bars for pier shafts, which is safe in operation, can improve the efficiency of steel bar tying, and can ensure the quality of steel bar tying.
[0004] The utility model is realized through the following technical scheme: an integrated work platform for tying steel bars of a pier body, characterized in that it comprises two vertical frames and at least two layers of platform frames at different heights, the vertical frames are rectangular frame structures welded by square tubes, the platform frame is a plane frame structure welded by section steel and conforming to the cross-sectional shape of the pier body, the platform frame is horizontally connected between the two vertical frames, and the upper part of the platform frame is paved with patterned steel plates, wherein the patterned steel plates at the two arc-shaped ends of the platform frame are longitudinally movable, and the patterned steel plates at the inner sides of the two arc-shaped ends of the platform frame are divided into two rows along the longitudinal direction. , and an adjustment space is left between the two rows of patterned steel plates, the two rows of patterned steel plates are both movable laterally, and a detachable steel bar groove is provided at the outer edge of the patterned steel plate on each layer of the platform frame, and five retractable adjustment rods are provided at the two arc-shaped ends of each layer of the platform frame, and the five retractable adjustment rods are evenly arranged radially along the arc-shaped end of the platform frame. The retractable adjustment rod includes a threaded sleeve and a screw threaded with the threaded sleeve, the threaded sleeve is fixedly arranged on the platform frame, and the outer end of the screw is connected with a U-shaped clamp, and a vertically arranged square tube is detachably connected between the U-shaped clamps of the upper and lower corresponding retractable adjustment rods.
[0005] When the utility model is used, before the pier body reinforcement is tied, the integrated working platform is hoisted into the pier body by the lifting equipment, and the patterned steel plate on the platform is unfolded to adjust the width of the platform, and the reinforcement tying operation can be carried out. In the utility model, the patterned steel plate is laid on the upper part of the platform frame as the working platform, and the construction personnel can carry out the reinforcement tying operation on the upper part of each layer of the working platform. The reinforcement slots arranged at the edge of the patterned steel plate laid on the upper part of the platform frame are used to fix the reinforcement spacing when the pier body reinforcement is tied, and can ensure the accurate positioning of the main reinforcement spacing. When the pier body reinforcement is tied, the patterned steel plate on the upper part of the platform frame can be moved into place in advance to ensure the accurate position of each reinforcement slot. The retractable adjustment rods arranged at both ends of the platform frame are used to adjust the size of the pier column of different arc sections. The retractable adjustment rods can drive the square tube connected to the U-shaped clamp to move. When the reinforcement is tied, the square tube can be close to the binding reinforcement at the end of the pier body through the retractable adjustment rod, and the verticality of the binding reinforcement is ensured by the vertical square tube, and the size of the arc section of the pier body is ensured. When the retractable adjustment rod is used, the patterned steel plate on the platform frame can be appropriately withdrawn. After the pier body reinforcement is tied, the integrated working platform is hoisted out and the template can be installed.
[0006] Furthermore, the upper platform frame and the lower platform frame are connected by a vertical frame socket connection. The socket connection is convenient for both the installation of the platform and the increase of the number of layers of the working platform according to the working requirements.
[0007] Furthermore, the sockets of the vertical frame are connected by a socket square steel joint, and a supporting component is fixed to the outside of the lower vertical frame to support the lower end of the socket square steel joint.
[0008] Furthermore, a three-layer platform frame is provided.
[0009] Furthermore, at least one width adjustment mechanism is provided between the two rows of patterned steel plates located inside the two arc-shaped ends of the platform frame, and the width adjustment mechanism includes an adjustment screw and two support plates with screw holes, the screw threads at both ends of the adjustment screw are in opposite directions, the two support plates are arranged oppositely and are respectively welded on the adjacent sides of the two rows of patterned steel plates, and the two ends of the adjustment screw are respectively connected to the two support plates through nuts. After loosening the corresponding nuts, the two rows of patterned steel plates can be driven to move laterally at the same time by rotating the adjustment screw, and the lateral positions of the two rows of patterned steel plates can be adjusted.
[0010] Furthermore, in order to facilitate construction workers to work on different working platforms, ladders are provided at the adjustment spaces of the upper and lower platform frames. Construction workers can enter different working platforms to work through the ladders at the adjustment spaces left between the two rows of patterned steel plates.
[0011] Furthermore, in order to ensure the stability and reliability of the integrated working platform, the square tube used for the vertical frame is 80×80×2mm square tube.
[0012] The beneficial effects of the utility model are as follows: by arranging an adjustable patterned steel plate on the upper part of the platform frame, the platform can be adjusted according to the construction needs, and can adapt to the construction needs of piers of different sizes, thereby increasing the flexibility and adaptability of the platform; by arranging a steel bar slot at the outer edge of the patterned steel plate on the platform frame, the main reinforcement spacing of the pier body steel bars can be accurately positioned; by arranging telescopic adjustment rods at both ends of the platform frame and connecting the vertically arranged square tubes between the U-shaped clamps of the upper and lower corresponding telescopic adjustment rods, the verticality of the tied steel bars can be ensured, thereby improving the quality of the pier body steel bar binding. The utility model can improve the efficiency of steel bar binding, can effectively ensure the spacing and verticality of the steel bars, and can ensure the safety of construction personnel, and can avoid the safety hazards existing in the traditional installation and disassembly of scaffolding. After use, the utility model can be reused, which can reduce construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0014] Figure 2 It is a top view schematic diagram of the platform frame in the utility model;
[0015] Figure 3 yes Figure 2 A partial enlarged schematic diagram of the middle right end portion;
[0016] Figure 4 It is a schematic diagram of laying a patterned steel plate on the platform frame of the utility model;
[0017] Figure 5 It is a structural schematic diagram of the width adjustment mechanism in the utility model;
[0018] Figure 6 It is a structural schematic diagram of the socket-and-spigot portion when the upper platform frame and the lower platform frame in the utility model are connected by a socket-and-spigot connection;
[0019] In the figure, 1, vertical frame, 2, platform frame, 3, telescopic adjustment rod, 4, square tube, 5, supporting steel tube, 6, steel bar slot, 7, patterned steel plate at the arc end, 8, patterned steel plate inside the two arc ends, 9, width adjustment mechanism, 10, socket square steel joint, 11, supporting component, 12 and 13 are square tubes of the vertical frame, 14, adjustment space;
[0020] 3.1, threaded sleeve, 3.2, screw, 3.3, U-shaped fixture;
[0021] 9.1. Adjusting screw, 9.2. Support plate, 9.3. Nut. DETAILED DESCRIPTION
[0022] The present invention is further described below by way of non-limiting embodiments and in conjunction with the accompanying drawings:
[0023] As shown in the attached drawings, an integrated work platform for tying steel bars of the pier body comprises two vertical skeletons 1 and at least two layers of platform frames 2 at different heights, wherein the vertical skeleton 1 is a rectangular frame structure welded by 80×80×2mm square tubes, and a diagonal brace can be arranged in the middle; the platform frame 2 is a plane frame structure welded by square tubes, angle steels and other steel sections in accordance with the cross-sectional shape of the pier body, and the main frame material of the platform frame 2 is 80×80×2mm square tubes. The platform frame 2 is horizontally connected between the two vertical skeletons 1, and a total of three layers of platform frames 2 are arranged in this embodiment. The spacing between the platform frames 2 is 2m, and the bottom platform frame can be set to be 40cm from the ground. A supporting steel pipe 5 is arranged on the platform frame 2, and a 3mm thick patterned steel plate is laid on the upper part of the supporting steel pipe 5, wherein the patterned steel plates 7 located at the two arc-shaped ends of the platform frame 2 are movable longitudinally (i.e., the patterned steel plates 7 can be moved along the length direction of the pier body), and the patterned steel plates 8 located on the inner side of the two arc-shaped ends of the platform frame 2 are divided into two rows along the longitudinal direction, and an adjustment space 14 is left between the two rows of patterned steel plates 8, and the two rows of patterned steel plates 8 are both movable transversely (i.e., the patterned steel plates 8 can be moved along the width direction of the pier body). A detachable steel bar slot 6 is arranged at the outer edge of the patterned steel plate on each layer of the platform frame 2. The steel bar slot 6 is made of angle steel, and is provided with a groove that can be engaged with the steel bar. The spacing of the grooves is determined according to the design spacing of the main reinforcement of the pier body. The steel bar slot 6 can be fixed to the edge of the patterned steel plate by bolts in sections, and a circle of steel bar slots can be formed around the platform. When tying the pier body reinforcement, the main reinforcement is positioned by the groove on the steel bar slot 6. Five telescopic adjustment rods 3 are provided at the two arc-shaped ends of each layer of the platform frame 2, and the five telescopic adjustment rods 3 at each arc-shaped end are evenly arranged in a radial pattern along the arc-shaped end of the platform frame 2. The telescopic adjustment rod 3 includes a threaded sleeve 3.1 and a screw 3.2 screwed to the threaded sleeve 3.1, the threaded sleeve 3.1 is fixedly arranged on the platform frame 2, and the outer end of the screw 3.2 is connected to a U-shaped fixture 3.3. A vertically arranged square tube 4 is detachably connected between the U-shaped fixtures 3.3 of the upper and lower corresponding telescopic adjustment rods 3. The length of the screw 3.2 can be adjusted by rotating the screw 3.2.
[0024] In order to facilitate the adjustment of the lateral position of the two rows of patterned steel plates 8, at least one width adjustment mechanism 9 is preferably provided between the two rows of patterned steel plates 8, and the width adjustment mechanism 9 includes an adjustment screw 9.1 and two support plates 9.2 with screw holes. The adjustment screw 9.1 adopts a screw with a diameter of φ18 mm, and the two ends of the adjustment screw 9.1 are provided with screws, and the screw threads at the two ends are rotated in opposite directions. The two support plates 9.2 adopt a 5*5*1cm steel plate with a screw hole in the middle. The two support plates 9.2 are arranged oppositely and welded to the adjacent sides of the two rows of patterned steel plates 8, respectively. The two ends of the adjustment screw 9.1 are connected to the two support plates 6.2 through nuts 9.3. After loosening the corresponding nuts, the two rows of patterned steel plates 8 can be driven to move inward or outward at the same time by rotating the adjustment screw 9.1, so that the lateral position of the two rows of patterned steel plates can be adjusted.
[0025] In order to facilitate the construction workers to work on different working platforms, it is preferred to provide a ladder at the adjustment space 14 of the upper and lower platform frames. The ladder is not shown in the drawings of this embodiment. The ladder can be a hanging ladder, which can be hung on the steel pipe of the platform frame at the adjustment space 14. The construction workers can enter different working platforms through the ladder at the adjustment space 14 left between the two rows of patterned steel plates to work.
[0026] The integrated work platform of the utility model can adopt an integral structure, or a structure in which the upper platform frame and the lower platform frame are connected by a vertical frame socket. The socket connection is convenient for the installation of the platform and the increase of the number of work platform layers according to the work requirements. Figure 5 As shown, when the vertical frame socket connection is adopted between the upper platform frame and the lower platform frame, the vertical frame socket is connected by a socket square steel joint 10, and the socket square steel joint 10 is sleeved on the outside of the square tube 12 of the upper vertical frame and the square tube 13 of the lower vertical frame, and a support component 11 is fixed on the outside of the square tube 13 of the lower vertical frame to support the lower end of the socket square steel joint 10. The support component 11 can be made of two φ5mm steel bars welded on the opposite sides of the outside of the square tube 13 of the vertical frame, or a support component of other structure can be used.
[0027] When the utility model is used, before the pier body reinforcement is tied, the integrated work platform is hoisted into the pier body by the lifting equipment, and the patterned steel plate on the platform is unfolded to adjust the width of the platform, and the construction personnel can perform the reinforcement tying operation on the upper part of each layer of the work platform. When the pier body reinforcement is tied, the patterned steel plate on the upper part of the platform frame can be moved into place in advance, and each reinforcement slot 6 can be installed in place, and the position of each reinforcement slot can be ensured to be accurate. When the reinforcement is tied, the main reinforcement spacing is fixed by the reinforcement slot 6, so as to ensure the accurate positioning of the main reinforcement spacing. When the telescopic adjustment rod 3 is used, the patterned steel plate 7 and the patterned steel plate 8 on the platform frame 2 can be appropriately withdrawn to facilitate the operation of the telescopic adjustment rod 3 and the square tube 4. By adjusting the telescopic adjustment rod 3, the square tube 4 can be close to the binding reinforcement at the end of the pier body, and the verticality of the binding reinforcement can be ensured by the vertical square tube 4, and the size of the arc section of the pier body can be ensured.
[0028] The other parts of this embodiment are all prior art and will not be described in detail here.
Claims
1. An integrated working platform for tying pier reinforcement bars, characterized by: The pier comprises two vertical frames and at least two layers of platform frames at different heights. The vertical frames are rectangular frame structures welded from square tubes. The platform frames are plane frame structures welded from section steel and conform to the cross-sectional shape of the pier body. The platform frames are horizontally connected between the two vertical frames. The upper part of the platform frames is paved with patterned steel plates. The patterned steel plates at the two arc-shaped ends of the platform frames are longitudinally movable. The patterned steel plates at the inner sides of the two arc-shaped ends of the platform frames are divided into two longitudinal rows, and an adjustment space is left between the two rows of patterned steel plates. The two rows of patterned steel plates are arranged on the upper part of the platform frames. The steel plates are all movable laterally, and removable steel bar grooves are provided at the outer edges of the patterned steel plates on each platform frame. Five retractable adjustment rods are provided at the two arc-shaped ends of each platform frame. The five retractable adjustment rods are evenly arranged radially along the arc-shaped end of the platform frame. The retractable adjustment rods include a threaded sleeve and a screw threadedly connected to the threaded sleeve. The threaded sleeve is fixedly set on the platform frame, and the outer end of the screw is connected to a U-shaped clamp. A vertically arranged square tube is detachably connected between the U-shaped clamps of the upper and lower corresponding retractable adjustment rods.
2. The integrated work platform for tying pier reinforcement bars according to claim 1 is characterized in that: The upper platform frame and the lower platform frame are connected by vertical frame sockets.
3. The integrated work platform for tying pier reinforcement bars according to claim 2 is characterized in that: The sockets of the vertical frame are connected by socket square steel joints, and a supporting component is fixed to the outside of the lower vertical frame to support the lower end of the socket square steel joint.
4. The integrated work platform for tying pier reinforcement bars according to claim 1 is characterized in that: A three-layer platform frame is provided.
5. The integrated work platform for tying pier reinforcement bars according to claim 1, 2, 3 or 4 is characterized in that: At least one width adjustment mechanism is arranged between the two rows of patterned steel plates located on the inner sides of the two arc-shaped ends of the platform frame. The width adjustment mechanism includes an adjusting screw and two support plates with screw holes. The screw threads at both ends of the adjusting screw have opposite rotation directions. The two support plates are arranged opposite to each other and are respectively welded on the adjacent sides of the two rows of patterned steel plates. The two ends of the adjusting screw are respectively connected to the two support plates through nuts.
6. The integrated work platform for tying pier reinforcement bars according to claim 5 is characterized in that: A ladder is arranged at the adjustment space of the upper and lower platform frames.
7. The integrated work platform for tying pier reinforcement bars according to claim 1, 2, 3 or 4 is characterized in that: The square tube used for the vertical frame is 80×80×2mm square tube.