Cable releasing auxiliary device for bridge in narrow channel
By designing cable deployment auxiliary devices for slide rails, vertical rods, slide rollers and cable traction machines on the bridge tray in narrow channels, the problems of time-consuming and labor-intensive use of traditional deployment methods and cable damage are solved, efficient and convenient cable deployment is achieved, and the service life of the cable is extended.
Patent Information
- Application Number
- CN202421504109.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2034-06-28
AI Technical Summary
In laying bridges in narrow channels, traditional cable deployment requires a lot of labor, time-consuming and labor-intensive, and is prone to cable damage and material loss.
A cable application auxiliary device including a slide rail, a vertical rod, a slide roller and a cable traction machine is designed. The slide rail is fixed along the length direction of the bridge steel, and the vertical rod and a slide roller form a parallel structure. The cable traction machine is connected to the end of the cable through a wire rope, and the slide roller and a traction machine are used to realize the automatic application of the cable.
The device is flexible in narrow channels, conveniently implementing the placement of cables in multiple bridges on the same floor, improving construction efficiency, reducing cable damage and reduced service life.
Smart Images

Figure CN222814154U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of cable laying, and in particular to a cable laying auxiliary device for a bridge in a narrow passage. Background Art
[0002] At present, large complexes, airports, stadiums, high-speed rail stations and other public buildings and residences all have a wide variety of equipment. The pipelines of various systems of mechanical and electrical installation are concentrated and complex. The pipelines in the channel are comprehensively deepened and laid in multiple layers of bridge frames, and the space for cable laying is narrow, which greatly increases the difficulty of subsequent construction.
[0003] The traditional laying method is manual laying or segmented laying of cables through other auxiliary tools such as pulleys. This laying method requires a lot of manpower and a high degree of coordination. During the laying process, adjustments need to be made section by section to facilitate the laying of other cables. The traditional method is time-consuming and labor-intensive, and it is easy to cause cable damage during the laying process, which can easily cause material loss. Utility Model Content
[0004] In order to facilitate the laying of cables in narrow areas, the present application provides a cable laying auxiliary device for a bridge in a narrow channel.
[0005] The present application provides a cable laying auxiliary device for a bridge in a narrow channel, which adopts the following technical solution:
[0006] A cable laying auxiliary device for a bridge in a narrow channel, comprising a slide rail, two vertical rods, a slide roller and a cable traction machine, wherein the slide rail is fixedly arranged along the length direction of the bridge frame steel, the upper ends of the two vertical rods are slidably connected along the length direction of the slide rail, the slide roller is arranged in parallel between the lower ends of the two vertical rods, and one end of the slide roller is rotatably connected to the lower end of one of the vertical rods, and the other end of the slide roller is detachably connected to the lower end of the other vertical rod, the cable is laid on the slide roller, and the cable traction machine is arranged at the end of the bridge frame and the steel wire rope of the cable traction machine is connected to the end of the cable.
[0007] Optionally, one end of the sliding roller is fixedly connected to a clamping block, and a lower end of one of the vertical rods is provided with a clamping groove for clamping the clamping block.
[0008] Optionally, the end of the steel wire rope of the cable traction machine is fixedly connected with a mesh sleeve for connecting with the end of the cable, and the mesh sleeve is sleeved on the end of the cable.
[0009] Optionally, it also includes a lead wire passing through each auxiliary device, one end of which passes through each sliding roller and is connected to the end of the wire rope of the cable traction machine.
[0010] Optionally, the upper surface of the slide rail is fixedly connected to a connecting component connected to the bridge frame steel, the connecting component includes a cross bar, a bracket, and a connecting rod, the cross bar is fixedly connected to the upper end surface of the slide rail and is located below the bridge frame steel, the bracket is L-shaped, and the bracket is erected on the bridge frame steel, the lower end of the bracket is fixedly connected to one end of the cross bar, the lower end of the connecting rod is rotatably connected to the end of the cross bar away from the bracket, and the upper end of the connecting rod is detachably connected to the end of the bracket away from the cross bar.
[0011] Optionally, a through slot is formed at one end of the bracket away from the cross bar, the through slot is open, the upper end of the connecting rod is passed through the through slot and is threadedly connected with a nut, and the nut abuts against the upper surface of the bracket.
[0012] Optionally, the vertical rod rotating sleeve is provided with a roller.
[0013] Optionally, the sliding roller sleeve is provided with a soft rubber protective sleeve.
[0014] To summarize, the present application includes the following beneficial technical effects: it can be installed on a space bridge in a narrow channel, the device is flexible and convenient to operate, and cables can be easily placed in multiple bridges on the same floor, thereby improving the construction efficiency of cables in narrow channels, reducing repeated dragging back and forth during construction, placing the cables in place at one time, reducing damage to the cables, and reducing cable collisions and breakages that may reduce the service life of the cables. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application.
[0016] Figure 2 It is a schematic diagram of the structure of the slide rail in the embodiment of the present application.
[0017] Figure 3 It is a structural schematic diagram of the connection component in an embodiment of the present application.
[0018] Figure 4 It is a schematic diagram of the structure of the bracket in the embodiment of the present application.
[0019] Explanation of the reference numerals: 1. slide rail; 2. vertical rod; 3. slide roller; 4. lead wire; 21. roller; 31. block; 32. slot; 5. connecting assembly; 51. cross bar; 52. bracket; 53. connecting rod; 54. through slot; 55. nut; 6. wire rope; 7. mesh sleeve. DETAILED DESCRIPTION
[0020] The following is combined with Figure 1-4 This application is described in further detail.
[0021] The embodiment of the present application discloses a cable laying auxiliary device for a bridge in a narrow passage.
[0022] The cable laying auxiliary device for the bridge in the narrow passage of the present application is installed on multiple bridge steels on the same layer.
[0023] Reference Figure 1 and Figure 2 The cable laying auxiliary device for the bridge in a narrow channel includes a slide rail 1, two vertical rods 2, a slide roller 3, a cable traction machine and a lead wire 4. The slide rail 1 is horizontally arranged and fixedly arranged along the length direction of the bridge steel. The two vertical rods 2 are vertically arranged and are provided with rollers 21 through bearing rotation sleeves, and the upper ends of the vertical rods 2 are connected to slide along the length direction of the slide rail 1. The slide roller 3 is arranged parallel between the lower ends of the two vertical rods 2. The outer surface of the slide roller 3 is provided with a soft rubber protective sleeve. One end of the slide roller 3 is hinged to the lower end of one of the vertical rods 2, and the other end of the slide roller 3 is detachably connected to the lower end of the other vertical rod 2, so that the rotation axis of the slide roller 3 is vertically arranged. A clamping block 31 is welded at one end of the slide roller 3, and a clamping groove 32 for clamping the clamping block 31 is opened at the lower end of one of the vertical rods 2. One end of the lead wire 4 passes through each slide roller 3 and is connected to the end of the steel wire rope 6 of the cable traction machine, so that the plurality of slide rollers 3 can be driven by the lead wire 4 to move along the length direction of the slide rail 1 to the position where the cable needs to be laid.
[0024] Reference Figure 3 and Figure 4 In order to facilitate the installation and disassembly of the slide rail 1 in each auxiliary device on each bridge steel, a connecting component 5 is welded on the upper surface of the slide rail 1. The connecting component 5 includes a cross bar 51, a bracket 52, and a connecting rod 53. The bracket 52 is L-shaped, and one end of the bracket 52 is welded to one end of the cross bar 51, and the connecting rod 53 is hinged to the other end of the cross bar 51, so that the connecting rod 53, the cross bar 51 and the bracket 52 can form a rectangular frame. At the same time, the cross bar 51 is welded to the upper surface of the slide rail 1, and the bracket 52 can be erected on the bridge steel. A through groove 54 is opened at one end of the bracket 52 close to the connecting rod 53, and the through groove 54 is open. By rotating the connecting rod 53 upward, the upper end of the connecting rod 53 is penetrated into the through groove 54 and is threadedly connected with a nut 55, and the nut 55 is pressed against the upper surface of the bracket 52, so that the bracket 52 together with the slide rail 1 and the bridge steel are fixed.
[0025] Therefore, when laying the cable, the cable bracket can be placed at the head end of the bridge, and the cable traction machine can be placed at the end of the bridge. After that, a cable is placed on each sliding roller 3, and the lead wire 4 is passed through each sliding roller 3. At the same time, the end of the lead wire 4 is fixed to the end of the steel wire rope 6 of the cable traction machine, and the end of the steel wire rope 6 of the cable traction machine is fixed with a mesh sleeve 7 for connecting with the cable end. The mesh sleeve 7 is set on the cable end, so that the steel wire rope 6 of the cable traction machine can pull the cable, and the cable is moved to the laying position through the sliding roller 3. When the cable is pulled into place , so that the block 31 at one end of the sliding roller 3 can be separated from the slot 32 of the vertical rod 2 by rotating the sliding roller 3, so that the sliding roller 3 can rotate along the horizontal plane, so that the cable applied on the sliding roller 3 can slide down to the predetermined application position section by section, and at the same time, the cable traction machine is kept working continuously to ensure that the cable has a certain tension, thereby eliminating the cable slack margin, and repeating the above operation for the laying of the remaining cables, thereby improving the construction efficiency of the cable in the narrow channel by using the cable laying auxiliary device, reducing the cable collision and the occurrence of cable breakage and the like, which leads to a reduction in the service life of the cable.
[0026] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A cable laying auxiliary device for a bridge in a narrow channel, characterized by: The invention comprises a slide rail (1), two vertical rods (2), a slide roller (3) and a cable traction machine, wherein the slide rail (1) is fixedly arranged along the length direction of the bridge frame steel, the upper ends of the two vertical rods (2) are slidably connected along the length direction of the slide rail (1), the slide roller (3) is arranged in parallel between the lower ends of the two vertical rods (2), and one end of the slide roller (3) is rotatably connected to the lower end of one of the vertical rods (2), and the other end of the slide roller (3) is detachably connected to the lower end of the other vertical rod (2), the cable is applied on the slide roller (3), the cable traction machine is arranged at the end of the bridge frame, and the steel wire rope (6) of the cable traction machine is connected to the end of the cable.
2. The cable laying auxiliary device for a bridge in a narrow passage according to claim 1 is characterized in that: One end of the sliding roller (3) is fixedly connected to a clamping block (31), and a clamping groove (32) for clamping the clamping block (31) is provided at the lower end of one of the vertical rods (2).
3. The cable laying auxiliary device for a bridge in a narrow passage according to claim 1 is characterized in that: The end of the steel wire rope (6) of the cable traction machine is fixedly connected with a mesh sleeve (7) for connecting with the end of the cable, and the mesh sleeve (7) is sleeved on the end of the cable.
4. The cable laying auxiliary device for a bridge in a narrow passage according to claim 1 is characterized in that: It also includes a lead wire (4) passing through each auxiliary device, one end of which passes through each sliding roller (3) and is connected to the end of a steel wire rope (6) of a cable traction machine.
5. The cable laying auxiliary device for a bridge in a narrow passage according to claim 1 is characterized in that: The upper surface of the slide rail (1) is fixedly connected with a connecting assembly (5) connected to the bridge frame steel. The connecting assembly (5) comprises a cross bar (51), a bracket (52), and a connecting rod (53). The cross bar (51) is fixedly connected to the upper end surface of the slide rail (1) and is located below the bridge frame steel. The bracket (52) is arranged in an L shape and is mounted on the bridge frame steel. The lower end of the bracket (52) is fixedly connected to one end of the cross bar (51). The lower end of the connecting rod (53) is rotatably connected to one end of the cross bar (51) away from the bracket (52). The upper end of the connecting rod (53) is detachably connected to one end of the bracket (52) away from the cross bar (51).
6. The cable laying auxiliary device for a bridge in a narrow passage according to claim 5, characterized in that: A through slot (54) is formed at one end of the bracket (52) away from the cross bar (51); the through slot (54) is open; the upper end of the connecting rod (53) is inserted into the through slot (54) and is threadedly connected with a nut (55); the nut (55) abuts against the upper surface of the bracket (52).
7. The cable laying auxiliary device for a bridge in a narrow passage according to claim 1, characterized in that: The vertical rod (2) is rotatably sleeved with a roller (21).