Mounting structure of stone curtain wall
By adopting a split-type clamping pendant structure in the installation of stone curtain walls, the installation steps are simplified, the problem of low installation efficiency in the existing technology is solved, and the rapid disassembly and efficient installation of stone curtain walls is realized.
Patent Information
- Application Number
- CN202421466458.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2025-05-23
- Estimated Expiration
- 2034-06-25
AI Technical Summary
There are many steps to install stone curtain walls and a large amount of labor, which leads to low installation efficiency and inconvenient disassembly and maintenance in the later stage.
The installation structure of split-type clamping pendant is adopted, including the main pendant, sub-pendant, clamping plate and fastening bolt. It is fixed with the building keel through the main pendant, and the secondary pendant is in line with the main pendant. The clamping plate achieves clamping effect through the fastening bolt, simplifying the installation steps.
It realizes rapid disassembly and efficient installation of stone curtain walls, reduces operating steps and labor, and improves work efficiency.
Smart Images

Figure CN222893818U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building curtain walls, in particular to an installation structure of a stone curtain wall. Background Art
[0002] Curtain wall is the outer wall of the building, which is non-load-bearing and is hung like a curtain, so it is also called "curtain wall". It is a lightweight wall with decorative effect commonly used in modern large and high-rise buildings. It is composed of panels and supporting structure systems, and can have a certain displacement ability relative to the main structure or a certain deformation ability itself, and is an external protective structure or decorative structure of the building that does not bear the effect of the main structure. Among them, the curtain wall made of stone is a natural material, bright and crystal, hard and permanent, noble and elegant, with good frost resistance and strong pressure resistance. However, there are still some shortcomings in the existing stone curtain wall installation operation.
[0003] In the existing stone curtain wall installation operation, fixing components are usually required to fasten the four corners of the stone curtain wall to the curtain wall keel outside the building. Although this operation method can meet the conventional installation requirements, it usually has many operation steps and a large amount of labor, resulting in low installation efficiency and inconvenience for subsequent disassembly and maintenance. Utility Model Content
[0004] The technical problem to be solved by the utility model is to provide a stone curtain wall installation structure which uses a split-type pressing hanger with a quick-detaching effect to fasten and install the stone curtain wall in view of the current status of the prior art.
[0005] The utility model is achieved through the following technical scheme: the utility model proposes an installation structure of a stone curtain wall, comprising an upper curtain wall and a lower curtain wall, characterized in that: a main hanger is arranged between the upper curtain wall and the lower curtain wall, an upper loading slot is provided at the connection between the upper end of the main hanger and the upper curtain wall, a unloading slot is provided at the connection between the lower end of the main hanger and the lower curtain wall, a secondary hanger is installed on one side of the upper end of the lower curtain wall through a card slot, the secondary hanger is matched with the lower end of the main hanger, a clamping plate is arranged on one side of the secondary hanger, the clamping plate is located between the upper curtain wall and the lower curtain wall, and the clamping plate abuts against the secondary hanger.
[0006] By adopting the above technical solution, the main hanger can support the upper curtain wall and can be combined with the auxiliary hanger to achieve the clamping and fixing installation of the lower curtain wall, so as to facilitate the disassembly and assembly of the upper curtain wall and the lower curtain wall by the staff.
[0007] Furthermore, fastening bolts are evenly distributed on the clamping plate, screw grooves are provided at corresponding positions of the main hanging parts and the fastening bolts, and the fastening bolts are meshed with the clamping plate and the screw grooves.
[0008] By adopting the above technical solution, the clamping plate is fastened and installed with the main hanger through the fastening bolt, thereby achieving a clamping effect on the auxiliary hanger, and achieving a top-pressing installation effect on the lower curtain wall through the auxiliary hanger.
[0009] Furthermore, a reinforcement block is formed at one end of the main hanging component away from the clamping plate, and the reinforcement block is hollow.
[0010] By adopting the above technical solution, the structural strength of the main hanging component is improved and the structural stability is ensured.
[0011] Furthermore, the main hanger is provided with an angle code on one side of the reinforcement block, and the main hanger and the angle code are connected via the mounting bolt.
[0012] By adopting the above technical solution, the main hanging component can be fixedly installed through the angle bracket and the building keel.
[0013] Furthermore, the main hanging component is bonded with an upper rubber pad in the upper loading groove.
[0014] By adopting the above technical solution, the connection effect between the main hanging component and the upper curtain wall is made tighter.
[0015] Furthermore, the main hanger is bonded with a lower rubber pad in the download groove.
[0016] By adopting the above technical solution, the connection effect between the main hanging component and the lower curtain wall is made tighter.
[0017] Furthermore, a secondary rubber pad is bonded to the connection between the lower curtain wall and the secondary hanger.
[0018] By adopting the above technical solution, the connection effect between the lower curtain wall and the auxiliary hanging component is made tighter.
[0019] Further.
[0020] By adopting the above technical solution.
[0021] Compared with the prior art, the utility model has the following beneficial effects:
[0022] The utility model provides a split-type clamping installation structure composed of a main hanger, a sub-hanger, a clamping plate and a fastening bolt, so that during the installation of the stone curtain wall, the staff only needs to fix the main hanger on the building keel in sequence through the angle code, put the sub-hanger into the notch at the upper end of the stone curtain wall, and then put the stone curtain wall into the upper loading slot of the lower main hanger, and then push the stone curtain wall to the lower end of the upper main hanger to make the sub-hanger coincide with the main hanger, and finally abut and fasten the clamping plate through the fastening bolt to complete the installation of the stone curtain wall. The above steps only need to fasten the upper part of the stone curtain wall to complete the installation of the stone curtain wall, which effectively reduces the operation steps, reduces the labor, and thus improves the work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram of an installation structure of a stone curtain wall described in the utility model;
[0024] Figure 2 It is a schematic diagram of the connection relationship between the main hanging parts and the auxiliary hanging parts of the installation structure of the stone curtain wall described in the utility model;
[0025] Figure 3 The utility model is a kind of installation structure of stone curtain wall Figure 2 Bottom view of
[0026] Figure 4 It is a schematic diagram of the positional relationship between the clamping plate and the auxiliary hanging parts in the installation structure of the stone curtain wall described in the utility model;
[0027] Figure 5 It is a cross-sectional view of an installation structure of a stone curtain wall described in the utility model.
[0028] The following are the descriptions of the reference numerals:
[0029] 1. Main hanging parts; 2. Upper curtain wall; 3. Lower curtain wall; 4. Upper loading slot; 5. Downloading slot; 6. Auxiliary hanging parts; 7. Clamping plate; 8. Fastening bolt; 9. Screw groove; 10. Reinforcement block; 11. Angle code; 12. Mounting bolt; 13. Upper rubber pad; 14. Lower rubber pad; 15. Auxiliary rubber pad. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0031] like Figure 1-Figure 3As shown, a stone curtain wall installation structure in this embodiment includes an upper curtain wall 2 and a lower curtain wall 3, and is characterized in that: a main hanger 1 is arranged between the upper curtain wall 2 and the lower curtain wall 3, an upper loading slot 4 is opened at the connection between the upper end of the main hanger 1 and the upper curtain wall 2, and the upper loading slot 4 is used to load the upper curtain wall 2, and a downloading slot 5 is opened at the connection between the lower end of the main hanger 1 and the lower curtain wall 3, and the downloading slot 5 is used to load the lower curtain wall 3, and a secondary hanger 6 is installed on one side of the upper end of the lower curtain wall 3 through a slot, and the secondary hanger 6 is consistent with the lower end of the main hanger 1, and a clamping plate 7 is arranged on one side of the secondary hanger 6, and the clamping plate 7 is located between the upper curtain wall 2 and the lower curtain wall 3, and the clamping plate 7 is abutted against the secondary hanger 6, so that the secondary hanger 6 can be stably abutted against the main hanger 1 under the pressing effect of the clamping plate 7.
[0032] like Figure 2-Figure 4 As shown, fastening bolts 8 are evenly distributed on the clamping plate 7, and screw grooves 9 are opened at the corresponding positions of the main hanger 1 and the fastening bolts 8. The fastening bolts 8 are meshed with the clamping plate 7 and the screw grooves 9, so that the clamping plate 7 can establish a stable connection with the main hanger 1 through the fastening bolts 8; a reinforcement block 10 is formed at the end of the main hanger 1 away from the clamping plate 7, and the reinforcement block 10 is hollow, which ensures the structural strength of the main hanger 1 itself and improves its bearing capacity and service life; the main hanger 1 is provided with an angle code 11 on one side of the reinforcement block 10, and the main hanger 1 is connected to the angle code 11 through the installation bolt 12, so that the main hanger 1 can establish a stable installation connection with the building keel through the angle code 11.
[0033] like Figure 2 , Figure 4 and Figure 5 As shown, the main hanger 1 is bonded with an upper rubber pad 13 in the upper loading groove 4, so that the upper curtain wall 2 can be turned and adjusted appropriately in the upper loading groove 4, so that the upper curtain wall 2 can be tilted outward, so as to facilitate the staff to disassemble and assemble the upper curtain wall 2; the main hanger 1 is bonded with a lower rubber pad 14 in the lower loading groove 5 to ensure the tight connection between the main hanger 1 and the lower curtain wall 3; the auxiliary rubber pad 15 is bonded at the connection between the lower curtain wall 3 and the auxiliary hanger 6 to ensure the tight connection between the lower curtain wall 3 and the auxiliary hanger 6.
[0034] The specific implementation process of this embodiment is as follows: during installation, the staff first fixes the main hanger 1 on the building keel through the angle code 11 and the installation bolt 12 in sequence, and puts the auxiliary hanger 6 into the notch at the upper end of the lower curtain wall 3, and then places the upper curtain wall 2 into the upper loading slot 4 of the main hanger 1, and then pushes the lower curtain wall 3 to the lower end of the main hanger 1, so that the auxiliary hanger 6 coincides with the main hanger 1, and finally the clamping plate 7 is abutted between the upper curtain wall 2 and the lower curtain wall 3, and the fastening bolt 8 is screwed in and tightened, so that the clamping plate 7 can realize the top pressure installation of the lower curtain wall 3 by pressing the auxiliary hanger 6, thereby completing the installation of the stone curtain wall;
[0035] The lower rubber pad 13 can improve the connection tightness effect between the main hanger 1 and the upper curtain wall 2. The lower rubber pad 14 can improve the connection tightness effect between the main hanger 1 and the lower curtain wall 3. The auxiliary rubber pad 15 can improve the connection tightness effect between the lower curtain wall 3 and the auxiliary hanger 6. At the same time, an appropriate amount of squeezable space is provided between the main hanger 1, the upper curtain wall 2 and the lower curtain wall 3, enabling the upper curtain wall 2 to perform an appropriate amount of flipping adjustment within the upper loading groove 4, facilitating the pushing operation of the upper curtain wall 2 that has been placed in the upper loading groove 4 by the staff. Similarly, it is also convenient to tilt the upper curtain wall 2 outwards for removal.
[0036] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be obvious to those skilled in the art. The general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather will be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A stone curtain wall installation structure, comprising an upper curtain wall (2) and a lower curtain wall (3), characterized in that: A main hanging component (1) is arranged between the upper curtain wall (2) and the lower curtain wall (3); an upper loading slot (4) is provided at the connection between the upper end of the main hanging component (1) and the upper curtain wall (2); a lower loading slot (5) is provided at the connection between the lower end of the main hanging component (1) and the lower curtain wall (3); a secondary hanging component (6) is installed on one side of the upper end of the lower curtain wall (3) through a slot; the secondary hanging component (6) is matched with the lower end of the main hanging component (1); a clamping plate (7) is provided on one side of the secondary hanging component (6); the clamping plate (7) is located between the upper curtain wall (2) and the lower curtain wall (3); and the clamping plate (7) is in contact with the secondary hanging component (6).
2. The installation structure of a stone curtain wall according to claim 1, characterized in that: The clamping plate (7) is evenly distributed with fastening bolts (8), and screw grooves (9) are provided at corresponding positions of the main hanging component (1) and the fastening bolts (8), and the fastening bolts (8) are meshed with the clamping plate (7) and the screw grooves (9).
3. The installation structure of a stone curtain wall according to claim 1, characterized in that: A reinforcing block (10) is formed at one end of the main hanging component (1) away from the clamping plate (7); the reinforcing block (10) is hollow; and a mounting bolt (12) is provided on one side of the reinforcing block (10) of the main hanging component (1).
4. The installation structure of a stone curtain wall according to claim 3, characterized in that: The main hanging component (1) is provided with an angle code (11) on one side of the reinforcing block (10), and the main hanging component (1) and the angle code (11) are connected via the mounting bolt (12).
5. The installation structure of a stone curtain wall according to claim 1, characterized in that: The main hanging component (1) is bonded with an upper rubber pad (13) in the upper loading groove (4).
6. The installation structure of a stone curtain wall according to claim 5, characterized in that: The main hanging component (1) is bonded with a lower rubber pad (14) in the downloading groove (5).