Rapid construction type infilled wall constructional column

Through modular design and length and width adjustment mechanisms, the problems of complex and low efficiency of traditional filling wall structural columns are solved, and the structural column size is rapidly adjusted and the installation process is simplified, and the construction efficiency and applicability are improved.

CN222962482UActive Publication Date: 2025-06-10ZHEJIANG CHENGTAI CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421954589.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2025-06-10
Estimated Expiration
2034-08-13

AI Technical Summary

Technical Problem

The construction methods of traditional filling wall structural columns are complex, have a long construction period, and are difficult to guarantee. They lack flexible modular structure and adjustment mechanism, resulting in low construction efficiency and high cost.

Method used

A rapid construction filling wall structural column is designed, adopting a modular design, equipped with a length adjustment mechanism and a width adjustment mechanism, which achieves length adjustment through the chute and movable baffle, width adjustment through the slot group and insert rod, and simplifies the installation process by using a fixed mechanism.

Benefits of technology

It realizes rapid adjustment of structural column size, shortens construction preparation and installation time, improves construction efficiency, is suitable for filling walls of different sizes and thicknesses, and simplifies the installation process and reduces construction difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222962482U_ABST
    Figure CN222962482U_ABST
Patent Text Reader

Abstract

The utility model provides a quick construction type infilled wall constructional column, which belongs to the technical field of building construction, and comprises a main baffle plate, side baffle plates are arranged on two sides of one side of the main baffle plate, the main baffle plate is connected with the side baffle plates through a fixing mechanism, the quick construction type infilled wall constructional column further comprises a length adjusting mechanism, and the length adjusting mechanism is arranged in the side baffle plates; and the width adjusting mechanism is arranged in the main baffle plate. Through the modular design, the length adjusting mechanism and the width adjusting mechanism, constructors can quickly adjust the size of the constructional column according to actual construction requirements, the construction preparation and installation time is greatly shortened, the construction efficiency is remarkably improved, the constructional column can flexibly adapt to infilled walls of different sizes and thicknesses, and the construction cost is reduced. The applicability in actual engineering is improved, the main baffle and the side baffles are firmly connected through the fixing mechanisms, and a stable overall frame is formed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, and particularly relates to a quickly constructed filler wall structural column. Background Art

[0002] With the rapid development of the construction industry, frame structures have been widely used in various buildings due to their clear force-bearing, good seismic performance, free and flexible space layout, and large space utilization rate. However, in the construction of filler wall structural columns in frame structures, traditional methods such as the layered pouring method or the column top back-pouring method have defects such as complex construction, long construction period, and difficult quality assurance. These problems not only increase the construction cost but also may affect the overall quality and safety of the building. Therefore, the technology of quickly constructed filler wall structural columns has emerged. This technology aims to solve various problems in traditional construction methods by optimizing the construction process, reducing construction steps, and improving construction efficiency.

[0003] The current design of structural columns lacks a flexible modular structure and adjustment mechanism, resulting in construction workers being unable to quickly adjust the size of the structural column according to actual needs. This forces the construction team to customize structural columns of different sizes for each specific construction site, thus greatly increasing the construction preparation time and installation cost and reducing the overall construction efficiency. Summary of the Utility Model

[0004] The purpose of the utility model is to provide a quickly constructed filler wall structural column, aiming to solve the problems put forward in the above background art.

[0005] To achieve the above purpose, the utility model provides the following technical solutions:

[0006] A quickly constructed filler wall structural column includes a main baffle, and two side baffles are arranged on both sides of one side of the main baffle. The main baffle is connected to the side baffles through a fixing mechanism, and further includes:

[0007] A length adjustment mechanism, which is arranged inside the side baffle;

[0008] A width adjustment mechanism, which is arranged inside the main baffle.

[0009] As a preferred scheme of the utility model, the number of the side baffles is two. The length adjustment mechanism includes a chute opened on the inner side of the side baffle, and a movable baffle is slidably installed inside the chute.

[0010] As a preferred scheme of the utility model, the number of the chutes is several, and both ends of the movable baffle are respectively arranged in the chutes of the two side baffles.

[0011] As a preferred embodiment of the present utility model, the width adjustment mechanism includes a slot group opened on the surface of the main baffle, and a plug rod is inserted into the inside of the slot group.

[0012] As a preferred embodiment of the present utility model, the number of the slot groups is several, and the slot group is composed of grooves respectively opened at the top, middle and bottom of the main baffle, and the plug rod is fixedly connected with the side baffle.

[0013] As a preferred embodiment of the present utility model, the fixing mechanism includes through holes opened on both sides of the main baffle, the through holes penetrate through the slot group, and further includes fixing holes opened on both sides of the plug rod, and fixing pins are inserted into the inside of the through holes and the fixing holes.

[0014] As a preferred embodiment of the present utility model, first braces are fixedly installed at the bottom of the outer sides of the main baffle and the side baffle, and clamping grooves are opened at the top of the outer sides of the main baffle and the side baffle, and second braces are inserted into the inside of the clamping grooves.

[0015] Compared with the prior art, the beneficial effects of the present utility model are as follows:

[0016] 1. For this kind of rapid construction type filling wall structural column, through modular design and the length adjustment mechanism and width adjustment mechanism, construction workers can quickly adjust the size of the structural column according to actual construction requirements, greatly shortening the construction preparation and installation time, significantly improving the construction efficiency, and enabling the structural column to flexibly adapt to filling walls of different sizes and thicknesses, improving its applicability in actual projects. The main baffle and the side baffle are firmly connected through the fixing mechanism to form a stable overall framework. Moreover, the design of the fixing mechanism is simple and efficient, and the main baffle and the side baffle can be quickly connected through fixing pins, simplifying the installation process and reducing the construction difficulty. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the following will briefly introduce the drawings required for the description of the embodiments. Obviously, the following drawings are only some embodiments of the present utility model. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts. Among them:

[0018] Figure 1 is the overall structural schematic diagram of the present utility model;

[0019] Figure 2 is the partial structural schematic diagram of the present utility model;

[0020] Figure 3 is the structural schematic diagram of the main baffle of the present utility model;

[0021] Figure 4 Schematic diagram of the length adjustment mechanism of the present utility model;

[0022] Figure 5 Schematic diagram of the side baffle of the present utility model.

[0023] In the figure: 1, main baffle; 2, side baffle; 3, fixing mechanism; 301, through hole; 302, fixing hole; 303, fixing pin; 4, length adjustment mechanism; 401, sliding groove; 402, movable baffle; 5, width adjustment mechanism; 501, slot group; 502, inserting rod; 6, first diagonal brace; 7, clamping groove; 8, second diagonal brace. Specific embodiments

[0024] In order to make the above objects, features and advantages of the present utility model more obvious and understandable, the specific embodiments of the present utility model will be described in detail below with reference to the accompanying drawings of the specification.

[0025] In the following description, many specific details are set forth in order to fully understand the present utility model. However, the present utility model can also be implemented in other ways different from those described herein. Those skilled in the art can make similar promotions without departing from the connotation of the present utility model. Therefore, the present utility model is not limited by the specific embodiments disclosed below.

[0026] Secondly, the so-called "one embodiment" or "embodiment" herein refers to a specific feature, structure or characteristic that can be included in at least one implementation manner of the present utility model. The "in one embodiment" that appears in different places in this specification does not all refer to the same embodiment, nor is it an embodiment that is separate from or mutually exclusive of other embodiments.

[0027] Embodiment

[0028] Refer to the figure, please refer to Figures 1-5 , which is the first embodiment of the present utility model. This embodiment provides a rapid construction type filling wall construction column, including a main baffle 1. On both sides of one side of the main baffle 1, side baffles 2 are provided. The main baffle 1 is connected to the side baffles 2 through a fixing mechanism 3, and further includes:

[0029] A length adjustment mechanism 4, which is arranged inside the side baffle 2;

[0030] A width adjustment mechanism 5, which is arranged inside the main baffle 1.

[0031] Specifically, the number of side baffles 2 is two. The length adjustment mechanism 4 includes sliding grooves 401 opened on the inner sides of the side baffles 2. Inside the sliding grooves 401, movable baffles 402 are slidably installed. The number of sliding grooves 401 is several, and both ends of the movable baffle 402 are respectively arranged in the sliding grooves 401 of the two side baffles 2.

[0032] Furthermore: The main baffle 1 is the main load-bearing and supporting component of the structural column. It provides the basic framework of the structural column and a firm support foundation for the side baffles 2 and the infill wall. The side baffles 2 are located on both sides of the main baffle 1 and are used to enhance the lateral stability and rigidity of the structural column. They are connected to the main baffle 1 through the fixing mechanism 3 to form an integral framework, effectively preventing the structural column from deforming or collapsing when subjected to lateral forces and improving the stability of the overall structure. The length adjustment mechanism 4 consists of a chute 401 inside the side baffle 2 and a movable baffle 402. By sliding the movable baffle 402 inside different chutes 401, the length of the structural column can be adjusted to meet different construction requirements.

[0033] Specifically, the width adjustment mechanism 5 includes a slot group 501 opened on the surface of the main baffle 1. Inside the slot group 501, there is an insertion rod 502 inserted. The number of slot groups 501 is several, and the slot group 501 consists of grooves respectively opened at the top, middle, and bottom of the main baffle 1. The insertion rod 502 is fixedly connected to the side baffle 2.

[0034] Furthermore: The width adjustment mechanism 5 consists of the slot group 501 on the surface of the main baffle 1 and the insertion rod 502. The insertion rod 502 is fixedly connected to the side baffle 2. By inserting it into the slot group 501 at different positions, the width of the structural column can be adjusted to adapt to infill walls of different thicknesses.

[0035] Specifically, the fixing mechanism 3 includes through holes 301 opened on both sides of the main baffle 1. The through holes 301 penetrate the slot group 501. It also includes fixing holes 302 opened on both sides of the insertion rod 502. Inside the through holes 301 and the fixing holes 302, there is a fixing pin 303 inserted.

[0036] Furthermore: The fixing mechanism 3 includes through holes 301, fixing holes 302, and fixing pins 303. By inserting the fixing pins 303 into the through holes 301 and the fixing holes 302, the main baffle 1 and the side baffle 2 can be firmly connected together to form a stable integral structure, preventing relative movement between components and simplifying the installation process, enabling quick connection and fixation of components.

[0037] Specifically, at the bottom of the outer sides of the main baffle 1 and the side baffle 2, there are first diagonal braces 6 fixedly installed. At the top of the outer sides of the main baffle 1 and the side baffle 2, there are card slots 7 opened. Inside the card slots 7, there is a second diagonal brace 8 inserted.

[0038] Furthermore, the first diagonal brace 6 is fixedly installed at the bottom outside the main baffle 1 and the side baffle 2, providing additional support force for the construction column, preventing inclination or collapse caused by load changes during the construction process. The second diagonal brace 8 is inserted into the top slot 7 outside the main baffle 1 and the side baffle 2, acting together with the first diagonal brace 6 to provide all-round support for the construction column. The second diagonal brace 8 and the first diagonal brace 6 together form a stable support system, further enhancing the overall stability of the construction column.

[0039] Working principle:

[0040] During use, first, determine the construction requirements, including the length and width of the construction column. Place the main baffle 1 at the predetermined position, place the two side baffles 2 on both sides of the main baffle 1 respectively, and ensure the accurate position through preliminary positioning. Insert the insertion rod 502 into the specified slot group 501 of the insertion hole. Use the fixing pin 303 to pass through the through hole 301 of the main baffle 1 and the fixing hole 302 of the insertion rod 502 on the side baffle 2 to firmly connect the main baffle 1 and the side baffle 2. Slide the movable baffle 402 into the specified sliding groove 401. Fix the first diagonal brace 6 at the bottom outside the main baffle 1 and the side baffle 2, and insert the second diagonal brace 8 into the top slot 7 outside the main baffle 1 and the side baffle 2 to jointly form a stable support system.

[0041] In summary, through the modular design and the length adjustment mechanism 4 and the width adjustment mechanism 5, construction workers can quickly adjust the size of the construction column according to the actual construction requirements, greatly shortening the construction preparation and installation time, significantly improving the construction efficiency. Moreover, the construction column can flexibly adapt to filling walls of different sizes and thicknesses, improving its applicability in actual projects. The main baffle 1 and the side baffle 2 are firmly connected by the fixing mechanism 3 to form a stable overall framework. And the design of the fixing mechanism 3 is simple and efficient. The main baffle 1 and the side baffle 2 can be quickly connected through the fixing pin 303, simplifying the installation process and reducing the construction difficulty.

Claims

1. A fast-construction infill wall structural column, characterized in that: The invention comprises a main baffle (1), side baffles (2) are arranged on both sides of one side of the main baffle (1), the main baffle (1) is connected to the side baffles (2) via a fixing mechanism (3), and further comprises: A length adjustment mechanism (4), wherein the length adjustment mechanism (4) is arranged inside the side baffle (2); A width adjustment mechanism (5), wherein the width adjustment mechanism (5) is arranged inside the main baffle (1).

2. A fast-construction infill wall structural column according to claim 1, characterized in that: The number of the side baffles (2) is two, and the length adjustment mechanism (4) comprises a slide groove (401) opened on the inner side of the side baffle (2), and a movable baffle (402) is slidably installed inside the slide groove (401).

3. The fast-construction infill wall structural column according to claim 2, characterized in that: The number of the slide grooves (401) is several, and the two ends of the movable baffle (402) are respectively arranged in the slide grooves (401) of the two side baffles (2).

4. The fast-construction infill wall structural column according to claim 1, characterized in that: The width adjustment mechanism (5) comprises a slot group (501) opened on the surface of the main baffle (1), and an insertion rod (502) is inserted into the interior of the slot group (501).

5. The fast-construction infill wall structural column according to claim 4, characterized in that: The number of the slot groups (501) is several, and the slot groups (501) are composed of grooves respectively opened at the top, middle and bottom of the main baffle (1), and the insertion rod (502) is fixedly connected to the side baffle (2).

6. The fast-construction infill wall structural column according to claim 1, characterized in that: The fixing mechanism (3) comprises through holes (301) formed on both sides of the main baffle (1), the through holes (301) passing through the slot group (501), and also comprises fixing holes (302) formed on both sides of the insertion rod (502), and fixing pins (303) are inserted into the interiors of the through holes (301) and the fixing holes (302).

7. The fast-construction infill wall structural column according to claim 1, characterized in that: A first diagonal brace (6) is fixedly mounted on the bottom of the outer sides of the main baffle (1) and the side baffle (2), a clamping groove (7) is provided on the top of the outer sides of the main baffle (1) and the side baffle (2), and a second diagonal brace (8) is inserted into the interior of the clamping groove (7).