Tower crane supporting leg anchoring device

By designing a tower crane leg anchoring device, the double fixation of embedded steel bars and threaded rods is used, and the installation plate is combined to increase the contact area between concrete and steel bars, the problems of inconvenient concrete transportation and insufficient overturning resistance during installation and dismantling of existing tower crane legs are solved, and higher stability and operational convenience are achieved.

CN222989641UActive Publication Date: 2025-06-17GUANGDONG LIANGJIAN ENG EQUIP SERVICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422055096.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2025-06-17
Estimated Expiration
2034-08-23

AI Technical Summary

Technical Problem

Existing tower crane legs need to be excavated and transported in large amounts of concrete when installed and removed, resulting in insufficient overturning resistance, inconvenient operation and easy accidents.

Method used

A tower crane leg anchoring device is designed, including mounting plates, legs, embedded steel bars and threaded rods. Through the double fixation of embedded steel bars and threaded rods, the stability of the tower crane body is ensured, and the contact area between concrete and steel bars is increased through the installation plate, thereby improving the connection firmness.

Benefits of technology

The device improves the stability and anti-population capability of the tower crane legs by double fixing and increasing contact area, simplifies the installation and removal process, reduces the risk of accidents, and improves the convenience of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222989641U_ABST
    Figure CN222989641U_ABST
Patent Text Reader

Abstract

The utility model provides a tower crane supporting leg anchoring device, and belongs to the technical field of tower crane supporting leg anchoring. The tower crane supporting leg anchoring device comprises a mounting plate, supporting legs are arranged in the mounting plate, embedded steel bars are arranged at the four corners of the mounting plate correspondingly, limiting blocks are arranged on the surfaces of the embedded steel bars in a sleeving mode, threaded rods are arranged in the limiting blocks, and the threaded rods are connected with the threaded rods in a sleeving mode. Through mutual cooperation of the tower crane body, the supporting legs, the limiting blocks, the embedded steel bars, the threaded holes and the threaded rods, the limiting blocks are aligned with the embedded steel bars firstly and then move downwards, and when the limiting blocks move to the concrete ground, the threaded rods are inserted into the threaded holes, so that the tower crane can be fixed through double fixation of the embedded steel bars and the threaded rods; the stability of the tower crane body is guaranteed, deviation of the supporting legs is avoided, the contact area between the embedded steel bars and concrete is increased through the installation plates on the outer sides of the embedded steel bars, and the embedded steel bars and the concrete are connected more firmly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tower crane leg anchoring, and more specifically, to a tower crane leg anchoring device. Background Art

[0002] Tower crane leg anchoring devices are usually designed to ensure the stability and safety of tower cranes during operation. Especially under windy or other external environmental influences, tower crane legs are usually composed of several thick steel pipes or steel plates, and their lengths are usually adjustable to adapt to different working sites and terrain conditions. The anchoring foundation for fixing the legs is generally a concrete foundation or steel anchor bolts. The design of the tower crane leg anchoring device should take into account the stability and safety requirements of the tower crane under different working conditions, and also consider the convenience of installation and movement.

[0003] In the specific anchoring of tower crane legs, existing tower crane legs are usually pre-buried together with reinforced concrete during installation to achieve a stable effect. Although this method can install the tower crane legs, after use, a large piece of concrete needs to be dug out and then transported. If it is convenient for transportation, the pre-burial is too shallow and the anti-overturning ability is insufficient, which is likely to cause accidents and is not convenient for operators to use. Summary of the Utility Model

[0004] To make up for the above deficiencies, the utility model provides a tower crane leg anchoring device that overcomes the above technical problems or at least partially solves the above problems.

[0005] The utility model is implemented as follows:

[0006] The utility model provides a tower crane leg anchoring device, including a mounting plate,

[0007] A leg is arranged inside the mounting plate. Embedded steel bars are arranged at the four corners of the mounting plate. A limiting block is sleeved on the surface of the embedded steel bar, and a threaded rod is arranged inside the limiting block;

[0008] Limiting frames are arranged on both sides of the leg, and a bolt and a limiting rod are arranged inside the limiting frame.

[0009] In a preferred solution, two groups of the limiting blocks are provided, and the two groups of limiting blocks are respectively arranged on both sides of the leg.

[0010] In a preferred solution, concrete is arranged outside the mounting plate, a groove is formed inside the concrete, and the mounting plate is arranged inside the groove.

[0011] In a preferred solution, steel bar holes are formed at the four corners of the mounting plate, and the embedded steel bars are arranged inside the steel bar holes.

[0012] In a preferred embodiment, a cone is provided at the bottom of the support leg, and an installation groove is formed inside the installation plate, and the support leg is arranged inside the installation groove.

[0013] In a preferred embodiment, threaded holes are formed on both sides of the installation plate, and the threaded rod is arranged inside the threaded holes.

[0014] In a preferred embodiment, a number of limiting holes are formed on both sides of the support leg, and the limiting rod is arranged inside one group of the limiting holes.

[0015] In a preferred embodiment, a number of installation holes are formed on both sides of the support leg, the bolt is arranged inside one group of the installation holes, and a tower crane main body is provided at the top of the support leg.

[0016] A tower crane support leg anchoring device provided by the present utility model has the following beneficial effects:

[0017] 1. Through the mutual cooperation of the tower crane main body, the support leg, the limiting block, the embedded steel bar, the threaded hole and the threaded rod, align the limiting block with the embedded steel bar, and then move it downward. When it moves to the concrete ground, insert the threaded rod into the threaded hole. Thus, through the double fixation of the embedded steel bar and the threaded rod, the stability of the tower crane main body can be ensured, and the deviation of the support leg can be avoided. The installation plate outside the embedded steel bar also increases the contact area between the embedded steel bar and the concrete, making the connection between the embedded steel bar and the concrete more firm. Compared with the situation where the embedded steel bar and the concrete are pre-embedded together, the demolition is more convenient and fast, and it is also more convenient to use again.

[0018] 2. Through the mutual cooperation of the support leg, the limiting frame, the limiting rod, the bolt, the embedded steel bar and the threaded rod, when the operator needs to improve the stability of the support leg, the operator can install the two groups of limiting frames on both sides of the support leg according to the usage situation. After the installation is completed, the operator can install the limiting rod and the bolt into the corresponding limiting holes and installation holes respectively, so as to install the limiting frame, and further cooperate with the embedded steel bar and the threaded rod, which can further improve the stability of the tower crane main body and the support leg, and is convenient for the operator to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings required for the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present utility model, and therefore should not be regarded as limiting the scope. For those of ordinary skill in the art, other related drawings can also be obtained based on these drawings without creative efforts.

[0020] Figure 1It is an overall three-dimensional view provided by the embodiment of the present utility model;

[0021] Figure 2 It is a schematic diagram of the bottom structure of the support leg provided by the embodiment of the present utility model;

[0022] Figure 3 It is an exploded view of the partial structure of the support leg provided by the embodiment of the present utility model;

[0023] Figure 4 Provided by the embodiment of the present utility model Figure 3 An enlarged view of part A in

[0024] In the figure: 11, support leg; 12, mounting plate; 13, embedded steel bar; 14, steel bar hole; 15, mounting groove; 16, threaded hole; 17, awl; 18, limit block; 19, threaded rod; 2, limit frame; 21, mounting hole; 22, bolt; 23, limit hole; 24, limit rod; 25, tower crane main body; 26, concrete. Specific embodiments

[0025] To make the purpose, technical solutions and advantages of the embodiments of the present utility model clearer, the technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are part of the embodiments of the present utility model, rather than all of the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.

[0026] Refer to Figures 1 - 4, the present utility model provides a technical solution: a tower crane leg anchoring device, including a mounting plate 12, a leg 11 is arranged inside the mounting plate 12, pre-buried steel bars 13 are arranged at the four corners of the mounting plate 12, a limiting block 18 is sleeved on the surface of the pre-buried steel bar 13, and a threaded rod 19 is arranged inside the limiting block 18. Through the mutual cooperation of the tower crane main body 25, the leg 11, the limiting block 18, the pre-buried steel bar 13, the threaded hole 16 and the threaded rod 19, when the operator needs to anchor the leg 11 of the tower crane main body 25, first, the pre-buried steel bar 13 can be installed into the concrete 26. The operator can align the limiting block 18 with the pre-buried steel bar 13 and then move it downward. When it moves to the ground of the concrete 26, the operator can insert the threaded rod 19 into the threaded hole 16. Thus, through the double fixation of the pre-buried steel bar 13 and the threaded rod 19, the stability of the tower crane main body 25 can be ensured, and the leg 11 can be prevented from shifting. The mounting plate 12 outside the pre-buried steel bar 13 also increases the contact area between the pre-buried steel bar 13 and the concrete 26, making the connection between the pre-buried steel bar 13 and the concrete 26 more firm. When transporting, only the mounting plate 12 needs to be dug out, which is convenient for the operator to transport. Compared with the situation where the pre-buried steel bar 13 and the concrete 26 are pre-buried together, the demolition is more convenient and fast, and it is also more convenient to use when used again.

[0027] Referring to Figures 1 - 4 , in a preferred embodiment, limiting frames 2 are arranged on both sides of the leg 11, bolts 22 and limiting rods 24 are arranged inside the limiting frames 2, the limiting blocks 18 are arranged in two groups, and the two groups of limiting blocks 18 are respectively arranged on both sides of the leg 11. Concrete 26 is arranged outside the mounting plate 12, a groove body is opened inside the concrete 26, the mounting plate 12 is arranged inside the groove body, reinforcing bar holes 14 are opened at the four corners of the mounting plate 12, and the pre-buried steel bars 13 are arranged inside the reinforcing bar holes 14. Through the mutual cooperation of the leg 11, the limiting frames 2, the limiting rods 24, the bolts 22, the pre-buried steel bars 13 and the threaded rods 19, when the operator needs to improve the stability of the leg 11, the operator can install the two groups of limiting frames 2 on both sides of the leg 11 according to the usage situation. After the installation is completed, the operator can install the limiting rods 24 and the bolts 22 into the correspondingly adapted limiting holes 23 and mounting holes 21 respectively, so as to install the limiting frames 2, and then cooperate with the pre-buried steel bars 13 and the threaded rods 19, which can further improve the stability of the tower crane main body 25 and the leg 11 and is convenient for the operator to use.

[0028] Referring to Figures 1 - 4In a preferred embodiment, an awl 17 is provided at the bottom of the leg 11, and the awl 17 is provided to facilitate the installation of the leg 11. A mounting groove 15 is provided inside the mounting plate 12, and the leg 11 is arranged inside the mounting groove 15. Threaded holes 16 are provided on both sides of the mounting plate 12, and the threaded rod 19 is arranged inside the threaded hole 16. A plurality of limiting holes 23 are provided on both sides of the leg 11, and the limiting rod 24 is arranged inside one group of the limiting holes 23. A plurality of mounting holes 21 are provided on both sides of the leg 11, and the bolt 22 is arranged inside one group of the mounting holes 21. A tower crane body 25 is provided on the top of the leg 11.

[0029] Specifically, the working process or working principle of the anchoring device of the tower crane leg 11 is as follows: in the specific anchoring of the tower crane leg 11, the existing tower crane leg 11 is usually pre-buried together with the reinforced concrete 26 during installation to achieve a stabilizing effect. Although this method can install the tower crane leg 11, after use, a large piece of concrete 26 needs to be dug out and then transported. If it is convenient to transport, the shallow pre-buried concrete 26 has insufficient anti-overturning ability, which is easy to cause accidents and inconvenient for operators to use. Therefore, the technical solution can solve the above problems. When the operator needs to anchor the tower crane body 25 leg 11, the quasi-embedded steel bar 13 can be installed into the interior of the concrete 26 first. The operator can align the limit block 18 with the embedded steel bar 13 and then move it downward. When it moves to the ground of the concrete 26, the operator can insert the threaded rod 19 into the threaded hole 16, so that the double fixation of the embedded steel bar 13 and the threaded rod 19 can be achieved. To ensure the stability of the tower crane body 25 and avoid the deviation of the support leg 11, the outer mounting plate 12 of the embedded steel bar 13 also increases the contact area between the embedded steel bar 13 and the concrete 26, so that the connection between the embedded steel bar 13 and the concrete 26 is more firm. When transporting, only the mounting plate 12 needs to be dug out, which is convenient for the operator to transport. Compared with the situation where the embedded steel bar 13 and the concrete 26 are embedded together, the removal is more convenient and quick, and it is also more convenient to use again. When the operator needs to improve the stability of the support leg 11, the operator can install the two sets of limit frames 2 on both sides of the support leg 11 according to the usage. After the installation is completed, the operator can install the limit rod 24 and the bolt 22 to the corresponding limit hole 23 and the mounting hole 21 respectively, so that the limit frame 2 can be installed, and then it can cooperate with the embedded steel bar 13 and the threaded rod 19, which can further improve the stability of the tower crane body 25 and the support leg 11, and is convenient for the operator to use. At this point, all processes are completed.

[0030] It should be noted that the tower crane main body 25 is electrically connected to an external power supply and is a device or equipment existing in the prior art, or a device or equipment that can be realized by the prior art. Its power supply, specific composition and principle are clear to those skilled in the art, so they will not be elaborated in detail.

Claims

1. A tower crane leg anchoring device, characterized in that: including a mounting plate (12), The mounting plate (12) is provided with a support leg (11) inside, and four corners of the mounting plate (12) are provided with embedded steel bars (13), and the surface of the embedded steel bars (13) is sleeved with a limit block (18), and the inside of the limit block (18) is provided with a threaded rod (19); Limiting frames (2) are arranged on both sides of the supporting leg (11), and bolts (22) and limiting rods (24) are arranged inside the limiting frames (2).

2. A tower crane leg anchoring device according to claim 1, characterized in that: The limit blocks (18) are arranged in two groups, and the two groups of limit blocks (18) are respectively arranged on both sides of the supporting leg (11).

3. A tower crane leg anchoring device according to claim 2, characterized in that: Concrete (26) is arranged on the outside of the installation plate (12), a groove body is opened inside the concrete (26), and the installation plate (12) is arranged inside the groove body.

4. A tower crane leg anchoring device according to claim 3, characterized in that: The four corners of the installation plate (12) are each provided with a steel bar hole (14), and the embedded steel bars (13) are arranged inside the steel bar hole (14).

5. A tower crane leg anchoring device according to claim 4, characterized in that: The bottom of the supporting leg (11) is provided with an awl (17), the interior of the mounting plate (12) is provided with a mounting groove (15), and the supporting leg (11) is arranged inside the mounting groove (15).

6. A tower crane leg anchoring device according to claim 5, characterized in that: Threaded holes (16) are provided on both sides of the mounting plate (12), and the threaded rods (19) are arranged inside the threaded holes (16).

7. A tower crane leg anchoring device according to claim 6, characterized in that: A plurality of limiting holes (23) are provided on both sides of the supporting leg (11), and the limiting rod (24) is arranged inside one group of the limiting holes (23).

8. A tower crane leg anchoring device according to claim 7, characterized in that: A plurality of mounting holes (21) are provided on both sides of the supporting leg (11), the bolts (22) are arranged inside one group of the mounting holes (21), and a tower crane body (25) is arranged on the top of the supporting leg (11).