Assembled temporarily-built enclosing wall

Through the combined structure of fence vertical panels, square cylinders, U-shaped card plates and fastening modules, the problems of complex installation and road damage of existing temporary walls are solved, and the assembled temporary walls with good rapid installation, disassembly and drainage effects are achieved.

CN223075285UActive Publication Date: 2025-07-08SHANDONG HIGHWAY TECHNICIAN COLLEGE
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422346833.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2025-07-08
Estimated Expiration
2034-09-25

AI Technical Summary

Technical Problem

The installation and dismantling process of existing temporary fences is complicated, and it causes damage to the road during construction, affecting traffic efficiency and leaving behind quality hazards.

Method used

The combined structure of fence vertical panels, square cylinders, U-shaped clamping boards, fence vertical piers and fastening modules is adopted. Through the connection of clamping blocks, clamping slots and fastening modules, the fastening modules are used to quickly fix and disassemble the fence vertical panels, and grooves are set on the fence vertical piers for drainage and easy lifting.

Benefits of technology

It realizes rapid installation and disassembly of temporary fences, reduces damage to the road, improves construction efficiency, and has good drainage effect in rainy weather, making lifting operation simple.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223075285U_ABST
    Figure CN223075285U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembled temporarily-built enclosing wall. The assembled temporarily-built enclosing wall comprises enclosing wall vertical plates, square cylinders, U-shaped clamping plates, enclosing wall vertical piers and fastening modules. The enclosing wall vertical pier comprises a circular through groove, a clamping groove, a groove and a clamping block. According to the position of the enclosing wall, a proper number of enclosing wall vertical piers are placed, the clamping block of one enclosing wall vertical pier is inserted into the clamping groove of another adjacent enclosing wall vertical pier, and the rest can be done in the same way, so that the enclosing wall vertical piers are connected end to end, and the enclosing wall vertical piers are prevented from being staggered end to end when being collided by external force; a set of top plates abut against the inner walls of the circular through grooves, the fastening modules, the square cylinders and the U-shaped clamping plates are fixed to the enclosing wall vertical pier, then the two ends of each enclosing wall vertical plate are inserted into the two adjacent U-shaped clamping plates correspondingly, the enclosing wall vertical plates and the U-shaped clamping plates can be reinforced and fixed through dovetail screws, and positioning and fixing of the enclosing wall vertical plates are achieved; and completing the construction work of the temporarily-built enclosing wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of temporary construction walls, in particular to an assembled temporary construction wall. Background Art

[0002] With the continuous and rapid development of China's economy and the accelerating urbanization process, the government has invested a large amount of resources in the construction and improvement of municipal facilities, bringing great changes to the environment and image of the whole city. However, during the construction period of these facilities, they generally have a certain negative impact on the already congested urban traffic. The main reason is that the construction operation area needs to occupy part of the road, and temporary construction walls are set up around for closed management. This kind of practice will not only reduce the vehicle passing efficiency, but also cause varying degrees of damage to the original finished road. For example, for the color steel walls commonly used by construction units at present, when fixing the light steel columns on the road surface, expansion bolt measures are often adopted, and drilling is required on the road surface, which is bound to cause damage to the road surface and leave quality hidden dangers such as water seepage and cracking;

[0003] A fixing device for a temporary construction wall disclosed in a patent document with the publication number of CN215760910U has the following installation process: Step 1: According to the content of the temporary construction planning plan, locate the positions of the temporary construction wall columns at the construction site. Step 2: Use a small lifting machine or other means to place the cement isolation piers at the positioning positions of the wall columns in the first step. Step 3: Install the fastening connecting pieces on the cement isolation piers. Specifically, pass two tie rods through the reserved holes of the isolation pier, put on the end face angle steel, and screw on the nuts at the ends of the tie rods. Step 4: Install the wall columns. Clip the wall columns into the positioning fastening clip plates, align the bolt holes, and then pass through two screws for fastening the wall columns and tighten them. Step 5: Install the diagonal braces. Place the diagonal braces well and fix the two ends to the wall columns and the end face angle steel respectively by self-tapping screws or by welding. In the installation process of the above patent, it is necessary to use threaded connecting pieces such as screws, bolts and nuts for fixation many times, and it is more troublesome during disassembly and installation, and the disassembly and installation efficiency is low.

[0004] Therefore, it is necessary to provide an assembled temporary construction wall to solve the above technical problems. Summary of the Utility Model

[0005] The purpose of the utility model is to solve the defects existing in the prior art and propose an assembled temporary construction wall.

[0006] In order to achieve the above purpose, the utility model adopts the following technical scheme:

[0007] An assembled temporary construction wall includes a wall vertical plate, a square tube, a U-shaped clamping plate, a wall pier, and a fastening module;

[0008] Among them, the enclosure vertical pier includes a circular through groove, a clamping groove, a concave groove, and a clamping block;

[0009] The fastening module includes a cylinder that can be inserted into the circular through groove. A group of uniformly arranged openings are respectively provided on the cylinder. Corresponding top plates are respectively provided in a group of openings. One side of a group of the top plates is respectively hinged to a corresponding connecting rod through a pin shaft. One end of a group of the connecting rods is respectively hinged to a slider through a pin shaft. The slider is threadedly connected to a lead screw;

[0010] Both ends of the lead screw are respectively movably connected to both sides of the cylinder. The cylinder is fixedly connected to the square tube. The upper end of the lead screw passes through and is movably connected to the lower side of the square tube. The end of the upper end of the lead screw is fixedly connected to the center of a first bevel gear. The first bevel gear meshes with a second bevel gear. The central axis of the second bevel gear passes through and is movably connected to one side of the square tube. The end of the central axis of the second bevel gear is fixedly connected to the center of a knob.

[0011] Preferably, symmetric U-shaped clamping plates are respectively fixedly connected to both sides of the square tube. One end of the enclosure vertical plate is respectively provided in two U-shaped clamping plates.

[0012] Preferably, a clamping groove is provided on one side of the enclosure vertical pier.

[0013] Preferably, a circular through groove is provided in the middle of the enclosure vertical pier.

[0014] Preferably, a clamping block is fixedly connected to the other side of the enclosure vertical pier.

[0015] Preferably, symmetric concave grooves are respectively provided on the lower side of the enclosure vertical pier.

[0016] Compared with the related art, the beneficial effects of the present utility model are:

[0017] 1. According to the position of the enclosure, place an appropriate amount of enclosure vertical piers, and insert the clamping block of one enclosure vertical pier into the clamping groove of an adjacent enclosure vertical pier, and so on, so that the enclosure vertical piers are connected end to end. When the enclosure vertical piers are subjected to external collisions, the enclosure vertical piers will not be staggered end to end. Through the fastening module, a group of top plates are pressed against the inner wall of the circular through groove, so that the fastening module, the square tube and the U-shaped clamping plate are fixed together with the enclosure vertical pier. Then, insert both ends of the enclosure vertical plate into two adjacent U-shaped clamping plates respectively. It is possible to use dovetail screws to reinforce and fix the enclosure vertical plate and the U-shaped clamping plate, so as to realize the positioning and fixing of the enclosure vertical plate and complete the construction work of the temporary enclosure;

[0018] 2. Moreover, the grooves provided on the enclosure piers can drain rainwater through the grooves in rainy weather, preventing rainwater from accumulating. Also, the grooves facilitate the hoisting of the enclosure piers. When hoisting is required, ropes can be passed through the grooves to lift the enclosure piers, making the operation convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 FIG. is a three-dimensional schematic diagram of the present utility model.

[0020] Figure 2 FIG. is a schematic diagram of the connection structure of some parts of the present utility model.

[0021] Figure 3 FIG. is a schematic diagram of the connection structure of some parts of the present utility model after sectioning.

[0022] Figure 4 FIG. is a schematic diagram of the connection structure of some parts of the present utility model.

[0023] Figure 5 FIG. is a schematic diagram of the connection structure of some parts of the present utility model.

[0024] Figure 6 FIG. is a schematic diagram of the connection structure of some parts of the present utility model after sectioning.

[0025] Figure 7 FIG. is a schematic diagram of the connection structure of some parts of the present utility model after sectioning.

[0026] In the figures:

[0027] 1. Enclosure vertical plate;

[0028] 2. Square tube;

[0029] 3. U-shaped clamping plate;

[0030] 4: Enclosure pier, 41. Circular through groove, 42. Card slot, 43. Groove, 44. Block;

[0031] 5: Fastening module, 51. Opening, 52. Knob, 53. Bevel gear two, 54. Bevel gear one, 55. Top plate, 56. Link, 57. Slide block, 58. Screw lever, 59. Cylinder. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0032] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments.

[0033] An assembled temporary building enclosure includes an enclosure vertical plate 1, a square tube 2, a U-shaped clamping plate 3, an enclosure pier 4, and a fastening module 5;

[0034] Among them, the enclosure pier 4 includes a circular through groove 41, a clamping groove 42, a concave groove 43, and a clamping block 44;

[0035] The fastening module 5 includes a cylinder 59 which can be inserted into the circular through groove 41. A group of uniformly arranged openings 51 are respectively provided on the cylinder 59. Corresponding top plates 55 are respectively arranged in a group of the openings 51. One side of a group of the top plates 55 is respectively hinged to a corresponding connecting rod 56 through a pin shaft. One end of a group of the connecting rods 56 is respectively hinged to a slider 57 through a pin shaft. The slider 57 is threadedly connected to a lead screw 58;

[0036] Both ends of the lead screw 58 are respectively movably connected to both sides of the cylinder 59. The cylinder 59 is fixedly connected to the square tube 2. The upper end of the lead screw 58 passes through and is movably connected to the lower side of the square tube 2. The end of the upper end of the lead screw 58 is fixedly connected to the center of a first bevel gear 54. The first bevel gear 54 meshes with a second bevel gear 53. The central axis of the second bevel gear 53 passes through and is movably connected to one side of the square tube 2. The end of the central axis of the second bevel gear 53 is fixedly connected to the center of a knob 52.

[0037] Symmetric U-shaped clamping plates 3 are respectively fixedly connected to both sides of the square tube 2. One end of the enclosure vertical plate 1 is respectively arranged in the two U-shaped clamping plates 3.

[0038] The clamping groove 42 is provided on one side of the enclosure pier 4.

[0039] The circular through groove 41 is provided in the middle of the enclosure pier 4.

[0040] The clamping block 44 is fixedly connected to the other side of the enclosure pier 4.

[0041] Symmetric concave grooves 43 are respectively provided on the lower side of the enclosure pier 4.

[0042] Working principle: According to the content of the temporary construction planning plan, the position of the temporary construction wall is located at the construction site. According to the position of the wall, an appropriate number of wall piers 4 are placed, and the clamping block 44 of one wall pier 4 is inserted into the clamping groove 42 of another adjacent wall pier 4, and so on, so that the wall piers 4 are connected end to end, preventing the wall piers 4 from being staggered when being collided by external forces. Then, cylinders 59 are respectively inserted into the circular through grooves 41 of the wall piers 4, and the knob 52 is rotated. The knob 52 drives the second bevel gear 53 to rotate. The second bevel gear 53 meshes with the first bevel gear 54 to rotate. The first bevel gear 54 drives the lead screw 58 to rotate. The lead screw 58 drives the slider 57 to slide. The slider 57 drives the corresponding connecting rods 56 to swing respectively. A group of connecting rods 56 drive the corresponding top plates 55 to extend along the opening 51, so that a group of top plates 55 abut against the inner wall of the circular through groove 41. At this time, stop rotating the knob 52, realizing the fixation of the fastening module 5, the square tube 2 and the U-shaped clamping plate 3 to the wall pier 4. Then, the two ends of the wall plate 1 are respectively inserted into two adjacent U-shaped clamping plates 3. Dovetail screws can be used to reinforce and fix the wall plate 1 and the U-shaped clamping plate 3, realizing the positioning and fixation of the wall plate 1 and completing the construction of the temporary construction wall;

[0043] Moreover, the groove 43 provided on the wall pier 4 can enable rainwater to drain through the groove 43 in rainy weather, avoiding the accumulation of rainwater. And the setting of the groove 43 enables the wall pier 4 to be lifted by using a rope through the groove 43 when it is necessary to lift the wall pier 4, which is convenient for operation.

[0044] Beneficial effects: According to the position of the wall, an appropriate number of wall piers 4 are placed, and the clamping block 44 of one wall pier 4 is inserted into the clamping groove 42 of another adjacent wall pier 4, and so on, so that the wall piers 4 are connected end to end, preventing the wall piers 4 from being staggered when being collided by external forces. Through the fastening module 5, a group of top plates 55 abut against the inner wall of the circular through groove 41, realizing the fixation of the fastening module 5, the square tube 2 and the U-shaped clamping plate 3 to the wall pier 4. Then, the two ends of the wall plate 1 are respectively inserted into two adjacent U-shaped clamping plates 3. Dovetail screws can be used to reinforce and fix the wall plate 1 and the U-shaped clamping plate 3, realizing the positioning and fixation of the wall plate 1 and completing the construction of the temporary construction wall.

[0045] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art within the technical scope disclosed by the present invention, according to the technical solution of the present invention and its inventive concept, makes equivalent substitutions or changes, and all should be covered within the protection scope of the present invention.

Claims

1. An assembled temporary construction fence, characterized in that, The assembled temporary construction fence includes: a fence vertical board (1), a square tube (2), a U-shaped clamping board (3), a fence vertical pier (4), and a fastening module (5); wherein, the fence vertical pier (4) includes a circular through groove (41), a clamping groove (42), a groove (43), and a clamping block (44); the fastening module (5) includes a cylinder (59), the cylinder (59) can be inserted into the circular through groove (41), a group of uniformly arranged openings (51) are respectively arranged on the cylinder (59), corresponding top plates (55) are respectively arranged in a group of the openings (51), one sides of a group of the top plates (55) are respectively hinge-connected to corresponding connecting rods (56) through pins, one ends of a group of the connecting rods (56) are respectively hinge-connected to sliders (57) through pins, and the sliders (57) are threadedly connected to a lead screw (58); both ends of the lead screw (58) are respectively movably connected to two sides of the cylinder (59), the cylinder (59) is fixedly connected to the square tube (2), the upper end of the lead screw (58) passes through and is movably connected to the lower side of the square tube (2), the end of the upper end of the lead screw (58) is fixedly connected to the center of a first bevel gear (54), the first bevel gear (54) meshes with a second bevel gear (53), the central axis of the second bevel gear (53) passes through and is movably connected to one side of the square tube (2), and the end of the central axis of the second bevel gear (53) is fixedly connected to the center of a knob (52).

2. The assembled temporary construction wall according to claim 1, wherein, Both sides of the square tube (2) are respectively fixedly connected to symmetric U-shaped clamping boards (3), and one ends of the fence vertical boards (1) are respectively arranged in the two U-shaped clamping boards (3).

3. The assembled temporary construction wall according to claim 1, wherein, One side of the fence vertical pier (4) is provided with the clamping groove (42).

4. The assembled temporary construction fence according to claim 1, wherein The middle part of the fence vertical pier (4) is provided with the circular through groove (41).

5. The assembled temporary construction fence according to claim 1, wherein, The other side of the fence vertical pier (4) is fixedly connected to the clamping block (44).

6. The assembled temporary construction fence according to claim 1, characterized in that, Both sides of the lower side of the fence vertical pier (4) are respectively provided with symmetric grooves (43).

Citation Information

Patent Citations

  • Temporarily-built enclosing wall fixing device

    CN215760910U