Sand blasting machine for processing wind power tower drum

By setting up fixing devices and clamping components on the sandblasting machine, the distorted drag problem caused by self-weight and artificial pulling of the output tube is solved, and the stable connection of the output tube is achieved, improving the stability of the sandblasting work and equipment safety.

CN223172732UActive Publication Date: 2025-08-01ZHANGJIAKOU DAJIN WIND POWER EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422300489.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2025-08-01
Estimated Expiration
2034-09-20

AI Technical Summary

Technical Problem

The output pipe of existing sandblasting machines is prone to twist and drag due to self-weight and artificial pulling when sandblasting the wind power tower, resulting in loose or disconnection of the connection, affecting the stability of work and causing equipment damage.

Method used

A sandblasting machine for wind power tower processing is designed. By setting up fixing devices, clamping components and positioning devices, including fixing seats, clamping rings, slide rails, mobile seats, clamping components, etc., the output tube is stable to avoid twisting and dragging.

Benefits of technology

Effectively prevent loosening and disconnection at the output tube connection, improve the stability of sandblasting work, and protect the equipment from damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223172732U_ABST
    Figure CN223172732U_ABST
Patent Text Reader

Abstract

The sand blasting machine comprises a rack, a machine body, a pipeline, a connecting end and an output pipe, the machine body is arranged at the upper end of the machine body and fixedly connected with the rack, the pipeline is arranged on the right side of the lower end of the machine body and communicated with the machine body, the connecting end is arranged on the left side of the lower end of the pipeline, and the output pipe is arranged on the right side of the lower end of the pipeline. The output pipe is arranged on the left side of the connecting end and movably connected with the connecting end. According to the sand blasting machine, the rack, the machine body, the pipeline, the connecting end, the output pipe, the supporting plate, the fixing device, the positioning device and the rubber protection pad are matched for use, so that the problems that when an existing sand blasting machine carries out sand blasting work on a wind power tower drum, the output pipe of the sand blasting machine is twisted and dragged for a long time due to self weight and pulling of workers during operation; therefore, the problems that the work stability is affected and the equipment is damaged due to the fact that the connection position is easy to loosen and even disconnected are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of sandblasting processing of wind power tower barrels, and particularly relates to a sandblaster for processing wind power tower barrels. Background Art

[0002] As a key support structure of a wind power generation system, the processing of a wind power tower barrel not only requires high precision but also emphasizes the durability and corrosion resistance of surface treatment; in order to improve the weather resistance and service life of the tower barrel, sandblasting treatment has become an indispensable process; in this context, the efficient connection of a wind power tower barrel processing production line with an advanced sandblaster realizes a one-stop solution from rough processing to fine surface treatment; the surface of the tower barrel is thoroughly cleaned and roughened by high-speed jetting of sand grains or steel shots, effectively removing the surface oxide scale, rust layer and impurities, while increasing the surface roughness, providing an ideal adhesion basis for subsequent painting; this integrated production method not only improves production efficiency but also ensures the uniformity and consistency of the surface treatment of the tower barrel, which is of great significance for improving the performance stability and safety of the overall wind turbine.

[0003] The problems existing in the prior art are as follows: when the existing sandblaster is performing sandblasting treatment on a wind power tower barrel, its output pipe will be distorted and dragged for a long time due to its own weight and the pulling during the operation of the staff, which is likely to cause the loosening or even disconnection of the connection, thus resulting in the problems of affecting the work stability and causing equipment damage. Summary of the Utility Model

[0004] Aiming at the problems existing in the prior art, the utility model provides a sandblaster for processing wind power tower barrels, which has the advantages of supporting and stabilizing the connection of the output pipe of the sandblaster and having a certain degree of tensile torsion resistance, and solves the problems that when the existing sandblaster is performing sandblasting treatment on a wind power tower barrel, its output pipe will be distorted and dragged for a long time due to its own weight and the pulling during the operation of the staff, which is likely to cause the loosening or even disconnection of the connection, thus resulting in the problems of affecting the work stability and causing equipment damage.

[0005] The utility model is realized as follows: a sandblaster for processing wind power tower barrels includes a frame, a machine body, a pipeline, a connection end and an output pipe. The machine body is arranged at the upper end of the frame and fixedly connected with the frame. The pipeline is arranged at the lower right side of the machine body and communicates with the machine body. The connection end is arranged at the lower left of the pipeline. The output pipe is arranged at the left side of the connection end and movably connected with the connection end. A support plate is arranged below the connection end. The front two ends of the support plate are respectively fixedly connected with the frame. A fixing device is arranged at the connection of the output pipe and the connection end. A positioning device is arranged at the front end of the fixing device.

[0006] As a preferred embodiment of the present utility model, the fixing device includes a fixing base, a first clamping ring and a clamping assembly. The fixing base is arranged at the rear end of the output pipe and is fixedly connected to the upper surface of the support plate at the lower end. The first clamping ring is fixedly connected to the front side of the upper end of the fixing base and corresponds to the output pipe. The clamping assembly is arranged on the front side of the output pipe. By providing the fixing device, it is used to fix and stabilize the output pipe, avoiding the situation that during the sandblasting of the tower barrel, the output pipe is distorted and dragged due to its own weight and manual pulling for a long time, resulting in loosening or even disconnection of the connection with the connection end, and having a certain anti-tensile and anti-torsion effect on the connection part of the output pipe.

[0007] As a preferred embodiment of the present utility model, the clamping assembly includes a slide rail, a moving seat, a second clamping ring and a limiting block. The slide rail is arranged on the front side of the output pipe and is fixedly connected to the upper surface of the support plate. The lower end of the moving seat is sleeved on the surface of the slide rail and is slidably connected to the slide rail. The second clamping ring is fixedly connected to the rear side of the upper end of the moving seat and corresponds to the first clamping ring. The number of the limiting blocks is two, and they are respectively fixedly connected to the front and rear ends of the slide rail. By providing the clamping assembly, it is used to move back and forth and cooperate with the fixing base and the first clamping ring to clamp and stabilize the output pipe, and to move and open to release the fixation when disassembling and assembling the output pipe.

[0008] As a preferred embodiment of the present utility model, the positioning device includes a box body, a clamping component and a docking component. The lower end of the box body is sleeved on the surface of the slide rail and is slidably connected to the slide rail. The rear side of the box body is fixedly connected to the moving seat. The clamping component is arranged inside the box body. The docking component is arranged on the left side of the box body. By providing the positioning device, it is used to position and fix the clamping assembly, having the effect of fixing the position of the clamping assembly after the clamping assembly moves and clamps the output pipe, so as to achieve fixation.

[0009] As a preferred embodiment of the present utility model, the clamping component includes a moving rod, a push plate, a push spring, a pin head and a pull knob. The number of the moving rods is two, and they are respectively arranged on the front and rear sides inside the box body. The left and right ends of the two moving rods are respectively fixedly connected to the left and right inner side surfaces of the box body. The push plate is sleeved on the left ends of the two moving rods and is slidably connected to the moving rods. The number of the push springs is two, and they are respectively sleeved on the surfaces of the two moving rods. The left and right ends of the two push springs are respectively fixedly connected to the inner surface of the box body and the push plate. The pin head is fixedly connected to the left surface of the push plate and extends out of the box body at the left end and is slidably connected to the box body. The pull knob is fixedly connected to the upper end of the push plate and extends out of the box body at the upper end and is slidably connected to the box body. By providing the clamping component, it is used to cooperate with the docking component to thereby achieve the positioning and fixation of the clamping assembly.

[0010] As a preferred embodiment of the present utility model, the docking assembly includes a fixing plate and a positioning groove. The fixing plate is arranged on the left side of the box body, and the lower end is fixedly connected to the upper surface of the support plate. The positioning groove is opened on the left surface of the fixing plate and penetrates through the fixing plate. The position of the positioning groove corresponds to the position of the pin head. By providing the docking assembly, when the clamping assembly moves with the clamping component to correspond to the positioning groove, it cooperates with the clamping component to be fixed, so as to position the clamping component.

[0011] On the mutually approaching surfaces of the first clamping ring and the second clamping ring, rubber protective pads are fixedly connected. By providing rubber protective pads on the mutually approaching surfaces of the first clamping ring and the second clamping ring, it has the functions of preventing slipping during the clamping operation and preventing frictional damage to the output pipe.

[0012] Compared with the prior art, the beneficial effects of the present utility model are as follows:

[0013] 1. By using the cooperation of the frame, the machine body, the pipeline, the connection end, the output pipe, the support plate, the fixing device, the fixing seat, the first clamping ring, the clamping component, the slide rail, the moving seat, the second clamping ring, the limiting block, the positioning device, the box body, the clamping component, the moving rod, the push plate, the push spring, the pin head, the pull button, the docking assembly, the fixing plate, the positioning groove and the rubber protective pad, the present utility model solves the problem that when the existing sandblasting machine performs sandblasting treatment on the wind power tower barrel, its output pipe will be distorted and dragged for a long time due to its own weight and the pulling during the operation of the staff, which is likely to cause loosening or even disconnection at the connection, thus affecting the work stability and causing equipment damage.

[0014] 2. By providing the fixing device, the present utility model is used to fix and stabilize the output pipe, avoiding the situation that when sandblasting the tower barrel, the output pipe is distorted and dragged for a long time due to its own weight and manual pulling, resulting in loosening or even disconnection at the connection with the connection end, and having a certain anti-torsion and anti-pull effect on the connection of the output pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 is a three-dimensional structural schematic diagram of the sandblasting machine provided by the embodiment of the present utility model;

[0016] Figure 2 is a three-dimensional structural schematic diagram of the positioning device in the sandblasting machine provided by the embodiment of the present utility model;

[0017] Figure 3 is a three-dimensional structural schematic diagram of the clamping component in the sandblasting machine provided by the embodiment of the present utility model;

[0018] Figure 4This is a three-dimensional structural schematic diagram of the clamping component and the docking component provided by the embodiment of the present utility model.

[0019] In the figure: 1, frame; 2, body; 3, pipeline; 4, connection end; 5, output pipe; 6, support plate; 7, fixing device; 71, fixing base; 72, clamping ring one; 73, clamping component; 731, slide rail; 732, moving seat; 733, clamping ring two; 734, limiting block; 8, positioning device; 81, box body; 82, clamping component; 821, moving rod; 822, push plate; 823, push spring; 824, pin head; 825, pull button; 83, docking component; 831, fixing plate; 832, positioning groove; 9, rubber protection pad. Detailed implementation manners

[0020] In order to further understand the inventive content, features and effects of the present utility model, the following embodiments are cited and described in detail in conjunction with the accompanying drawings.

[0021] The structure of the present utility model will be described in detail below with reference to the accompanying drawings.

[0022] As Figures 1 to 4 shown, a sandblasting machine for processing wind power tower barrels provided by the embodiment of the present utility model includes a frame 1, a body 2, a pipeline 3, a connection end 4 and an output pipe 5. The body 2 is arranged at the upper end of the body 2 and fixedly connected to the frame 1. The pipeline 3 is arranged at the lower right side of the body 2 and communicates with the body 2. The connection end 4 is arranged at the lower left of the pipeline 3. The output pipe 5 is arranged on the left side of the connection end 4 and is movably connected to the connection end 4. A support plate 6 is arranged below the connection end 4. The front ends of both sides of the support plate 6 are fixedly connected to the frame 1 respectively. A fixing device 7 is arranged at the connection part of the output pipe 5 and the connection end 4, and a positioning device 8 is arranged at the front end of the fixing device 7.

[0023] Referring to Figure 1 and Figure 2 , the fixing device 7 includes a fixing base 71, a clamping ring one 72 and a clamping component 73. It is fixedly arranged at the rear end of the output pipe 5 and the lower end is fixedly connected to the upper surface of the support plate 6. The clamping ring one 72 is fixedly connected to the front side of the upper end of the fixing base 71 and corresponds to the output pipe 5. The clamping component 73 is arranged on the front side of the output pipe 5.

[0024] Adopting the above solution: By setting the fixing device 7, it is used to fix and stabilize the output pipe 5, avoiding the situation that when sandblasting the tower barrel, the output pipe 5 is distorted and dragged due to its own weight and manual pulling for a long time, resulting in loosening or even disconnection of the connection with the connection end 4, and having a certain anti-torsion effect on the connection part of the output pipe 5.

[0025] Referring to Figure 2 and Figure 3, the clamping assembly 73 includes a slide rail 731, a moving seat 732, a second clamping ring 733 and a limit block 734. The slide rail 731 is arranged on the front side of the output pipe 5 and is fixedly connected to the upper surface of the support plate 6. The lower end of the moving seat 732 is sleeved on the surface of the slide rail 731 and is slidably connected to the slide rail 731. The second clamping ring 733 is fixedly connected to the rear side of the upper end of the moving seat 732 and corresponds to the first clamping ring 72. The number of the limit blocks 734 is two, and they are respectively fixedly connected to the front and rear ends of the slide rail 731.

[0026] Adopting the above solution: By setting the clamping assembly 73, it is used for moving back and forth and cooperating with the fixed seat 71 and the first clamping ring 72 to clamp and stabilize the output pipe 5, and when disassembling and assembling the output pipe 5, it is used for moving and opening to release the fixation.

[0027] Reference Figure 2 、 Figure 3 And Figure 4 , the positioning device 8 includes a box body 81, a clamping component 82 and a docking component 83. The lower end of the box body 81 is sleeved on the surface of the slide rail 731 and is slidably connected to the slide rail 731. The rear side of the box body 81 is fixedly connected to the moving seat 732. The clamping component 82 is arranged inside the box body 81, and the docking component 83 is arranged on the left side of the box body 81.

[0028] Adopting the above solution: By setting the positioning device 8, it is used for positioning and fixing the clamping assembly 73, and has the function of fixing the position of the clamping assembly when the clamping assembly 73 moves and clamps the output pipe 5, so as to play a fixing role.

[0029] Reference Figure 3 And Figure 4 , the clamping component 82 includes a moving rod 821, a push plate 822, a push spring 823, a pin head 824 and a pull button 825. The number of the moving rods 821 is two, and they are respectively arranged on the front and rear sides inside the box body 81. The left and right ends of the two moving rods 821 are respectively fixedly connected to the left and right side surfaces inside the box body 81. The push plate 822 is sleeved on the left ends of the two moving rods 821 and is slidably connected to the moving rods 821. The number of the push springs 823 is two, and they are respectively sleeved on the surfaces of the two moving rods 821. The left and right ends of the two push springs 823 are respectively fixedly connected to the inner surface of the box body 81 and the push plate 822. The pin head 824 is fixedly connected to the left surface of the push plate 822, and the left end extends out of the box body 81 and is slidably connected to the box body 81. The pull button 825 is fixedly connected to the upper end of the push plate 822, and the upper end extends out of the box body 81 and is slidably connected to the box body 81.

[0030] Adopting the above solution: By setting the clamping component 82, it is used for cooperating with the docking component 83, so as to play a role in positioning and fixing the clamping assembly 73.

[0031] ReferenceFigure 3 With reference to the figure, the docking component 83 includes a fixing plate 831 and a positioning groove 832. The fixing plate 831 is arranged on the left side of the box body 81, and the lower end is fixedly connected to the upper surface of the support plate 6. The positioning groove 832 is opened on the left surface of the fixing plate 831 and penetrates through the fixing plate 831. The position of the positioning groove 832 corresponds to the position of the pin head 824.

[0032] Adopting the above solution: By setting the docking component 83, when the clamping component 82 moves with the clamping component 73 to correspond to the positioning groove 832, it cooperates and fixes with the clamping component 82, so as to position the clamping component 73.

[0033] Reference Figure 3 As shown in the figure, rubber protection pads 9 are fixedly connected to the mutually approaching surfaces of the first clamping ring 72 and the second clamping ring 733.

[0034] Adopting the above solution: By arranging rubber protection pads 9 on the mutually approaching surfaces of the first clamping ring 72 and the second clamping ring 733, it has the functions of preventing slipping during the clamping operation and preventing friction damage to the output pipe 5.

[0035] The working principle of the present utility model:

[0036] When stabilizing the connection part of the output pipe 5, first smooth out the output pipe 5 after connecting it to the connection end 4 and align it inside the first clamping ring 72. Then, by pulling the moving seat 732 backward, while pulling, the moving seat 732 is driven to slide on the surface of the slide rail 731, and at the same time, the box body 81 is driven to move on the slide rail 731. After moving the moving seat 732 to the position where the second clamping ring 733 and the first clamping ring 72 cooperate to clamp the output pipe 5, the position of the pin head 824 will correspond to the position of the positioning groove 832 on the fixing plate 831. At this time, the push spring 823 will push the push plate 822 to move leftward on the surface of the moving rod 821. The movement of the push plate 822 drives the pin head 824 to move leftward and insert into the corresponding positioning groove 832 to position the moving seat 732, thus completing the stabilization of the connection part of the output pipe 5. When disassembling and assembling the output pipe 5 to release the fixation later, by pulling the pull button 825 to the right, while pulling, the push plate 822 is driven to move leftward on the surface of the moving rod 821, and at the same time, the push spring 823 is compressed. The movement of the push plate 822 drives the pin head 824 to move into the box body 81, so that the pin head 824 moves out of the positioning groove 832, releasing the positioning of the clamping component 73. Then, pull the moving seat 732 forward to drive the second clamping ring 733 away from the output pipe 5, thus releasing the stabilization of the output pipe 5.

[0037] In summary, for the sandblasting machine used for processing wind power tower barrels, by using the cooperation of the frame 1, the machine body 2, the pipeline 3, the connection end 4, the output pipe 5, the support plate 6, the fixing device 7, the fixing seat 71, the clamping ring one 72, the clamping assembly 73, the slide rail 731, the moving seat 732, the clamping ring two 733, the limiting block 734, the positioning device 8, the box body 81, the clamping component 82, the moving rod 821, the push plate 822, the push spring 823, the pin head 824, the pull button 825, the docking component 83, the fixing plate 831, the positioning groove 832 and the rubber protection pad 9, it solves the problem that when the existing sandblasting machine performs sandblasting treatment on the wind power tower barrel, its output pipe will be distorted and dragged for a long time due to its own weight and the pulling during the operation of the staff, which is likely to cause loosening or even disconnection at the connection, thus affecting the work stability and causing equipment damage.

[0038] It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the term "comprising", "including" or any other variant thereof is intended to cover non-exclusive inclusion, so that a process, method, article or device comprising a series of elements not only includes those elements, but also includes other elements not expressly listed, or elements inherent to such process, method, article or device.

[0039] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A sandblasting machine for processing wind power tower barrels, comprising a frame (1), a body (2), a pipeline (3), a connection end (4) and an output pipe (5). The body (2) is arranged at the upper end of the frame (1) and fixedly connected to the frame (1). The pipeline (3) is arranged on the right side of the lower end of the body (2) and communicates with the body (2). The connection end (4) is arranged on the left of the lower end of the pipeline (3). The output pipe (5) is arranged on the left side of the connection end (4) and is movably connected to the connection end (4). It is characterized in that: A support plate (6) is arranged below the connection end (4). The front two ends of the support plate (6) are respectively fixedly connected to the frame (1). A fixing device (7) is arranged at the connection of the output pipe (5) and the connection end (4), and a positioning device (8) is arranged at the front end of the fixing device (7).

2. The sandblasting machine for processing wind power tower barrels according to claim 1, characterized in that: The fixing device (7) includes a fixing base (71), a first clamping ring (72) and a clamping component (73). The fixing base is arranged at the rear end of the output pipe (5) and its lower end is fixedly connected to the upper surface of the support plate (6). The first clamping ring (72) is fixedly connected to the front side of the upper end of the fixing base (71) and corresponds to the output pipe (5). The clamping component (73) is arranged on the front side of the output pipe (5).

3. The sandblasting machine for processing wind power tower barrels according to claim 2, characterized in that: The clamping component (73) includes a slide rail (731), a moving seat (732), a second clamping ring (733) and a limiting block (734). The slide rail (731) is arranged on the front side of the output pipe (5) and is fixedly connected to the upper surface of the support plate (6). The lower end of the moving seat (732) is sleeved on the surface of the slide rail (731) and is slidably connected to the slide rail (731). The second clamping ring (733) is fixedly connected to the rear side of the upper end of the moving seat (732) and corresponds to the first clamping ring (72). The number of the limiting blocks (734) is two, and they are respectively fixedly connected to the front and rear ends of the slide rail (731).

4. The sandblasting machine for processing wind power tower barrels according to claim 3, characterized in that: The positioning device (8) includes a box body (81), a clamping component (82) and a docking component (83). The lower end of the box body (81) is sleeved on the surface of the slide rail (731) and is slidably connected to the slide rail (731). The rear side of the box body (81) is fixedly connected to the moving seat (732). The clamping component (82) is arranged inside the box body (81), and the docking component (83) is arranged on the left side of the box body (81).

5. The sandblasting machine for processing wind power tower barrels according to claim 4, characterized in that: The clamping component (82) includes two moving rods (821), a push plate (822), two push springs (823), a pin head (824) and a pull knob (825). The number of the moving rods (821) is two, and they are respectively arranged on the front and rear sides inside the box body (81). The left and right ends of the two moving rods (821) are respectively fixedly connected to the left and right side surfaces inside the box body (81). The push plate (822) is sleeved on the left ends of the two moving rods (821) and is slidably connected to the moving rods (821). The number of the push springs (823) is two, and they are respectively sleeved on the surfaces of the two moving rods (821). The left and right ends of the two push springs (823) are respectively fixedly connected to the inner surface of the box body (81) and the push plate (822). The pin head (824) is fixedly connected to the left surface of the push plate (822), and its left end extends out of the box body (81) and is slidably connected to the box body (81). The pull knob (825) is fixedly connected to the upper end of the push plate (822), and its upper end extends out of the box body (81) and is slidably connected to the box body (81).

6. The sandblasting machine for processing wind power tower barrels according to claim 5, characterized in that: The docking component (83) includes a fixing plate (831) and a positioning groove (832). The fixing plate (831) is arranged on the left side of the box body (81), and the lower end thereof is fixedly connected to the upper surface of the support plate (6). The positioning groove (832) is formed in the left surface of the fixing plate (831) and penetrates through the fixing plate (831). The position of the positioning groove (832) corresponds to the position of the pin head (824).

7. The sandblasting machine for processing wind power tower barrels according to claim 3, characterized in that: Rubber protective pads (9) are fixedly connected to the mutually approaching surfaces of the first clamping ring (72) and the second clamping ring (733).