Monorail crane device for curtain wall installation

Through the combined design of a single-rail lifting device, the problems of complex structure of the existing device and the inability to adjust the track distance are solved, and flexible construction, cost saving and rainproof and anti-smashing effects are achieved, and it is suitable for the connection of rail beams of different specifications.

CN223188830UActive Publication Date: 2025-08-05SHANGHAI BAOYE GRP CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422463259.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2025-08-05
Estimated Expiration
2034-10-12

AI Technical Summary

Technical Problem

The existing single-rail lifting device for curtain wall installation is complex in structure, the distance between the track and structural cannot be adjusted, the installation between the track beams cannot be horizontally adjusted, and it cannot be recycled. It is not suitable for connecting track beams of different specifications and lacks rain and smashing measures.

Method used

It adopts a combination design of structures including fixed blocks, bow shackles, fixed components, I-steel, single-rail double-piece components, chain electric hoist, etc., and is fixed by embedded parts and T-bolts. The distance of the track steel is adjusted through the single-rail double-piece components, and is equipped with a rain-proof and anti-smash shed, so that the structure is simple and flexible on-site materials are obtained, and it is suitable for rail steel connections of different specifications.

Benefits of technology

It realizes the simple production, convenient construction, accelerates construction speed, can be recycled, saves costs, and has the function of rain and smashing, suitable for rail steel connections of different specifications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223188830U_ABST
    Figure CN223188830U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of curtain wall installation, and discloses a monorail crane device for curtain wall installation, which comprises two fixing blocks and four bow shackles, the interiors of the two fixing blocks are fixedly connected with two fixing components for fixing other structures; wherein the outer side of one fixing assembly is slidably connected with two fixing plates, the outer side of the other fixing assembly is slidably connected with two pieces of angle steel, the top ends of the two fixing plates are fixedly connected with I-shaped steel, and the outer sides of the two pieces of I-shaped steel are slidably connected with two single-rail double-splicing assemblies. Connecting bolts are arranged in the two single-rail double-splicing assemblies. According to the utility model, through the cooperation of all structures, the manufacturing is simple, and local materials are used; construction is convenient, the construction speed is increased, and cyclic utilization and turnover can be achieved; the distance between the rail steel and the fixing block can be adjusted, the mounting level of the rail steel can be adjusted, the device is suitable for connection of rail steel of different specifications, and rain-proof and smashing-proof measures are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of curtain wall installation, in particular to a monorail hanging device for curtain wall installation. Background Art

[0002] A curtain wall installation monorail hoist is a mechanical device specifically designed for the installation of building curtain walls. It typically consists of a monorail, a hoisting device, and related supporting structures, and is primarily used for hoisting and installing curtain walls on building facades.

[0003] After searching, the existing Chinese patent publication number is: CN118529632A, which discloses a unitized curtain wall hoisting device, comprising a track, a combined chain electric hoist disposed on the track, a plurality of cantilever beams disposed above the track, a tensioning mechanism connected between the cantilever beams and the track, two fixing mechanisms disposed on the cantilever beams, a tensioning mechanism disposed on the cantilever beams, and a pulling mechanism disposed on the side of the tensioning mechanism away from the cantilever beams. The present invention is easy to assemble and construct, and is more convenient for workers to operate. It solves the problems of traditional curtain wall vertical transportation and installation, which are inconvenient, long construction period, and high labor and material consumption. It greatly reduces the workload of workers, speeds up on-site construction progress, and improves the safety of curtain wall vertical transportation and construction. The device is also reusable, reducing labor and material consumption and construction costs. However, the device in this patent has a complex structure, the distance between the track and the structure cannot be adjusted, the installation between the track beams cannot be adjusted horizontally, it cannot be recycled, it is not suitable for connecting track beams of different specifications, and it lacks rain and anti-smash measures. Therefore, a single-rail hanging device for curtain wall installation is proposed to solve the above problems. Utility Model Content

[0004] In order to make up for the above shortcomings, the utility model provides a monorail hanging device for curtain wall installation, which aims to improve the problems in the existing technology such as complex device structure, inability to adjust the distance between the track and the structure, inability to adjust the installation between the track beams horizontally, inability to recycle, unsuitable for connecting track beams of different specifications, and lack of rain and anti-smashing measures.

[0005] In order to achieve the above purpose, the present invention adopts the following technical solutions:

[0006] The lifting mechanism is a kind of in-built rotation of the lifting link, and the lifting link is equipped with a lifting mechanism, and the lifting mechanism is affixed to the lifting link, and the lifting mechanism is connected with the lifting link of the lifting link.

[0007] As a further description of the above technical solution:

[0008] Each of the fixing assemblies includes an embedded part and a T-bolt, wherein the outer side of the embedded part is fixedly connected to the interior of the fixing block, and the outer side of the T-bolt is threadedly connected to the interior of the embedded part;

[0009] As a further description of the above technical solution:

[0010] The bottom ends of the two angle steels are in contact with the top end of one of the fixing blocks, and the bottom ends of the two fixing plates are in contact with the top end of the other fixing block;

[0011] As a further description of the above technical solution:

[0012] The top of the monorail double assembly is internally threaded with two fastening screws, and the bottom ends of the fastening screws are in contact with the top of the I-beam;

[0013] As a further description of the above technical solution:

[0014] The top end of the rail steel contacts the bottom end of the I-beam, and the material of the rail steel is carbon steel;

[0015] As a further description of the above technical solution:

[0016] Two of the bow-shaped shackles are respectively installed inside the two angle steels, and the other two bow-shaped shackles are respectively installed inside the two ear plates.

[0017] The utility model has the following beneficial effects:

[0018] In the utility model, through the coordination of various structures, the monorail crane is easy to manufacture, locally made materials are available, and the manufacture is flexible and simple; the construction is convenient and the construction speed is accelerated; it can be recycled and the existing embedded parts of the curtain wall are utilized to save costs; the distance between the track steel and the fixed block can be adjusted, the installation level of the track steel can be adjusted, and it is suitable for connecting track steels of different specifications, and at the same time has rain and smash prevention measures. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a three-dimensional schematic diagram of a monorail hanging device for curtain wall installation proposed by the present invention;

[0020] Figure 2 This is a structural diagram of a rainproof and smash-proof shed for a monorail hanging device for curtain wall installation proposed by the present invention;

[0021] Figure 3 This is a structural diagram of a turnbuckle screw of a monorail hanging device for curtain wall installation proposed by the present invention;

[0022] Figure 4 for Figure 2 Enlarged view of point A in the middle;

[0023] Figure 5 for Figure 3 Enlarged view of point B in the middle.

[0024] Legend:

[0025] 1. Fixing block; 2. Embedded parts; 3. T-bolts; 4. Fixing plate; 5. I-beam; 6. Monorail double assembly; 7. Connecting bolts; 8. Track steel; 9. Electric chain hoist; 10. Rainproof and anti-smashing shed; 11. Ear plate; 12. Angle steel; 13. Wire rope; 14. Rope clamp; 15. Turnbuckle; 16. Bow shackle; 17. Fastening screw. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0027] Reference Figures 1 to 3The present invention provides an embodiment of a monorail hanging device for curtain wall installation, comprising two fixing blocks 1 and four bow-shaped shackles 16. The bow-shaped shackles 16 are designed to facilitate connection to other structures. Two fixing assemblies for fixing other structures are fixedly connected to the interior of each fixing block 1. Two fixing plates 4 are slidably connected to the exterior of one of the fixing assemblies. The fixing plates 4 are designed to facilitate the fixing of an I-beam 5. Two angle steels 12 are slidably connected to the exterior of the other fixing assembly. The angle steels 12 are designed to facilitate the connection of the two bow-shaped shackles 16.

[0028] like Figures 3 to 5 As shown, the tops of the two fixing plates 4 are fixedly connected to an I-beam 5, which is designed to be the main support structure of the monorail crane. The outer sides of the two I-beams 5 are slidably connected to two monorail double-joined components 6. The monorail double-joined components 6 are designed to cooperate with the connecting bolts 7 to fix the track steel 8. The two monorail double-joined components 6 are internally provided with connecting bolts 7, which are designed to facilitate the docking of the two monorail double-joined components 6.

[0029] The two monorail double-jointed assemblies 6 are internally slidably connected to rail steel 8, which is designed to facilitate the installation and sliding of a chain hoist 9. The outer side of the rail steel 8 is mounted with a chain hoist 9, which is designed to facilitate the lifting of the curtain wall. The tops of the two I-beams 5 are fixedly connected to a rainproof and smash-proof shed 10, which is designed to provide rain and smash-proof protection for the monorail crane.

[0030] The tops of the two I-beams 5 are fixedly connected with ear plates 11. The ear plates 11 are designed to facilitate the connection of two bow-shaped shackles 16. One end of the two bow-shaped shackles 16 is fixedly connected with a wire rope 13. The wire rope 13 is designed to cooperate with other structures to facilitate the lifting of the monorail crane. One end of the other two bow-shaped shackles 16 is installed with a basket screw 15. The basket screw 15 is designed to facilitate the connection of the wire rope 13. Two rope clips 14 are set on the outside of the two wire ropes 13. The rope clips 14 are designed to facilitate locking the wire rope 13 to prevent the wire rope 13 from falling off. Each fixing component includes an embedded part 2 and a T-bolt 3.

[0031] The outer side of the embedded part 2 is fixedly connected to the inside of the fixed block 1, and the outer side of the T-bolt 3 is threadedly connected to the inside of the embedded part 2. The embedded part 2 and the T-bolt 3 are designed to fix the angle steel 12 and the fixed plate 4 respectively by cooperating with each other. The bottom ends of the two angle steels 12 are in contact with the top of one of the fixed blocks 1. The angle steel 12 is designed to facilitate the connection of two bow-shaped shackles 16. The bottom ends of the two fixed plates 4 are in contact with the top of the other fixed block 1. The fixed plate 4 is designed to facilitate the fixing of the I-beam 5.

[0032] The top of the monorail double-jointed component 6 is internally threaded with two fastening screws 17, and the bottom end of the fastening screw 17 is in contact with the top of the I-beam 5. The fastening screw 17 is designed to make the monorail double-jointed component 6 more firmly connected to the I-beam 5. The top of the track steel 8 is in contact with the bottom end of the I-beam 5. The material of the track steel 8 is carbon steel. The design of the track steel 8 is to facilitate the installation and sliding of the chain electric hoist 9. Two of the bow-shaped shackles 16 are respectively installed inside the two angle steels 12, and the other two bow-shaped shackles 16 are respectively installed inside the two ear plates 11. The bow-shaped shackles 16 are designed to facilitate the connection to other structures.

[0033] Working principle: As an important component structure of the monorail crane, the surfaces of the I-beam 5 and the monorail double-jointed component 6 are deburred, rust-proofed, and treated with corrosion resistant treatment. The I-beam 5 is installed on the fixing block 1 at the bottom end through the cooperation of the lower T-bolt 3 and the embedded embedded part 2, while the upper T-bolt 3 and the embedded embedded part 2 are cooperated to fix the angle steel 12. The angle steel 12 is cooperated with the bow shackle 16, the wire rope 13 and the basket screw 15. By pulling the ear plate 11, the I-beam 5 is pulled, making the I-beam 5 more firmly fixed. After the wire rope 13 is connected to the basket screw 15 and the rope clamp 14 is firmly fixed, the upper end is connected to the upper layer of angle steel 12 with the bow shackle 16, and the lower end is connected to the ear plate 11 with the bow shackle 16. As the rail steel 8 for installing the chain electric hoist 9, it is itself stuck between the two monorail double-jointed components 6 and then fixed with the connecting bolts 7.

[0034] By loosening or tightening the fastening screws 17 on the monorail double assembly 6, the horizontal distance between the track steel 8 and the bottom fixed block 1 can be adjusted. As a rainproof and anti-smashing shed 10 for rainproof and anti-smashing, it can provide rainproof and anti-smashing functions for the monorail crane. Finally, after debugging and acceptance, the curtain wall can be hoisted and installed. Through the coordination of various structures, the monorail crane is simple to manufacture, uses local materials, and is flexible and simple to manufacture; construction is convenient and speeds up construction; it can be recycled and turned around, using the existing embedded parts of the curtain wall to save costs; the distance between the track steel 8 and the fixed block 1 can be adjusted, the installation level of the track steel 8 can be adjusted, and it is suitable for connecting track steel 8 of different specifications, while also having rainproof and anti-smashing measures.

[0035] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent replacements for some of the technical features therein. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A monorail hanging device for curtain wall installation, comprising two fixing blocks (1) and four bow-shaped shackles (16), characterized in that: The interiors of the two fixed blocks (1) are fixedly connected to two fixing components for fixing other structures, the outer sides of one of the fixing components are slidably connected to two fixing plates (4), the outer sides of the other fixing component are slidably connected to two angle steels (12), the tops of the two fixing plates (4) are fixedly connected to I-beams (5), the outer sides of the two I-beams (5) are slidably connected to two single-rail double-joined components (6), the interiors of the two single-rail double-joined components (6) are provided with connecting bolts (7), and the two single-rail double-joined components are slidably connected to the tops of the two fixing plates (4). The inside of the component (6) is slidably connected to a track steel (8), an electric chain hoist (9) is installed on the outside of the track steel (8), the top ends of the two I-beams (5) are fixedly connected to a rainproof and anti-smashing shed (10), the top ends of the two I-beams (5) are fixedly connected to an ear plate (11), one end of each of the two bow-shaped shackles (16) is fixedly connected to a steel wire rope (13), one end of each of the other two bow-shaped shackles (16) is installed with a basket screw (15), and two rope clamps (14) are provided on the outside of the two steel wire ropes (13).

2. The monorail hanging device for curtain wall installation according to claim 1, characterized in that: Each fixing assembly comprises an embedded part (2) and a T-bolt (3), wherein the outer side of the embedded part (2) is fixedly connected to the interior of the fixing block (1), and the outer side of the T-bolt (3) is threadedly connected to the interior of the embedded part (2).

3. The monorail hanging device for curtain wall installation according to claim 1, characterized in that: The bottom ends of the two angle steels (12) are in contact with the top end of one of the fixing blocks (1), and the bottom ends of the two fixing plates (4) are in contact with the top end of the other fixing block (1).

4. The monorail hanging device for curtain wall installation according to claim 1, characterized in that: The top end of the monorail double-joined assembly (6) is internally threadedly connected to two fastening screws (17), and the bottom ends of the fastening screws (17) are in contact with the top end of the I-beam (5).

5. The monorail hanging device for curtain wall installation according to claim 1, characterized in that: The top end of the rail steel (8) contacts the bottom end of the I-beam (5), and the material of the rail steel (8) is carbon steel.

6. The monorail hanging device for curtain wall installation according to claim 1, characterized in that: Two of the bow-shaped shackles (16) are respectively installed inside the two angle steels (12), and the other two bow-shaped shackles (16) are respectively installed inside the two ear plates (11).

Citation Information

Patent Citations

  • Unit type curtain wall hoisting device

    CN118529632A