Protective fence structure on building site

By introducing folding and moving components into the construction site guardrail structure, the problem of the guardrail occupying a large space and being inconvenient to store and transport is solved. The guardrail can be easily folded, unfolded and moved, which improves the flexibility and safety of the construction site.

CN223330354UActive Publication Date: 2025-09-12济南市章丘区能源和价格服务中心 +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422757110.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-13
Publication Date
2025-09-12
Estimated Expiration
2034-11-13

AI Technical Summary

Technical Problem

The existing construction site guardrail structure occupies a large space, is inconvenient to fold and unfold for use, is inconvenient to store and transport, and needs to be moved when the construction area is changed, resulting in inconvenience in movement and fixation.

Method used

It adopts the design of folding components and moving components. The fence body connected by the hinge shaft can realize rotation and folding, and is fixed by the threaded connection between the stud and the screw hole. The screw and roller in the moving component can realize the convenient expansion and movement of the fence body.

Benefits of technology

The fence can be folded and unfolded conveniently, which reduces the occupied space, facilitates storage and transportation, improves the rapid fixation and movement of the fence at different positions, and reduces the manual handling operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223330354U_ABST
    Figure CN223330354U_ABST
Patent Text Reader

Abstract

The utility model discloses a building site protective fence structure, which relates to the field of building construction, and comprises two upright posts, a folding component is arranged between the two upright posts, the folding component comprises two fence bodies, a hinged shaft is connected and arranged between the two fence bodies, two hanging cylinders are fixedly arranged on the outer sides of the two fence bodies, and the two hanging cylinders are fixedly arranged on the outer sides of the two fence bodies. Two fixing blocks are fixedly mounted on the rear portions, close to the inner sides, of the two fence bodies, guide rods are movably mounted in the two fixing blocks penetrating through the rear portion of one fence body, rotary knobs are fixedly mounted at the outer ends of the guide rods, studs are fixedly mounted at the inner ends of the guide rods, and the outer ends of the rotary knobs are fixedly connected with the rotary knobs. Screw holes are formed in the inner sides of the two fixing blocks on the rear portion of the other fence body, the two fence bodies are movably connected through a hinged shaft, and the two fence bodies are symmetrically arranged. The integral storage and transportation are facilitated, the occupied space is reduced, meanwhile, the integral movement and fixation are facilitated, and the carrying operation of personnel is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building construction, in particular to a construction site guardrail structure. Background Art

[0002] During construction, the construction site environment is complex. In order to prevent pedestrians and unauthorized personnel from entering by mistake and reduce accidents caused by chaos, it is necessary to use guardrails to isolate and maintain order on the construction site. This solution specifically involves a construction site guardrail structure.

[0003] When using the existing construction site guardrail structure, due to the large scope of the construction site, multiple guardrails need to be connected and installed for protection. The guardrails take up a large space, are inconvenient to fold and unfold for use, and are inconvenient to store and transport. When the construction area is changed, the guardrails need to be moved to the designated location, which is inconvenient to move and fix the entire structure. Utility Model Content

[0004] The main purpose of the utility model is to provide a construction site guardrail structure, which can effectively solve the technical problems in the background technology that "the fence takes up a large space, is inconvenient to fold and unfold for use, is inconvenient to store and transport, and when the construction area is changed, the fence needs to be moved to a designated location, which is inconvenient to move and fix the entire structure."

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A construction site guardrail structure comprises two upright posts, a folding assembly is installed between the two upright posts, the folding assembly comprises two fence bodies, a hinge shaft is connected and installed between the two fence bodies, two hanging tubes are fixedly installed on the outer sides of the two fence bodies, two fixed blocks are fixedly installed on the inner sides of the rear parts of the two fence bodies, a guide rod is movably installed inside the two fixed blocks passing through the rear of one of the fence bodies, a knob is fixedly installed on the outer end of the guide rod, a stud is fixedly installed on the inner end of the guide rod, and screw holes are provided on the inner sides of the two fixed blocks at the rear of the other fence body.

[0007] As a further solution of the present invention, the two fence bodies are movably connected via a hinge shaft, and the two fence bodies are symmetrically arranged.

[0008] As a further solution of the present invention, the two fixed blocks at the rear of the fence bodies correspond to each other, and the guide rod passes through the interior of the fixed block and is movably rotatable.

[0009] As a further solution of the present invention, the diameter of the stud is larger than the diameter of the guide rod, and the stud is threadedly connected to the screw hole.

[0010] As a further solution of the present invention, a moving component is installed inside the column, and the moving component includes a screw rod, which is installed through the interior of the column, a turntable is fixedly installed on the top of the screw rod, two hooks are fixedly installed on both sides of the column, and lifting grooves are provided on the inner walls on both sides of the bottom end of the column, and a lifting frame is movably installed on the bottom end of the screw rod and located between the two lifting grooves, and rollers are installed on both ends of the bottom of the lifting frame.

[0011] As a further solution of the present invention, the screw rod passes through the interior of the column and is arranged in a threaded connection, and the hook is located in the interior of the hanging tube and is arranged in a clamping connection.

[0012] As a further solution of the present invention, the bottom end of the screw is connected to the lifting frame via a bearing, and the lifting frame is located between the two lifting slots and is slidable up and down.

[0013] The beneficial effects of the utility model are as follows:

[0014] By setting up a folding assembly, the two fences are rotated by the connection of the hinge shaft, which facilitates the folding and unfolding of the fence, facilitates the overall storage and transportation, and reduces the occupied space. Through the threaded connection of the stud and the screw hole, the guide rod is located in the fixed block and rotates and slides, which facilitates the rapid fixation of the two fences after unfolding and improves the overall stability.

[0015] By setting up a moving component, the fence is hung and fixed with a hook and a hanging tube. The screw is lifted and lowered inside the column under the action of the thread, so that the lifting frame can rise and fall synchronously. The contact and separation of the roller with the ground can facilitate the movement and fixation of the fence as a whole, and reduce the handling operations of personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the overall structure of a construction site guardrail structure of the utility model;

[0017] Figure 2 This is a structural diagram of a folding component in a construction site guardrail structure of the utility model;

[0018] Figure 3 This is a schematic diagram of the rear structure of a folding assembly in a construction site guardrail structure of the present utility model;

[0019] Figure 4 This utility model is a kind of construction site guardrail structure Figure 3 A magnified view of point A;

[0020] Figure 5 The utility model is a structural schematic diagram of a movable component in a construction site guardrail structure.

[0021] In the figure: 1. Post; 2. Folding assembly; 3. Moving assembly; 4. Column; 5. Hinge; 6. Hanging tube; 7. Fixing block; 8. Guide rod; 9. Knob; 10. Stud; 11. Screw hole; 12. Screw; 13. Turntable; 14. Hook; 15. Lifting slot; 16. Lifting frame; 17. Roller. DETAILED DESCRIPTION

[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easier to understand, the present invention is further described below in conjunction with specific implementation methods.

[0023] like Figure 1-5 As shown, a construction site guardrail structure includes two columns 1, a folding component 2 is installed between the two columns 1, the folding component 2 includes two fence bodies 4, a hinge shaft 5 is connected and installed between the two fence bodies 4, two hanging tubes 6 are fixedly installed on the outer sides of the two fence bodies 4, two fixing blocks 7 are fixedly installed on the inner sides of the rear parts of the two fence bodies 4, a guide rod 8 is movably installed inside the two fixing blocks 7 passing through the rear of one of the fence bodies 4, a knob 9 is fixedly installed on the outer end of the guide rod 8, a stud 10 is fixedly installed on the inner end of the guide rod 8, and screw holes 11 are provided on the inner sides of the two fixing blocks 7 at the rear of the other fence body 4.

[0024] In this embodiment, the two fence bodies 4 are movably connected via a hinge shaft 5 , and the two fence bodies 4 are symmetrically arranged.

[0025] The two fence bodies 4 can rotate relative to each other through the connection of the hinge shaft 5, which facilitates the folding and unfolding of the two fence bodies 4 and facilitates the storage of the entire structure.

[0026] In this embodiment, the fixing blocks 7 at the rear of the two fence bodies 4 correspond to each other, and the guide rod 8 passes through the interior of the fixing block 7 and is movably rotatable.

[0027] When the two fence bodies 4 are unfolded and parallel to each other, they are connected by rotating the knob 9, and the guide rod 8 is located inside the fixed block 7 and slides to extend and retract.

[0028] In this embodiment, the diameter of the stud 10 is greater than the diameter of the guide rod 8 , and the stud 10 and the screw hole 11 are threadedly connected.

[0029] The stud 10 is connected in the screw hole 11 by a thread, so that the two fence bodies 4 are fixed after being unfolded to prevent shaking and bending.

[0030] In this embodiment, a moving component 3 is installed inside the column 1. The moving component 3 includes a screw 12. The screw 12 is installed through the interior of the column 1. A turntable 13 is fixedly installed on the top of the screw 12. Two hooks 14 are fixedly installed on both sides of the column 1. Lifting grooves 15 are provided on the inner walls on both sides of the bottom end of the column 1. A lifting frame 16 is movably installed at the bottom end of the screw 12 and located between the two lifting grooves 15. Rollers 17 are installed on both ends of the bottom of the lifting frame 16.

[0031] By rotating the turntable 13, the screw rod 12 drives the lifting frame 16 to move up and down under the action of the thread, thereby making the roller 17 contact or disengage with the ground, thereby performing overall movement and fixation.

[0032] In this embodiment, the screw rod 12 passes through the interior of the column 1 and is threadedly connected, and the hook 14 is located inside the hanging tube 6 and is clamped.

[0033] Under the action of the screw thread of the screw 12 , the screw 12 is moved up and down inside the column 1 , and the lifting frame 16 is positioned between the two lifting slots 15 to guide and lift the screw 12 , so as to facilitate the height adjustment of the roller 17 .

[0034] In this embodiment, the bottom end of the screw rod 12 is connected to the lifting frame 16 via a bearing. The lifting frame 16 is located between the two lifting slots 15 and is slidable up and down.

[0035] When the screw 12 rotates and drives the lifting frame 16 to rise and fall, the lifting frame 16 is prevented from rotating with the screw 12 through the connection of the bearing, and the roller 17 follows the rise and fall and contacts or separates from the ground, which facilitates the overall movement and fixation.

[0036] It should be noted that the present invention is a construction site guardrail structure. When in use, the two columns 1 are fixed at the designated position at the construction site. When installing the fence body 4, the two fence bodies 4 are unfolded through the connection of the hinge shaft 5, and the two knobs 9 are rotated respectively to connect the studs 10 with the screw holes 11, thereby fixing the two fence bodies 4 to each other. The hanging tubes 6 on the outside of the two fence bodies 4 are then hung on the hooks 14 of the corresponding columns 1, and protection is provided by the fence body 4. When moving the position, the two turntables 13 are rotated respectively to rotate the screw rod 12 and move downward under the action of the thread. The lifting frame 16 is connected to the screw rod 12 through the bearing and is located between the two lifting slots 15 and follows the synchronous decline, so that the two rollers 17 are in contact with the ground, and the overall movement is performed by the rotation of the rollers 17.

[0037] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are merely illustrative of the principles of the present invention. Various changes and improvements may be made to the present invention without departing from the spirit and scope of the present invention. Such changes and improvements are intended to fall within the scope of the present invention. The scope of protection claimed in this invention is defined by the appended claims and their equivalents.

Claims

1. A construction site guardrail structure, comprising two upright posts (1), with a folding assembly (2) installed between the two upright posts (1), characterized in that: The folding assembly (2) comprises two fence bodies (4), a hinge shaft (5) is connected and installed between the two fence bodies (4), two hanging tubes (6) are fixedly installed on the outer sides of the two fence bodies (4), two fixed blocks (7) are fixedly installed on the inner sides of the rear parts of the two fence bodies (4), a guide rod (8) is movably installed inside the two fixed blocks (7) passing through the rear part of one of the fence bodies (4), a knob (9) is fixedly installed on the outer end of the guide rod (8), a stud (10) is fixedly installed on the inner end of the guide rod (8), and screw holes (11) are opened on the inner sides of the two fixed blocks (7) at the rear part of the other fence body (4).

2. A construction site guardrail structure according to claim 1, characterized in that: The two fence bodies (4) are movably connected via a hinge shaft (5), and the two fence bodies (4) are symmetrically arranged.

3. The construction site guardrail structure according to claim 1, characterized in that: The fixed blocks (7) at the rear of the two fence bodies (4) correspond to each other, and the guide rod (8) penetrates the interior of the fixed block (7) and is movably rotatable.

4. The construction site guardrail structure according to claim 1, characterized in that: The diameter of the stud (10) is larger than the diameter of the guide rod (8), and the stud (10) and the screw hole (11) are threadedly connected.

5. The construction site guardrail structure according to claim 1, characterized in that: A moving assembly (3) is installed inside the column (1), and the moving assembly (3) includes a screw (12). The screw (12) is installed through the inside of the column (1), and a turntable (13) is fixedly installed on the top of the screw (12). Two hooks (14) are fixedly installed on both sides of the column (1). Lifting grooves (15) are opened on the inner walls on both sides of the bottom end of the column (1). A lifting frame (16) is movably installed at the bottom end of the screw (12) and located between the two lifting grooves (15). Rollers (17) are installed on the bottom of the lifting frame (16) at both ends.

6. The construction site guardrail structure according to claim 5, characterized in that: The screw rod (12) passes through the interior of the column (1) and is arranged in a threaded connection, and the hook (14) is located inside the hanging tube (6) and is arranged in a clamping connection.

7. The construction site guardrail structure according to claim 5, characterized in that: The bottom end of the screw rod (12) is connected to the lifting frame (16) via a bearing, and the lifting frame (16) is located between the two lifting slots (15) and is arranged to slide up and down.