Scaffold rear-mounted water-stopping wall-connecting piece and scaffold rear-mounted water-stopping wall-connecting structure

The combination of extended expansion waterstop bolts and water-expanding waterstop rubber parts solved the construction delay and water leakage problems caused by chemical bolts waiting for grouting to solidify, and achieved fast and safe scaffolding connection and water-stopping effects.

CN223343663UActive Publication Date: 2025-09-16SHANGHAI CONSTR NO 5 GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422509167.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2025-09-16
Estimated Expiration
2034-10-16

AI Technical Summary

Technical Problem

In construction, chemical bolts as post-installed wall connections require waiting for the grouting to solidify, which slows down the scaffolding erection process. In addition, pre-buried chemical bolts pose a safety hazard of water leakage after being inserted into holes in existing buildings.

Method used

An extended expansion waterstop bolt is placed horizontally into the hole in the wall of an existing building, and the extended screw is tightly combined with the expansion tube by rotating the nut. The water-expanding waterstop rubber part of the extended screw is pressed against the wall surface and connected to the wall steel pipe to achieve installation and avoid water leakage.

Benefits of technology

There is no need to wait for the chemical bolt grouting period, which improves the efficiency of scaffolding installation, ensures safe and stable connection, prevents rainwater leakage, shortens the erection period, and reduces safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223343663U_ABST
    Figure CN223343663U_ABST
Patent Text Reader

Abstract

The utility model discloses a scaffold rear-mounted type water-stopping wall-connecting piece and a scaffold rear-mounted type water-stopping wall-connecting structure, the water-stopping wall-connecting piece comprises a lengthened expansion water-stopping bolt which is horizontally arranged in a hole of an existing building wall body, the lengthened expansion water-stopping bolt comprises an expansion pipe located in the hole and a lengthened screw rod, and the two ends of the lengthened screw rod extend out of the expansion pipe. The end of the lengthened screw located in the existing building wall adheres to or wraps a water swelling water stopping rubber part, the water swelling water stopping rubber part abuts against the wall face in a hole of the existing building wall, and a nut is arranged on the lengthened screw located outside the existing building wall. The nut abuts against the end face of the existing building wall, and the portion, located outside the existing building wall, of the lengthened screw is connected with a wall connecting steel pipe parallel to the lower portion of the lengthened screw through a wall connecting fastener. According to the utility model, the erection efficiency of the scaffold can be improved, the erection period of the scaffold connecting wall is shortened, and leakage at the connecting wall is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a scaffolding rear-mounted water-stop wall connecting piece and a scaffolding rear-mounted water-stop wall connecting structure. Background Art

[0002] During construction, scaffolding is erected to construct or maintain the main structure of a building. Scaffolding wall connections are typically pre-buried steel pipes or pre-buried bolts. However, for scaffolding in older housing renovation projects or projects that require secondary scaffolding, wall connections cannot be effectively installed by pre-buried means and must be installed post-installed. Post-installed wall connections are commonly installed by inserting chemical bolts to secure the base plate to which the pre-buried steel pipes are attached. However, chemical bolts must be left to cure for 24 to 48 hours after grouting. If construction or loading is applied immediately after grouting, the connection becomes unstable, ultimately leading to loosening and cracking. This can hinder the progress of scaffolding installation, increase the risk of scaffolding construction operations, and create safety hazards. Furthermore, pre-buried chemical bolts in newly drilled holes in existing buildings may create a safety hazard of water leakage. Utility Model Content

[0003] The purpose of the utility model is to provide a scaffolding post-installed water-stop wall connection member and a scaffolding post-installed water-stop wall connection structure, so as to solve the problem that chemical bolts as post-installed wall connection members need to wait for the grouting curing time, resulting in a slow scaffolding erection period, and the pre-buried chemical bolts have a safety hazard of water leakage at the wall connection position after being implanted into the openings of existing buildings.

[0004] In order to solve the above technical problems, the utility model provides a scaffolding post-mounted water-stop wall connection component, including an extended expansion water-stop bolt horizontally inserted into the hole of the existing building wall, partially located inside the existing building wall and partially located outside the existing building wall, the extended expansion water-stop bolt includes an expansion tube located in the hole of the existing building wall, and an extended screw rod with both ends extending out of the expansion tube, one end of the extended screw rod is located in the hole of the existing building wall, and the other end extends outside the existing building wall, the end of the extended screw rod located in the existing building wall is bonded or wrapped with a water-swelling water-stop rubber component, the water-swelling water-stop rubber component rests on the wall surface in the hole of the existing building wall, a nut is provided on the extended screw rod located outside the existing building wall, the nut rests on the end surface of the existing building wall, and the extended screw rod located outside the existing building wall is connected to a wall connecting steel pipe parallel to the bottom of the extended screw rod through a wall connecting fastener.

[0005] Furthermore, the utility model provides a scaffolding rear-mounted water-stopping wall connection member, wherein the wall connection steel pipe is against the end surface of the wall of the existing building.

[0006] Furthermore, in the scaffolding rear-mounted water-stop wall connection provided by the present invention, the extended expansion water-stop bolt also includes a gasket sleeved on the extended screw rod, and the nut is lowered on the end face of the existing building wall through the gasket.

[0007] Furthermore, the utility model provides a scaffolding rear-mounted water-stop wall connection member, wherein the gasket includes a spring gasket and a plane gasket, the spring gasket is located on one side of the nut, and the plane gasket is located on one side of the existing building wall.

[0008] Furthermore, in the scaffolding rear-mounted water-stopping wall connection member provided by the present invention, the water-swelling water-stopping rubber member is a sheet-shaped body or a cylindrical body.

[0009] Furthermore, in the scaffolding rear-mounted water-stop wall connection provided by the present invention, one end of the lengthened screw rod located outside the wall of the existing building is a hexagonal bolt head, and the bolt head and the wall connection fastener are clamped together.

[0010] Furthermore, in the scaffolding rear-mounted water-stop wall connection member provided by the present invention, the length of the extended screw is 300-350 mm.

[0011] Furthermore, in the scaffolding rear-mounted water-stop wall connection member provided by the present invention, the nut is a hexagonal nut.

[0012] In order to solve the above technical problems, the utility model also provides a scaffolding rear-mounted water-stop wall connection structure, including the above-mentioned scaffolding rear-mounted water-stop wall connection parts, and the wall connection steel pipes of the scaffolding rear-mounted water-stop wall connection parts are connected to the vertical poles of the scaffolding through right-angle fasteners.

[0013] Furthermore, in the scaffolding rear-mounted water-stop wall connection structure provided by the present invention, the vertical pole is a steel pipe with the same diameter as the wall connection steel pipe.

[0014] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0015] The utility model provides a scaffolding rear-mounted water-stop wall connection member and a scaffolding rear-mounted water-stop wall connection structure. The extended expansion water-stop bolt is horizontally placed in the hole of the existing building wall, and the extended screw rod is tightly combined with the expansion tube by rotating the nut, and the expansion tube and the rod body of the extended screw rod located in the hole of the existing building wall are expanded and tightened in the hole of the existing building wall, so that the extended expansion water-stop bolt is firmly installed on the existing building wall, without waiting for the grouting period of the chemical bolt. By connecting the wall steel pipe with the extended screw outside the existing building wall through the wall fastener, the installation of the scaffolding post-type water-stop wall tie on the existing building wall can be completed, thereby improving the installation period of the post-type water-stop wall tie. Then, it can be connected to the vertical pole of the scaffolding through a direct fastener to effectively connect the scaffolding to the existing building wall through the post-type water-stop wall tie. While ensuring the safety and stability of the scaffolding, the erection efficiency of the scaffolding is improved and the erection period of the scaffolding wall is shortened.

[0016] The utility model provides a scaffolding rear-mounted water-stop wall connection member and a scaffolding rear-mounted water-stop wall connection structure. The extended expansion water-stop bolt is located in the wall of the existing building. The end of the extended screw is bonded or wrapped with a water-swelling water-stop rubber member that is pressed against the wall surface inside the hole in the wall of the existing building, thereby achieving water stopping at the hole in the wall of the existing building, preventing rainwater from seeping into the interior of the wall of the existing building from the hole in the wall of the existing building, and overcoming the safety hazard of water leakage at the wall connection caused by installing chemical bolts in the hole formed in the wall of the existing building. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural diagram of a scaffolding rear-mounted water-stop wall connection member and a scaffolding rear-mounted water-stop wall connection structure;

[0018] As shown in the figure:

[0019] 1. Wall, 2. Water-swelling rubber waterstop, 3. Extension screw, 4. Expansion tube, 5. Flat gasket, 6. Spring gasket, 7. Nut, 8. Wall fastener, 9. Wall steel pipe, 10. Right-angle fastener, 11. Vertical pole, 12. Opening. DETAILED DESCRIPTION

[0020] The present invention is described in detail below with reference to the accompanying drawings. The advantages and features of the present invention will become more apparent from the following description. It should be noted that the accompanying drawings are all simplified and not accurately scaled, and are only used to facilitate and clearly illustrate the embodiments of the present invention.

[0021] Please refer to Figure 1The embodiment of the present invention provides a scaffolding rear-mounted water-stop wall connection member, comprising an extended expansion water-stop bolt horizontally inserted into an opening 12 of an existing building wall 1, partially located inside the existing building wall 1 and partially located outside the existing building wall 1, the extended expansion water-stop bolt comprising an expansion tube 4 located in the opening 12 of the existing building wall 1, an extended screw rod 3 with both ends extending from the expansion tube 4, one end of the extended screw rod 3 being located in the opening 12 of the existing building wall 1 and the other end extending from the existing building wall The end of the extended screw rod 3 located inside the wall 1 of the existing building is bonded or wrapped with a water-swelling water-stopping rubber part 2, and the water-swelling water-stopping rubber part 2 is pressed against the wall surface inside the opening 12 of the wall 1 of the existing building. The extended screw rod 3 located outside the wall 1 of the existing building is provided with a nut 7, and the nut 7 is pressed against the end surface of the wall 1 of the existing building. The extended screw rod 3 located outside the wall 1 of the existing building is connected to a wall connecting steel pipe 9 parallel to the bottom of the extended screw rod 3 through a wall connecting fastener 8.

[0022] Please refer to Figure 1 The present invention further provides a scaffolding rear-mounted water-stop wall tie structure, comprising the aforementioned scaffolding rear-mounted water-stop wall tie, wherein the wall tie steel pipe 9 of the scaffolding rear-mounted water-stop wall tie is connected to the scaffolding upright 11 via a right-angle fastener 10. To facilitate connection, the upright 11 is a steel pipe having the same diameter as the wall tie steel pipe 9.

[0023] The scaffolding rear-mounted water-stop wall connection member and the scaffolding rear-mounted water-stop wall connection structure provided by the embodiment of the present invention are arranged horizontally into the hole 12 of the existing building wall 1 by extending the expansion water-stop bolt, and the extension screw rod 3 is tightly combined with the expansion tube 4 by rotating the nut 7, and the expansion tube 4 and the rod body of the extension screw rod 3 located in the hole 12 of the existing building wall 1 are expanded and tightened in the hole 12 of the existing building wall 1, so that the extension expansion water-stop bolt is firmly installed on the existing building wall 1, without waiting for the grouting work of the chemical bolt. During the period, the extended screw rod 3 located outside the wall 1 of the existing building is used to connect the wall connecting steel pipe 9 through the wall connecting fastener 8 to complete the installation of the scaffolding post-type water-stop wall connecting parts on the existing building wall 1, thereby improving the installation period of the post-type water-stop wall connecting parts. Then, a connection can be formed with the vertical pole 11 of the scaffolding through a direct fastener to effectively connect the scaffolding to the existing building wall 1 through the post-type water-stop wall connecting parts. While ensuring the safety and stability of the scaffolding, the erection efficiency of the scaffolding is improved and the erection period of the scaffolding wall is shortened.

[0024] The embodiment of the utility model provides a scaffolding post-mounted water-stop wall connection member and a scaffolding post-mounted water-stop wall connection structure. The water-swelling water-stop rubber member 2 bonded or wrapped to the end of the extended screw 3 located in the wall 1 of the existing building is pressed against the wall surface inside the hole 12 of the wall 1 of the existing building, thereby achieving water stopping at the hole 12 of the wall 1 of the existing building, preventing rainwater from seeping into the interior of the wall 1 of the existing building from the hole 12 of the wall 1 of the existing building, and overcoming the safety hazard of water leakage at the wall connection caused by installing chemical bolts in the hole 12 formed in the wall 1 of the existing building. The water-swelling water-stop rubber member 2 can be a sheet that matches the shape of the end of the extended screw 3, or it can be a cylindrical body that is sleeved on the end of the extended screw 3. When the water-swelling water-stop rubber member 2 is a cylindrical body, it can press against the hole 12 at the axial end and the radial end to improve the water-stopping effect.

[0025] Please refer to Figure 1 In order to improve the reliability of the connection of the wall-connecting steel pipe 9 and prevent it from loosening with the wall-connecting fastener 8, the embodiment of the present invention provides a scaffolding post-mounted water-stopping wall-connecting member and a scaffolding post-mounted water-stopping wall-connecting structure, wherein the wall-connecting steel pipe 9 is pressed against the end face of the existing building wall 1; one end of the extended screw 3 located outside the existing building wall 1 is a bolt head with a hexagonal shape, etc., and the bolt head and the wall-connecting fastener 8 are clamped together. Then, when one end of the wall-connecting steel pipe 9 is pressed against the existing building wall 1, it is constrained, and the wall-connecting steel pipe 9 is firmly connected to the extended screw 3 at the wall-connecting fastener 8 through the mutual clamping relationship between the bolt head of the extended screw 3 and the wall-connecting fastener 8, thereby preventing the wall-connecting steel pipe 9 from loosening at the node of the wall-connecting fastener 8 and improving the reliability of the connection of the wall-connecting steel pipe 9.

[0026] Please refer to Figure 1 To securely install the extended expansion waterstop bolt within the opening 12 of the existing building wall 1, the scaffolding post-mounted waterstop wall connection and structure provided by the present invention include a washer sleeved over the extended screw 3, through which the nut 7 rests on the end face of the existing building wall 1. To eliminate gaps and enhance the locking force between the extended screw 3 and the expansion tube 4, the washer includes a spring washer 6 and a flat washer 5. The spring washer 6 is positioned on one side of the nut 7, while the flat washer 5 is positioned on the other side of the existing building wall 1.

[0027] To ensure a reliable connection between the extended screw rod 3 and the wall-connecting steel pipe 9, the embodiment of the present invention provides a scaffolding rear-mounted water-stopping wall connection member and a scaffolding rear-mounted water-stopping wall connection structure. The length of the extended screw rod 3 includes, but is not limited to, 300-350 mm. That is, the rod portion of the extended screw rod 3 extending outside the existing building wall 1 is connected to the wall-connecting steel pipe 9 via the wall fastener 8.

[0028] In order to facilitate the rotation of the extended screw 3 to form a reliable connection with the expansion tube 4, the scaffolding rear-mounted water-stopping wall connection member and the scaffolding rear-mounted water-stopping wall connection structure provided by the embodiment of the present invention, the nut 7 can be a hexagonal nut 7.

[0029] The scaffolding rear-mounted water-stopping wall-connecting member and the scaffolding rear-mounted water-stopping wall-connecting structure provided by the embodiment of the present invention are particularly suitable for the scaffolding wall-connecting construction of the exterior wall finishing layer of the old community renovation project.

[0030] The present invention is not limited to the above-mentioned specific embodiments. Obviously, the above-described embodiments are only some embodiments of the present invention, not all embodiments. Based on the described embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field fall within the scope of protection of the present invention. Those skilled in the art can make other levels of modifications and changes to the present invention. In this way, if these modifications and changes of the present invention fall within the scope of the claims of the present invention, the present invention is also intended to include these changes and changes.

Claims

1. A scaffolding rear-mounted water-stop wall connection, characterized in that: It includes an extended expansion water-stop bolt which is horizontally inserted into a hole in the wall of an existing building, partially located inside the wall of the existing building and partially located outside the wall of the existing building. The extended expansion water-stop bolt includes an expansion tube located in the hole in the wall of the existing building, and an extended screw rod with both ends extending out of the expansion tube. One end of the extended screw rod is located in the hole in the wall of the existing building, and the other end extends out of the wall of the existing building. The end of the extended screw rod located in the wall of the existing building is bonded or wrapped with a water-swellable water-stop rubber part, and the water-swellable water-stop rubber part rests on the wall surface in the hole in the wall of the existing building. A nut is provided on the extended screw rod located outside the wall of the existing building, and the nut rests on the end surface of the wall of the existing building. The extended screw rod located outside the wall of the existing building is connected to a wall-connecting steel pipe parallel to the bottom of the extended screw rod through a wall-connecting fastener.

2. The scaffolding rear-mounted water-stop wall connection according to claim 1, characterized in that: The wall-connecting steel pipe is against the end surface of the wall of the existing building.

3. The scaffolding rear-mounted water-stop wall connection according to claim 1, characterized in that: The lengthened expansion water-stop bolt further comprises a washer sleeved on the lengthened screw rod, and the nut is lowered on the end surface of the existing building wall through the washer.

4. The scaffolding rear-mounted water-stop wall connection according to claim 3, characterized in that: The gasket includes a spring gasket and a plane gasket. The spring gasket is located on one side of the nut, and the plane gasket is located on one side of the wall of the existing building.

5. The scaffolding rear-mounted water-stop wall connection according to claim 1, characterized in that: The water-swelling water-stopping rubber member is a sheet-shaped body or a cylindrical body.

6. The scaffolding rear-mounted water-stop wall connection according to claim 1, characterized in that: One end of the lengthened screw rod located outside the wall of the existing building is a hexagonal bolt head, and the bolt head and the wall fastener are clamped together.

7. The scaffolding rear-mounted water-stop wall connection according to claim 1, characterized in that: The length of the extended screw is 300-350 mm.

8. The scaffolding rear-mounted water-stop wall connection according to claim 1, characterized in that: The nut is a hexagonal nut.

9. A scaffolding rear-mounted water-stop wall structure, characterized in that: It comprises the post-mounted water-stop wall connection piece for scaffolding according to any one of claims 1 to 8, wherein the wall connection steel pipe of the post-mounted water-stop wall connection piece for scaffolding is connected to the vertical pole of the scaffolding through a right-angle fastener.

10. The scaffolding rear-mounted water-stop wall structure according to claim 9, characterized in that: The vertical pole is a steel pipe with the same diameter as the wall connecting steel pipe.