Garbage bin roof daylighting skylight mounting structure
By installing a combination structure of steel beams, roof frame, cement mortar layer and waterproof components in the skylight of the garbage bin roof, the problems of garbage odor leakage and rainwater and snowmelt ingress are solved, achieving sealing and heat preservation effects, preventing environmental pollution and heat loss.
Patent Information
- Application Number
- CN202423099513.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-16
- Publication Date
- 2025-11-25
- Estimated Expiration
- 2034-12-16
AI Technical Summary
The existing skylights on the roofs of garbage storage facilities cannot effectively prevent the leakage of garbage odors when closed, leading to environmental pollution. Furthermore, external water may enter the storage facility during rainy or snowy weather.
The structure adopts a combination of steel beams, roof frame, cement mortar layer, waterproof components and insulation board. The skylight body is installed in a sealed manner, and the cement mortar layer, waterproof components and insulation board work together to achieve a sealing and insulation effect, preventing odor leakage and water ingress.
It effectively seals the skylights to prevent the odor from escaping, while maintaining the fermentation temperature inside the waste bin and preventing external water from entering the bin during rain or snow.
Smart Images

Figure CN223593680U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the field of waste warehouse assembly, in particular to a waste warehouse roof daylighting skylight mounting structure. BACKGROUND
[0002] With the progress of society, more and more garbage is produced. In order to reasonably dispose of various types of garbage and prepare for the next step of processing, it is usually necessary to establish a waste warehouse to store garbage. The waste warehouse in the related art has a warehouse body and a ceiling, and the ceiling is supported above the warehouse body by columns, and the warehouse body is used to store garbage.
[0003] The top of the waste warehouse is generally reserved for the installation of light glass to absorb sunlight and ferment the garbage inside the waste warehouse, thereby saving energy. Therefore, when installing the roof daylighting skylight, the daylighting skylight needs to be closed to prevent the garbage odor inside the waste warehouse from leaking out and polluting the external environment. SUMMARY
[0004] In order to overcome the existing deficiencies, the present application provides a waste warehouse roof daylighting skylight mounting structure, which can solve the problem of closing the daylighting skylight to prevent the garbage odor inside the waste warehouse from leaking out and polluting the external environment.
[0005] The technical solution adopted by the application to solve the technical problem is: a waste warehouse roof daylighting skylight mounting structure, comprising a steel beam.
[0006] A roof frame is stacked on the steel beam, a daylighting skylight body is installed on the roof frame, and a gap between the daylighting skylight body and the roof frame is sequentially filled with a cement mortar layer, a waterproof element and an insulation board.
[0007] In a specific embodiment, the waterproof element includes a first waterproof roll material, a second waterproof roll material and a third waterproof roll material, and the first waterproof roll material, the third waterproof roll material and the second waterproof roll material are sequentially filled between the insulation board and the cement mortar layer.
[0008] In a specific embodiment, the outer side of the cement mortar layer is further pressed with a glass fiber layer.
[0009] In a specific embodiment, the roof frame and the bottom of the daylighting skylight body are filled with a fine stone concrete layer.
[0010] In a specific embodiment, the insulation board and the roof frame are sealed by filling sealant therebetween.
[0011] In a specific embodiment, the cement mortar layer is mixed with cement mortar.
[0012] In a specific embodiment, the insulation board is a B1 grade polystyrene insulation material.
[0013] In a specific embodiment, the strength of the fine stone concrete layer is C20.
[0014] The advantages of the embodiments of the present application are:
[0015] Through the cooperation of the cement mortar layer, the waterproof member and the insulation board, the sealing installation of the light skylight body can be realized, and the effects of heat preservation and waterproofing are achieved. In the case that the odor leakage of the interior of the garbage bin can be prevented from polluting the environment, the fermentation temperature in the interior of the garbage bin can also be prevented from being dissipated, and at the same time, the water outside can be prevented from entering the interior of the garbage bin through the gap in rainy and snowy weather. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1 A schematic diagram of a garbage bin roof light skylight installation structure is provided for the embodiments of the present application;
[0017] Figure 2 A schematic diagram of an enlarged structure at A in the above figure is provided for the embodiments of the present application; Figure 1
[0018] In the figure: 1-steel beam; 2-roof frame; 3-waterproof member; 31-first waterproof roll material; 32-second waterproof roll material; 33-third waterproof roll material; 4-cement mortar layer; 5-insulation board; 6-filling body; 7-light skylight body; 8-fine stone concrete layer. DETAILED DESCRIPTION
[0019] The technical solution in the embodiments of the present application is to solve the problem of preventing the odor of the garbage in the interior of the garbage bin from leaking out and polluting the environment, and the general idea is as follows:
[0020] Please refer to Figure 1 and Figure 2 A garbage bin roof light skylight installation structure, comprising a steel beam 1.
[0021] Please refer to Figure 1 and Figure 2 The roof frame 2 is stacked on the steel beam 1, the light skylight body 7 is installed on the roof frame 2, and the gaps between the light skylight body 7 and the roof frame 2 are filled with the cement mortar layer 4, the waterproof piece 3 and the heat preservation plate 5 in sequence. The corners of the roof frame 2 are filled with the filling body 6, so that the corners of the roof frame 2 are padded flat, and the subsequent installation of the light skylight body 7 is facilitated. When the light skylight body 7 is installed, the light skylight body 7 is first installed on the roof frame 2, then the waterproof piece 3 and the heat preservation plate 5 are placed and compacted in the gap between the roof frame 2 and the light skylight body 7, and then the cement mortar layer 4 is filled into the internal gap, so that the sealing installation of the light skylight body 7 is realized. Through the cooperation of the cement mortar layer 4, the waterproof piece 3 and the heat preservation plate 5, the sealing installation of the light skylight body 7 can be realized, and the heat preservation and waterproof effects are achieved. In the case that the odor leakage of the inside of the garbage bin can prevent the environment from being polluted, the fermentation temperature inside the garbage bin can not be dispersed, and at the same time, the water outside in rainy and snowy weather can be prevented from entering the inside of the garbage bin through the gap.
[0022] The waterproof piece 3 includes a first waterproof roll material 31, a second waterproof roll material 32 and a third waterproof roll material 33, and the first waterproof roll material 31, the third waterproof roll material 33 and the second waterproof roll material 32 are filled between the heat preservation plate 5 and the cement mortar layer 4 in sequence. Through the cooperation of the first waterproof roll material 31, the second waterproof roll material 32 and the third waterproof roll material 33, the outside rainwater can be prevented from entering the inside of the garbage bin. The first waterproof roll material 31, the third waterproof roll material 33 and the second waterproof roll material 32 have water resistance, that is, the performance is basically unchanged after being affected by water and soaked by water, and have water resistance under the action of pressure water, which is usually indicated by water resistance, water absorption and other indicators. Temperature stability refers to the performance of not flowing, not foaming and not sliding at high temperature, and not brittle cracking at low temperature, that is, the ability to maintain the original performance under certain temperature changes. Therefore, the garbage bin can be effectively waterproofed.
[0023] The outer side of the cement mortar layer 4 is further combined with a glass fiber layer. The glass fiber layer is a polypropylene glass fiber plate, which is combined with the outer side of the cement mortar layer 4, so as to increase the rigidity of the plate and facilitate the adhesion with the structural layer wall.
[0024] The roof frame 2 and the bottom of the light skylight body 7 are filled with a fine stone concrete layer 8. The strength of the fine stone concrete layer 8 is C20.
[0025] The heat preservation plate 5 and the roof frame 2 are sealed by filling sealing glue.
[0026] The cement mortar layer 4 is mixed by 1:3 cement mortar. The 1:3 cement mortar is mixed by 1 weight of cement and 3 weight of sand, and the water is actually ignored, and the ratio is about 0.65, that is, it should be called 1:3:0.65. The density of the cement mortar is 2000 Kg / m3
[0027] The insulation board 5 is a B1 grade polyphenyl insulation material.
[0028] In use of the application, the following steps are taken:
[0029] In the installation of the light skylight body 7, the light skylight body 7 is first installed on the roof frame 2, and then the waterproof member 3 and the insulation board 5 are placed and compacted in the gap between the roof frame 2 and the light skylight body 7, and then the cement mortar layer 4 is filled into the internal gap to realize the sealing installation of the light skylight body 7. Through the cooperation of the cement mortar layer 4, the waterproof member 3 and the insulation board 5, the sealing installation of the light skylight body 7 can be realized, and the effect of heat preservation and waterproofing can be achieved. In the case of preventing the odor inside the garbage bin from leaking out to pollute the environment, the fermentation temperature inside the garbage bin will not be dispersed, and at the same time, the water outside can be prevented from entering the garbage bin through the gap in rainy and snowy weather.
[0030] In summary, through the cooperation of the cement mortar layer 4, the waterproof member 3 and the insulation board 5, the sealing installation of the light skylight body 7 can be realized, and the effect of heat preservation and waterproofing can be achieved. In the case of preventing the odor inside the garbage bin from leaking out to pollute the environment, the fermentation temperature inside the garbage bin will not be dispersed, and at the same time, the water outside can be prevented from entering the garbage bin through the gap in rainy and snowy weather.
[0031] Finally, it should be noted that: obviously, the above embodiments are only examples for clearly illustrating the application, and are not limitations of the embodiments. For ordinary skilled persons in the art, other different forms of changes or variations can be made on the basis of the above description. Here, it is not necessary and impossible to exhaust all the embodiments. The obvious changes or variations derived therefrom are still within the protection scope of the application.
Claims
1. A skylight installation structure for a garbage bin roof, characterized in that, The utility model relates to a kind of steel roof frame and light roof, including Steel beam (1), the roof frame (2) is piled on the steel beam (1), the light roof body (7) is installed on the roof frame (2), and the gap between the light roof body (7) and the roof frame (2) is filled with cement mortar layer (4), waterproof part (3) and insulation board (5) in turn.
2. The installation structure of the trash warehouse roof daylighting skylight according to claim 1, wherein, The waterproof part (3) includes first waterproof roll material (31), second waterproof roll material (32) and third waterproof roll material (33), and the first waterproof roll material (31), the third waterproof roll material (33) and the second waterproof roll material (32) are filled between the insulation board (5) and the cement mortar layer (4) in turn.
3. The installation structure of the daylighting roof skylight for a garbage storage according to claim 1, wherein The outer side of the cement mortar layer (4) is further pressed with glass fiber layer.
4. The installation structure of the trash warehouse roof daylighting louvre according to claim 1, wherein, The bottom of the roof frame (2) and the light roof body (7) is filled with fine stone concrete layer (8).
5. The installation structure of the daylighting roof skylight for a garbage storage according to claim 1, wherein The insulation board (5) and the roof frame (2) are sealed by filling sealant.
6. The installation structure of a light window for a refuse storage building roof according to claim 1, wherein The cement mortar layer (4) is mixed with 1:3 cement mortar.
7. The installation structure of a light window for a garbage storage house roof according to Claim 1, wherein The insulation board (5) is B1 grade polystyrene insulation material.
8. The installation structure of a light window for a garbage storage house roof according to claim 4, wherein The strength of the fine stone concrete layer (8) is C20.