A load-reducing structure for the web arch of an old arch bridge
By setting longitudinal and transverse beams in the old arch bridge to form a grid-like frame, the bridge deck load is transferred to the main arch ring, which solves the problem of top cracking of the inter-arch ring caused by excessive load, improves the structural durability and reduces the maintenance frequency, and is suitable for the renovation of old arch bridges.
Patent Information
- Application Number
- CN202522256642.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-24
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-10-24
AI Technical Summary
Existing technologies cannot effectively solve the problems of top cracking caused by the overload on the spandrel arch of old arch bridges, which makes it difficult to guarantee the long-term durability of the structure.
In the old arch bridge, longitudinal beams and transverse beams are set up to form a grid-like frame. The load on the bridge deck is directly transferred to the main arch ring through the grid-like frame composed of longitudinal beams and transverse beams, reducing the stress on the inter-arch ring. Foamed concrete is used to fill the transition part for connection.
It effectively controls the generation and development of cracks in the arch ring, extends the service life, reduces the maintenance frequency, improves structural durability, and is simple to construct and low in cost, making it suitable for the renovation of widely used old arch bridges.
Smart Images

Figure CN224954994U_ABST
Abstract
Description
Technical Field
[0001] The embodiments of this utility model belong to the field of bridge engineering technology, and more specifically, relate to a load-reducing structure for the web arch of an old arch bridge. Background Technology
[0002] Arch bridges are suitable for highway and railway bridges of various spans, and are widely used in my country's transportation construction due to their beautiful shapes. Hollow-web concrete arch bridges are a type of arch bridge, commonly used in mountainous areas of my country. However, some concrete arch bridges have suffered from structural defects such as cracks at the top of the arch rings due to lower design standards during construction and traffic exceeding design loads.
[0003] In response to the aforementioned defects such as cracks in the arch ring, existing solutions mainly involve conventional treatments: (1) for cracks at the top of the arch ring, surface sealing or pressure grouting techniques are used; (2) for the damaged and peeled parts on the surface of the arch ring caused by cracks, local chiseling and replacement are carried out; (3) if the cracks penetrate deep and cause corrosion of the steel bars inside the arch ring, local rust removal and protection are carried out on the corroded steel bars. However, the above conventional treatment methods are all inadequate, only addressing the symptoms and not the root cause, failing to solve the core problem of the arch ring bearing overload for a long time. Vehicles may still pass overloaded in the future, cracks are likely to reappear, and defects will recur. Moreover, as the service time goes on, problems such as concrete aging and steel bar corrosion will continue to develop, making it difficult to guarantee the structural durability in the long term. The only way to avoid the aggravation of defects is to reduce the load level, which sacrifices the design capacity of the bridge and cannot meet the load requirements of mountainous transportation development.
[0004] Therefore, there is an urgent need for a load-reducing structure for the web arch of old arch bridges, which can effectively reduce the load on the web arch ring, thereby improving the durability of the web arch ring of the arch bridge and controlling the generation and development of cracks in the web arch ring. Summary of the Invention
[0005] The existing methods for treating cracks in the arch ring of an arch bridge fail to address the core problem of the arch ring bearing excessive loads over long periods. This invention provides a load-reducing structure for the arch ring of an old arch bridge, which effectively reduces the load on the arch ring, thereby improving the durability of the arch ring and controlling the generation and development of cracks in the arch ring.
[0006] To achieve the above objectives, this utility model provides a load-reducing structure for the spandrel arch of an old arch bridge, including a vertical wall fixed to the top of a column; multiple sets of longitudinal beams arranged parallel to the longitudinal direction of the bridge, located between the bottom of the bridge deck structure and the spandrel arch ring, with the bottom fixed to the top of the vertical wall; and multiple sets of transverse beams arranged parallel to the transverse direction of the bridge, which intersect with the longitudinal beams and are vertically fixedly connected to form a grid-like frame.
[0007] Furthermore, there is a first gap between the top of the grid frame and the bottom of the bridge deck structure, and a second gap between the bottom and the top of the arch ring. Transition parts are provided in the first gap and the second gap respectively to connect them, thereby realizing the transfer of load.
[0008] Furthermore, the transition section is formed by filling with foamed concrete.
[0009] Furthermore, the wall is a reinforced concrete structure with a rebar anchoring section at the bottom and connecting rebar components on both sides of the top.
[0010] Furthermore, the rebar is glued to the rebar holes on the column to fix the wall to the top of the column.
[0011] Furthermore, one end of the connecting steel bar is pre-embedded in the vertical wall, and the other end is fixedly connected to the longitudinal beam by welding.
[0012] Furthermore, the crossbeam is a reinforced concrete structure, and anchor bolts are pre-embedded at corresponding locations on both sides.
[0013] Furthermore, the longitudinal beam is made of I-beams, with flanges at both ends. Anchor bolts are inserted into the flanges and tightened with nuts to achieve a fixed connection between the longitudinal beam and the transverse beam.
[0014] In summary, compared with the prior art, the above-described technical solution conceived by this utility model can achieve the following beneficial effects: (1) The load reduction structure of this utility model directly reduces the load pressure of the abutment arch and improves the durability and service life of the abutment arch. Through the grid-like frame composed of longitudinal beams and transverse beams, the bridge deck load above the abutment arch is directly transferred to the main arch ring instead of relying on the abutment arch ring for load bearing. This greatly reduces the stress burden on the abutment arch ring and solves the problems such as top cracking caused by excessive load on the abutment arch in old arch bridges from the root, avoiding the problem of load exceeding the original design bearing capacity of the abutment arch. Due to the optimized load transfer path, the abutment arch ring does not need to bear excessive stress, effectively controlling the "generation and development" of cracks, reducing secondary problems such as weathering and leakage caused by stress damage to the concrete structure, extending the service life of the abutment arch ring, and reducing the frequency of later maintenance of old arch bridges.
[0015] (2) The load-reducing structure of this utility model is simple in structure and adaptable to the existing structure of the old bridge. The core components (longitudinal beams are I-beams and transverse beams are reinforced concrete beams) are all conventional engineering materials and do not require special customization. Moreover, the height of the longitudinal beams and transverse beams is less than the height from the top of the arch ring to the bottom of the bridge deck pavement. They can be directly arranged in the arch cavity of the old bridge without the need for large-scale demolition and reconstruction of the bridge deck and the arch ring. This maximizes the preservation of the original bridge structure and reduces interference with traffic.
[0016] (3) The load reduction structure of this utility model has a reliable connection method and low construction difficulty. All components are connected using mature technology: the longitudinal beam and the transverse beam are connected by pre-embedded anchor bolts, the vertical wall and the longitudinal beam are fixed by welding with connecting steel bars, and the vertical wall and the column are connected by rebar installation. These processes do not require complex equipment, the construction process is standardized, the technical requirements for on-site workers are low, the construction cycle can be shortened, and the renovation cost can be reduced.
[0017] (4) The load reduction structure of this utility model is designed for hollow concrete arch bridges with spandrels. These arch bridges are widely used in mountainous areas of my country, and most of them have common problems such as low construction standards and excessive loads. The load reduction structure does not need to be significantly adjusted according to the bridge span and the number of spandrels, and can be applied in batches to the renovation of similar old arch bridges, making it highly practical. Attached Figure Description
[0018] Figure 1 This is a structural schematic diagram of a load-reducing structure for the web arch of an old arch bridge according to an embodiment of this utility model; Figure 2 This is a schematic diagram of the planar layout of the longitudinal and transverse beams in an embodiment of this utility model.
[0019] In all the accompanying drawings, the same reference numerals denote the same technical features, specifically: 1-longitudinal beam, 2-transverse beam, 3-vertical wall, 4-arch ring, 5-column, 6-old arch bridge, 7-main arch ring Detailed Implementation
[0020] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only for explaining the present utility model and are not intended to limit the present utility model. Furthermore, the technical features involved in the various embodiments of the present utility model described below can be combined with each other as long as they do not conflict with each other.
[0021] like Figure 1-2This utility model provides a load-reducing structure for the spandrel arch of an old arch bridge, including longitudinal beams 1, transverse beams 2, and vertical walls 3; wherein, the vertical walls 3 are fixedly installed on the top of the columns 5, and the longitudinal beams 1 are arranged in multiple sets parallel to the bridge direction, located between the bottom of the bridge deck structure and the spandrel arch ring 4, with the bottom fixed to the top of the vertical walls 3; the transverse beams 2 are arranged in multiple sets parallel to the transverse direction of the bridge, intersecting with the longitudinal beams 1 and vertically fixedly connected, thereby forming a grid-like frame. The load-reducing structure of this utility model forms a grid-like frame through the crossbeams 2 and longitudinal beams 1 to bear the bridge deck load and transfer it sequentially through the vertical walls 3 and columns 5 to the main arch ring 7. This cuts off the direct transfer of the bridge deck load to the inter-arch ring, significantly reducing the stress burden on the inter-arch ring. It fundamentally solves the problems such as "top cracking" caused by excessive inter-arch load in old arch bridges, and avoids the problem of the load exceeding the original design bearing capacity of the inter-arch ring. Due to the optimized load transfer path, the inter-arch ring does not need to bear excessive stress, effectively controlling the "generation and development" of cracks, reducing secondary problems such as weathering and leakage caused by stress damage to the concrete structure, extending the service life of the inter-arch ring, and reducing the frequency of later maintenance of old arch bridges.
[0022] like Figure 1 As shown, the load-reducing structure of this utility model involves modifying an old arch bridge 6. The old arch bridge 6 includes a main arch ring 7 fixedly connected to the piers at both ends, and multiple sets of columns 5 spaced apart and arranged vertically on the main arch ring 7. The tops of adjacent columns 5 are connected by a secondary arch ring 4. The top of the secondary arch ring 4 is connected to the cap beam or crossbeam at the bottom of the bridge deck structure by a low wall, directly bearing the load transmitted from the bridge deck. The load is transmitted to the secondary arch ring 4 through the low wall, and then to the main arch ring 7 by the secondary arch ring. At this time, the secondary arch ring 4 needs to directly bear the load of the bridge deck, which is also the core reason why the top of the secondary arch ring of the old bridge is prone to cracking.
[0023] In this embodiment of the utility model, multiple sets of crossbeams 2 are arranged parallel to the transverse direction of the bridge, and their two ends are fixedly connected to the longitudinal beams 1 by pre-embedded anchor bolts. The crossbeam 2 is a reinforced concrete structure. During construction, the height from the top of the arch ring to the bottom of the bridge deck pavement is determined by surveying and confirming, and the height of the crossbeam, the specifications of the longitudinal beams, and the grid spacing are calculated. Templates are erected at the transverse design position of the arch structure, the crossbeam steel reinforcement skeleton is tied, and anchor bolts are precisely pre-embedded according to the longitudinal beam spacing. The exposed length of the anchor bolts meets the flange connection requirements. The crossbeam concrete (strength grade according to design) is poured, vibrated to compact, and cured to the design strength. The templates on both sides and the top are removed to form the crossbeam 2. The bottom template machine support components are removed after the construction of the longitudinal beams 1 and the vertical wall 3 is completed.
[0024] The longitudinal beam 1 is laid out along the bridge direction, and its two ends are respectively fixedly connected to the cross beam 2 by flanges. The bottom is fixed to the top of the vertical wall 3. When installing the longitudinal beam 1, according to the position of the pre-embedded anchor bolts of the cross beam, the I-beam longitudinal beam is hoisted between two adjacent cross beams 2 (i.e., in the gap formed by the cross beams), and the elevation and level of the longitudinal beam are adjusted so that the flange holes at both ends are aligned with the anchor bolts of the cross beam. The flange is put into the anchor bolt and tightened with nuts to form a grid-like frame.
[0025] In this embodiment of the utility model, by providing a vertical wall 3, most of the bridge deck load is directly transferred from the column 5 to the main arch ring 7. The vertical wall 3 is a reinforced concrete structure with a rebar anchoring part at the bottom and connecting steel bars on both sides of the top. The rebar anchoring part is glued to the rebar anchoring holes on the column 5 to fix the vertical wall 3 to the top of the column 5. One end of the connecting steel bar is pre-embedded in the vertical wall 3, and the other end is fixedly connected to the longitudinal beam 1 by welding. During the construction of the vertical wall 3, according to the design location, drilling holes for rebar installation is carried out on the column 5. The hole depth and diameter must conform to the rebar installation specifications. The dust and debris inside the holes are cleaned with a high-pressure air gun or brush to ensure that the hole walls are dry and clean, providing conditions for the bonding of the rebar adhesive. The rebar adhesive is injected into the holes, and the rebar of the preset specification is inserted. The verticality of the rebar is adjusted. After the rebar adhesive cures to form the rebar installation part, a pull-out test can be carried out to verify the anchorage strength. After completion, the wall rebar is tied at the rebar installation position of the column, and the rebar is pre-connected (one end is connected to the wall rebar, and the other end extends to the side of the longitudinal beam). The wall formwork is erected, concrete is poured and cured. After the strength reaches the standard, the wall extension rebar is welded to the longitudinal beam 1.
[0026] In this embodiment of the utility model, after the construction of the grid-like frame formed by the longitudinal beam 1 and the transverse beam 2 is completed, there is a first gap between the top of the grid-like frame and the bottom of the bridge deck structure, and a second gap between the bottom and the top of the spandrel arch 4. The load is transferred by providing transition parts in the first gap and the second gap respectively; the transition parts are formed by filling with foamed concrete.
[0027] This utility model's load-reduction structure directly reduces the load pressure on the main arch ring and improves its durability and service life. Through a grid-like frame composed of longitudinal and transverse beams, the bridge deck load above the main arch ring is directly transferred to the main arch ring, rather than relying on the main arch ring for load-bearing. This significantly reduces the stress burden on the main arch ring and fundamentally solves the problems of top cracking caused by excessive load on the main arch ring in old arch bridges, avoiding the problem of load exceeding the original design bearing capacity of the main arch ring. Due to the optimized load transfer path, the main arch ring does not need to bear excessive stress, effectively controlling the "generation and development" of cracks, reducing secondary problems such as weathering and leakage caused by stress damage to the concrete structure, extending the service life of the main arch ring, and reducing the frequency of later maintenance of old arch bridges.
[0028] The load-reducing structure of this utility model is simple in design and adaptable to the existing structure of old bridges. The core components (longitudinal beams are I-beams and transverse beams are reinforced concrete beams) are all conventional engineering materials and do not require special customization. Moreover, the height of the longitudinal beams and transverse beams is less than the height from the top of the arch ring to the bottom of the bridge deck pavement, so they can be directly arranged in the arch cavity of the old bridge without the need for large-scale demolition and reconstruction of the bridge deck and the arch ring, thus preserving the original bridge structure to the greatest extent and reducing interference with traffic.
[0029] The load-reducing structure of this utility model has a reliable connection method and low construction difficulty. The connection of each component adopts mature technology: the longitudinal beam and the transverse beam are connected by pre-embedded anchor bolts, the vertical wall and the longitudinal beam are fixed by welding with connecting steel bars, and the vertical wall and the column are connected by rebar installation. These processes do not require complicated equipment, the construction process is standardized, the technical requirements for on-site workers are low, the construction cycle can be shortened, and the renovation cost can be reduced.
[0030] The load-reducing structure of this utility model is designed for hollow concrete arch bridges with spandrels. These types of arch bridges are widely used in mountainous areas of my country, and most of them have common problems such as low construction standards and excessive loads. This load-reducing structure does not require significant adjustments based on the bridge span and the number of spandrels, and can be applied in batches to the renovation of similar old arch bridges, making it highly practical.
[0031] Those skilled in the art will readily understand that the above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A load-reducing structure for the web arch of an old arch bridge, characterized in that, include: The old arch bridge (6) includes a main arch ring (7) that is fixedly connected to the piers at both ends, and multiple sets of columns (5) spaced apart and arranged vertically on the main arch ring (7). The tops of adjacent columns (5) are connected by a web arch ring (4). A fixed wall (3) is installed on the top of the column (5); Multiple sets of longitudinal beams (1) are provided parallel to the bridge direction, located between the bottom of the bridge deck structure and the spandrel arch (4), with the bottom fixed to the top of the vertical wall (3); Multiple sets of transverse beams (2) are arranged parallel to the transverse direction of the bridge. They are intersected with the longitudinal beams (1) and fixed vertically to form a grid-like frame. The top of the grid-like frame has a first gap with the bottom of the bridge deck structure, and the bottom has a second gap with the top of the spandrel arch (4). The first gap and the second gap are respectively provided with transition parts for connection, so as to realize the transfer of load. The transition parts are formed by filling with foamed concrete.
2. The load-reducing structure for the web arch of an old arch bridge according to claim 1, characterized in that, The wall (3) is a reinforced concrete structure with a rebar section at the bottom and connecting steel bars on both sides at the top.
3. The load-reducing structure for the web arch of an old arch bridge according to claim 2, characterized in that, The rebar section is glued to the rebar hole on the column (5) to form a whole, so that the wall (3) is fixed to the top of the column (5).
4. The load-reducing structure for the web arch of an old arch bridge according to claim 2, characterized in that, One end of the connecting steel bar is pre-embedded in the vertical wall (3), and the other end is fixedly connected to the longitudinal beam (1) by welding.
5. The load-reducing structure for the web arch of an old arch bridge according to claim 1, characterized in that, The crossbeam (2) is a reinforced concrete structure, and anchor bolts are pre-embedded at corresponding locations on both sides.
6. The load-reducing structure for the web arch of an old arch bridge according to claim 5, characterized in that, The longitudinal beam (1) is made of I-beams and has flanges at both ends. Anchor bolts are inserted into the flanges and nuts are tightened to fix the longitudinal beam (1) and the transverse beam (2).