A concrete pouring device for high-pile wharf projects

By using structures such as support plates, fixing blocks, and storage boxes in the concrete pouring device of the high-pile wharf project, the safety hazards and pollution problems caused by pipeline swaying were solved, and the stable fixing and easy cleaning of the conveying pipe were achieved.

CN224955095UActive Publication Date: 2026-11-10TIANJIN PORT COKE TERMINAL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522409969.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-13
Publication Date
2026-11-10
Estimated Expiration
2035-11-13

AI Technical Summary

Technical Problem

When existing concrete pumps are used with pipeline systems, the pipeline length exceeds the placing boom, and there is a lack of a support mechanism, which makes the pipeline prone to swinging, posing a safety hazard and potentially injuring equipment or personnel.

Method used

A concrete pouring device for a high-pile wharf project was designed, which adopts a combination structure of support plate, fixing block, spring, clamping block and storage box. Through the elastic connection and storage box design, the conveying pipe is fixed and stored to prevent it from swinging and contaminating.

Benefits of technology

It effectively prevents the conveying pipe from swinging and rubbing, avoids safety hazards and cleaning difficulties, and reduces the risk of concrete pollution and corrosion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224955095U_ABST
    Figure CN224955095U_ABST
Patent Text Reader

Abstract

This utility model belongs to the technical field of concrete pouring devices, specifically relating to a concrete pouring device for a high-pile wharf project. It includes a base, a push handle connected to the top of the base, a concrete pump mounted on the top of the base, a pipe connected to the inlet end of the concrete pump, a discharge hose connected to the outlet end of the concrete pump, a conveying pipe connected to the end of the discharge hose, a placing boom rotatably connected to the top of the base, a storage box provided at the top of the base, and a support plate mounted on the top of the base. Two fixing blocks are symmetrically connected to the top of the support plate, and a first spring is installed inside each fixing block. This utility model, through the cooperation of the support plate, fixing blocks, first spring, connecting column, and clamping block, avoids damage caused by friction between the conveying pipe and the support plate when the base moves and vibrates, and also prevents potential safety hazards caused by the uncontrolled swinging of the conveying pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the technical field of concrete pouring devices, specifically relating to a concrete pouring device for a high-pile wharf project. Background Technology

[0002] The concrete pouring device for high-pile wharf projects is a key piece of equipment used to achieve efficient and precise concrete pouring in the construction of high-pile wharves. The concrete pouring device for high-pile wharf projects includes a series of equipment such as a concrete delivery pump and pipeline system, a concrete truck pump pouring device, a ship-mounted hydraulic placing boom, and a guide pipe system.

[0003] In the construction of high-pile wharf projects, concrete pumps are required in conjunction with pipeline systems. The concrete pumps transport concrete along the pipelines to the pouring site, while a placing boom enables long-distance horizontal 360° rotation and vertical lifting and conveying. However, in existing concrete pump and pipeline systems, the pipeline length exceeds the placing boom. This facilitates occasional manual control of the pipeline position during pouring to ensure uniform concrete delivery. After use, the placing boom is used to fold and store the pipeline. However, the existing concrete pump and pipeline systems lack a suitable placement mechanism for the pipeline exceeding the placing boom, causing the pipeline to easily swing. This swinging pipeline poses a safety hazard, potentially injuring equipment or nearby personnel. Utility Model Content

[0004] The purpose of this utility model is to provide a concrete pouring device for high-pile wharf projects, aiming to solve the problems proposed in the existing technology. However, when using existing concrete pumps and pipeline devices, the length of the pipeline exceeds the placing boom. This facilitates occasional manual control of the pipeline position during pouring to ensure the uniformity of concrete delivery. After use, the pipeline is folded and stored using the placing boom. However, the existing concrete pump and pipeline devices lack a placement mechanism for the pipeline that exceeds the placing boom, causing the pipeline to easily swing. The swinging pipeline can pose a safety hazard, leading to damage to equipment or nearby personnel.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a concrete pouring device for a high-pile wharf project, comprising a seat, a push handle connected to the top of the seat, a concrete pump installed at the top of the seat, a pipe connected to the inlet end of the concrete pump, a discharge hose connected to the outlet end of the concrete pump, a conveying pipe connected to the end of the discharge hose, a placing rod rotatably connected to the top of the seat, a storage box provided at the top of the seat, a support plate installed at the top of the seat, two fixing blocks symmetrically connected to the top of the support plate, a first spring installed inside the fixing block, a docking post connected to the end of the first spring, and a clamping block connected to the end of the docking post.

[0006] As a preference of the concrete pouring device for high-piled wharf engineering of the present utility model, the clamping block can form an elastic telescopic connection with the fixed block through the docking post and the first spring.

[0007] As a preference of the concrete pouring device for high-piled wharf engineering of the present utility model, the support plate is in a "C" shape, and the top end of the support plate is provided with a through hole.

[0008] As a preference of the concrete pouring device for high-piled wharf engineering of the present utility model, the back end of the support plate is provided with a groove, the inner wall opening of the support plate is provided with a second spring, the end of the second spring is connected with a limit block, and the side wall of the limit block is provided with a toggle block.

[0009] As a preference of the concrete pouring device for high-piled wharf engineering of the present utility model, two sides of the storage box are connected with docking blocks, and the limit block penetrates through the support plate to connect with the through opening on the surface of the docking block.

[0010] As a preference of the concrete pouring device for high-piled wharf engineering of the present utility model, the limit block can form an elastic telescopic connection with the support plate through the second spring and the toggle block.

[0011] As a preference of the concrete pouring device for high-piled wharf engineering of the present utility model, the side wall of the docking block is attached to the inner wall of the groove.

[0012] Compared with the prior art, the beneficial effects of the present utility model are:

[0013] Through the cooperation of the support plate, the fixed block, the first spring, the docking post and the clamping block, when the distributing boom drives the discharge hose to fold, the operator can put the delivery pipe connected to the end of the discharge hose into the through hole at the top of the support plate, and the delivery pipe extends beyond the distributing boom, at this time the delivery pipe is located between the two clamping blocks, which squeezes the clamping blocks during the placing process, drives the docking post to compress the first spring to make it contract. After the delivery pipe is placed in position, the reverse acting force of the first spring will push the clamping blocks to fit closely with the delivery pipe, which avoids the damage caused by friction between the movable delivery pipe and the support plate when the vehicle seat moves and jolts, and also prevents the potential safety hazard that may be caused by the random swing of the delivery pipe.

[0014] Through the cooperation of the groove, the second spring, the limiting block, the pusher block, and the docking block, the operator pushes the pusher block upwards, causing the limiting block to squeeze the second spring and retract, allowing the limiting block to retract into the support plate. Then, the storage box drives the docking block to insert into the groove. After releasing the pusher block, the reverse force of the second spring will push the limiting block downwards, allowing it to pass through the support plate and insert into the opening at the top of the docking block, thus completing the fixing of the storage box. After the storage box is fixed, it can collect the concrete dripping from the inner wall of the delivery pipe, preventing concrete from dripping onto the seat and causing pollution, and avoiding the situation where the concrete solidifies and causes corrosion and cleaning difficulties. Attached Figure Description

[0015] The accompanying drawings are provided to further illustrate the present invention and form part of the specification. They are used together with the embodiments of the present invention to explain the present invention, but do not constitute a limitation thereof. In the drawings:

[0016] Figure 1 This is a three-dimensional structural diagram of the present invention;

[0017] Figure 2 This is a schematic cross-sectional view of the support plate and fixing block of this utility model;

[0018] Figure 3 This is a cross-sectional view of the support plate structure of this utility model;

[0019] Figure 4 This utility model Figure 3 A magnified structural diagram at point A in the diagram.

[0020] In the diagram: 1. Car seat; 2. Concrete pump; 3. Push handle; 4. Placing bar; 5. Discharge hose; 6. Conveying pipe; 7. Storage box; 8. Support plate; 9. Fixing block; 10. First spring; 11. Connecting post; 12. Clamping block; 13. Groove; 14. Second spring; 15. Limiting block; 16. Pulling block; 17. Connecting block. Detailed Implementation

[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0022] Please see Figures 1-4The present utility model provides the following technical solution: a concrete pouring device for high-pile wharf engineering, comprising a vehicle base 1, the top end of the vehicle base 1 is connected with a push handle 3, the top end of the vehicle base 1 is equipped with a concrete delivery pump 2, the feeding end of the concrete delivery pump 2 is connected with a pipeline, the discharging end of the concrete delivery pump 2 is connected with a discharging hose 5, the end of the discharging hose 5 is connected with a delivery pipe 6, the top end of the vehicle base 1 is rotatably connected with a distributing boom 4, the top end of the vehicle base 1 is provided with a storage box 7, the top end of the vehicle base 1 is equipped with a support plate 8, the top end of the support plate 8 is symmetrically connected with two fixing blocks 9, a first spring 10 is installed inside the fixing block 9, the end of the first spring 10 is connected with an abutting post 11, and the end of the abutting post 11 is connected with a clamping block 12.

[0023] In specific use, the concrete pouring device for high-pile wharf engineering is composed of the vehicle base 1, the concrete delivery pump 2, the push handle 3, the distributing boom 4, the discharging hose 5 and the delivery pipe 6. In practical construction applications, first, the pipeline at the discharging end of the concrete delivery pump 2 is docked with a mixing plant or a concrete transport vehicle, then the concrete delivery pump 2 is connected to a power supply and the equipment is started. At this time, the concrete delivery pump 2 will pump concrete into the pipeline. Under the power of the pump body, the concrete first flows along the pipeline to the discharging hose 5, then flows into the delivery pipe 6 through the discharging hose 5, and finally the concrete is discharged from the delivery pipe 6 to the designated pouring area of the high-pile wharf engineering. After the concrete solidifies, the relevant structural members of the high-pile wharf, such as abutments, surface courses and pile caps, can be formed.

[0024] It is worth noting that the discharging hose 5 is made of rubber, while the delivery pipe 6 is made of metal. The distributing boom 4 can also be called a mechanical arm, whose multiple connecting arms are rotatably connected and then driven by a driving motor to move, so as to realize the folding of the distributing boom 4. The push handle 3 can be used to push the vehicle base 1 to the vicinity of the high-pile wharf construction site, and then cooperate with the mixing plant or the concrete transport vehicle.

[0025] Preferably, the clamping block 12 can form an elastic telescopic connection with the fixing block 9 through the abutting post 11 and the first spring 10. The support plate 8 is in a "U" shape, and the top end of the support plate 8 is provided with a through hole.

[0026] In specific use, when the distributing boom 4 drives the discharging hose 5 to fold, the operator can place the delivery pipe 6 connected to the end of the discharging hose 5 into the through hole at the top end of the support plate 8, and the delivery pipe 6 extends beyond the distributing boom 4. At this time, the delivery pipe 6 is located between the two clamping blocks 12. During the placing process, the clamping blocks 12 are squeezed, driving the abutting post 11 to compress the first spring 10 to make it contract. After the delivery pipe 6 is placed in place, the reverse acting force of the first spring 10 will push the clamping blocks 12 to fit closely with the delivery pipe 6, which avoids the damage caused by friction between the movable delivery pipe 6 and the support plate 8 when the vehicle base 1 moves and jolts, and also prevents the potential safety hazard that may be caused by the random swing of the delivery pipe 6.

[0027] Preferably, the support plate 8 has a groove 13 at its back end, and a second spring 14 is installed in the opening of the inner wall of the support plate 8. A limiting block 15 is connected to the end of the second spring 14, and a lever 16 is installed on the side wall of the limiting block 15. A mating block 17 is connected to both sides of the storage box 7, and the limiting block 15 passes through the support plate 8 and connects to the opening on the surface of the mating block 17. The limiting block 15 can form an elastic telescopic connection with the support plate 8 through the second spring 14 and the lever 16. The side wall of the mating block 17 fits against the inner wall of the groove 13.

[0028] In practical use, the operator moves the lever 16 upwards, causing the limiting block 15 to compress the second spring 14 and retract it, allowing the limiting block 15 to retract into the support plate 8. Then, the storage box 7 drives the docking block 17 to insert into the groove 13. After releasing the lever 16, the reverse force of the second spring 14 will push the limiting block 15 downwards, allowing it to pass through the support plate 8 and insert into the opening at the top of the docking block 17, thus completing the fixation of the storage box 7. After the storage box 7 is fixed, it can collect the concrete dripping from the inner wall of the delivery pipe 6, preventing concrete from dripping onto the seat 1 and causing pollution, and avoiding the situation where the concrete solidifies and causes corrosion and cleaning difficulties.

[0029] It is worth noting that the electrical equipment mentioned in the article is started by connecting to the corresponding power supply or by connecting to the control cabinet for convenient start-up.

[0030] Working principle: First, connect the pipe at the discharge end of the concrete pump 2 to the mixing plant or concrete truck. Then, connect the power supply to the concrete pump 2 and start the equipment. At this time, the concrete pump 2 will pump concrete into the pipe. Under the power of the pump body, the concrete first flows along the pipe to the discharge hose 5, and then flows into the conveying pipe 6 through the discharge hose 5. Then, in conjunction with the placing boom 4, it realizes long-distance horizontal 360° rotation and vertical lifting and conveying. Finally, the concrete is discharged from the conveying pipe 6 to the designated pouring area of ​​the high-pile wharf project. After the concrete solidifies, it can form the relevant structural components of the high-pile wharf, such as piers, surface layers and pile caps.

[0031] After the equipment is used, the operator moves the lever 16 upwards, causing the limiting block 15 to compress the second spring 14 and retract it, allowing the limiting block 15 to retract into the support plate 8. Then, the storage box 7 moves the docking block 17 into the groove 13. After releasing the lever 16, the reverse force of the second spring 14 will push the limiting block 15 downwards, allowing it to pass through the support plate 8 and insert into the opening at the top of the docking block 17, thereby completing the fixation of the storage box 7.

[0032] When the placing rod 4 folds the discharge hose 5, the operator can insert the conveying pipe 6 connected to the end of the discharge hose 5 into the through hole at the top of the support plate 8. The conveying pipe 6 extends beyond the placing rod 4. At this time, the conveying pipe 6 is located between the two clamping blocks 12. During the placement process, the clamping blocks 12 are squeezed, which causes the docking column 11 to compress the first spring 10 and shrink it. After the conveying pipe 6 is placed in place, the reverse force of the first spring 10 will push the clamping block 12 to fit tightly with the conveying pipe 6. Then the conveying pipe 6 is at the top of the storage box 7, which collects the concrete dripping from the inner wall of the conveying pipe 6, avoiding concrete dripping onto the seat 1 and causing pollution, and avoiding concrete solidification causing corrosion and cleaning difficulties.

[0033] Finally, it should be noted that the above are merely preferred embodiments of this utility model and are not intended to limit the utility model. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.

Claims

1. A concrete pouring device for a high-pile wharf project, comprising a vehicle seat (1), characterized in that: A pushing handle (3) is connected to the top end of the vehicle base (1), a concrete delivery pump (2) is mounted on the top end of the vehicle base (1), the feeding end of the concrete delivery pump (2) is connected with a pipeline, and the discharging end of the concrete delivery pump (2) is connected with a discharging hose (5); The end of the discharging hose (5) is connected with a delivery pipe (6), the top end of the vehicle base (1) is rotatably connected with a placing boom (4), a storage box (7) is arranged on the top end of the vehicle base (1), a support plate (8) is mounted on the top end of the vehicle base (1), two fixing blocks (9) are symmetrically connected to the top end of the support plate (8), a first spring (10) is mounted inside the fixing block (9), the end of the first spring (10) is connected with an abutting post (11), and the end of the abutting post (11) is connected with a clamping block (12).

2. The concrete pouring device for a high-pile wharf project according to claim 1, characterized in that: The clamping block (12) can form an elastic telescopic connection with the fixing block (9) through the abutting post (11) and the first spring (10).

3. The concrete pouring device for a high-pile wharf project according to claim 1, characterized in that: The support plate (8) is in a "U" shape, and a through hole is opened at the top end of the support plate (8).

4. The concrete pouring device for a high-pile wharf project according to claim 1, characterized in that: A groove (13) is opened at the back end of the support plate (8), a second spring (14) is mounted at the inner wall opening of the support plate (8), the end of the second spring (14) is connected with a limiting block (15), and a shifting block (16) is mounted on the side wall of the limiting block (15).

5. A concrete pouring device for a high-pile wharf project according to claim 4, characterized in that: Abutting blocks (17) are connected to both sides of the storage box (7), and the limiting block (15) penetrates through the support plate (8) to be connected with the through opening on the surface of the abutting block (17).

6. A concrete pouring device for a high-pile wharf project according to claim 4, characterized in that: The limiting block (15) can form an elastic telescopic connection with the support plate (8) through the second spring (14) and the shifting block (16).

7. A concrete pouring device for a high-pile wharf project according to claim 5, characterized in that: The side wall of the abutting block (17) is fitted with the inner wall of the groove (13).