A fastening device for water conservancy and hydropower construction
By adjusting the spacing of the guard plates and using a fastening device with axial positioning of the knob bolts, the problem of the existing device being unable to be adjusted was solved, achieving stable support for the inner wall of the foundation pit and improving fastening and safety.
Patent Information
- Application Number
- CN202522660647.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-16
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-16
AI Technical Summary
Existing fastening devices used in water conservancy and hydropower construction cannot adjust the support structure according to the actual size of the foundation pit, and the support tightness is not easy to adjust, resulting in unstable support of the inner wall of the foundation pit.
A fastening device was designed to adjust the spacing of the guard plates to make them fit against the inner wall of the pit, and to use knob bolts to axially position the screw rods, thereby achieving effective support of the guard plates by the fastening rods and adjusting rods, and improving fastening and stability.
This achieves a tight fit and stable support between the protective plate and the inner wall of the foundation pit, improving the firmness and stability of the support and avoiding the risk of the inner wall of the foundation pit collapsing or soil falling.
Smart Images

Figure CN224955103U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of construction support technology, specifically a fastening device for water conservancy and hydropower construction. Background Technology
[0002] Water conservancy and hydropower projects mainly involve surveying, planning, design, construction, scientific research, and management. With the severe shortage of water resources in my country and even globally, and the increasing energy crisis, it is urgent to accelerate river management, prioritize the development of hydropower, develop and utilize water energy, and optimize the allocation of water resources. Water conservancy and hydropower projects are important infrastructure and basic industries.
[0003] In the construction of water conservancy and hydropower projects, it is often necessary to excavate foundation pits. However, since the inner walls of the foundation pits are not properly compacted, problems such as collapse or falling soil clods injuring people often occur. Therefore, it is necessary to support the inner walls of the foundation pits. However, existing support plate fastening devices cannot be adjusted according to the actual size of the foundation pits, and the tightness of the support is inconvenient to adjust. In view of this, we propose a fastening device for water conservancy and hydropower construction that can adjust the support plate structure according to the size of the inner walls of the foundation pits and can flexibly adjust the tightness of the support. Utility Model Content
[0004] The purpose of this section is to outline some aspects of the embodiments of this utility model and to briefly introduce some preferred embodiments. Simplifications or omissions may be made in this section, as well as in the abstract and title of this application, to avoid obscuring the purpose of these documents; however, such simplifications or omissions should not be used to limit the scope of this utility model.
[0005] In view of the problems existing in the above and / or existing fastening devices for water conservancy and hydropower construction, this utility model is proposed.
[0006] Therefore, the purpose of this utility model is to provide a fastening device for water conservancy and hydropower construction. When the fastening mechanism is installed, the spacing of the guard plates is adjusted to make the guard plates fit against the inner wall of the foundation pit. At the same time, the knob bolts position the screw rod axially so that the fastening rod and the adjusting rod can effectively support the guard plate, thereby improving the fastening and stability of the guard plate support.
[0007] To solve the above-mentioned technical problems, according to one aspect of the present invention, the present invention provides the following technical solution:
[0008] A fastening device for construction of water conservancy and hydropower projects, comprising:
[0009] The protective plates are installed end-to-end on both sides of the pit, and the inner wall of the protective plates is fixed with connecting rods.
[0010] The fastening assembly includes a fastening rod and an adjusting rod slidably inserted into the fastening rod. Both the fastening rod and the adjusting rod have a fastening plate integrally formed on them and fixed to the connecting rod. A screw for driving the adjusting rod is rotatably installed in the fastening rod, and the fastening rod is provided with a fastening mechanism for axially fixing the screw.
[0011] As a preferred embodiment of the fastening device for water conservancy and hydropower construction described in this utility model, one end of the guard plate is integrally formed with a connecting part, and the other end of the guard plate is integrally formed with a protrusion, and the protrusion is provided with a connecting groove that matches the connecting part.
[0012] As a preferred embodiment of the fastening device for water conservancy and hydropower construction described in this utility model, one end of the connecting rod is provided with a T-shaped groove, and the other end of the connecting rod is integrally formed with a protrusion that fits into the groove.
[0013] As a preferred embodiment of the fastening device for water conservancy and hydropower construction described in this utility model, metal rings are embedded and fixed at equal intervals in the protective plate, and first through holes matching the metal rings are opened at equal intervals on the connecting rod.
[0014] In a preferred embodiment of the fastening device for water conservancy and hydropower construction described in this utility model, a first bolt is installed on the connecting rod, and the first bolt passes through a first through hole and is threaded into a metal ring.
[0015] As a preferred embodiment of the fastening device for water conservancy and hydropower construction described in this utility model, an adjustment groove is provided at the center of the fastening rod, and a through groove is provided at the top of the fastening rod. A screw hole is provided at the end of the adjustment rod that extends into the adjustment groove.
[0016] As a preferred embodiment of the fastening device for water conservancy and hydropower construction described in this utility model, one end of the screw is threaded into a screw hole, the other end of the screw is mounted on the inner wall of the through groove through a bearing, and a rotating part located in the through groove is integrally formed on the screw.
[0017] As a preferred embodiment of the fastening device for water conservancy and hydropower construction described in this utility model, the fastening mechanism includes ear plates integrally formed on both sides of the inner wall of the through groove and a knob bolt installed between the two ear plates. The outer wall of the screw is provided with positioning holes corresponding to the knob bolt in a ring array.
[0018] As a preferred embodiment of the fastening device for water conservancy and hydropower construction described in this utility model, each of the two ear plates is provided with a second through hole, and the knob bolt passes through the second through hole and the positioning hole and is threaded with a nut.
[0019] As a preferred embodiment of the fastening device for water conservancy and hydropower construction described in this utility model, the fastening plate has fastening bolts installed in a rectangular array on its sidewalls, and the fastening bolts are threaded into the connecting rod.
[0020] Compared with the prior art, the beneficial effects of this utility model are as follows: When the fastening mechanism is installed, the two connecting rods are fixed to the guard plate by the first bolt, and the fastening plates on the fastening rod and the adjusting rod are fixed to the two connecting rods by fastening bolts respectively. The rotating part drives the screw to rotate, and during the rotation, the adjusting rod slides in the adjusting groove, thereby adjusting the distance between the two connecting rods and the guard plate. By adjusting the distance of the guard plate, the guard plate is made to fit against the inner wall of the pit. At the same time, the knob bolt positions the screw axially, so that the fastening rod and the adjusting rod can effectively support the guard plate, improving the fastening and stability of the guard plate support. Attached Figure Description
[0021] To more clearly illustrate the technical solutions of the embodiments of this utility model, the present utility model will be described in detail below with reference to the accompanying drawings and detailed embodiments. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. Among them:
[0022] Figure 1 This is a schematic diagram of the overall structure of a fastening device for water conservancy and hydropower construction according to the present invention.
[0023] Figure 2 This is a schematic diagram of the protective plate structure of a fastening device for water conservancy and hydropower construction according to the present invention;
[0024] Figure 3 This is a schematic diagram of the connecting rod structure of a fastening device for water conservancy and hydropower construction according to the present invention;
[0025] Figure 4 This is a cross-sectional structural diagram of the connecting rod of a fastening device for water conservancy and hydropower construction according to the present invention;
[0026] Figure 5 This is a cross-sectional structural diagram of the fastening rod of a fastening device for water conservancy and hydropower construction according to the present invention;
[0027] Figure 6 This utility model relates to a fastening device for construction of water conservancy and hydropower projects. Figure 5 Enlarged schematic diagram of the structure at point A in the middle.
[0028] In the diagram: 100, guard plate; 101, connecting part; 102, protrusion; 103, connecting groove; 104, metal ring; 200, connecting rod; 201, protrusion; 202, groove; 203, first bolt; 204, first through hole; 300, fastening rod; 301, adjusting rod; 302, screw hole; 303, screw; 304, adjusting groove; 305, fastening plate; 306, fastening bolt; 307, through groove; 308, rotating part; 309, second through hole; 310, positioning hole; 311, knob bolt; 312, ear plate. Detailed Implementation
[0029] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the specific embodiments of this utility model will be described in detail below with reference to the accompanying drawings.
[0030] Secondly, this utility model is described in detail with reference to the schematic diagrams. When describing the embodiments of this utility model, for ease of explanation, the cross-sectional views showing the device structure may be partially enlarged, not according to the usual scale. Furthermore, the schematic diagrams are merely examples and should not limit the scope of protection of this utility model. In addition, in actual manufacturing, the three-dimensional spatial dimensions of length, width, and depth should be included.
[0031] To make the objectives, technical solutions, and advantages of this utility model clearer, the embodiments of this utility model will be described in further detail below with reference to the accompanying drawings.
[0032] This utility model provides a fastening device for water conservancy and hydropower construction. When the fastening mechanism is installed, the spacing of the guard plate 100 is adjusted so that the guard plate 100 fits against the inner wall of the foundation pit. At the same time, the knob bolt 311 axially positions the screw rod 303 so that the fastening rod 300 and the adjusting rod 301 can effectively support the guard plate 100, thereby improving the fastening and stability of the guard plate 100 support.
[0033] Figures 1-6 The diagram shown is an overall structural schematic of one embodiment of a fastening device for water conservancy and hydropower construction according to this utility model. Please refer to [link / reference]. Figures 1-6 This embodiment of a fastening device for hydraulic and hydropower construction includes:
[0034] Multiple protective plates 100 are installed end to end on both sides of the foundation pit, and connecting rods 200 are fixed on the inner wall of the protective plate 100.
[0035] The fastening assembly includes a fastening rod 300 and an adjusting rod 301 slidably inserted into the fastening rod 300. Both the fastening rod 300 and the adjusting rod 301 have integrally formed fastening plates 305 fixed to the connecting rod 200. A screw 303 for driving the adjusting rod 301 is rotatably mounted in the fastening rod 300, and the fastening rod 300 is provided with a fastening mechanism for axially fixing the screw 303. When the fastening mechanism is in place, the two connecting rods 200 are fixed to the guard plate 100 by a first bolt 203. The fastening plates 305 on the fastening rod 300 and the adjusting rod 301 are connected by... The fastening bolts 306 are fixed to the two connecting rods 200 respectively. The rotating part 308 drives the screw 303 to rotate, which in turn drives the adjusting rod 301 to slide in the adjusting groove 304, thereby adjusting the distance between the two connecting rods 200 and the guard plate 100. By adjusting the distance between the guard plate 100, the guard plate 100 is made to fit against the inner wall of the pit. At the same time, the knob bolt 311 axially positions the screw 303, so that the fastening rod 300 and the adjusting rod 301 can effectively support the guard plate 100, improving the tightness and stability of the guard plate 100 support.
[0036] Combination Figures 1-6 The specific usage process of the fastening device for water conservancy and hydropower construction in this embodiment is as follows: When the fastening mechanism is installed, multiple guard plates 100 are connected end to end on both sides of the inner wall of the foundation pit. The connecting part 101 on the guard plate 100 is slidably engaged in the connecting groove 103. Multiple connecting rods 200 are connected end to end so that the protrusion 201 fits into the groove 202. The first bolt 203 on the side wall of the connecting rod 200 passes through the first through hole 204 and is threaded into the screw hole 302 at the center of the metal ring 104, so that the connecting rod 200 is fixed to the guard plate 100. The fastening bolts 306 on the side wall of the fastening plate 305 on the fastening rod 300 and the adjusting rod 301 are respectively threaded into the two connecting rods 200. The hand reaches into the through groove 307 to grasp the rotating part 308 and drive the screw 303 to rotate, so that the screw... During the rotation of rod 303, the adjusting rod 301 slides in the adjusting groove 304, thereby adjusting the distance between the two connecting rods 200 and the guard plate 100. After the position of the guard plate 100 is adjusted, the knob bolt 311 passes through the through hole and the positioning hole 310 and is threaded onto the nut. After the knob bolt 311 is fixed, the screw rod 303 is axially positioned through the positioning hole 310, which avoids the situation where the adjusting rod 301 slides in the adjusting groove 304 due to the pressure on the guard plate 100, causing the screw rod 303 to rotate. By adjusting the distance of the guard plate 100, the guard plate 100 is made to fit against the inner wall of the pit. At the same time, the knob bolt 311 axially positions the screw rod 303, so that the fastening rod 300 and the adjusting rod 301 can effectively support the guard plate 100, improving the tightness and stability of the guard plate 100 support.
[0037] In this embodiment, one end of the protective plate 100 is integrally formed with a connecting portion 101, and the other end of the protective plate 100 is integrally formed with a protrusion 102. The protrusion 102 has a connecting groove 103 that matches the connecting portion 101. One end of the connecting rod 200 has a T-shaped groove 202, and the other end of the connecting rod 200 has an integrally formed protrusion 201 that fits into the groove 202. Metal rings 104 are evenly embedded and fixed in the protective plate 100. First through holes 204 that match the metal rings 104 are evenly spaced on the connecting rod 200. First bolts 203 are installed on the connecting rod 200, passing through the first through holes 204 and threaded into the metal rings 104. An adjustment groove 304 is provided at the center of the fastening rod 300, and a through groove 307 is provided at the top of the fastening rod 300. One end of the section rod 301 extending into the adjustment groove 304 has a screw hole 302. One end of the screw rod 303 is threaded into the screw hole 302. The other end of the screw rod 303 is mounted on the inner wall of the through groove 307 via a bearing. The screw rod 303 has an integrally formed rotating part 308 located in the through groove 307. The fastening mechanism includes ear plates 312 integrally formed on both sides of the inner wall of the through groove 307 and a knob bolt 311 installed between the two ear plates 312. The outer wall of the screw rod 303 has positioning holes 310 in a ring array corresponding to the knob bolt 311. Each of the two ear plates 312 has a second through hole 309. The knob bolt 311 passes through the second through hole 309 and the positioning hole 310 and is threaded with a nut. The side wall of the fastening plate 305 has a rectangular array of fastening bolts 306 installed. The fastening bolts 306 are threaded into the connecting rod 200.
[0038] Although the present invention has been described above with reference to embodiments, various modifications can be made and components can be replaced with equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the features in the embodiments disclosed in this invention can be combined with each other in any way. The lack of an exhaustive description of these combinations in this specification is merely for the sake of brevity and resource conservation. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. A fastening device for construction of water conservancy and hydropower projects, characterized in that, include: A protective plate (100) is installed on both sides of the pit, with multiple protective plates (100) connected end to end, and a connecting rod (200) is fixed on the inner wall of the protective plate (100). The fastening assembly includes a fastening rod (300) and an adjusting rod (301) slidably inserted into the fastening rod (300). Both the fastening rod (300) and the adjusting rod (301) have a fastening plate (305) integrally formed on them and fixed to the connecting rod (200). A screw (303) for driving the adjusting rod (301) is rotatably installed in the fastening rod (300), and the fastening rod (300) is provided with a fastening mechanism for axially fixing the screw (303).
2. The fastening device for hydraulic and hydropower construction according to claim 1, characterized in that, One end of the guard plate (100) is integrally formed with a connecting part (101), and the other end of the guard plate (100) is integrally formed with a protrusion (102). The protrusion (102) is provided with a connecting groove (103) that matches the connecting part (101).
3. A fastening device for hydraulic and hydropower construction according to claim 1, characterized in that, One end of the connecting rod (200) is provided with a T-shaped groove (202), and the other end of the connecting rod (200) is integrally formed with a protrusion (201) that fits into the groove (202).
4. A fastening device for hydraulic and hydropower construction according to claim 1, characterized in that, Metal rings (104) are embedded and fixed at equal intervals in the guard plate (100), and first through holes (204) matching the metal rings (104) are opened at equal intervals on the connecting rod (200).
5. A fastening device for hydraulic and hydropower construction according to claim 4, characterized in that, The connecting rod (200) is equipped with a first bolt (203), which is threaded into the metal ring (104) through the first through hole (204).
6. A fastening device for hydraulic and hydropower construction according to claim 1, characterized in that, An adjustment groove (304) is provided at the center of the fastening rod (300), and a through groove (307) is provided at the top of the fastening rod (300). A screw hole (302) is provided at one end of the adjusting rod (301) that extends into the adjustment groove (304).
7. A fastening device for hydraulic and hydropower construction according to claim 6, characterized in that, One end of the screw (303) is threaded into the screw hole (302), and the other end of the screw (303) is mounted on the inner wall of the through groove (307) through a bearing. The screw (303) has an integrally formed rotating part (308) located in the through groove (307).
8. A fastening device for hydraulic and hydropower construction according to claim 7, characterized in that, The fastening mechanism includes ear plates (312) integrally formed on both sides of the inner wall of the through groove (307) and knob bolts (311) installed between the two ear plates (312). The outer wall of the screw (303) is provided with positioning holes (310) corresponding to the knob bolts (311) in a ring array.
9. A fastening device for hydraulic and hydropower construction according to claim 8, characterized in that, Both ear plates (312) are provided with a second through hole (309), and the knob bolt (311) passes through the second through hole (309) and the positioning hole (310) and is threaded with a nut.
10. A fastening device for hydraulic and hydropower construction according to claim 1, characterized in that, The fastening plate (305) has fastening bolts (306) installed in a rectangular array on its sidewalls, and the fastening bolts (306) are threaded into the connecting rod (200).
