A type of combined cofferdam
By using a combined cofferdam structure and employing gabion pipes and support mechanisms, the problems of soil waste and insufficient stability in traditional earth-rock cofferdams have been solved, achieving the effects of reducing soil usage, preventing river siltation, and improving structural stability.
Patent Information
- Application Number
- CN202522732962.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-24
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-24
AI Technical Summary
Traditional earth-rock cofferdams suffer from problems such as large earthwork consumption leading to waste of clay resources, easy siltation in river channels, insufficient structural stability, and difficulty in cleanup after the project is completed.
The cofferdam adopts a combined structure, which includes multiple layers of gabion pipes stacked from bottom to top and a support mechanism. The gabion pipes are composed of steel wire and filler inside and geotextile is laid on the outside. The support mechanism provides stable support through positioning frames and connecting pipes, forming a tower-shaped structure to enhance stability, and uses a double-layer reverse seepage structure to prevent leakage.
It significantly reduces earthwork usage, prevents river siltation, improves the overall robustness and safety of the cofferdam, simplifies subsequent cleanup work, and achieves water-blocking effects while saving clay resources and improving structural stability.
Smart Images

Figure CN224955121U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of water conservancy engineering construction technology, and in particular to a combined cofferdam. Background Technology
[0002] In the construction of water conservancy projects, river regulation and bridge construction, cofferdams are widely used as a temporary water-retaining structure. Their main function is to protect the foundation pit, isolate the water flow from the work area, and provide a dry working environment for subsequent construction. Traditional cofferdam construction methods mostly use earth-rock cofferdams, that is, directly filling a large amount of earth and stones into the river channel to form a water-retaining dam.
[0003] However, this traditional earth-rock cofferdam method has revealed many structural deficiencies in practical applications. Since the cofferdam mainly relies on the weight and cohesion of the earth itself to block water, a huge amount of earthwork is often required to achieve sufficient strength and seepage prevention. This not only leads to a serious waste of clay resources, but also the large amount of earthwork directly dumped into the river channel is easily washed away by the water flow, causing the river water to become turbid and forming silt that is difficult to clean at the bottom of the riverbed. In severe cases, it may even block the river channel and affect flood control safety. In addition, the simple earth-rock structure has poor lateral stability when facing large water flow impacts or deep water operations, and is prone to collapse or sliding accidents. After the project is completed, the huge amount of earthwork cleanup work is also extremely heavy and difficult to completely remove.
[0004] Therefore, this utility model proposes a combined cofferdam to address the shortcomings of the prior art. Utility Model Content
[0005] In view of the problems of traditional earth-rock cofferdams in the prior art, such as large earthwork consumption leading to waste of clay resources, easy siltation in the river channel, insufficient structural stability, and difficulty in cleaning after the project is completed, this utility model aims to provide a combined cofferdam with improved structure that can effectively solve the above problems.
[0006] This utility model provides a combined cofferdam, including a combined mechanism and a support mechanism disposed on one side of the combined mechanism. The combined mechanism includes multiple layers of gabion pipes stacked from bottom to top and geotextile laid on one side of the gabion pipes.
[0007] The support mechanism is located on the side of the gabion pipe away from the river channel. The support mechanism includes a positioning frame fixed to the ground and a connecting pipe connecting two adjacent sets of positioning frames.
[0008] Two sets of positioning blocks are fixedly connected to adjacent sides of the positioning frame. The positioning block closer to the river channel abuts against the outer wall of the gabion tube to form a positioning reference for stacking gabion tubes.
[0009] The connecting pipe has slots on both sides. The connecting pipe is engaged with the positioning block on the side away from the river channel through the slots, thereby fixing the connecting pipe between the two sets of positioning frames.
[0010] A fixing plate is fixedly connected to the top of the connecting pipe. Multiple sets of limiting blocks are slidably connected to the inner wall of the fixing plate. The limiting blocks abut against the outer wall of the gabion pipe on the side away from the river channel to form support.
[0011] The outer wall of the fixing plate is threaded with fixing bolts. The ends of the fixing bolts abut against the outer wall of the limiting block to lock the position of the limiting block inside the fixing plate.
[0012] Preferably, the inner wall of the positioning frame has two sets of mounting holes. The mounting holes penetrate the base of the positioning frame along the vertical direction of the positioning frame. The positioning frame is fixed to the ground through the mounting holes. The mounting holes provide a standard anchoring position for the positioning frame, which is convenient to use steel rods or expansion bolts to firmly lock the positioning frame to the ground, thereby enhancing the stability of the overall support structure.
[0013] Preferably, the number of the multi-layered gabion tubes decreases from bottom to top, so that the multi-layered gabion tubes are stacked in the area to be built into a tower-shaped structure. This tower-shaped stacking method utilizes the principle of gravity distribution, making the bottom of the cofferdam wider and more stable, effectively resisting the large water pressure at the bottom, while providing a stable support platform for the upper structure.
[0014] Preferably, the gabion tube is composed of steel wire and filler. The steel wire is a high-strength galvanized structure and is covered with a polyvinyl chloride layer. This double protection structure not only ensures the high tensile strength of the steel wire, but also gives it excellent corrosion resistance to prevent river water erosion. The filler is filled inside the wire mesh cage to increase weight and density.
[0015] Preferably, the filler is composed of stone and recycled concrete blocks, with the recycled concrete blocks accounting for no more than one-quarter of the filler. This ratio not only realizes the recycling of construction waste and reduces engineering costs, but also ensures that the filler as a whole has sufficient compressive strength and structural stability.
[0016] Preferably, the stone material is one or more of granite or limestone, and the stone material is filled inside the gabion tube in a combination of large and small particles. The small particles fill the gaps between the large particles, thereby significantly increasing the filling density inside the gabion tube, reducing the porosity, and enhancing the overall water-blocking performance.
[0017] Preferably, the geotextile adopts a double-layer reverse osmosis structure. The geotextile is located on the side of the gabion pipe closer to the river channel, and the geotextile is laid below the top layer of the gabion pipe and extends to the bottom layer of the gabion pipe. The double-layer reverse osmosis structure can effectively block water seepage. With the gravity compaction of the gabion pipe, a continuous and reliable seepage barrier is formed on the water-facing side.
[0018] Preferably, the combined cofferdam also includes earth piled on the side of the gabion pipe closest to the river channel. The earth covers and compacts the surface of the geotextile. The earth not only provides physical protection for the geotextile to prevent impact from floating objects, but also uses its own adhesion and weight to press the geotextile more tightly against the surface of the gabion pipe, further eliminating the risk of leakage. At the same time, it significantly reduces the amount of earthwork compared to a pure earth cofferdam.
[0019] This utility model has the following beneficial effects: 1. This utility model uses a tower-shaped structure made of gabion pipes filled with steel wire and filler as the main body, combined with geotextile with a double-layer reverse seepage structure and a small amount of earthwork for seepage prevention. It solves the problems of large earthwork consumption in cofferdams leading to waste of clay resources, easy river siltation, and difficulty in cleaning after the project is completed in the existing technology. It achieves the effect of significantly reducing earthwork consumption and preventing river siltation while ensuring the water-blocking effect of the cofferdam. Moreover, the gabion pipes and internal structure can be recycled, making the subsequent dismantling and cleaning work simpler and more environmentally friendly.
[0020] 2. This utility model solves the problems of insufficient stability of simple stacked cofferdam structures in the prior art, which are prone to displacement or overturning when subjected to large water pressure, by setting a support mechanism on the side of the gabion pipe away from the river channel, using a positioning frame fixed to the ground to provide basic anchoring, and using an adjustable limiting block on the connecting pipe to tightly abut against the outer wall of the gabion pipe. It achieves the effect of providing a precise positioning benchmark for stacking gabion pipes and forming a stable lateral rigid support, thereby effectively resisting the river water pressure and significantly improving the overall stability and safety of the cofferdam. Attached Figure Description
[0021] Figure 1 This is a front perspective view of a combined cofferdam proposed in this utility model; Figure 2 A structural breakdown diagram of the geotechnical layout of a combined cofferdam proposed in this utility model. Figure 3 This is a partial structural breakdown diagram of the gabion tube of a combined cofferdam proposed in this utility model; Figure 4 This is a cross-sectional view of a gabion tube for a combined cofferdam proposed in this utility model; Figure 5This is a partial structural breakdown diagram of the connecting pipe of a combined cofferdam proposed in this utility model.
[0022] Legend: 1. Earthwork; 2. Combined mechanism; 201. Gabion pipe; 202. Geotextile; 203. Steel wire; 204. Fill material; 3. Support mechanism; 301. Positioning frame; 302. Mounting hole; 303. Connecting pipe; 304. Fixing plate; 305. Limiting block; 306. Fixing bolt; 307. Slot; 308. Positioning block. Detailed Implementation
[0023] To make the objectives, technical solutions, and advantages of this utility model clearer, the technical solutions in the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this utility model without creative effort are within the scope of protection of this utility model.
[0024] Example: Please refer to Figures 1 to 5 This utility model provides a combined cofferdam, which aims to solve the problems in the prior art where the large amount of earthwork used in the cofferdam leads to resource waste, easy siltation of the river channel, and insufficient stability of the simple earth and rock structure and difficulty in subsequent cleaning.
[0025] Please refer to Figure 1 and Figure 2 The combined cofferdam includes a combined mechanism 2, a support mechanism 3 set on the side of the combined mechanism 2 away from the river channel, and earthwork 1 piled on the side of the combined mechanism 2 close to the river channel. The combined mechanism 2 is used to construct the main water-retaining structure of the cofferdam, the support mechanism 3 is used to provide the combined mechanism 2 with positioning reference and lateral rigid support to resist water pressure, and the earthwork 1 is used to assist in sealing and compacting the waterproof layer.
[0026] Please refer to Figure 1 , Figure 2 and Figure 5The support mechanism 3, as a key component enhancing the robustness of the combined mechanism 2, includes positioning frames 301 fixed to the ground and connecting pipes 303 connecting adjacent sets of positioning frames 301. The positioning frames 301 provide basic anchor points for the entire support structure. Two sets of positioning blocks 308 are fixedly connected to adjacent sides of each set of positioning frames 301. The positioning blocks 308 are divided into a set closer to the river channel and a set farther from the river channel. The positioning blocks 308 closer to the river channel abut against the outer wall of the combined mechanism 2 to provide a positioning reference for stacking installation. The connecting pipes 303 have slots 307 on both sides, and the connecting pipes 303 connect to the side farther from the river channel via the slots 307. The positioning block 308 engages to fix the connecting pipe 303 between the two sets of positioning frames 301. A fixing plate 304 is fixedly connected to the top of the connecting pipe 303. Multiple sets of limiting blocks 305 are slidably connected to the inner wall of the fixing plate 304. The limiting blocks 305 are used to abut against the outer wall of the combined mechanism 2 away from the river channel to form support. The outer wall of the fixing plate 304 is threaded with fixing bolts 306. The ends of the fixing bolts 306 abut against the outer wall of the limiting blocks 305. By tightening the fixing bolts 306, the position of the limiting blocks 305 in the fixing plate 304 can be locked, so that the limiting blocks 305 can adapt to the undulation of the outer wall of the combined mechanism 2 and maintain a continuous abutment support state.
[0027] Please refer to Figure 2 , Figure 3 and Figure 4 The combined structure 2 includes multiple layers of gabion pipes 201 stacked from bottom to top. The gabion pipes 201 are stacked in the area to be built up in a manner that decreases in number from bottom to top, so that the multiple layers of gabion pipes 201 are stacked to form a tower-shaped structure with a stable base. This tower-shaped structure utilizes its own gravity distribution to provide a solid water-blocking benchmark for subsequent cofferdam work. On the side of the gabion pipes 201 that is close to the river channel, a layer of geotextile 202 is laid. The geotextile 202 adopts a double-layer reverse seepage structure to block water infiltration to the greatest extent. The path of the geotextile 202 starts below the top layer of gabion pipes 201 and extends downward to cover the entire water-facing surface until it reaches the bottom layer of gabion pipes 201. The huge weight of the gabion pipes 201 themselves tightly compresses the upper and lower ends of the geotextile 202, thereby forming a continuous and sealed seepage barrier on the water-facing surface of the gabion pipes 201, reducing the seepage of river water during cofferdam construction.
[0028] Meanwhile, to enhance the overall compactness and erosion resistance of the cofferdam, the internal structure of the gabion pipe 201 was optimized. The gabion pipe 201 is composed of steel wire 203 and filler 204. The steel wire 203 is woven into a mesh cage structure to constrain the internal filler 204. The steel wire 203 adopts a high-strength galvanized structure and the surface of the steel wire 203 is coated with a polyvinyl chloride layer. This double protection structure effectively prevents the river water from corroding the steel wire 203 and extends the service life of the gabion pipe 201. The filler 204 is filled inside the mesh cage woven by the steel wire 203. The filler 204 is composed of a mixture of stone and recycled concrete blocks, in which the proportion of recycled concrete blocks in the filler 204 is no more than one-quarter. This realizes the resource utilization of construction waste and ensures the strength of the overall structure. The stone is selected from one or more of granite or limestone, and the stone particles are filled in a way that combines large and small particles. The small particles fill the gaps between the large particles, which significantly increases the internal compactness of the gabion pipe 201 and further improves the water-blocking effect.
[0029] Based on the aforementioned stacking and filling, the support mechanism 3 and the combination mechanism 2 form a crucial mechanical fit. When multiple layers of gabion tubes 201 are stacked and installed, the positioning block 308 near the river channel first provides a precise horizontal positioning reference for the bottom gabion tube 201, preventing slippage of the bottom layer. As the gabion tubes 201 are stacked upwards, the limiting block 305 in the sliding adjustment fixing plate 304 is used to ensure that the limiting block 305 can tightly abut against the outer wall of the gabion tube 201 on the side away from the river channel. Due to the fixing screw... Bolt 306 locks the position of limit block 305, which in turn applies a continuous horizontal reaction force to gabion pipe 201. When the river side of gabion pipe 201 is subjected to a huge water pressure thrust, the back side of gabion pipe 201 is firmly supported by limit block 305 and positioning block 308, thereby transferring the water pressure to the positioning frame 301 fixed to the ground, which greatly enhances the fixing effect and anti-overturning ability of gabion pipe 201. Finally, the support mechanism 3 achieves effective support for gabion pipe 201.
[0030] As a preferred embodiment, to further enhance the stability of the positioning frame 301 on the ground and facilitate rapid on-site installation, please refer to... Figure 5 The inner wall of the positioning frame 301 is provided with two sets of mounting holes 302. The mounting holes 302 penetrate the base of the positioning frame 301 along the vertical direction of the positioning frame 301. The mounting holes 302 provide standard anchoring positions for the positioning frame 301. Construction personnel can drive steel rods or expansion bolts into the ground through the mounting holes 302 to firmly lock the positioning frame 301 to the ground, effectively reducing the shaking or displacement of the positioning frame 301 when subjected to lateral water pressure.
[0031] As another preferred embodiment, in order to ensure the quick assembly and disassembly and stability of the connection between the connecting pipe 303 and the positioning frame 301, a positioning block 308 is fixedly connected to the side of the positioning frame 301. The connecting pipe 303 has slots 307 on both sides that match the shape of the positioning block 308. The connecting pipe 303 is tightly engaged with the positioning block 308 through the slots 307, which realizes the lateral fixed connection between the two sets of positioning frames 301. This engaging structure can not only transmit horizontal support force, but also allow the connecting pipe 303 to be quickly disassembled after the project is completed, thus improving construction efficiency.
[0032] As another preferred embodiment, in order to further improve the overall water-blocking effect of the cofferdam and protect the geotextile 202, please refer to... Figure 1 and Figure 2 On the side of the gabion pipe 201 closest to the river channel, earthwork 1 is also piled up. Earthwork 1 covers and compacts the surface of geotextile 202. The piling of earthwork 1 not only provides an additional physical protective layer for geotextile 202, preventing floating objects in the river from directly impacting or tearing geotextile 202, but also the adhesiveness and weight of earthwork 1 can press geotextile 202 more tightly onto the surface of gabion pipe 201, eliminating the gap between geotextile 202 and gabion pipe 201, thereby greatly enhancing the seepage prevention performance of the cofferdam. At the same time, with gabion pipe 201 as the core skeleton, the amount of earthwork 1 used is greatly reduced compared with traditional pure earth cofferdams, effectively saving clay resources and reducing the impact of siltation on the river channel.
[0033] In another preferred embodiment, in order to ensure the adaptability of the support, the inner wall of the fixing plate 304 and the limiting block 305 are slidably connected, so that the limiting block 305 can move horizontally along the fixing plate 304, thereby adapting to the positional changes of the backwater side surface of the gabion tube 201 under different layers or different stacking conditions, ensuring that the limiting block 305 can be adjusted to a tight abutting state regardless of the outer contour of the stacked gabion tube 201.
[0034] Working principle: When carrying out cofferdam construction, workers first stack multiple layers of gabion pipes 201 from bottom to top in the area to be cofferdammed, controlling the number of gabion pipes 201 to decrease layer by layer from bottom to top. This creates a stable tower-shaped structure in the area, providing a solid water-retaining benchmark for subsequent cofferdam work. On the side closest to the river channel, workers lay geotextile 202 below the top layer of gabion pipes 201 and extend it downwards to the bottom layer of gabion pipes 201, covering the entire water-facing side. Figure 3As shown, after the gabion pipe 201 is laid, its enormous weight firmly compresses the upper and lower ends of the geotextile 202. Because the geotextile 202 employs a double-layer reverse seepage structure, the compaction effect under the weight of the gabion pipe 201 significantly reduces the outflow of river water during the cofferdam construction. Subsequently, by piling earth 1 on one side of the gabion pipe 201 along the river channel, the earth 1 further presses the geotextile 202 against the surface of the gabion pipe 201, thus significantly enhancing the water-blocking effect of the cofferdam. The gabion pipe 201 is internally composed of high-strength galvanized steel wire 203 coated with a PVC layer, and is made of stone and recycled concrete blocks. The gabion pipe 201 is composed of filler material 204, in which large and small particles of stone are used for filling, ensuring that the gabion pipe 201 has extremely high density and structural strength. Finally, through earthwork 1 and combined mechanism 2, a complete cofferdam structure with solid inside and dense outside is formed. This structure not only enhances the water-blocking effect, but also greatly reduces the amount of earthwork 1 used, avoids the waste of clay resources, and prevents earthwork 1 from forming silt that is difficult to clean in the river channel. After the project is completed, the gabion pipe 201 and its internal structure can be completely recycled and reused. Moreover, due to the reduction in the amount of earthwork 1 used, the subsequent cleaning work is more convenient. When gabion tubes 201 are stacked, the support mechanism 3 significantly increases their stability. Before stacking, positioning frames 301 are placed on both sides of the area to be enclosed. Using the two sets of mounting holes 302 on the inner wall of the positioning frames 301, the positioning frames 301 are firmly fixed to the ground, reducing their sway. Since two sets of positioning blocks 308 are fixedly connected to adjacent sides of multiple positioning frames 301, the positioning blocks 308 closer to the river channel provide a precise initial positioning reference for stacking the gabion tubes 201. After the gabion tubes 201 are stacked, the connecting pipe 303 is securely fixed between the two sets of positioning frames 301 by engaging the positioning blocks 308 on the side furthest from the river channel with the slots 307 on both sides of the connecting pipe 303. A fixing plate 304 is fixedly connected to the top of the connecting pipe 303. Furthermore, the inner wall of the fixing plate 304 is slidably connected with multiple sets of limiting blocks 305. Therefore, construction personnel can slide the limiting blocks 305 to make them tightly abut against the outer wall of the gabion pipe 201 away from the river channel. Then, using the fixing bolts 306 threaded to the outer wall of the fixing plate 304, the fixing bolts 306 are tightened to lock the position of the limiting blocks 305 within the fixing plate 304, thereby restricting the movement of the limiting blocks 305. This allows the limiting blocks 305 to provide continuous and rigid lateral support to the gabion pipe 201. When the gabion pipe 201 is used to create a cofferdam to block water, the river channel side of the gabion pipe 201 is subjected to a huge water pressure thrust, while the backwater side of the gabion pipe 201 is strongly supported by the limiting blocks 305 and the positioning frame 301 system. This greatly enhances the fixing effect and anti-overturning ability of the gabion pipe 201. Finally, the support mechanism 3 achieves effective support for the gabion pipe 201.
Claims
1. A combined cofferdam, comprising a combined mechanism (2) and a support mechanism (3) disposed on one side of the combined mechanism (2); The combined structure (2) includes multiple layers of gabion tubes (201) stacked from bottom to top and geotextile (202) laid on one side of the gabion tubes (201). Its features are, The support mechanism (3) is located on the side of the gabion tube (201) away from the river channel. The support mechanism (3) includes a positioning frame (301) fixed to the ground and a connecting pipe (303) connecting two adjacent sets of positioning frames (301). Two sets of positioning blocks (308) are fixedly connected to the adjacent side of the positioning frame (301). The connecting pipe (303) has slots (307) on both sides. A fixing plate (304) is fixedly connected to the top of the connecting pipe (303). Multiple sets of limiting blocks (305) are slidably connected to the inner wall of the fixing plate (304). A fixing bolt (306) is threadedly connected to the outer wall of the fixing plate (304). The end of the fixing bolt (306) abuts against the outer wall of the limiting block (305) to lock the position of the limiting block (305) in the fixing plate (304) by the fixing bolt (306).
2. The combined cofferdam according to claim 1, characterized in that, The inner wall of the positioning frame (301) is provided with two sets of mounting holes (302). The mounting holes (302) penetrate the base of the positioning frame (301) along the vertical direction of the positioning frame (301), and the positioning frame (301) is fixed to the ground through the mounting holes (302).
3. A combined cofferdam according to claim 1, characterized in that, The number of the multi-layered gabion tubes (201) decreases from bottom to top, so that the multi-layered gabion tubes (201) are stacked in the area to be built into a tower structure.
4. A combined cofferdam according to claim 1, characterized in that, The gabion tube (201) is composed of steel wire (203) and filler (204). The steel wire (203) is a high-strength galvanized structure and is covered with a polyvinyl chloride layer.
5. A combined cofferdam according to claim 4, characterized in that, The filler (204) is composed of stone and recycled concrete blocks, with the recycled concrete blocks accounting for no more than one-quarter of the filler (204).
6. A combined cofferdam according to claim 5, characterized in that, The stone material is one or more of granite or limestone, and the stone material is filled inside the gabion tube (201) in a combination of large and small particles.
7. A combined cofferdam according to claim 1, characterized in that, The geotextile (202) adopts a double-layer reverse osmosis structure. The geotextile (202) is located on the side of the gabion pipe (201) close to the river channel, and the geotextile (202) is laid below the top layer of the gabion pipe (201) and extends to the bottom layer of the gabion pipe (201).
8. A combined cofferdam according to claim 1, characterized in that, The combined cofferdam also includes earthwork (1) piled on the side of the gabion pipe (201) near the river channel, the earthwork (1) covering and compacting the surface of the geotextile (202).