A pile head clamp for pile foundation static load test

By designing a pile head clamp with an arc-shaped clamping plate and connectors, the problems of unstable clamping and time-consuming disassembly and assembly caused by pile diameter errors in pile foundation static load tests were solved, enabling rapid installation, disassembly, and multiple reuses, and reducing testing costs.

CN224955159UActive Publication Date: 2026-11-10CHINA NUCLEAR IND HUAXING CONSTR +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522495925.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-25
Publication Date
2026-11-10
Estimated Expiration
2035-11-25

AI Technical Summary

Technical Problem

In existing static load tests of pile foundations, traditional methods suffer from problems such as unstable clamping due to pile diameter manufacturing errors, time-consuming assembly and disassembly, high costs, and difficulty in repeated reuse.

Method used

A pile head clamp comprising an arc-shaped clamping plate and connectors is designed. It utilizes an anti-slip coating and connectors to provide uniform clamping force, adapts to pile diameter errors, and enables rapid installation and disassembly through a synchronous drive mechanism, making it suitable for repeated use.

Benefits of technology

It achieves stable clamping of the pile head, adapts to pile diameter errors, improves testing efficiency, reduces testing costs, and supports multiple reuses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224955159U_ABST
    Figure CN224955159U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pile foundation engineering detection, especially relates to a pile head clamp for pile foundation static load test, include: arc clamping plate and pile head, the arc clamping plate is provided with two symmetry, the arc clamping plate has elasticity, and two arc clamping plates are fixed on the outer wall of pile head through the embrace of connecting piece, at this moment, the end of two arc clamping plates not contact each other, the inner wall of arc clamping plate is equipped with antiskid coating, the outer wall middle part of arc clamping plate is fixedly connected with loading force transmission plate, the utility model provides a kind of pile head clamp that can adapt to pile diameter manufacturing error, can be stably clamped, quickly disassembled and can be multiple turnover.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of pile foundation engineering testing technology, and in particular to a pile head clamp for static load testing of pile foundations. Background Technology

[0002] Static load testing is the most direct method for determining the vertical compressive / tension bearing capacity of a single pile. Traditional methods include: 1. Casting a reinforced concrete pile cap at the pile head, which involves a long curing period, material waste, and requires removal after the test, resulting in high costs and environmental pollution; 2. Using a round steel pipe pile head with no adjustment margin, where even slight deviations in pile diameter can lead to point contact or eccentricity, causing localized crushing, distorted test data, and time-consuming assembly and disassembly. Therefore, there is an urgent need for a pile head clamp that can accommodate pile diameter manufacturing errors, provide stable clamping, allow for rapid assembly and disassembly, and can be reused multiple times. Utility Model Content

[0003] The purpose of this utility model is to provide a pile head clamp for static load testing of pile foundations, so as to solve the technical problems existing in the background art.

[0004] To achieve the above objectives, the technical solution of this utility model is as follows: A pile head clamp for static load testing of pile foundations includes: an arc-shaped clamp plate and a pile head. Two arc-shaped clamp plates are symmetrically arranged and are elastic. The two arc-shaped clamp plates are tightly fixed to the outer wall of the pile head by a connector. At this time, the opposite ends of the two arc-shaped clamp plates do not contact each other. The inner wall of the arc-shaped clamp plate is provided with an anti-slip coating, and a loading force transmission plate is fixedly connected to the middle of the outer wall of the arc-shaped clamp plate.

[0005] Furthermore, the connecting component includes: a connecting plate, bolts and nuts. Two connecting plates are symmetrically and vertically fixedly connected to the outer sides of the tangential ends of the arc-shaped clamping plate. Several bolts and nuts are provided. The two connecting plates on the same side of the front and back of the two arc-shaped clamping plates are detachably fixedly connected by several bolts and several nuts.

[0006] Furthermore, the connecting plate is evenly provided with several connecting holes, and several bolts are respectively moved or slidably passing through several connecting holes on the front and back sides of the two connecting plates that are opposite to each other, and are threaded to several nuts on the outer side of one of the connecting plates.

[0007] Furthermore, it also includes: a washer, which is fitted onto the shank of the bolt, with both ends of the washer pressing against the outer wall of one of the connecting plates and the inner end face of the nut.

[0008] Furthermore, it also includes: transverse reinforcing ribs, wherein several transverse reinforcing ribs are uniformly fixedly connected to the two internal corners formed by the arc-shaped clamp and the two connecting plates fixedly connected thereto.

[0009] Furthermore, the anti-slip coating is an Fe-Cr-B anti-slip coating.

[0010] Furthermore, it also includes: an intermediate pad, which is a rectangular plate and there are two of them. The intermediate pad is placed between two connecting plates that are opposite each other on the same side, and its two plate surfaces are respectively in contact with the inner ends of the two connecting plates facing each other; the intermediate pad is evenly provided with a number of through holes, and a number of bolts on the same side of it move or slide through the number of through holes.

[0011] Furthermore, it also includes: longitudinal reinforcing ribs, wherein the loading force transmission plate is horizontally arranged and vertically fixedly connected to the middle of the outer wall of the arc-shaped clamp, and four longitudinal reinforcing ribs are symmetrically fixedly connected at the two right angles formed by the loading force transmission plate and the arc-shaped clamp.

[0012] Furthermore, it also includes: force transmission columns, studs, nuts, a jack mounting plate, and T-shaped sliders. Two force transmission columns, studs, nuts, and T-shaped sliders are symmetrically arranged. A vertically penetrating connecting hole is provided at the center of the top of the loading force transmission plate. The tops of the two studs are fixedly connected to the center of the bottom of the two force transmission columns, respectively. The bottoms of the two studs slide through the connecting holes on the two loading force transmission plates and are threaded with two nuts at the bottom of the two loading force transmission plates. The tops of the two force transmission columns are fixedly connected to the bottom of the two T-shaped sliders. Two T-shaped grooves are symmetrically provided on the left and right sides of the bottom of the jack mounting plate. The two T-shaped sliders are symmetrically slidably connected within the two T-shaped grooves. The jack mounting plate is equipped with a synchronous drive mechanism for driving the two T-shaped sliders to move synchronously towards or away from each other.

[0013] Furthermore, the synchronous drive mechanism includes: a screw, bearings, and a throttle. Two bearings are provided. A transverse through-hole is provided on the jack mounting plate, and the through-hole is connected to two T-shaped sliding grooves. Two bearing mounting slots are symmetrically provided on the inner ends of the two T-shaped sliding grooves facing each other. The screw movably passes through the through-hole and is rotatably mounted in the two bearing mounting slots via the two bearings. Two transverse through-threaded holes are symmetrically provided on the two T-shaped sliding blocks. The left and right ends of the screw pass through and are threadedly connected to the two threaded holes on the two T-shaped sliding blocks. A throttle is fixedly connected to one end of the screw. The thread directions on the left and right sides of the screw are opposite.

[0014] Compared with the prior art, the beneficial effects of this utility model are: This invention provides a uniform radial clamping force by setting an anti-slip coating on the inner wall of the arc-shaped clamping plate and using connectors to hold and fix the pile head, ensuring the stability of the clamping. At the same time, the entire device can adapt to pile diameter manufacturing errors; it is also convenient for quick installation and disassembly, improving testing efficiency; moreover, the entire device can be reused multiple times, effectively reducing testing costs. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a cross-sectional view of the present invention at the bolt location; Figure 3 This is a transverse longitudinal sectional view of the screw of this utility model; Figure 4 This is a top-view perspective of the present invention; Figure 5 This is an installation diagram of this utility model.

[0016] The labels in the attached diagram are as follows: 1-arc-shaped clamp, 2-connecting plate, 3-transverse reinforcing rib, 4-bolt, 5-nut one, 6-washer, 7-intermediate pad, 8-loading force transmission plate, 9-longitudinal reinforcing rib, 10-force transmission column, 11-stud, 12-nut two, 13-jack placement plate, 1301-T-shaped slide, 14-T-shaped slider, 15-screw, 16-bearing, 17-handle, 18-pile head. Detailed Implementation

[0017] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments.

[0018] See Figures 1-5 As shown, a pile head clamp for static load testing of pile foundation includes: an arc-shaped clamp plate 1 and a pile head 18. Two arc-shaped clamp plates 1 are symmetrically arranged. The arc-shaped clamp plates 1 are elastic. The two arc-shaped clamp plates 1 are tightly fixed to the outer wall of the pile head 18 by a connector. At this time, the opposite ends of the two arc-shaped clamp plates 1 do not contact each other. The inner wall of the arc-shaped clamp plate 1 is provided with an anti-slip coating. The anti-slip coating is an Fe-Cr-B anti-slip coating. A loading force transmission plate 8 is fixedly connected to the middle of the outer wall of the arc-shaped clamp plate 1.

[0019] In this embodiment, the connector includes: a connecting plate 2, bolts 4, nuts 5, and washers 6. Two connecting plates 2 are symmetrically and vertically fixedly connected to the outer sides of the tangential ends of the arc-shaped clamping plate 1. Several bolts 4 and nuts 5 are provided. The two connecting plates 2 on the same front and back sides and opposite left and right sides of the two arc-shaped clamping plates 1 are detachably fixedly connected by several bolts 4 and several nuts 5. Several connecting holes are evenly opened on the connecting plate 2. Several bolts 4 are movably or slidably passed through several connecting holes on the two connecting plates 2 on the same front and back sides and opposite left and right sides, and are threaded to several nuts 5 on the outer side of one of the connecting plates 2. Washers 6 are sleeved on the shank of bolts 4. The two ends of washers 6 are pressed against the outer wall of one of the connecting plates 2 and the inner end face of the nut 5, respectively. By clamping and fixing the pile head 18 through the connector, a uniform radial clamping force can be provided to ensure the stability of the clamping.

[0020] In this embodiment, the connector further includes: a transverse reinforcing rib 3. Several transverse reinforcing ribs 3 are uniformly fixedly connected to the two internal corners formed by the arc-shaped clamp 1 and the two connecting plates 2 fixedly connected thereto. The transverse reinforcing ribs 3 can prevent local buckling.

[0021] In this embodiment, the pile head clamp for the static load test of the pile foundation further includes: an intermediate pad 7, which is a rectangular plate and there are two of them. The intermediate pad 7 is placed between two connecting plates 2 that are opposite each other on the same side, and its two plate surfaces are in contact with the inner ends of the two connecting plates 2 facing each other. A number of through holes are evenly opened on the intermediate pad 7, and a number of bolts 4 on the same side of it move or slide through the number of through holes. The intermediate pad 7 can be used to fill the gap between it and the pile head 18 with grout or cement slurry, thereby increasing the contact area between the entire clamp and the pile head 18 and preventing the pile head from being crushed.

[0022] In this embodiment, the pile head clamp for the static load test of the pile foundation further includes: longitudinal reinforcing ribs 9, the loading force transmission plate 8 is horizontally set and vertically fixedly connected to the middle of the outer wall of the arc-shaped clamp 1, and four longitudinal reinforcing ribs 9 are symmetrically fixedly connected at the two right angles formed by the loading force transmission plate 8 and the arc-shaped clamp 1; the longitudinal reinforcing ribs 9 can improve the connection strength between the loading force transmission plate 8 and the arc-shaped clamp 1.

[0023] In this embodiment, the pile head clamp for the static load test of the pile foundation further includes: a force transmission column 10, studs 11, nuts 12, a jack mounting plate 13, and a T-shaped slider 14. Two force transmission columns 10, studs 11, nuts 12, and T-shaped sliders 14 are symmetrically arranged. A vertically penetrating connecting hole 2 is opened at the center of the top of the loading force transmission plate 8. The tops of the two studs 11 are respectively fixedly connected to the center of the bottom of the two force transmission columns 10. The bottom ends of the two studs 11 slide through the connecting holes 2 on the two loading force transmission plates 8 and are threadedly connected to the bottom ends of the two loading force transmission plates 8. The top ends of the force transmission column 10 are fixedly connected to the bottom ends of the two T-shaped sliders 14. Two T-shaped grooves 1301 are symmetrically opened on the left and right sides of the bottom end of the jack mounting plate 13. The two T-shaped sliders 14 are symmetrically slidably connected within the two T-shaped grooves 1301. The jack mounting plate 13 is equipped with a synchronous drive mechanism for driving the two T-shaped sliders 14 to move synchronously towards or away from each other. The synchronous drive mechanism includes a screw 15, a bearing 16, and a throttle 17. Two bearings 16 are provided. The jack mounting plate 13 has transverse through mounting holes, which are respectively connected to the two T-shaped grooves. 1301 is connected. Two bearing mounting slots are symmetrically opened on the inner ends of the two T-shaped slides 1301 facing each other. The screw 15 movably passes through the mounting hole and is rotatably mounted in the two bearing mounting slots via two bearings 16. Two transverse threaded holes are symmetrically opened on the two T-shaped sliders 14. The left and right ends of the screw 15 pass through and are threadedly connected to the two threaded holes on the two T-shaped sliders 14. A handle 17 is fixedly connected to one end of the screw 15. The thread directions on the left and right sides of the screw 15 are opposite. The distance between the two studs 11 is adjusted by rotating the handle 17 to accommodate... The spacing between the two loading force transmission plates 8 is not uniform after the two arc-shaped clamps 1 are tightened due to the error in pile diameter manufacturing. The two force transmission columns 10 are fixedly installed on the top of the two loading force transmission plates 8 by vertically penetrating the two connecting holes 2 on the two loading force transmission plates 8 by two studs 11 and tightening them with two nuts 2 12. Then, the two force transmission columns 10 support the jack placement plate 13 through two T-shaped sliders 14. The jack is placed on the top of the jack placement plate 13, and then the detection beam is installed on the top of the jack. The corresponding weight of the stacking platform is stacked on both ends of the detection beam to test the bearing capacity.

[0024] Working principle: When a static load test of the pile foundation is required, two arc-shaped clamps 1 are symmetrically clamped on the outer wall of the pile head 18. Then, an intermediate pad 7 of appropriate thickness is selected according to the diameter of the pile head 18 and fixed by connecting parts. Grouting material or cement grout is filled in the gap between the intermediate pad 7 and the pile head 18. Then, the distance between the two studs 11 is adjusted by turning the handle 17 so that the two studs 11 can be vertically inserted through the connecting holes 2 on the two load transmission plates 8 respectively, and fixed by tightening the two nuts 2 12. The two force transmission columns 10 are fixedly installed on the top of the two load transmission plates 8. Then, the two force transmission columns 10 support the jack placement plate 13 through the two T-shaped sliders 14. The jack is placed on the top of the jack placement plate 13. Then, the test beam is installed on the top of the jack. The corresponding weight of the stacking platform is stacked on both ends of the test beam to perform the bearing capacity test.

[0025] In the description of this utility model, it should be noted that the terms "upper", "lower", "left", "right", "inner", "outer", "top / bottom", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0026] The above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model in any way. Any simple modifications, equivalent substitutions, and improvements made by those skilled in the art to the above embodiments without departing from the scope of the present utility model's technical solution and based on the technical essence of the present utility model shall still fall within the protection scope of the present utility model's technical solution.

Claims

1. A pile head clamp for use in a static load test of a pile foundation, characterized in that, The utility model relates to a pile head loading device, including: The arc clamping plate (1) and pile head (18), the arc clamping plate (1) is provided with two symmetry, the arc clamping plate (1) has elasticity, and two arc clamping plates (1) are fixed on the outer wall of pile head (18) by the connecting piece and are embraced tightly, when, the end of two arc clamping plates (1) is not contacted towards each other, the inner wall of arc clamping plate (1) is equipped with antiskid coating, and the outer wall middle part of arc clamping plate (1) is fixedly connected with loading force plate (8).

2. A pile head clamp for static load testing of a pile foundation according to claim 1, characterized in that: The connecting piece includes: connecting plate (2), bolt (4) and nut one (5), the tangent two ends outside symmetry of arc clamping plate (1) are fixedly connected with two connecting plates (2) perpendicularly, bolt (4) and nut one (5) are all provided with several, and the two connecting plates (2) of two arc clamping plates (1) are respectively fixedly connected through several bolts (4) and several nut one (5) on the same side left and right before and after.

3. A pile head clamp for static load testing of a pile foundation according to claim 2, characterized in that: Several connecting holes one are evenly formed on the connecting plate (2), and several bolts (4) are respectively movably or slidably threaded through the several connecting holes one on the two connecting plates (2) on the same side left and right before and after and the outside of one of the connecting plates (2).

4. A pile head clamp for static load testing of a pile foundation according to claim 3, characterized in that: Further including: The washer (6) is sleeved on the rod of bolt (4), and the two ends of washer (6) are respectively pressed and contacted with the outer wall of one of the connecting plates (2) and the inner side end surface of nut one (5).

5. The pile head clamp for static load test of pile foundation according to claim 2, characterized in that: Further including: The two inside corners formed by the arc clamping plate (1) and the two connecting plates (2) fixedly connected thereto are uniformly fixedly connected with several transverse reinforcing ribs (3) respectively.

6. The pile head clamp for static load test of pile foundation according to claim 1, characterized in that: The antiskid coating is a Fe-Cr-B antiskid coating.

7. The pile head clamp for static load test of pile foundation according to claim 1, characterized in that: Further including: The intermediate pad (7) is a rectangular plate body and is provided with two, the intermediate pad (7) is arranged between the two connecting plates (2) on the same side left and right before and after, and the two plate surfaces thereof are respectively contacted and matched with the inner side ends of the two connecting plates (2) towards each other, and several perforations are evenly formed on the intermediate pad (7), and several bolts (4) on the same side thereof are respectively movably or slidably threaded through the several perforations.

8. The pile head clamp for static load test of pile foundation according to claim 1, characterized in that: Further including: The loading force plate (8) is horizontally arranged and fixedly connected to the outer wall middle part of the arc clamping plate (1) perpendicularly, and four longitudinal reinforcing ribs (9) are fixedly connected to the two right angles formed by the loading force plate (8) and the arc clamping plate (1) symmetrically.

9. The pile head clamp for static load test of pile foundation according to claim 1, characterized in that: Further including: The utility model provides force transmission column (10), stud (11), nut two (12), jack placing plate (13) and T -shaped sliding block (14), force transmission column (10), stud (11), nut two (12) and T -shaped sliding block (14) all are provided with two symmetry, the top middle part of loading force transmission plate (8) is equipped with the connecting hole no. two that vertically penetrates, and the top of two studs (11) is fixedly connected in the middle part of two force transmission column (10) bottom, and the bottom of two studs (11) respectively slidingly penetrates the connecting hole no. two on two loading force transmission plate (8) and is in two loading force transmission plate (8) bottom screw thread connection two nut two (12), and the top of two force transmission column (10) is fixedly connected in the bottom of two T -shaped sliding block (14) respectively, the bottom left and right sides of jack placing plate (13) are equipped with two T -shaped sliding slot (1301) symmetry, and two T -shaped sliding block (14) are symmetrically slidably connected in two T -shaped sliding slot (1301), the jack placing plate (13) is provided with the synchronous drive mechanism for driving two T -shaped sliding block (14) synchronous displacement or synchronous displacement of opposite direction.

10. A pile head clamp for static load testing of a pile foundation according to claim 9, characterized in that: The synchronous drive mechanism comprises a screw rod (15), a bearing (16), and a handle (17). The bearing (16) is provided with two. The jack placing plate (13) is provided with an installation hole that penetrates horizontally. The installation hole is in communication with the two T-shaped sliding slots (1301). The inner side ends of the two T-shaped sliding slots (1301) are symmetrically provided with two bearing installation grooves. The screw rod (15) is movably inserted into the installation hole and is rotatably installed in the two bearing installation grooves through the two bearings (16). The two T-shaped sliding blocks (14) are symmetrically provided with two horizontally penetrating threaded holes. The left and right ends of the screw rod (15) are inserted into and screwed with the two threaded holes of the two T-shaped sliding blocks (14). One end of the screw rod (15) is fixedly connected with the handle (17). The screw threads of the left and right sides of the screw rod (15) are opposite.