A prefabricated formwork
By designing prefabricated, non-removable formwork, the problems of large formwork usage and complex construction in large-volume concrete construction have been solved, resulting in improved construction efficiency and cost savings.
Patent Information
- Application Number
- CN202522640605.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-12
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-12
AI Technical Summary
Large-volume concrete construction requires a large amount of formwork and scaffolding, and the construction is complex. The heavy steel formwork requires large equipment for installation, making construction difficult. Repeated erection and dismantling slows down the construction progress.
Design a prefabricated, non-removable formwork, including a first prefabricated block and a second prefabricated block. The first prefabricated block has an L-shaped structure, and the second prefabricated block consists of a vertical section and a horizontal prefabricated block. The prefabricated blocks can be fabricated and installed on site, and their stability can be enhanced by reinforcing steel bars. The formwork can be reused as part of the building structure.
Reduce the work and cost of template transportation, improve construction efficiency, simplify the installation process, reduce the cost of dismantling later, and improve construction efficiency.
Smart Images

Figure CN224955238U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of water conservancy engineering technology, specifically relating to a prefabricated, non-removable template. Background Technology
[0002] Large-volume concrete has a large surface area, requiring a large amount of formwork during concrete pouring. Using small formwork results in extensive and complex scaffolding installation, a long service life, and high costs, especially for tall buildings. To reduce scaffolding and improve formwork erection efficiency, large-volume concrete construction typically uses large steel formwork. During on-site construction, one layer of formwork is erected and one layer of concrete is poured. After the concrete reaches a certain curing period, another layer of formwork is erected and concrete is poured, using 2-3 sets of formwork in a cycle. Due to the weight of the large steel formwork, large lifting equipment is required for installation, making the construction difficult.
[0003] The repeated erection and dismantling of existing concrete construction formwork greatly slows down the construction progress. Based on this, this patent designs a prefabricated, non-removable formwork suitable for large-volume concrete to solve the above problems. Utility Model Content
[0004] This utility model solves the technical problems mentioned in the background section by providing a prefabricated, non-removable template. The specific solution is as follows: A prefabricated, non-removable template includes a first prefabricated block and a second prefabricated block. The first prefabricated block has an L-shaped structure. The second prefabricated block includes a first vertical section, a second vertical section, and a horizontal prefabricated block connecting the first vertical section and the second vertical section. The first vertical section is disposed on the inner side of the first prefabricated block. The lower surface of the horizontal prefabricated block is attached to the top of the first prefabricated block. The second vertical section is connected to one side of the top of the horizontal prefabricated block.
[0005] Furthermore, a reinforcing beam is vertically connected to the horizontal portion of the first precast block along its length.
[0006] Furthermore, a number of reinforcing steel bars are provided at intervals along the length of the inner side of the first vertical section, and the reinforcing steel bars are inverted L-shaped structures.
[0007] Furthermore, two sets of reinforcing bars are arranged along the height of the first vertical section. The two sets of reinforcing bars are respectively arranged in the middle and upper part of the first vertical section, and the upper reinforcing bars are located in the upper concrete pouring layer.
[0008] Furthermore, the vertical height of the first precast block is the same as the layer height of the concrete pouring, and the horizontal width is 0.7 to 1 times the vertical height.
[0009] Furthermore, the vertical height of the second precast block is equal to twice the height of the concrete layer minus the thickness of the second precast block.
[0010] Furthermore, the thickness of both the first and second precast blocks is 10-15 cm.
[0011] The beneficial effects of this utility model are: This utility model discloses a prefabricated, non-removable formwork, wherein the first and second prefabricated blocks can be fabricated on-site, reducing the formwork transportation work and costs; the size of the prefabricated blocks can be determined according to the on-site construction conditions, making construction more convenient; the prefabricated blocks are easy to install and can be used as part of the building after construction without dismantling, greatly improving construction efficiency, providing convenience for construction and saving subsequent dismantling costs. Attached Figure Description
[0012] Figure 1 This is an overall rendering of the present invention.
[0013] Figure 2 This is a schematic diagram of the structure of the first precast block of this utility model.
[0014] Figure 3 This is a schematic diagram of the second precast block structure of this utility model.
[0015] Explanation of reference numerals in the attached drawings: 1. First precast block; 2. Second precast block; 201. First vertical section; 202. Second vertical section; 203. Horizontal precast block; 3. Reinforcing beam; 4. Reinforcing steel bar; 5. Layered concrete pouring. Detailed Implementation
[0016] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.
[0017] See Figure 1-3 A prefabricated, non-removable formwork includes a first prefabricated block 1 and a second prefabricated block 2. Both the first prefabricated block 1 and the second prefabricated block 2 can be sized on-site according to actual needs and formed by concrete pouring. The first prefabricated block 1 has an L-shaped structure. The second prefabricated block 2 includes a first vertical section 201, a second vertical section 202, and a horizontal prefabricated block 203 connecting the first vertical section 201 and the second vertical section 202. The first vertical section 201 is located on the inner side of the first prefabricated block 1. The lower surface of the horizontal prefabricated block 203 is in contact with the top of the first prefabricated block 1. The second vertical section 202 is connected to one side of the top of the horizontal prefabricated block 203. The first vertical section 201 is in contact with the inner side of the first prefabricated block 1, and the outer side of the second vertical section 202 is on the same plane as the outer side of the first prefabricated block 1.
[0018] The horizontal part of the first precast block 1 is vertically connected to a reinforcing beam 3 along its length, wherein the reinforcing beam 3 can strengthen the solidity between the first precast block 1 and the bottom layer of the concrete pouring layer 5.
[0019] The inner side of the first vertical section 201 is provided with a number of reinforcing steel bars 4 at intervals along its length. The reinforcing steel bars 4 are inverted L-shaped structures. The setting of the reinforcing steel bars 4 can strengthen the firmness between the second precast block 2 and the concrete pouring layer 5.
[0020] Two sets of reinforcing steel bars 4 are arranged along the height of the first vertical section 201. The two sets of reinforcing steel bars 4 are respectively arranged in the middle and upper parts of the first vertical section 201, and the upper reinforcing steel bars 4 are located in the upper concrete pouring layer 5, which can strengthen the firmness between the second precast block 2 and the upper and lower concrete pouring layers 5.
[0021] The preferred first precast block 1 has the same vertical height as the concrete pouring layer 5 and a horizontal width that is 0.7 to 1 times the vertical height, as shown in the figure. The vertical height of the first precast block 1 is h1, the horizontal width is b1, the thickness is t, and the height of the concrete pouring layer 5 is h.
[0022] The preferred vertical height of the second precast block 2 is twice the concrete layer height minus the thickness of the second precast block 2. As shown in the figure, the vertical height of the second precast block 2 is h2, where h2 = 2h - t.
[0023] The thickness of the first precast block 1 and the second precast block 2 is preferably 10~15cm.
[0024] The operation process of the prefabricated, non-removable template of this utility model is as follows: S1: Lay the first precast block 1 along the outline of the building, and then place the second precast block 2 along the first precast block 1. When placing the second precast block 2, the bottom end of the first vertical segment 201 is placed on the upper surface of the first precast block 1, and its side is in contact with the side of the first precast block 1. S2: Pour the first layer of concrete into layer 5. After the first layer of concrete into layer 5 has reached a certain age, place the second precast block 2. When placing it, the side of the first vertical section 201 of the second precast block 2 should be in contact with the side of the second vertical section 202 of the next layer of second precast block 2, and the horizontal precast block 203 should be placed on top of the second vertical section 202 of the next layer. After placing it, pour the second layer of concrete into layer 5. S3: Follow the steps in S2 according to the pouring height at the construction site.
[0025] For ease of description, this specification focuses on buildings with planar exterior surfaces. However, the invention can be applied to other types of buildings with curved planes and sloping or curved facades through variations. It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects. The scope of the invention is defined by the appended claims rather than the foregoing description. Therefore, all variations falling within the meaning and scope of equivalents of the claims are intended to be included within the invention, and no reference numerals in the claims should be construed as limiting the scope of the claims.
[0026] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can be appropriately combined to form other embodiments that can be understood by those skilled in the art. Therefore, any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.
Claims
1. A prefabricated, non-removable formwork, characterized in that: The device includes a first precast block (1) and a second precast block (2). The first precast block (1) has an L-shaped structure. The second precast block (2) includes a first vertical section (201), a second vertical section (202), and a horizontal precast block (203) connecting the first vertical section (201) and the second vertical section (202). The first vertical section (201) is located inside the first precast block (1). The lower surface of the horizontal precast block (203) is in contact with the top of the first precast block (1). The second vertical section (202) is connected to one side of the top of the horizontal precast block (203).
2. The prefabricated, non-removable template according to claim 1, characterized in that: The horizontal part of the first precast block (1) is vertically connected to a reinforcing beam (3) along its length.
3. The prefabricated, non-removable template according to claim 1, characterized in that: The first vertical section (201) has a number of reinforcing steel bars (4) spaced apart along its length. The reinforcing steel bars (4) are inverted L-shaped structures.
4. A prefabricated, non-removable template according to claim 3, characterized in that: Two sets of reinforcing bars (4) are arranged along the height of the first vertical section (201). The two sets of reinforcing bars (4) are arranged in the middle and upper parts of the first vertical section (201), respectively, and the upper reinforcing bars (4) are located in the upper concrete pouring layer (5).
5. A prefabricated, non-removable template according to claim 4, characterized in that: The vertical height of the first precast block (1) is the same as the height of the concrete pouring layer (5), and the horizontal width is 0.7 to 1 times the vertical height.
6. A prefabricated, non-removable template according to claim 1, characterized in that: The vertical height of the second precast block (2) = twice the concrete layer height - the thickness of the second precast block (2).
7. A prefabricated, non-removable template according to claim 1, characterized in that: The thickness of the first precast block (1) and the second precast block (2) is 10~15cm.