A smart construction installation frame
By designing an intelligent construction and installation frame, the system can monitor the environment and weight in real time, and the support leg components can be detached and raised, solving the problems of low safety and inconvenient assembly and disassembly of traditional construction frames, thus achieving both safety and convenience in the construction process.
Patent Information
- Application Number
- CN202522694856.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-19
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-19
AI Technical Summary
Existing construction and installation scaffolds have low safety, rely on manual experience, are inconvenient to disassemble and assemble, are difficult to transport, and cannot monitor the environment and weight in real time, leading to frequent safety accidents.
Design an intelligent construction installation frame, comprising a main frame, support components, a control box, and a mobile lifting device. Equipped with environmental detection, weight detection, alarm units, and wireless communication, it monitors in real time and issues warnings in case of abnormalities. The support leg components are detachable and liftable, and the support components include fixed and movable support legs.
It improves construction safety by detecting and alarming real-time environmental and weight conditions, thus preventing accidents. The support leg components are easy to assemble and disassemble, further enhancing the safety factor of construction.
Smart Images

Figure CN224955407U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of installation and construction technology, and in particular to an intelligent construction and installation frame. Background Technology
[0002] In the construction of water conservancy projects, such as pipeline laying, gate installation, and pump station construction, various construction and installation frames and work platforms are frequently used. Traditional installation frames are mostly fixed or simple manually adjustable structures, which have the following main drawbacks:
[0003] Low safety and reliance on human experience: Existing installation frames cannot monitor and warn of the current environment such as strong winds or whether the frame is overloaded during the operation. They mostly rely on the construction personnel's independent judgment and experience, which can easily lead to safety accidents such as frame overturning or being blown down by the wind due to untimely or inaccurate judgment.
[0004] Inconvenient assembly and disassembly: Most mounting brackets are integral welded or bolted structures, which are bulky and difficult to transport and disassemble, making them very inconvenient to use.
[0005] To address the aforementioned technical problems, those skilled in the art urgently need to design an intelligent construction and installation frame to accurately determine the current environment and hazards, thereby improving construction safety. Utility Model Content
[0006] To address the aforementioned shortcomings, the technical problem to be solved by this utility model is to provide an intelligent construction installation frame that can use an appropriate number of movable support legs according to the actual construction height, and can use a mobile lifting device to raise and lower the main frame, facilitating the installation of the support leg components. It can also detect the environment and weight in real time, and issue local and remote alarms when abnormalities occur, thereby improving the construction safety factor.
[0007] To solve the above-mentioned technical problems, the technical solution of this utility model is as follows:
[0008] An intelligent construction and installation frame includes a main frame, a support assembly supporting the main frame, a control box mounted on the main frame, and a mobile lifting device. The support assembly includes at least four sets of support leg assemblies, each set comprising a fixed support leg and multiple movable support legs. The top end of each fixed support leg is fixed to the main frame, and the bottom end of each fixed support leg is detachably connected to one end of any one of the movable support legs. The other end of each movable support leg is detachably connected to another movable support leg or a base. The control box includes a control unit and a human-machine interface unit, an environmental detection unit, a weight detection unit, an alarm unit, and a wireless communication unit, all electrically connected to the control unit. The environmental detection unit detects environmental signals and transmits them to the control unit. The weight detection unit detects the weight of the main frame and transmits the weight signal to the control unit. The control unit controls the alarm unit based on the environmental and weight signals. The wireless communication unit is wirelessly connected to a remote monitoring terminal. The mobile lifting device is positioned below the main frame and drives the main frame to rise and fall.
[0009] In a preferred embodiment, the main frame includes a work platform and a protective net surrounding the work platform, with the control box mounted on top of the work platform.
[0010] In a preferred embodiment, the environmental detection unit includes a wind speed sensor and a humidity sensor.
[0011] In a preferred embodiment, the support assembly further includes multiple support beams, each of which is detachably disposed between the two fixed support legs or between the two movable support legs.
[0012] In a preferred embodiment, the alarm unit includes an audible and visual alarm unit.
[0013] In a preferred embodiment, the human-computer interaction unit includes a touchscreen and / or operation keys.
[0014] In a preferred embodiment, the bottom end of the fixed support leg is threadedly connected to one end of the movable support leg, and any two movable support legs are threadedly connected.
[0015] In a preferred embodiment, the control box is provided with a shock-absorbing structure on its inner side.
[0016] The beneficial effects of this utility model after adopting the above technical solution are:
[0017] The intelligent construction and installation frame of this utility model includes a main frame, a support assembly supporting the main frame, a control box mounted on the main frame, and a mobile lifting device. The support assembly includes at least four sets of support leg assemblies, each set of support leg assemblies including a fixed support leg and multiple movable support legs. The top of the fixed support leg is fixed to the main frame, and the bottom of the fixed support leg is detachably connected to one end of any movable support leg. The other end of the movable support leg is detachably connected to another movable support leg or a base. The control box is equipped with a control unit and a human-machine interaction unit, an environmental detection unit, a weight detection unit, an alarm unit, and a wireless communication unit, which are electrically connected to the control unit. The environmental detection unit detects environmental signals and transmits them to the control unit. The weight detection unit detects the weight of the main frame and transmits the weight signal to the control unit. The control unit controls the alarm unit based on the environmental signal and the weight signal. The wireless communication unit is wirelessly connected to a remote monitoring terminal. The mobile lifting device is used to be located below the main frame and drives the main frame to rise and fall. As can be seen, the intelligent construction installation frame of this utility model can use an appropriate number of movable support legs according to the actual construction height. When assembling and disassembling the movable support legs, the main frame can be raised and lowered using a mobile lifting device, making the assembly and disassembly of the support leg components convenient. Furthermore, this utility model can detect the environment and weight in real time, and can issue local and remote alarms in a timely manner when abnormalities occur, thereby improving the construction safety factor. Attached Figure Description
[0018] Figure 1 This is a structural schematic diagram of the intelligent construction and installation frame in this utility model;
[0019] Figure 2 This is a schematic diagram of the intelligent construction and installation frame in this utility model;
[0020] In the diagram: 1-Main frame, 10-Working platform, 11-Safety net, 2-Support leg assembly, 20-Fixed support leg, 21-Movable support leg, 22-Support beam, 23-Base, 3-Control box, 4-Touch screen, 5-Wind speed sensor, 6-Antenna, 7-Mobile lifting device, 8-Speaker. Detailed Implementation
[0021] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present utility model and are not intended to limit the present utility model.
[0022] It should be noted that in the description of this utility model, the terms "upper", "lower", "left", "right", "inner", "outer", etc., indicating the direction or positional relationship are based on the direction or positional relationship shown in the drawings. This is only for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, it should not be construed as a limitation of this utility model.
[0023] Furthermore, it should be noted that, in the description of this utility model, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0024] like Figure 1 and Figure 2 As shown, an intelligent construction installation frame includes a main frame 1, a support component supporting the main frame 1, a control box 3 installed on the main frame 1, and a mobile lifting device 7. In this embodiment, the main frame 1 includes a working platform 10 and a protective net 11 surrounding the working platform 10. Specifically, the control box 3 is installed on the top of the working platform 10.
[0025] like Figure 1 As shown, the support assembly of this utility model includes at least four sets of support leg assemblies 2. Each set of support leg assemblies 2 includes a fixed support leg 20 and multiple movable support legs 21. The top end of the fixed support leg 20 is fixed to the main frame 1. The bottom end of the fixed support leg 20 is detachably connected to one end of any movable support leg 21. The other end of the movable support leg 21 is detachably connected to another movable support leg 21 or a base 23. The base 23 can be directly fitted onto the bottom end of the fixed support leg 20 or onto the end of the movable support leg 21. In this embodiment, the bottom end of the fixed support leg 20 and one end of the movable support leg 21 are threadedly connected, and any two movable support legs 21 are threadedly connected. The movable support legs 21 can be modularly configured, thereby reducing production costs.
[0026] In this embodiment, the support assembly also includes multiple support beams 22. Each support beam 22 is detachably disposed between two fixed support legs 20 or between two movable support legs 21, thereby increasing the reliability of the connection. The support beams 22 can be connected to the fixed support legs 20 and the movable support legs 21 via a plug-in structure, or can be connected using detachable connection components, as long as disassembly is convenient.
[0027] like Figure 2As shown, the control box 3 of this utility model is equipped with a control unit and a human-machine interaction unit, an environmental detection unit, a weight detection unit, an alarm unit, a wireless communication unit, and a power supply unit, which are electrically connected to the control unit. The power supply unit can be a rechargeable battery, a solar cell, etc., and is used to provide the working voltage. In a preferred embodiment, the inner side of the control box 3 is provided with a shock-absorbing structure, which can be, but is not limited to, a shock-absorbing pad, a shock-absorbing spring, etc. The shock-absorbing structure can reduce the vibration generated during construction to ensure the performance of the control box 3.
[0028] The control unit may include, but is not limited to, an STM32 series microcontroller. The human-machine interaction unit includes a touch screen 4 and / or operation keys. Wind speed threshold, humidity threshold, and weight threshold can be set through the human-machine interaction unit. Construction time and construction parameters can also be input through the human-machine interaction unit. The construction parameters can be wirelessly transmitted to the remote monitoring terminal through the wireless communication unit. At the same time, the touch screen 4 displays environmental signals, weight signals, alarm signals, and construction tasks transmitted by the remote monitoring terminal.
[0029] The environmental detection unit is used to detect environmental signals and transmit them to the control unit. In this embodiment, the environmental detection unit includes a wind speed sensor 5 and a humidity sensor. The wind speed sensor 5 is used to detect real-time wind speed and transmit the wind speed signal to the control unit. When the wind speed signal is greater than a preset wind speed threshold, the alarm unit is triggered to issue a warning. Similarly, the humidity sensor is used to detect real-time humidity and transmit the humidity signal to the control unit. When the humidity signal is greater than a preset humidity threshold, the alarm unit is triggered to issue a warning to ensure safe construction.
[0030] The weight detection unit is used to detect the weight of the main frame 1 and transmit the weight signal to the control unit. When the weight signal is greater than the preset weight threshold, the alarm unit is triggered to issue a warning to ensure safe construction.
[0031] The wireless communication unit is wirelessly connected to the remote monitoring terminal. The wireless communication unit can be, but is not limited to, a GPS communication unit or a Beidou communication unit. Online remote monitoring is achieved through the remote monitoring terminal, ensuring the safety of construction. The wireless communication unit includes antenna 6.
[0032] The alarm unit includes an audible and visual alarm unit, specifically a speaker 8 and an LED installed on the control box 3. The speaker 8 emits an audible alarm, and the LED emits a warning light.
[0033] like Figure 1As shown, the mobile lifting device 7 of this utility model is installed below the main frame 1 and is used to drive the main frame 1 to rise and fall. The mobile lifting device 7 may include a lifting platform and a lifting power source installed on the lifting platform. The lifting power source includes a lifting rod, and a support plate may be provided at the top of the lifting rod. The support plate may be placed on the bottom surface of the main frame 1, and the main frame 1 is raised and lowered under the drive of the lifting power source.
[0034] like Figure 1 and Figure 2 As shown, when using the intelligent construction installation frame of this utility model, an appropriate number of movable support legs 21 can be used according to the actual construction height. When assembling or disassembling the movable support legs 21, the main frame 1 can be raised using the mobile lifting device 7. After the support leg assembly 2 is assembled or disassembled, the mobile lifting device 7 is lowered. At this time, the bottom of the main frame 1 reaches the required height under the support of the support assembly. In addition, after the movable support legs 21 are installed, a suitable support beam 22 is installed. Of course, the mobile lifting device 7 can also remain in place and continue to support the main frame 1, depending on the actual construction needs.
[0035] During construction, the environmental monitoring unit and the weight monitoring unit monitor in real time. When an abnormality occurs, the control unit triggers the audible and visual alarm unit to issue a warning. At the same time, the alarm signal is transmitted to the remote monitoring terminal through the wireless communication unit to achieve dual alarms, both local and remote, thereby preventing the fault from escalating and improving the construction safety factor.
[0036] The above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications or improvements to the same intelligent construction installation frame made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. An intelligent construction installation frame, characterized in that, It includes a main frame, a support assembly supporting the main frame, a control box mounted on the main frame, and a mobile lifting device; The support assembly includes at least four sets of support leg assemblies. Each set of support leg assemblies includes a fixed support leg and multiple movable support legs. The top end of the fixed support leg is fixed to the main frame. The bottom end of the fixed support leg is detachably connected to one end of any one of the movable support legs. The other end of the movable support leg is detachably connected to another movable support leg or a base. The control box is equipped with a control unit and a human-machine interaction unit, an environmental detection unit, a weight detection unit, an alarm unit, and a wireless communication unit, which are electrically connected to the control unit. The environmental detection unit detects environmental signals and transmits them to the control unit. The weight detection unit detects the weight of the main frame and transmits the weight signal to the control unit. The control unit controls the alarm unit based on the environmental signal and the weight signal. The wireless communication unit is wirelessly connected to a remote monitoring terminal. The mobile lifting device is located below the main frame and drives the main frame to rise and fall.
2. The intelligent construction installation frame according to claim 1, characterized in that, The main frame includes a work platform and a protective net surrounding the work platform, with the control box mounted on top of the work platform.
3. The intelligent construction installation frame according to claim 1, characterized in that, The environmental monitoring unit includes a wind speed sensor and a humidity sensor.
4. The intelligent construction installation frame according to claim 1, characterized in that, The support assembly also includes multiple support beams, each of which is detachably disposed between the two fixed support legs or between the two movable support legs.
5. The intelligent construction installation frame according to claim 1, characterized in that, The alarm unit includes an audible and visual alarm unit.
6. The intelligent construction installation frame according to claim 1, characterized in that, The human-computer interaction unit includes a touch screen and / or operation keys.
7. The intelligent construction installation frame according to claim 1, characterized in that, The bottom end of the fixed support leg is threaded to one end of the movable support leg, and any two movable support legs are threaded together.
8. The intelligent construction installation frame according to claim 1, characterized in that, The control box is equipped with a shock-absorbing structure on its inner side.