A photovoltaic integrated rooftop thermal system

By designing components such as serpentine cooling pipes and circulating delivery pipes in the photovoltaic integrated rooftop thermal system, the problem of blockage in the water cooling channel during non-operation periods was solved, ensuring normal cooling of the solar panels and hot water supply, and achieving efficient system operation.

CN224959616UActive Publication Date: 2026-11-10HENAN GUANGKUN NEW ENERGY TECH DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522586713.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-05
Publication Date
2026-11-10
Estimated Expiration
2035-12-05

AI Technical Summary

Technical Problem

During non-operational periods, the water cooling channels in existing photovoltaic integrated roofs solidify due to excessive cooling, causing blockages that affect the normal operation of solar panels and the supply of hot water.

Method used

A photovoltaic integrated rooftop thermal system was designed, including components such as a serpentine cooling pipe, a buffer tank, a circulating delivery pipe, and a regulating valve. During non-operation periods, water in the water-cooled channel is discharged through the circulating delivery pipe to prevent solidification. The water temperature is controlled by multi-stage buffer tanks and sensors to ensure normal cooling of the solar panels and hot water supply.

Benefits of technology

It effectively prevents blockage of the water cooling channel, maintains the normal operating temperature of the solar panels, improves the system's working efficiency and the reliability of hot water supply, and has the advantages of simple structure and convenient operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224959616U_ABST
    Figure CN224959616U_ABST
Patent Text Reader

Abstract

This utility model relates to a photovoltaic integrated rooftop thermal collection system, including a solar panel assembly. The solar panel assembly includes solar panels, cooling pipes, a first water supply branch pipe, and a first return water branch pipe. A first main supply pipe is installed on the first water supply branch pipe, and a first main return water pipe is installed on the first return water branch pipe. An air vent valve is installed on the first main return water pipe. A second supply branch pipe is installed on the first main supply pipe, and a first circulating supply pipe is installed on the second supply branch pipe. A low-temperature buffer tank is installed on the first circulating supply pipe. A first filter, a first booster pump, a first regulating valve, a second return water branch pipe, and a first check valve are installed on the first circulating supply pipe. The first circulating supply pipe and the second supply branch pipe are connected. A second regulating valve is installed on the second supply branch pipe. The second return water branch pipe is connected to the first main return water pipe. This system solves the problem of blockage caused by water solidification due to excessive cooling in the water-cooling channel. This utility model is easy to use and has broad market prospects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of solar collectors for photovoltaic integrated roofs, and specifically to a photovoltaic integrated roof solar collector system. Background Technology

[0002] The widespread adoption of the building-integrated photovoltaics (BIPV) concept has spurred the rapid development of photovoltaic roofing systems in recent years. BIPV systems integrate photovoltaic power generation with the building's roof and other envelope structures, enabling the building itself to generate electricity using solar energy. In addition to photovoltaic power generation, BIPV systems also possess the necessary performance characteristics and unique decorative functions of a building envelope. Integrating photovoltaic power generation, building envelope, building energy conservation, and building decoration, they fully embody the architectural concepts and development trends of circular economy and sustainable development. Solar panels are devices that absorb sunlight and convert solar radiation energy directly or indirectly into electrical energy through the photoelectric effect or photochemical effect.

[0003] According to the law of conservation of energy, the total solar radiation energy received by the solar panel minus the energy of reflected light equals the power generation plus the energy exchanged between the panel and the surrounding environment. Based on this principle, it's clear that during the process of receiving solar radiation energy, besides the unavoidable partial reflection, a portion of the absorbed solar radiation energy is converted into electricity, and a portion is converted into heat. This heat causes the solar panel's temperature to rise, which can then act as a heat source, releasing heat into the surrounding space. This is especially true in summer when solar radiation is intense, and the non-transparent external photovoltaic (PV) wall can cause the building's temperature to rise, affecting the living and working environment. Furthermore, existing literature demonstrates a correlation between the solar panel's temperature and its ability to convert electrical energy. The normal operating temperature of solar panels is -45℃ to 80℃, with an optimal operating temperature of 25℃. As the temperature increases, the photoelectric conversion efficiency of the solar panel decreases. When the temperature rises above 135℃, noticeable burn-in hot spots, or yellowing spots, will appear over time. When the yellow spots reach a certain level, they can melt the solder joints of the module, damage the grid lines, and eventually destroy the entire solar panel.

[0004] Some customers not only need the electricity generated by solar panels but also require hot water. Integrated photovoltaic rooftops can be equipped with solar water heating systems to achieve the technical goal of comprehensive utilization of both electricity and heat energy. The core component of solar water heating systems is the collector tube. Solar panels can be cooled by air or water. However, using water cooling to fully absorb the heat scattered by the solar panels during operation and then further heating the cooling water with a solar water heating system undoubtedly maintains the normal operation of the solar panels and provides hot water to customers in winter, making it easier to meet market demand. However, since solar panels only operate under daytime solar radiation conditions, water cooling can cause problems in winter. The water temporarily stored in the water-cooling pipes on the solar panels, which does not circulate at night, is prone to freezing in localized areas. This makes it difficult to supply cooling water to the water-cooling pipes during operation, leading to localized overheating and damage to the solar panels. Therefore, there is room for improvement in the existing technology to reduce these issues. Some customers require not only the electricity generated by solar panels but also hot water. Therefore, existing technologies have room for improvement. The aim is to maintain the normal operating temperature of the solar panels, reducing damage caused by overheating, and to collect heat generated during power generation as part of the heat for heating hot water, thereby reducing energy consumption in hot water supply. Furthermore, existing technologies have room for improvement to address the technical problem of water-cooling channels in photovoltaic integrated roofs becoming clogged during non-operational periods due to excessive cooling and solidification of the water within the channels. Summary of the Invention

[0005] To address the shortcomings of existing technologies, this utility model provides a photovoltaic integrated roof heat collection system that prevents water cooling channels from becoming blocked during non-operation periods due to excessive cooling and solidification of the water within the channels. This system aims to overcome the deficiencies in existing technologies.

[0006] The technical solution adopted by this utility model is as follows: a photovoltaic integrated roof heat collection system, comprising several solar panel groups, each of which includes several solar panels connected end to end, a serpentine cooling pipe respectively arranged on the back of each solar panel, a first water supply branch pipe arranged at the inlet end of each cooling pipe, and a first return water branch pipe arranged at the inlet end of each cooling pipe. A first main supply pipe is arranged at the inlet end of each first water supply branch pipe, and a first main return water pipe is arranged at the outlet end of each first return water branch pipe. The first main return water pipe is located above the first main supply pipe, and a low-temperature buffer tank is located below the first main supply pipe. A drain is provided on the first main return water pipe. The system includes a gas valve, a second delivery branch pipe outlet end at the inlet end of the first delivery main pipe, a first circulation delivery pipe at the inlet end of the second delivery branch pipe, a low-temperature buffer tank at the inlet and outlet ends of the first circulation delivery pipe, a first filter, a first booster pump, a first regulating valve, the outlet end of the second return water branch pipe, and a first check valve sequentially arranged along the direction from the inlet to the outlet end of the first circulation delivery pipe, the first booster pump and the first regulating valve being connected at the inlet ends of the first circulation delivery pipe and the second delivery branch pipe, a second regulating valve on the second delivery branch pipe, and the inlet end of the second return water branch pipe being connected to the outlet end of the first return water main pipe.

[0007] Preferably, a plurality of parallel heat collection tubes are provided on one side of the plurality of solar power generation panels. A second main transmission pipe is provided at the inlet end of the plurality of heat collection tubes, and a second return water main is provided at the outlet end of the plurality of heat collection tubes. The inlet end of a hot water transmission pipe is provided at the outlet end of the second return water main, and a high-temperature water storage tank is provided at the outlet end of the hot water transmission pipe. A first temperature sensor, the inlet end of a third return water branch pipe, and a fourth regulating valve are sequentially provided along the direction from the second return water main to the high-temperature water storage tank on the hot water transmission pipe.

[0008] Preferably, a second circulation conveying pipe is provided at the outlet end of the third return water branch pipe, and a medium-temperature buffer tank is provided at the inlet end and the outlet end of the second circulation conveying pipe. A fifth regulating valve, the outlet end of the medium-temperature water conveying pipe, a second filter, a second booster pump, the inlet end of the third water supply branch pipe, and a sixth regulating valve are sequentially arranged along the direction from the inlet end to the outlet end of the second circulation conveying pipe. The sixth regulating valve is connected to the outlet end of the second circulation conveying pipe and the third return water branch pipe between the medium-temperature buffer tank. A seventh regulating valve and a second check valve are provided on the third return water branch pipe, and the inlet end of the medium-temperature water conveying pipe is connected to the second return water branch pipe.

[0009] Preferably, the second return water branch pipe is sequentially provided with a second temperature sensor, an eighth regulating valve, and a third check valve along the direction from the first return water main pipe to the first circulating conveying pipe. The inlet end of the second return water branch pipe between the second temperature sensor and the eighth regulating valve is connected to the inlet end of the medium-temperature water conveying pipe. The outlet end of the fourth water conveying branch pipe is provided on the first circulating conveying pipe between the first check valve and the low-temperature buffer tank. The inlet end of the second circulating conveying pipe between the second booster pump and the sixth regulating valve is connected to the inlet end of the fourth water conveying branch pipe. A ninth regulating valve is provided on the fourth water conveying branch pipe, the third water conveying branch pipe, and the medium-temperature water conveying pipe.

[0010] Preferably, the medium-temperature buffer tank, the low-temperature buffer tank, and the high-temperature water storage tank are each equipped with a ventilation valve, a liquid level sensor, and a third temperature sensor.

[0011] Preferably, the low-temperature buffer tank, the medium-temperature buffer tank, and the high-temperature water storage tank are each equipped with a drain pipe and a water supply bend. The drain pipe is equipped with a drain valve, and the inlet end of the drain pipe is located below the inlet end of the water supply bend. The inlet end of the first circulation conveying pipe is connected to the outlet end of the water supply bend installed on the low-temperature buffer tank, and the inlet end of the second circulation conveying pipe is connected to the outlet end of the water supply bend installed on the medium-temperature buffer tank.

[0012] Preferably, a high-temperature water delivery pipe is provided at the outlet end of the water delivery bend installed on the high-temperature water storage tank, and a tenth regulating valve, a third filter, and a third booster pump are sequentially installed on the high-temperature water delivery pipe along the direction from near the high-temperature water storage tank to far away from the high-temperature water storage tank.

[0013] The beneficial effects of this utility model are as follows: First, by opening the exhaust valve installed on the first return water main pipe, this utility model can send the water in the first return water branch pipe, the water in several first water supply branch pipes, the water in several cooling pipes, the water in several first return water branch pipes, and the water in the first delivery main pipe back to the low temperature buffer tank through the first circulation delivery pipe. This solves the problem that the water temporarily stored in the cooling pipes of the photovoltaic integrated roof water cooling channel will solidify due to excessive cooling during non-working periods, thus causing blockage of the water cooling channel.

[0014] Secondly, a high-temperature water storage tank is provided at the outlet end of the hot water delivery pipe of this utility model. The hot water delivery pipe is provided with a first temperature sensor, the inlet end of the third return water branch pipe and a fourth regulating valve in sequence along the direction from the second return water main pipe to the high-temperature water storage tank. The installation of the first temperature sensor facilitates the feedback of temperature parameters.

[0015] Furthermore, the medium-temperature buffer tank, low-temperature buffer tank, and high-temperature water storage tank described in this utility model are each equipped with a ventilation valve, a liquid level sensor, and a third temperature sensor; the liquid level sensor facilitates the feedback of liquid level parameters, and the third temperature sensor facilitates the feedback of temperature parameters.

[0016] This utility model has a simple structure, is easy to operate, and has a clever design, which greatly improves work efficiency and has good social and economic benefits. It is a product that is easy to promote and use. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the structure of this utility model.

[0018] Figure 2 for Figure 1 A magnified view of detail A. Detailed Implementation

[0019] like Figure 1 and Figure 2 As shown, a photovoltaic integrated rooftop thermal system includes several solar panel groups. Each solar panel group includes several solar panels 1 connected end-to-end, serpentine cooling pipes 2 respectively arranged on the back of each solar panel 1, first water supply branch pipes 3 arranged at the inlet ends of the cooling pipes 2, and first return water branch pipes 4 arranged at the inlet ends of the cooling pipes 2. A first main supply pipe 5 is arranged at the inlet ends of the first water supply branch pipes 3, and a first main return water pipe 6 is arranged at the outlet ends of the first return water branch pipes 4. The first main return water pipe 6 is located above the first main supply pipe 5, and a low-temperature buffer tank 10 is located below the first main supply pipe 5. An air vent valve 7 is arranged on the first main return water pipe 6, and an air release valve 7 is arranged at the inlet end of the first main supply pipe 5. A first circulating conveying pipe 9 is installed at the outlet end of the second conveying branch pipe 8 and at the inlet end of the second conveying branch pipe 8. A low-temperature buffer tank 10 is installed at both the inlet and outlet ends of the first circulating conveying pipe 9. A first filter 11, a first booster pump 12, a first regulating valve 13, the outlet end of the second return water branch pipe 14, a first check valve 15, and a third conveying main pipe 51 are sequentially arranged along the direction from the inlet end to the outlet end of the first circulating conveying pipe 9. The inlet ends of the first circulating conveying pipe 9 and the second conveying branch pipe 8 are connected between the first booster pump 12 and the first regulating valve 13. A second regulating valve 16 is installed on the second conveying branch pipe 8. The inlet end of the second return water branch pipe 14 is connected to the outlet end of the first return water main pipe 6. A third regulating valve 17 is installed between the inlet end of each first water conveying branch pipe 3 and the first conveying main pipe 5, as well as on the first conveying main pipe 5.

[0020] When the water temperature delivered through the first circulation pipe 9 reaches the preset range, the third main pipe 51 delivers municipal water to the first circulation pipe 9, and a portion of the first return water delivered through the first main pipe 6 to the second return water branch pipe 14 also needs to be discharged, so that the water temperature delivered through the first circulation pipe 9 reaches below the preset range, thereby maintaining the water delivered through the cooling pipe 2 to cool the corresponding solar power panels 1. Therefore, one side of several solar power panel groups of this product is provided with several parallel heat collection pipes 18. The inlet end of several heat collection pipes 18 is provided with a second main pipe 19, the outlet end of several heat collection pipes 18 is provided with a second return water branch pipe 20, the outlet end of the second return water branch pipe 20 is provided with the inlet end of a hot water delivery pipe 21, the outlet end of the hot water delivery pipe 21 is provided with a high temperature water storage tank 22, and the hot water delivery pipe 21 is sequentially provided with a first temperature sensor 23, the inlet end of the third return water branch pipe 24, and a fourth regulating valve 25 along the direction from the second return water branch pipe 20 to the high temperature water storage tank 22. A second circulation conveying pipe 26 is provided at the outlet end of the third return water branch pipe 24. A medium-temperature buffer tank 27 is provided at the inlet end and the outlet end of the second circulation conveying pipe 26. A fifth regulating valve 28, the outlet end of the medium-temperature water conveying pipe 29, a second filter 30, a second booster pump 31, the inlet end of the third water supply branch pipe 32, and a sixth regulating valve 33 are sequentially provided along the direction from the inlet end to the outlet end of the second circulation conveying pipe 26. The sixth regulating valve 33 is connected to the outlet end of the second circulation conveying pipe 26 and the third return water branch pipe 24 between the medium-temperature buffer tank 27. A seventh regulating valve 34 and a second check valve 35 are provided on the third return water branch pipe 24. The inlet end of the medium-temperature water conveying pipe 29 is connected to the second return water branch pipe 14. A portion of the first return water, transported through the first return water main pipe 6, is continuously transported through the medium-temperature water transport pipe 29 to the second circulation transport pipe 26, thereby further heating the first return water to obtain hot water for use.

[0021] Furthermore, when the water temperature transported through the first circulating conveying pipe 9 is too low, the second return water branch pipe 14 of this product is sequentially equipped with a second temperature sensor 36, an eighth regulating valve 37, and a third one-way valve 38 along the direction from the first return water main pipe 6 to the first circulating conveying pipe 9. The inlet end of the second return water branch pipe 14 between the second temperature sensor 36 and the eighth regulating valve 37 is connected to the medium-temperature water conveying pipe 29. The outlet end of the fourth water conveying branch pipe 50 is provided on the first circulating conveying pipe 9 between the first one-way valve 15 and the low-temperature buffer tank 10. The inlet end of the second circulating conveying pipe 26 between the second booster pump 31 and the sixth regulating valve 33 is connected to the fourth water conveying branch pipe 50. The fourth water conveying branch pipe 50, the third water conveying branch pipe 32, and the medium-temperature water conveying pipe 29 are each equipped with a ninth regulating valve 39. The medium-temperature water transported by the second circulation pipe 26 is transported to the low-temperature buffer tank 10 through the first circulation pipe 9, thereby reducing the blockage caused by localized excessive cold solidification due to the low temperature of the water transported by the first circulation pipe 9.

[0022] Each of the aforementioned medium-temperature buffer tank 27, low-temperature buffer tank 10, and high-temperature water storage tank 22 is equipped with a vent valve 40, a liquid level sensor 41, and a third temperature sensor 42. The liquid level sensor 41 facilitates the feedback of liquid level parameters, and the third temperature sensor 42 facilitates the feedback of temperature parameters. Each of the aforementioned low-temperature buffer tank 10, medium-temperature buffer tank 27, and high-temperature water storage tank 22 is equipped with a drain pipe 43 and a water supply bend 44. The drain pipe 43 is equipped with a drain valve 45, and the drain pipe 43 facilitates the discharge of mechanical impurities temporarily stored at the bottom of the medium-temperature buffer tank 27, low-temperature buffer tank 10, or high-temperature water storage tank 22. The inlet end of the drain pipe 43 is located below the inlet end of the water supply bend 44. The inlet end of the first circulation conveying pipe 9 is connected to the outlet end of the water supply bend 44 installed on the low-temperature buffer tank 10, and the inlet end of the second circulation conveying pipe 26 is connected to the outlet end of the water supply bend 44 installed on the medium-temperature buffer tank 27. The water delivery bend 44 includes a straight pipe section and an inclined pipe section. The straight pipe section is installed on the medium-temperature buffer tank 27, the low-temperature buffer tank 10, or the high-temperature water storage tank 22. The height of the inclined pipe section gradually decreases as it moves further away from the straight pipe section. The outlet end of the inclined pipe section is connected to the inlet end of the straight pipe section, and the inlet end of the inclined pipe section faces the inlet end of the adjacent drain pipe 43, thereby reducing the entry of mechanical impurities temporarily stored at the bottom of the medium-temperature buffer tank 27, the low-temperature buffer tank 10, or the high-temperature water storage tank 22 into the corresponding water delivery bend 44. A high-temperature water delivery pipe 46 is provided at the outlet end of the water delivery bend 44 installed on the high-temperature water storage tank 22. Along the direction from near the high-temperature water storage tank 22 to away from the high-temperature water storage tank 22, the high-temperature water delivery pipe 46 contains, in sequence, a tenth regulating valve 47, a third filter 48, and a third booster pump 49.

[0023] The usage instructions for this product are as follows: Figure 1 and Figure 2 As shown, it includes the following steps: S1. First, municipal water is supplied to the cryogenic buffer tank 10 through the third main supply pipe 51 until the liquid level parameter fed back by the liquid level sensor 41 on the cryogenic buffer tank 10 reaches the preset range. Then, the first booster pump 12 is turned on. At this time, the water temporarily stored in the cryogenic buffer tank 10 forms the first water circulation through the first circulation supply pipe 9. When the temperature parameter fed back by the third temperature sensor 42 on the cryogenic buffer tank 10 tends to stabilize, the second regulating valve 16 and several third regulating valves 17 are opened. At this time, the water supplied by the cryogenic buffer tank 10 to the first circulation supply pipe 9 is divided into two parts, namely the first part of cooling water and the second part of cooling water. The first part of cooling water continues to move along the first circulation supply pipe 9 and maintains the first water circulation. The second portion of cooling water is transported to the first main pipe 5 through the second branch pipe 8. The first main pipe 5 then transports the received second portion of cooling water to several first return water branch pipes 4. The several first return water branch pipes 4 then transport the received second portion of cooling water to the corresponding cooling pipes 2 and the adjacent solar power panels 1 for heat exchange to form initial temperature water. The initial temperature water is transported to the first main pipe 6 through the corresponding first return water branch pipes 4. The first main pipe 6 then transports the received initial temperature water to the second return water branch pipe 14.

[0024] S2. After the initial temperature water entering the second return water branch pipe 14 is fed back by the second temperature sensor 36, if the temperature fed back by the second temperature sensor 36 is lower than the preset range of the second temperature sensor 36, then the second return water branch pipe 14 will send all of it to the first circulation conveying pipe 9 and the first part of cooling water that continuously participates in the first water circulation in the first circulation conveying pipe 9 will be combined and sent back to the low temperature buffer tank 10.

[0025] If the temperature fed back by the second temperature sensor 36 is not less than the preset range of the second temperature sensor 36 and / or the temperature fed back by the third temperature sensor 42 installed on the low-temperature buffer tank 10 is not less than the preset range of the third temperature sensor 42 installed on the low-temperature buffer tank 10, then the third main delivery pipe 51 will again deliver municipal water to the first circulating delivery pipe 9. At the same time, the initial warm water in the second return branch pipe 14 will be divided into two parts, namely the first part of initial warm water and the second part of initial warm water. The first part of initial warm water will continue to flow along the second return branch pipe 14 and be sent to the first circulating delivery pipe 9 to merge with the first part of cooling water that continuously participates in the first water circulation in the first circulating delivery pipe 9 and then sent back to the low-temperature buffer tank 10. The second part of initial warm water will then be delivered to the second circulating delivery pipe 26 through the medium-temperature water delivery pipe 29.

[0026] S3. Turn on the second booster pump 31. At this time, the water temporarily stored in the medium-temperature buffer tank 27 enters the second circulation conveying pipe 26 and merges with the second part of the initial temperature water, then splits into two parts: the first part of medium-temperature water and the second part of medium-temperature water. The first part of medium-temperature water continues to travel along the second circulation conveying pipe 26 and is sent back to the medium-temperature buffer tank 27 through the outlet end of the second circulation conveying pipe 26 to form the second water circulation. The second part of medium-temperature water is then conveyed to the second conveying main pipe 19 through the third water supply branch pipe 32. The second conveying main pipe 19 conveys the received second part of medium-temperature water to several heat collection pipes 18 for heating to form high-temperature water, and then conveys it to the second return water main pipe 20. The second return water main pipe 20 then conveys the received high-temperature water to the hot water conveying pipe 21.

[0027] S4. The high-temperature water received by the hot water delivery pipe 21 is first fed back by the first temperature sensor 23. If the temperature fed back by the first temperature sensor 23 is below the preset range of the first temperature sensor 23, then the hot water delivery pipe 21 will deliver all the high-temperature water received to the second circulation delivery pipe 26 through the third return water branch pipe 24. The water will be combined with the first part of the medium-temperature water in the second water circulation of the second circulation pipe 26 and then sent back to the medium-temperature buffer tank 27.

[0028] If the temperature fed back by the first temperature sensor 23 is not less than the preset range of the first temperature sensor 23, the high-temperature water received by the hot water delivery pipe 21 is divided into two parts: a first part of high-temperature water and a second part of high-temperature water. The first part of high-temperature water is delivered to the high-temperature storage tank 22 for temporary storage through the outlet end of the hot water delivery pipe 21. The second part of high-temperature water is delivered to the second circulation delivery pipe 26 through the third return water branch pipe 24. After merging with the first part of medium-temperature water in the second water circulation of the second circulation pipe 26, it is sent back to the medium-temperature buffer tank 27. The delivery ratio between the first part of high-temperature water and the second part of high-temperature water needs to be reasonably allocated according to the temperature fed back by the first temperature sensor 23, so that the third temperature sensor 42 installed on the medium-temperature buffer tank 27 is always below the preset range of the third temperature sensor 42 of the medium-temperature buffer tank 27.

[0029] S5. When a customer needs hot water, the third booster pump 49 is turned on. At this time, the high-temperature water temporarily stored in the high-temperature storage tank 22 is delivered to the user through the outlet of the high-temperature water delivery pipe 46. When the collector tube 18 and the solar power panel 1 are not in operation, the exhaust valve 7 is turned on. At this time, the water in the first return water branch pipe 4, the water in several first water delivery branch pipes 3, the water in several cooling pipes 2, the water in several first return water branch pipes 4, and the water in the first delivery main pipe 5 are all sent back to the low-temperature buffer tank 10 through the first circulation delivery pipe 9.

[0030] In this embodiment, by opening the vent valve 7 installed on the first return water main pipe 6, the water in the first return water branch pipe 4, the water in several first water supply branch pipes 3, the water in several cooling pipes 2, the water in several first return water branch pipes 4, and the water in the first delivery main pipe 5 can all be sent back to the low-temperature buffer tank 10 through the first circulation delivery pipe 9. This solves the problem that the water temporarily stored in the cooling pipe 2, which serves as the water cooling channel of the photovoltaic integrated roof, solidifies due to excessive cooling during non-working periods, causing blockage of the water cooling channel.

[0031] The embodiments described above are merely preferred embodiments of this utility model and are not intended to limit the scope of implementation of this utility model. Therefore, all equivalent changes or modifications made to the structure, features and principles described in the patent claims of this utility model should be included within the scope of the patent application of this utility model.

Claims

1. A photovoltaic integrated rooftop thermal collector system, characterized in that: The system includes several solar panel groups. Each solar panel group includes several solar panels (1) connected end to end, a serpentine cooling pipe (2) arranged on the back of each solar panel (1), a first water supply branch pipe (3) arranged on the inlet end of each cooling pipe (2), and a first return water branch pipe (4) arranged on the inlet end of each cooling pipe (2). A first main conveying pipe (5) is arranged on the inlet end of each first water supply branch pipe (3), and a first return water main pipe (6) is arranged on the outlet end of each first return water branch pipe (4). The first return water main pipe (6) is located above the first main conveying pipe (5), and a low-temperature buffer tank (10) is located below the first main conveying pipe (5). An exhaust valve (7) is arranged on the first return water main pipe (6), and a second conveying branch pipe is arranged on the inlet end of the first main conveying pipe (5). At the outlet end of 8), a first circulating conveying pipe (9) is provided at the inlet end of the second conveying branch pipe (8). A low temperature buffer tank (10) is provided at the inlet end and the outlet end of the first circulating conveying pipe (9). A first filter (11), a first booster pump (12), a first regulating valve (13), the outlet end of the second return water branch pipe (14) and a first check valve (15) are sequentially provided on the first circulating conveying pipe (9) along the direction from the inlet end to the outlet end of the first circulating conveying pipe (9). The inlet end of the first circulating conveying pipe (9) between the first booster pump (12) and the first regulating valve (13) is connected to the inlet end of the second conveying branch pipe (8). A second regulating valve (16) is provided on the second conveying branch pipe (8). The inlet end of the second return water branch pipe (14) is connected to the outlet end of the first return water main pipe (6).

2. The photovoltaic integrated rooftop thermal collector system according to claim 1, characterized in that: A plurality of parallel heat collection tubes (18) are provided on one side of a plurality of solar power generation panels. A second main transmission pipe (19) is provided at the inlet end of the plurality of heat collection tubes (18). A second return water main pipe (20) is provided at the outlet end of the plurality of heat collection tubes (18). The inlet end of a hot water transmission pipe (21) is provided at the outlet end of the second return water main pipe (20). A high-temperature water storage tank (22) is provided at the outlet end of the hot water transmission pipe (21). A first temperature sensor (23), the inlet end of a third return water branch pipe (24) and a fourth regulating valve (25) are sequentially provided along the direction from the second return water main pipe (20) to the high-temperature water storage tank (22) on the hot water transmission pipe (21).

3. The photovoltaic integrated rooftop thermal collector system according to claim 2, characterized in that: The outlet end of the third return water branch pipe (24) is provided with a second circulation conveying pipe (26). The inlet end of the second circulation conveying pipe (26) and the outlet end of the second circulation conveying pipe (26) are provided with a medium temperature buffer tank (27). The second circulation conveying pipe (26) is provided with a fifth regulating valve (28), the outlet end of the medium temperature water conveying pipe (29), a second filter (30), a second booster pump (31), the inlet end of the third water supply branch pipe (32), and a sixth regulating valve (33) in sequence along the direction from the inlet end of the second circulation conveying pipe (26) to the outlet end of the second circulation conveying pipe (26). The sixth regulating valve (33) is connected to the outlet end of the second circulation conveying pipe (26) and the third return water branch pipe (24) between the medium temperature buffer tank (27). The third return water branch pipe (24) is provided with a seventh regulating valve (34) and a second check valve (35). The inlet end of the medium temperature water conveying pipe (29) and the second return water branch pipe (14) are connected.

4. The photovoltaic integrated rooftop thermal collector system according to claim 3, characterized in that: The second return water branch pipe (14) is provided with a second temperature sensor (36), an eighth regulating valve (37) and a third check valve (38) in sequence along the direction from the first return water main pipe (6) to the first circulation conveying pipe (9). The second return water branch pipe (14) between the second temperature sensor (36) and the eighth regulating valve (37) is connected to the inlet end of the medium temperature water conveying pipe (29). The first circulation conveying pipe (9) between the first check valve (15) and the low temperature buffer tank (10) is provided with the outlet end of the fourth water conveying branch pipe (50). The second circulation conveying pipe (26) between the second booster pump (31) and the sixth regulating valve (33) is connected to the inlet end of the fourth water conveying branch pipe (50). The fourth water conveying branch pipe (50), the third water conveying branch pipe (32) and the medium temperature water conveying pipe (29) are each provided with a ninth regulating valve (39).

5. The photovoltaic integrated rooftop thermal collector system according to claim 3, characterized in that: The medium-temperature buffer tank (27), the low-temperature buffer tank (10) and the high-temperature water storage tank (22) are each equipped with an air exchange valve (40), a liquid level sensor (41) and a third temperature sensor (42).

6. The photovoltaic integrated rooftop thermal collector system according to claim 3, characterized in that: The low-temperature buffer tank (10), the medium-temperature buffer tank (27) and the high-temperature water storage tank (22) are each equipped with a drain pipe (43) and a water supply bend (44). The drain pipe (43) is equipped with a drain valve (45). The inlet end of the drain pipe (43) is located below the inlet end of the water supply bend (44). The inlet end of the first circulation conveying pipe (9) is connected to the outlet end of the water supply bend (44) installed on the low-temperature buffer tank (10). The inlet end of the second circulation conveying pipe (26) is connected to the outlet end of the water supply bend (44) installed on the medium-temperature buffer tank (27).

7. The photovoltaic integrated rooftop thermal collector system according to claim 6, characterized in that: A high-temperature water delivery pipe (46) is provided at the outlet end of the water delivery bend (44) installed in the high-temperature water storage tank (22). Along the direction from near the high-temperature water storage tank (22) to away from the high-temperature water storage tank (22), a tenth regulating valve (47), a third filter (48) and a third booster pump (49) are installed in sequence.