A prefabricated steel structure temporary construction bridge
By using modular design and detachable prefabricated steel structure temporary bridges, the problems of low prefabrication degree, poor adaptability to working conditions, and low load-bearing capacity of existing temporary bridges have been solved, achieving efficient, flexible construction convenience and safety.
Patent Information
- Application Number
- CN202522726058.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-23
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-23
AI Technical Summary
Existing temporary construction bridges have low prefabrication levels, poor adaptability to working conditions, and low load-bearing capacity, resulting in low construction efficiency, high costs, and inflexible adjustments.
The modular prefabricated steel structure bridge is assembled using detachable connections such as bolts and hinges. The main frame modules are adjustable in length and the support fixing modules are adjustable in height. The bridge deck treads are made of patterned steel plates to enhance strength, and the components are reusable.
It improved construction efficiency, reduced costs, enhanced adaptability to working conditions and load-bearing capacity, and ensured safety and stability.
Smart Images

Figure CN224982028U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of municipal construction auxiliary facilities technology, specifically to a prefabricated steel structure temporary construction bridge, suitable for pedestrians, handcarts, two-wheeled electric vehicles and electric tricycles. Background Technology
[0002] In municipal engineering construction, temporary bridges are often needed to ensure passage during trench excavation and pipeline foundation pit construction. Existing temporary bridges have the following drawbacks: 1. Low degree of prefabrication: It mostly adopts on-site welding and splicing, which is time-consuming to install and disassemble, resulting in low construction efficiency; 2. Poor adaptability to working conditions: The main beam length and outrigger height are fixed and cannot be flexibly adjusted according to the trench width and pit depth. Customization is required for different working conditions, which is costly. 3. Low load-bearing capacity: Designed primarily according to heavy vehicle standards, resulting in excessive component redundancy and a lack of lightweight temporary bridge structures for pedestrians and small vehicles. To address the aforementioned problems, this invention proposes a modular, adjustable prefabricated steel structure temporary construction bridge, resolving the pain points of existing technologies. Utility Model Content
[0003] To address the shortcomings of existing technologies, the purpose of this utility model is to provide a prefabricated steel structure temporary construction bridge to solve the problems of low prefabrication degree, poor adaptability to working conditions, and low load-bearing capacity of existing temporary construction bridges. This construction bridge adopts a modular design, has high construction efficiency, and can be reused, meeting the specific passage needs during the construction of municipal trenches and pipeline foundation pits.
[0004] To achieve the above objectives, the technical solution adopted by this utility model is as follows: A prefabricated steel structure temporary construction bridge includes a bridge deck module, a main frame module, a support and fixing module, and ramp slabs; the main frame module has several symmetrically arranged support and fixing modules at its bottom, the bridge deck module is laid in an array on the upper side of the main frame module, the top edge of the bridge deck module is provided with a guardrail, and ramp slabs are provided at both ends of the main frame module along its length.
[0005] The main frame module includes two sets of main longitudinal beams, main transverse beams, secondary longitudinal beams, and secondary transverse beams; the two sets of main longitudinal beams are arranged in parallel longitudinal direction, and parallel secondary longitudinal beams are provided at their internal center lines. The bottom ends of both sets of main longitudinal beams are bolted to main transverse beams, and several secondary transverse beams are evenly arranged transversely between the main longitudinal beams and the secondary longitudinal beams.
[0006] Furthermore, several pairs of connecting plates are welded to the inner side of the main longitudinal beam and both sides of the secondary longitudinal beam. The connecting plates are clamped on both sides of the end face of the secondary crossbeam, and the connecting plates are fixedly connected to the secondary crossbeam with bolts and nuts.
[0007] Furthermore, the bridge deck module includes bridge deck treads, partitions, and edge plates; the partitions are fixed to the top surface of the secondary longitudinal beam along the length direction, and edge plates are fixed to the top surface of the main longitudinal beam near the outer edge along the length direction; a number of bridge deck treads are laid in an array in the area between the partitions and the edge plates; the bridge deck treads are made of patterned steel plates.
[0008] Furthermore, the top surface of the partition is flush with the surface of the bridge deck tread, and the height of the side plate is greater than the height of the bridge deck tread surface.
[0009] Furthermore, the bottom surface of the bridge deck tread is provided with several reinforcing ribs evenly distributed longitudinally, and the bottom surface of the reinforcing ribs is provided with several limiting baffles transversely. The width between adjacent limiting baffles is adapted to the width of the secondary crossbeam. After the bridge deck tread is laid, the limiting baffles are locked onto both sides of the secondary crossbeam.
[0010] Furthermore, a positioning hole is provided on the surface of the bridge deck tread near the outer edge, and the lower end of the guardrail is inserted into the positioning hole. A fixing plate is fixed on the guardrail near the bottom position, and the fixing plate is screwed to the bridge deck tread by bolts.
[0011] Furthermore, the support and fixing module is provided in four sets, which are respectively located at the four corners of the bottom of the main frame module, including a base, a support beam and a bottom plate; the support beam is located at the bottom of the main crossbeam and is bolted to it, the bottom of the support beam is welded to the bottom plate, the bottom of the bottom plate is cast with a base, and the bottom plate is fixedly connected to the base by a number of expansion bolts.
[0012] Furthermore, the ramp slab is hinged to the main crossbeam on the main frame module.
[0013] Compared with the prior art, the present invention has the following beneficial effects: 1. All components of this utility model adopt detachable connection methods such as bolts and hinges, eliminating the need for on-site welding operations. The assembly and disassembly process is simple and convenient, requiring only ordinary construction personnel to complete the operation, which greatly shortens the construction and dismantling time of the temporary bridge and improves construction efficiency. At the same time, the detachable structure avoids damage to the components, allowing the temporary bridge to be reused in multiple projects, thus reducing construction costs.
[0014] 2. The main longitudinal beams and secondary longitudinal beams of the main frame module adopt a multi-segment splicing structure, which can flexibly adjust the length of the temporary bridge according to the trench width; the support beams of the fixed support module adopt a height-adjustable structure, which can adjust the support height of the temporary bridge according to the depth of the foundation pit. There is no need to customize special components for different working conditions, which effectively solves the problem of poor adaptability of existing temporary bridges and reduces construction costs and component storage and transportation pressure.
[0015] 3. This utility model is specifically designed for the lightweight passage needs of pedestrians, handcarts, and small electric vehicles. The bridge deck treads are made of patterned steel plates with stiffening plates to enhance strength. The main frame module adopts a grid structure to optimize stress. While ensuring that the load-bearing capacity meets the requirements, it minimizes component redundancy and reduces the overall weight of the temporary bridge. This not only saves steel materials but also facilitates the transportation and handling of components, improving construction convenience.
[0016] 4. The edge guards on the bridge deck module prevent objects from falling. The guardrails are double-fixed with positioning holes and fixing plates, ensuring a firm connection and good protection. The ramp slabs are made of anti-slip patterned steel plates and the tilt angle can be flexibly adjusted to ensure safety when going up and down the bridge. The support and fixing modules are double-fixed with concrete bases and expansion bolts. Combined with four sets of symmetrically set support structures, the temporary bridge has strong overall stability and can effectively resist traffic loads and environmental interference from the construction site.
[0017] Of course, any product implementing this utility model does not necessarily need to achieve all of the advantages described above at the same time. Attached Figure Description
[0018] To more clearly illustrate the technical solutions of the embodiments of this utility model, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0019] Figure 1 This is a schematic diagram of the overall structure of this utility model.
[0020] Figure 2 This is a right view of the present invention.
[0021] Figure 3 This is a partial structural schematic diagram of the present invention.
[0022] Figure 4 This is a partial disassembly diagram of the present invention.
[0023] Figure 5 This is a structural schematic diagram of the main longitudinal beam, support beam, main cross beam, secondary longitudinal beam, and secondary cross beam in this utility model.
[0024] Figure 6 This is a schematic diagram of the bridge deck tread of this utility model.
[0025] Figure 7 This is a schematic diagram of the bottom structure of the bridge deck tread in this utility model.
[0026] Figure 8 This is a schematic diagram showing the usage status of the temporary construction bridge in this utility model.
[0027] In the diagram: 1. Guardrail; 2. Bridge deck tread; 3. Ramp slab; 4. Abutment; 5. Main longitudinal beam; 6. Support beam; 7. Main transverse beam; 8. Base plate; 9. Secondary longitudinal beam; 10. Secondary transverse beam; 11. Connecting plate; 12. Positioning hole; 13. Fixing plate; 14. Rib plate; 15. Limiting baffle; 16. Partition plate; 17. Edge plate. Detailed Implementation
[0028] The technical solutions of this utility model will be clearly and completely described below with reference to the embodiments of this utility model. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of this utility model.
[0029] Example 1: As Figures 1 to 8 As shown, this embodiment provides a prefabricated steel structure temporary construction bridge, including a bridge deck module, a main frame module, a support and fixing module, and a ramp slab 3; several support and fixing modules are symmetrically arranged at the bottom of the main frame module, the bridge deck module is laid in an array on the upper side of the main frame module, a guardrail 1 is provided at the top edge of the bridge deck module, and ramp slabs 3 are provided at both ends of the main frame module in the length direction.
[0030] In this embodiment, the main frame module adopts a modular splicing structure, including two sets of main longitudinal beams 5, main transverse beams 7, secondary longitudinal beams 9, and secondary transverse beams 10. The two sets of main longitudinal beams 5 are arranged in parallel longitudinally and adopt a multi-segment splicing design. Each segment of the main longitudinal beam 5 is welded to a flange connecting plate 11 at its end. The multiple segments of the main longitudinal beams 5 are detachably connected by bolt assemblies, thereby flexibly adjusting the overall length of the temporary bridge to adapt to trenches or pits of different widths. A parallel secondary longitudinal beam 9 is provided at the centerline inside the main longitudinal beam 5. The secondary longitudinal beam 9 also adopts a segmented splicing structure and maintains synchronous length adjustment with the main longitudinal beam 5.
[0031] Both ends of the two sets of main longitudinal beams 5 are connected to main transverse beams 7 by high-strength bolts. Several secondary transverse beams 10 are evenly arranged transversely between the main longitudinal beams 5 and the secondary longitudinal beams 9. Several pairs of connecting plates 11 are welded to the inner side of the main longitudinal beams 5 and both sides of the secondary longitudinal beams 9. The connecting plates 11 are clamped on both sides of the end face of the secondary transverse beams 10. The secondary transverse beams 10 are detachably fixed to the main longitudinal beams 5 and the secondary longitudinal beams 9 by bolt and nut cooperation, so as to ensure the stability of the main frame and the convenience of disassembly and assembly.
[0032] In this embodiment, the bridge deck module includes bridge deck treads 2, partitions 16, and edge plates 17. The partitions 16 are welded to the top surface of the secondary longitudinal beam 9 along the length direction, and edge plates 17 are welded to the top surface of the main longitudinal beam 5 near the outer edge along the length direction. Several bridge deck treads 2 are laid in an array in the area between the partitions 16 and the edge plates 17. The bridge deck treads 2 are made of patterned steel plates with a thickness of 6-8mm. The patterned structure on the surface enhances the anti-slip performance and is suitable for wet construction environments. The top surface of the partitions 16 is flush with the surface of the bridge deck treads 2 to ensure the flatness of the bridge deck. The edge plates 17 are 5-8cm higher than the surface of the bridge deck treads 2, which serves to prevent falls and block water.
[0033] Among them, several stiffening plates 14 are evenly distributed longitudinally on the bottom surface of the bridge deck tread 2. The stiffening plates 14 are welded to the bridge deck tread 2 to enhance the load-bearing rigidity of the bridge deck tread 2. Several limiting baffles 15 are provided transversely on the bottom surface of the stiffening plates 14. The width between adjacent limiting baffles 15 is adapted to the width of the secondary crossbeam 10. After the bridge deck tread 2 is laid, the limiting baffles 15 are locked on both sides of the secondary crossbeam 10 to achieve rapid positioning and avoid laying deviation.
[0034] Furthermore, a positioning hole 12 is provided on the surface of the bridge deck tread 2 near the outer edge. The lower end of the guardrail 1 is inserted into the positioning hole 12. A fixing plate 13 is welded to the bottom of the guardrail 1. The fixing plate 13 is bolted to the bridge deck tread 2 to ensure that the guardrail 1 is firmly installed and to ensure traffic safety.
[0035] In this embodiment, there are four sets of support and fixing modules, which are respectively located at the four corners of the bottom of the main frame module, including a base 4, a support beam 6, and a bottom plate 8. The support beam 6 is made of I-beams, and its top is screwed to the bottom of the main crossbeam 7 through a flange plate. The bottom of the support beam 6 is welded to the bottom plate 8. The bottom plate 8 is made of steel plate with a thickness of 10-12mm. A concrete base 4 is poured at the bottom of the bottom plate 8. The base 4 is pre-embedded with steel mesh to enhance the bonding force with the soil. The bottom plate 8 is fixedly connected to the base 4 by several expansion bolts to ensure the overturning resistance of the support and fixing module.
[0036] In this embodiment, the ramp slab 3 is made of the same patterned steel plate as the bridge deck tread 2, with anti-slip patterns on the surface. The bottom of the ramp slab 3 is equipped with a steel structure frame, one end of which is hinged to the main crossbeam 7 on the main frame module. The ramp slab 3 can rotate around the hinge, which makes it easy to adjust the tilt angle of the ramp slab 3 according to the ground slope of the construction site, so that the lower end of the ramp slab 3 is in contact with the ground to form a gentle ramp, which is convenient for pedestrians and small vehicles to go up and down the temporary bridge. When not in use, it can be flipped up to save space and avoid tripping. The length of the ramp slab 3 is designed to be adapted to the height of the temporary bridge to ensure that pedestrians and small vehicles can go up and down smoothly.
[0037] Example 2: This example provides the working principle of a prefabricated steel structure temporary construction bridge: In actual use, firstly, in the soil on both sides of the foundation pit, according to the four corner positions of the main frame module, dig out the corresponding soil pits, and pour four sets of concrete foundations 4 in the soil pits. Then, take two sets of main crossbeams 7 and set them parallel to each other in the transverse direction and on the same horizontal plane to form the end support of the main frame; according to the width of the trench, splice multiple sections of main longitudinal beams 5 with bolts to form two sets of main longitudinal beams 5 with the same length, place the two sets of main longitudinal beams 5 parallel to each other in the longitudinal direction between the two sets of main crossbeams 7, with the two ends of the main longitudinal beams 5 attached to the top of the main crossbeams 7, and fix the main longitudinal beams 5 and the main crossbeams 7 with bolts. At the inner centerline of the two sets of main longitudinal beams 5, multiple sections of secondary longitudinal beams 9 are spliced together with bolts to be the same length as the main longitudinal beams 5. The two ends of the secondary longitudinal beams 9 are also fixedly connected to the main cross beams 7 to ensure that the secondary longitudinal beams 9 are parallel to the main longitudinal beams 5 and the spacing is uniform. Between the main longitudinal beam 5 and the secondary longitudinal beam 9, several secondary crossbeams 10 are evenly arranged. The two ends of the secondary crossbeams 10 are respectively clamped between the connecting plate 11 on the inner side of the main longitudinal beam 5 and the connecting plate 11 on both sides of the secondary longitudinal beam 9. The bolt holes on the end faces of the connecting plate 11 and the secondary crossbeams 10 are aligned, and the secondary crossbeams 10 and the connecting plate 11 are fixed with bolts and nuts to complete the assembly of the main frame module. The spacing of the secondary crossbeams 10 is preferably 60cm to ensure uniform load-bearing. The support beam 6 is connected to the main cross beam 7 with bolts. The assembled main frame module is lifted onto the foundation pit using a crane, and the base plate 8 is placed on the top surface of the base platform 4. The mounting holes of the base plate 8 are aligned with the pre-embedded holes in the base platform 4. The base plate 8 is fixedly connected to the base platform 4 with expansion bolts. Then the pit is filled, and the base platform 4, support beam 6 and main cross beam 7 are buried in the soil. In the area between the partition plate 16 and the side plate 17, bridge deck treads 2 are laid in an array. The bridge deck treads 2 are laid longitudinally. The limiting baffle 15 under the bottom stiffener plate 14 of each bridge deck tread 2 is locked on both sides of the corresponding sub-beam 10 to achieve longitudinal positioning of the bridge deck treads 2 and prevent the bridge deck treads 2 from undergoing longitudinal displacement under traffic load. Insert the lower end of the guardrail 1 into the positioning hole 12 near the outer edge of the surface of the bridge deck tread 2, attach the fixing plate 13 at the bottom of the guardrail 1 to the surface of the bridge deck tread 2, and fix the fixing plate 13 to the bridge deck tread 2 with bolts. The two sets of ramp slabs 3 are respectively hinged to the main crossbeams 7 at both ends of the main frame module. The tilt angle of the ramp slabs 3 is adjusted so that the lower end of the ramp slabs 3 is in contact with the ground of the construction site, and the upper surface of the ramp slabs 3 smoothly transitions with the surface of the bridge deck tread 2. Guardrails 1 can be installed on both sides of the ramp slabs 3 and connected with the guardrails 1 of the bridge deck module to form a complete protection system.
[0038] Obviously, the above embodiments of this utility model are merely examples for clearly illustrating this utility model, and are not intended to limit the implementation of this utility model. For those skilled in the art, other variations or modifications can be made based on the above description. It is impossible to exhaustively list all the implementation methods here. Any obvious variations or modifications derived from the technical solutions of this utility model are still within the protection scope of this utility model.
Claims
1. A prefabricated steel structure temporary construction bridge, characterized in that: It includes a bridge deck module, a main frame module, a support and fixing module and a ramp slab (3); the bottom of the main frame module is provided with several symmetrical support and fixing modules, the bridge deck module is laid in an array on the upper side of the main frame module, the top edge of the bridge deck module is provided with a guardrail (1), and both ends of the main frame module in the length direction are provided with ramp slabs (3). The main frame module includes two sets of main longitudinal beams (5), main transverse beams (7), secondary longitudinal beams (9) and secondary transverse beams (10); the two sets of main longitudinal beams (5) are arranged in parallel longitudinal direction, and parallel secondary longitudinal beams (9) are provided at their internal center lines. The bottom ends of the two sets of main longitudinal beams (5) are bolted to the main transverse beams (7), and several secondary transverse beams (10) are evenly arranged in the transverse direction between the main longitudinal beams (5) and the secondary longitudinal beams (9).
2. The prefabricated steel structure temporary construction bridge according to claim 1, characterized in that: Several pairs of connecting plates (11) are welded to the inner side of the main longitudinal beam (5) and both sides of the secondary longitudinal beam (9). The connecting plates (11) are clamped on both sides of the end face of the secondary crossbeam (10). The connecting plates (11) are fixedly connected to the secondary crossbeam (10) with bolts and nuts.
3. The prefabricated steel structure temporary construction bridge according to claim 1, characterized in that: The bridge deck module includes bridge deck treads (2), partitions (16) and side plates (17); the partitions (16) are fixed to the top surface of the secondary longitudinal beam (9) along the length direction, and the side plates (17) are fixed to the top surface of the main longitudinal beam (5) near the outer edge along the length direction. Several bridge deck treads (2) are laid in an array between the partitions (16) and the side plates (17); the bridge deck treads (2) are made of patterned steel plates.
4. The prefabricated steel structure temporary construction bridge according to claim 3, characterized in that: The top surface of the partition (16) is flush with the surface of the bridge deck tread (2), and the height of the side plate (17) is greater than the surface height of the bridge deck tread (2).
5. The prefabricated steel structure temporary construction bridge according to claim 3, characterized in that: The bottom surface of the bridge deck tread (2) is provided with several stiffening plates (14) evenly distributed longitudinally, and several limiting baffles (15) are provided transversely on the bottom surface of the stiffening plates (14). The width between adjacent limiting baffles (15) is adapted to the width of the secondary crossbeam (10). After the bridge deck tread (2) is laid, the limiting baffles (15) are locked on both sides of the secondary crossbeam (10).
6. The prefabricated steel structure temporary construction bridge according to claim 3, characterized in that: The bridge deck tread (2) has a positioning hole (12) near the outer edge. The lower end of the guardrail (1) is inserted into the positioning hole (12). A fixing plate (13) is fixed on the guardrail (1) near the bottom. The fixing plate (13) is bolted to the bridge deck tread (2).
7. The prefabricated steel structure temporary construction bridge according to claim 1, characterized in that: The support and fixing module is provided in four groups, which are respectively located at the four corners of the bottom of the main frame module, including the base (4), the support beam (6) and the bottom plate (8); the support beam (6) is located at the bottom of the main crossbeam (7) and is screwed to it; the bottom plate (8) is welded to the bottom of the support beam (6); the base (4) is cast at the bottom of the bottom plate (8); the bottom plate (8) is fixedly connected to the base (4) by several expansion bolts.
8. The prefabricated steel structure temporary construction bridge according to claim 1, characterized in that: The ramp slab (3) is hinged to the main crossbeam (7) on the main frame module.