Method for determining the current during zero-voltage switching
Patent Information
- Application Number
- DE102022129779
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-11-10
- Publication Date
- 2024-10-10
- Estimated Expiration
- 2042-11-10
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
The present invention relates to a method for determining the current during zero-voltage switching, comprising the steps of:- zero-voltage switching of an electrical component by a zero-voltage switching operation, wherein the electrical component has at least a first and a second switching component, wherein the zero-voltage switching operation is carried out by switching the first and / or the second switching component;- recharging a charge during the zero-voltage switching operation;- determining the amount of the recharged charge;- determining the commutation duration;- determining the current during zero-voltage switching. To reduce switching losses and increase the efficiency of power electronics, zero voltage switching (ZVS) is used for switching operations according to the state of the art. For example, the junction capacitance of switching components is recharged during switching operations by a load current flowing in the appropriate direction. This allows the switching components' channels to be switched on or off with virtually zero transient voltage. This allows the resulting switching loss to be kept very low. In the concrete topologies, the load current or coil current should be monitored using the measure so that the load current generated in controlled operation can continuously realize this switching type in switching components. A typical example is a buck / boost converter. In this converter, this switching mode is implemented by a sign-changing inductor current in switching components. This corresponding control method is referred to as triangular current mode (TCM), as described in "JB a. JWKC Marxgut, "Interleaved Triangular Current Mode (TCM) resonant transition, single-phase PFC rectifier with high efficiency and high power density," in The 2010 International Power Electronics Conference - ECCE ASIA -, 2010." As a technical extension, the load current or coil current can be extended in other forms in other topologies, e.g. in various inverters, isolating or non-isolating DC / DC converters, whereby zero-voltage switching in switching components can also be realized. Controlling switching operations in converters is particularly challenging due to the periodically varying output variables. Therefore, the controller must measure the coil current in real time to determine the required switching duration of each switching component. It is also conceivable for the controller to systematically estimate the required switching duration using an algorithm, and for the planned coil current profile and operating state to be regularly updated to reflect the actual operating state through a current measurement. In the state of the art, this current measurement is often implemented by a shunt resistor, a Hall current sensor, or by sensitive current zero-crossing detection, as described in “JB a. JWKC Marxgut, “Interleaved Triangular Current Mode (TCM) resonant transition, single phase PFC rectifier with high efficiency and high power density,” in The 2010 International Power Electronics Conference - ECCE ASIA -, 2010” or “DHJM a. JWKJ Biela, “Optimal design of a 5kW / dm3 / 98.3% efficient TCM resonant transition single-phase PFC rectifier,” in The 2010 International Power Electronics Conference - ECCE ASIA -, 2010”. Since the measurement signal in these cases is converted directly from the current, this measurement method results in energy loss. At higher switching frequencies or current frequencies, measurement or detection is difficult to implement due to the sensor's lower available bandwidth, especially with Hall sensors. Due to electromagnetic interference from the fast-pulsing power circuit, such sensitive current measurement or current zero-crossing detection is also susceptible to interference. From Zhang, S. [ua]: A High Efficiency Two-Stage ZVS AC / DC Converter with all SiC MOSFET, in 2017 IEEE 3rd International Future Energy Electronics Conference and ECCE Asia (IFEEC 2017 - ECCE Asia), Kaohsiung, Taiwan, pp. 163-169, 2017, zero-voltage switching is known in which the charge to be transferred and a current value are used to determine a switching time. The current value is determined by a measurement. Instead of determining a current value to determine the time for zero-voltage switching, a voltage measurement is used to dynamically optimize zero-voltage switching in Lu, S. [ua]: A Simplified Zero-Voltage Switching Detection Circuit and Switching Loss Dynamic Optimisation Method for Synchronous Buck Converter, in Electronics Letters, 57(2), pp. 71-73, 2021. This voltage value is used to evaluate the quality of zero-voltage switching.However, this prior art does not determine a current value from the amount of charge transferred and the commutation time. In Yan, Y [et al.]: Complete ZVS Analysis in Dual Active Bridge, in IEEE Transactions on Power Electronics, vol. 36, no. 2, pp. 1247-1252, 2021, a resonant zero-voltage switching process is described as an example. This publication discloses the relevant time, whereby the input voltage is also used to determine this time. The current measurement method known from US 2017 / 0040894 A1 is particularly susceptible to interference because the capacitor in the measuring circuit must be matched to the junction capacitance due to the current distribution. This junction capacitance is very small in real switching components and is usually on the order of nF. In addition, the current measurement information is laboriously converted into an analog voltage and sampled in the measuring circuit. Against this background, the present invention is based on the object of providing a method for determining the current during zero-voltage switching which is improved compared to the prior art. This object is achieved by the method having the features of independent claim 1. Advantageous developments of the invention are the subject of the dependent claims. Accordingly, the invention provides that the current is determined from the amount of charge transferred and the commutation time. Determination of the current can preferably be understood as a measurement, recording or calculation of the current. The commutation duration is the duration of charge transfer during the zero-voltage switching process, as well as the duration of the zero-voltage switching process. The commutation duration can also be measured, calculated, or recorded. The charge is preferably transferred from one switching component to another. The charge can be transferred from the first to the second or from the second to the first switching component or to another element. The switching components can preferably be switched on and off. Switching a switching component preferably changes the state of the switching component from "establishing an electrical connection" to "breaking an electrical connection" and vice versa. For the purposes of this invention, electrical is the generic term for electrical and / or electronic. The method is primarily intended for current measurement in power electronics. In this technical field, zero-voltage switching is often used to reduce switching losses. In this process, the junction capacitance of the switching components is discharged by the load current or coil current before they are turned on, so that the switching components can be turned on without voltage. To ensure this switching condition during operation, it is preferably necessary to measure or detect the load current. This method can be used for current measurement in many topologies, e.g., for isolating and non-isolating DC / DC converters, inverters, converters, Active Front Ends (AFE), etc., that can utilize zero-voltage switching. The method can be particularly advantageously used for the "Triangular Current Mode" (TCM) modulation method for non-isolating DC / DC converters or converters. The method is preferably used for current measurement during the switching process of zero-voltage switching without a special current sensor. In the method, the switching components, which recharge their junction capacitance during the zero-voltage switching process (or ZVS switching process) due to the load current, are preferably used as current sensors. Preferably, the average value of the load current during the zero-voltage switching process can be determined using the known junction charge of the switching components at a certain operating voltage using the measured commutation duration. Preferably, a control unit can determine the charge QZVS that is transferred from the load current during the zero-voltage switching process between the last and next switching state of the topology with the operating voltage and the property of the designed switching components. The gate driver preferably has a zero voltage detection (ZVD) circuit to ensure zero voltage switching (ZVS). The circuit preferably monitors the voltage across the corresponding switching component and locks the gate drive for zero voltage switching. The ZVD circuit preferably locks the control signal from the control unit for the switch-on control during the charging process of the zero voltage switching as long as the voltage across this switching component is above a set threshold. When this voltage drops below the set threshold, the control signal is preferably unlocked. Preferably, the control signal can now drive the switching component, and preferably the gate driver simultaneously sends the zero voltage detection signal to the control unit. The set threshold for zero voltage detection is preferably small. Preferably, the threshold is so small that it can be detected as equivalent to zero compared to the operating voltage of the switching device. The commutation period tZVS can preferably be detected by the control unit using the time from the signal edge of the zero-voltage detection signal (ZVD signal) for the switching component that is switched off from the last switching state to the next switching state as the beginning. The end of the commutation period tZVS can preferably be detected based on the signal edge of the ZVD signal for the switching component that is to be switched on in the next switching state. Preferably, the state of the voltage detection signal (ZVD signal) changes almost immediately after the switching device is turned off. The delay between these two times is very short and constant. Therefore, the gate signal for turning off a switching device can practically also be used as the starting time for detecting the commutation duration, instead of the ZVD signal of this switching device. Preferably, after the zero-voltage switching operation, the magnitude of the mean value of the load current during the zero-voltage switching operation | iZVS| with the measured commutation duration tZVS can be calculated as follows: Preferably, the current is determined from the quotient of the amount of charge and the commutation time. In an advantageous embodiment, it is provided that no special, separate current sensor is used for current measurement. It is preferably provided that the amount of the transferred charge is determined from an operating voltage of the electrical component and from the capacitance(s), preferably junction capacitance(s) of the switching component(s) and / or one or more capacitors. In an advantageous embodiment, it is provided that the commutation duration is determined by the duration between the switching of the first switching component and the switching of the second switching component. Preferably, the mean value of the current is determined during the zero-voltage switching process. In an advantageous embodiment, it is provided that the electrical component comprises a control unit, preferably a microcontroller, wherein the control unit switches the switching components and determines the amount of charge transferred when switching the switching component(s), the commutation duration and / or the current during zero-voltage switching. It is preferably provided that the zero-voltage switching is part of a modulation method, in particular part of a triangular current mode method. In an advantageous embodiment, it is provided that the switching component(s) are or comprise semiconductors, preferably transistors, and / or are controlled by a gate driver. Preferably, it is provided that a zero-voltage detection takes place before the zero-voltage switching of an electrical component, wherein the zero-voltage switching process only takes place if the voltages across the first and / or the second switching component are below a defined threshold value. The defined threshold value is technically low in relation to the operating voltage of the switching component; preferably, the defined threshold value is below 10 V, in particular below 5 V or 1 V. Preferably, the zero-voltage detection ensures zero-voltage switching, whereby the commutation duration is measured or recorded based on the zero-voltage detection signal. It is preferably provided that the electrical component is or comprises a power electronics unit, an isolating or non-isolating DC / DC converter, an inverter, a converter or an active front end (AFE) and / or comprises a half-bridge and / or is a component of an electric vehicle, a charging system or a system for generating electrical energy, in particular a solar system. The invention also relates to an electrical component having at least a first and a second switching component, wherein the component is designed such that a current can be determined during zero-voltage switching of the component using a method according to the invention. The features described herein are, mutatis mutandis, preferably features of the process as well as of the product. The invention preferably has the following advantages. The switching components are preferably used as current sensors. The load current during zero-voltage switching is preferably measured by the junction charge of the switching components and the commutation time. Preferably, no additional current measurement component is present in the current path circuit, thus eliminating the additional energy loss caused by current measurement. The circuit therefore requires little effort. The method allows the current during the zero-voltage switching process to be determined precisely in time, preferably even at high switching frequencies, whereby the switching components can be switched at the frequency of the zero-voltage switching. The method is particularly advantageous at high switching frequencies, since a measurement using a standard current sensor at high switching frequencies often results in measurement errors or distorted amplitude and phase delay when measuring the current. Preferably, only the ZVD circuit determines the voltage state. Compared to analog readings, state determination is therefore simple and robust to implement. Signal processing can easily be digitized using a microcontroller. This makes the process less susceptible to electromagnetic interference. The method can preferably ensure higher measurement accuracy at a lower load current during the zero-voltage switching process because a weaker load current delays the zero-voltage switching process and a longer commutation time can be easily measured more accurately. Preferably, the method automatically determines the average load current during the zero-voltage switching process. The oscillation of the load current due to the energy fed by the junction is automatically taken into account in the determination. According to the state of the art, this oscillation, as important information, must be estimated using a complex algorithm. Preferably, due to the implanted doping in the switching components, the junction charge is a stable parameter. This preferably ensures low measurement drift. Zero-voltage switching in switching devices is preferably automatically enabled by the ZVD circuit. Precise dead-time adjustment to compensate for higher conduction losses in the passive freewheeling path, which is often represented as a body diode in the switching device when the channel is deactivated, is preferably not required. It should be noted here that the terms "a" and "an" do not necessarily refer to exactly one of the elements, although this represents a possible embodiment, but can also refer to a plurality of the elements. Likewise, the use of the plural also includes the presence of the element in question in the singular, and conversely, the singular also encompasses several of the elements in question. Furthermore, all features of the invention described herein can be combined with one another as desired or claimed in isolation from one another. Further advantages, features and effects of the present invention will become apparent from the following description of preferred embodiments with reference to the figures, in which identical or similar components are designated by the same reference numerals. Fig. 1: shows a schematic circuit diagram for an embodiment of an electrical system according to the invention. Fig. 2: shows a diagram of values and states of an embodiment of a method according to the invention. Fig. 3: shows a diagram of values and states of an embodiment of a method according to the invention. Fig. 4: shows a diagram of values and states of an embodiment of a method according to the invention. Fig. 5: shows a diagram of values and states of an embodiment of a method according to the invention. Fig. 6: shows a schematic circuit diagram for an embodiment of an electrical system according to the invention. Fig.7: a schematic circuit diagram for an embodiment of an electrical system according to the invention. Fig. 8: a schematic circuit diagram for an embodiment of an electrical system according to the invention. Fig. 9: a diagram of values and states of an embodiment of a method according to the invention. Fig. 10: a diagram of values and states of an embodiment of a method according to the invention. Fig. 11: a diagram of values and states of an embodiment of a method according to the invention. Fig. 12: a schematic circuit diagram for an embodiment of a part of an electrical system according to the invention. Fig. 13: a schematic circuit diagram for an embodiment of a part of an electrical system according to the invention. For example, it is possible to recharge the switching components over the entire intermediate circuit voltage during the zero-voltage switching process. As an example, a half-bridge for DC / DC converters is also presented for the isolating converter (LLC, DAB, etc.), or for one phase of a converter. Fig. 1 shows the schematic circuit diagram for such an embodiment. The voltage U1 is the intermediate circuit voltage, and the load current of the circuit is referred to as the coil current iL. The circuit of Fig. 1 comprises a control unit 1 and two gate drivers 2 for the switching components S1 and S2. In this example, control unit 1 generates the control signals Gate-S1 and Gate-S2 for the switching components S1 and S2. Gate driver 2 has a zero-voltage detection (ZVD) circuit that blocks gate control during zero-voltage switching as long as one of the voltages uS1 and uS2 across a switching component is above a set threshold. If one or all voltages drop below this set threshold, the logic lock is released. The switching components are directly controlled with the respective control signal Gate-S1 or Gate-S2. The ZVD circuit thus ensures zero-voltage switching in the switching components S1 and S2. At the same time, gate driver 2 sends the zero-voltage detection signals ZVD-S1 and ZVD-S2 back to control unit 1 for current measurement. For current measurement, the charge QZVS, which is transferred during the zero-voltage switching process, can be determined using the intermediate circuit voltage U1, i.e., the operating voltage of the switching components, and the properties of the designed switching components. The capacitances in the switching components CS1 and CS2 include or consist of the junction capacitance and / or the capacitance of an additional capacitor, whose properties are specified as known information during design and dimensioning. Therefore, the charge QZVS can be determined from the operating voltage. In this example, the operating voltage of the switching components is equal to the intermediate circuit voltage U1. Therefore, the charge QZVS is: In a half-bridge, there are two permissible switching states during operation. These are shown in the table below, where 0 means blocking and 1 means conducting. Switching state 11010 Switching state 20101 The commutation time tZVSbetween the switching states can be measured using the logic signals, as shown in the table below. Switching state 1 → Switching state 2iL > 0ZVD-S1 or Gate-S1ZVD-S2 Switching state 2 → Switching state 1iL < 0ZVD-S2 or Gate-S2ZVD-S1 For the switching process from switching state 2 to switching state 1, Fig. 2 shows a diagram for one implementation of the current measurement. For the implementation of the ZVS, the transient load current is negative. In the diagram in Fig. 2, the load current and the switching states are plotted on the ordinate and the time on the abscissa. In the diagram in Fig. 3, the voltages and switching states are plotted on the ordinate and the time on the abscissa. Fig. 3 shows the voltage curve across the switching components during the switching process. The capacitance CS1, which develops across the switching component S1, is discharged by the negative load current iL in the time interval [t0,t1]. This causes the voltage uS1 to drop. Conversely, the capacitance CS2, which develops across the switching component S2, is charged, and the voltage uS2 rises to the intermediate circuit voltage U1, i.e., the operating voltage of the switching components. The times t0 and t1 are determined as follows. The control is structured similarly to a control loop because the method according to the invention can preferably only measure the current during zero-voltage switching (ZVS) or during the zero-voltage switching process. At time t0, the switching component for the last switching state is switched off. This time is calculated and implemented by the control unit for a previous switching period based on the operating state measured at that time. The prerequisite is that the direction and magnitude of the load current iLam at time t0 must be suitable for ZVS. At time t0, control unit 1 switches off switching component S2 with the Gate-S2 control signal, and simultaneously, the state of the corresponding zero-voltage detection signal changes. The zero-voltage switching process now begins, and control unit 1 can detect the starting time t0 using the zero-voltage detection signal ZVD-S2 or the Gate-S2 control signal. During the switching process, both switching components S1 and S2 are switched off; the ZVD circuit blocks the Gate-S1 control signal to switch on switching component S1. As soon as the voltage uS1 has dropped to virtually zero, the ZVD circuit releases the logic block. Switching component S1 is now controlled by the Gate-S1 control signal. Using the corresponding activating zero-voltage detection signal ZVD-S1, control unit 1 detects time t1 as the end time of the zero-voltage switching process. The commutation time tZVS is recorded in control unit 1 and is calculated as follows: With the available information, the average value of the load current during the zero-voltage switching operation with the current direction considered can be calculated as follows. The zero-voltage switching operation with transient load current iL< 0 can be summarized as follows:The last switching state: switching state 2 before t0.The next switching state: switching state 1 after t1. For the switching process from switching state 1 to switching state 2, Fig. 4 shows an example of the current measurement. For the implementation of the ZVS, the transient load current is positive. In the diagram in Fig. 5, the voltages and switching states are plotted on the ordinate and the time on the abscissa. Fig. 5 shows the voltage curve across the switching components. During the switching process, the capacitance CS2, which is created across the switching component S2, is discharged by the positive load current iL, and the corresponding voltage uS2 drops. Conversely, the capacitance CS1, which is created across the switching component S1, is charged, and the voltage uS1 rises to the intermediate circuit voltage U1 (operating voltage). At time t0, control unit 1 switches off switching component S1 with the Gate-S1 control signal. Using the zero-voltage detection signal ZVD-S1 or the Gate-S1 control signal, control unit 1 records this time t0 as the start time of the zero-voltage switching process. During the zero-voltage switching process, both switching components S1 and S2 are switched off; the ZVD circuit blocks the Gate-S2 control signal to switch on switching component S2. As soon as the voltage uS2 drops to virtually zero, this ZVD circuit triggers the logic block. Switching component S2 is now controlled by the Gate-S2 control signal. Using the corresponding activating zero-voltage detection signal ZVD-S2, control unit 1 records time t1 as the end time of the zero-voltage switching process. The commutation time tZVS is recorded in control unit 1 and is calculated as follows: The mean value of the load current during the zero-voltage switching process is to be calculated taking into account the current sign as follows: The zero-voltage switching operation with transient load current iL> 0 can be summarized as follows:The last switching state: switching state 1 before t0.The next switching state: switching state 2 after t1. In the method according to the invention, this dead time, which in this embodiment is set between the control signals Gate-S1 and Gate-S2 to connect the bridge short circuit, does not affect the current measurement. The ZVD circuit ensures that the capacitances across the switching components are only recharged based on the appropriate load current iL during the zero-voltage switching process. As a typical extension of the half-bridge, an H-bridge can have multiple control states and allows flexible adjustment of the input / output voltage. Figure 6 shows the circuit diagram of such a half-bridge. In Fig. 6, a control unit 1 controls the switching components S1 to S4 via respective gate drivers 2. For example, in the zero-voltage switching process, the switching components are recharged via a part of the intermediate circuit voltage. One example concerns a three-level flying capacitor inverter. Fig. 7 shows a schematic circuit diagram of a flying capacitor inverter, with switching elements from Fig. 6 arranged in the configuration shown in Fig. 7. In this topology, the permissible switching states are shown in the following table, taking into account the voltage distribution, where 0 means blocking and 1 means conducting. Switching state 111001100 Switching state 210101010 Switching state 301010101 Switching state 400110011 Between the different switching states, the switching components can be switched to zero-voltage switching with the appropriate direction of the load current, and the commutation time tZVS can be measured using the logic signals. The following table shows the arrangement, where "&" represents an AND logic operation. Switching state 1 →Switching state 2iL > 0ZVD-S2 or Gate-S2ZVD-S3QZVS1 Switching state 2 →Switching state 1iL < 0ZVD-S3 or Gate-S3ZVD-S2 Switching state 3 →Switching state 4iL > 0ZVD-S2 or Gate-S2ZVD-S3 Switching state 4 →Switching state 3iL < 0ZVD-S3 or Gate-S3ZVD-S2 Switching state 1 →Switching state 3iL > 0ZVD-S1 or Gate-S1ZVD-S4QZVS2 Switching state 3 →Switching state 1iL < 0ZVD-S4 or Gate-S4ZVD-S1 Switching state 2iL > 0ZVD-S1 or Gate-S1ZVD-S4 →Switching state 4 Switching state 4 →Switching state 2iL < 0ZVD-S4 or Gate-S4ZVD-S1 Switching state 1 →Switching state 4iL > 0Gate-S1 & Gate-S2 (or with ZVD-S1 & ZVD-S2)ZVD-S3 & ZVD-S4QZVS3 Switching state 4 →Switching state 1iL < 0Gate-S3 & Gate-S4 (or with ZVD-S3 &ZVD-S4)ZVD-S1 & ZVD-S2 The corresponding charge between the different switching states can be calculated as follows, taking the topology into account. With this determined charge, the magnitude of the mean value of the load current during zero-voltage switching can be calculated. Furthermore, the average value of the load current iL during the zero-voltage switching process can be arranged with the presented suitable direction of the load current for zero-voltage switching. In particular, in the application of isolating DC / DC converters, a transformer can be arranged as the load of the power circuits. Using the measurement results of the method according to the invention, the transformer current can be checked or monitored during operation, for example, whether the current through the transformer winding is symmetrical and whether the DC current component is maintained at a low level. This allows for appropriate control to ensure that the transformer material does not enter magnetic saturation. The following example of a calculation method for the load current during zero-voltage switching in a converter is essentially state-of-the-art. However, in the state-of-the-art, the current is measured or recorded using a different method or a current sensor. Fig. 8 shows a circuit of a half-bridge for a DC / DC converter or inverter with a control unit 1 and two switching components controlled via gate drivers 2. In the diagrams in Figs. 9 to 11, the load current is plotted on the ordinate and the time on the abscissa. Fig. 9 shows a curve of the coil current iL, or the load current of the half-bridge, during one switching period. In principle, the current determination or measurement according to the invention can be performed during each zero-voltage switching operation. In this example, the coil current is measured by the method at the beginning of each switching period. At the beginning of a switching period, the controller can calculate the duty cycles for each switching component, i.e., for each transistor, using the current measured by the inventive method - IZVS as the initial value - and the operating state represented by U1, u2, inductance L, and the required peak value of the coil current IL,S. After time t1 (see Fig. 2 to Fig. 5), the duty cycles can be applied in the new switching period. The duty cycle for the switching component S1 can be calculated using the following formula: The duty cycle for the switching component S2 can be calculated using the following formula: At the end of the switching period, the coil current is measured again. This measurement result – IZVS – is used as the initial value for the next switching period. For a more detailed explanation of the calculation of the duty cycle, Fig. 10 and Fig. 11 show a schematic current curve in a circuit according to the circuit diagram in Fig. 7, where u2>UFC. Thus, the trapezoidal current curve ensures zero-voltage switching in every switching operation. In principle, the current measurement according to the invention can be performed during every switching operation. In this example, the coil current is measured at the beginning of each switching period. The controller calculates the corresponding duty cycle of each switching component based on the measured value IZVS (or -IZVS) with the operating state, represented by the voltages U1, UFC,u2, the inductance L, and the required peak and intermediate values of the coil current IL,S and IL,Z. In Fig. 10, the duty cycle tS1,2,on corresponds to switching state 1, the duty cycle tS1,3,on corresponds to switching state 2, and the duty cycle tS3,4,on corresponds to switching state 4. The duty cycles can be calculated as follows: In Fig. 11, the duty cycle tS1,2,on corresponds to switching state 1, the duty cycle tS2,4,on corresponds to switching state 3, and the duty cycle tS3,4,on corresponds to switching state 4. The duty cycles can be calculated as follows: At the end of a switching period, the current coil current is measured using the method according to the invention. The result (or -) is used as the initial value for calculating the next switching period. In one possible embodiment, the gate driver 2 can be constructed with zero voltage detection, as shown in Fig. 12. During a zero-voltage switching operation, the ZVD circuit 3 compares the voltage across the switching component uS with the set threshold value uRef for zero-voltage detection. In the actual circuit, the voltage across the switching component uS is transiently negative for a short time after the zero-voltage switching operation due to the current flowing through the freewheeling path or the diode. Therefore, this threshold value uRef for zero-voltage detection can, in principle, be set to virtually zero. In case uS> uRef, the ZVD circuit 3 provides a low voltage level for logic “0” and the ZVD-S signal is deactivated. If uS< uRef, the ZVD circuit 3 delivers a high voltage level for logic “1” and the ZVD-S signal is activated. This zero-voltage detection signal ZVD-S is sent to the gate driver 4 and the control unit 1. This allows the gate driver 4 to turn on the switching device with the Gate-S control signal when the zero-voltage detection signal ZVD-S has a logic "1." For a more precise understanding of the operating principle, Fig. 13 shows a possible design of a gate driver 2. In the ZVD circuit 3, diode D is blocked when the voltage uS is greater than the flying supply voltage UFV. Because the voltage UFV is dimensioned higher than the threshold value uRef, the comparator outputs a logic "0." If the voltage uS is lower than the voltage UFV, diode D conducts. The comparator now compares the voltage uS with the set threshold value uRef. As soon as the voltage uS is lower than the threshold value uRef, the ZVD circuit outputs a logic "1." If the switching device is not to be switched by zero-voltage switching, control unit 1 outputs the direct control signal DS-S as logic "1." The zero-voltage detection signal ZVD-S is now overwritten, allowing the switching device to be controlled directly by the control signal Gate-S. The direct control signal DS-S is only used during operation if the switching operation is not performed in zero-voltage switching. In the method according to the invention, the direct control signal DS-S must be permanently deactivated with logic "0."
Claims
Method for determining the current during zero-voltage switching, comprising the steps of:- zero-voltage switching of an electrical component by a zero-voltage switching operation, wherein the electrical component has at least a first and a second switching component, wherein the zero-voltage switching operation occurs by switching the first and / or the second switching component;- recharging a charge during the zero-voltage switching operation;- determining the amount of the recharged charge;- determining the commutation duration;- determining the current during zero-voltage switching,characterized in thatthe current is determined from the amount of the recharged charge and the commutation duration. Method according to claim 1, characterized in that the current is determined from the quotient of the amount of charge and the commutation time. Method according to claim 1 or 2, characterized in that no separate current sensor is used for current measurement. Method according to one of the preceding claims, characterized in that the amount of the transferred charge is determined from an operating voltage of the electrical component and from the capacitance(s), preferably junction capacitance(s) of the switching component(s) and / or one or more capacitors. Method according to one of the preceding claims, characterized in that the commutation duration is determined by the duration between the switching of the first switching component and the switching of the second switching component. Method according to one of the preceding claims, characterized in that the mean value of the current is determined during the zero-voltage switching process. Method according to one of the preceding claims, characterized in that the electrical component comprises a control unit, preferably a microcontroller, wherein the control unit switches the switching components and determines the amount of charge transferred when switching the switching component(s), the commutation duration and / or the current during zero-voltage switching. Method according to one of the preceding claims, characterized in that the switching component(s) are or comprise semiconductors, preferably transistors, and / or are controlled by a gate driver. Method according to one of the preceding claims, characterized in that a zero-voltage detection takes place before the zero-voltage switching of an electrical component, wherein the zero-voltage switching process only takes place if the voltages across the first and / or the second switching component are below a defined threshold value. Electrical component with at least a first and a second switching component, wherein the component is designed such that a current can be determined during zero-voltage switching of the component using a method according to one of the preceding claims.
Citation Information
Patent Citations
Low loss current sensor and power converter using the same
US20170040894A1
