Method for regulating the moisture in a gas

EP4452459A1Pending Publication Date: 2024-10-30H2GREMM
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
EP2022839700
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-12-24
Filing Date
2022-12-16
Publication Date
2024-10-30

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

The invention relates to a method for regulating the moisture in a gas, the method comprising the following steps: a first step (101) of regulating the moisture in a gas entering a bubbler (B) at a flow rate of between 200 NL / h and 2000 NL / h, wherein the gas entering the bubbler (B) via the inlet of the bubbler tank (3) passes through the first porous matrix (4) and wherein the humidified gas exits via the outlet of the bubbler tank (3) and flows to a compressor (18); a second step (102) of drying the gas from the first step, wherein the gas exiting the compressor (18) passes through a T-shaped tube (19) comprising one inlet and two outlets, one of the outlets being vertical thus enabling the liquid phase to flow from the gas under the effect of gravity and to create a condensate (20), the other outlet being connected at the bottom to a desiccant reservoir (24).
Need to check novelty before this filing date? Find Prior Art

Description

Method for regulating the humidity of a gas Technical field of the invention

[0001] The present invention relates to a method for regulating the humidity of a gas. It applies, in particular, to the method requiring hydrogen saturated with humidity at the inlet and dry at the outlet.

[0002] For example, the field of the invention applies to electrochemical compressors or gas separators.

[0003] In existing systems or existing processes, the inlet gas must contain sufficient relative humidity for the system to operate properly. The outlet gas must contain a low enough absolute humidity for storage and use in various applications.

[0004] There are documents disclosing methods of humidifying a gas using a bubbler, for example documents US2010 / 201006, CN112713288, US2003 / 188638 and FR2018902.

[0005] Relative humidity is the ratio of the partial pressure of water vapor in the air to the saturated vapor pressure (or vapor tension) at the same temperature.

[0006] If the inlet gas contains insufficient moisture, the system may be damaged or destroyed in the short term.

[0007] If the outlet gas contains excess moisture, storage elements and regulators can corrode, and components using this excessively humid hydrogen can experience a reduced lifespan. To avoid these problems, standards require a moisture concentration in hydrogen of less than 5 ppm.

[0008] The system operates at a given optimum temperature (e.g. 20°C to 60°C).

[0009] In order to achieve humidity saturation of the gas entering the system, the humidity control process must operate at the same inlet temperatures and pressure as the system.

[0010] At the system outlet, the dryer must operate at the system's set pressure (for example between 300 and 1000 bar).

[0011] The system operates for gas flow rates between 200 and 2000 NL / hour.

[0012] The unit NL / hour stands for normo-liter per hour or liter of gas per hour at standard temperature and pressure conditions. The flow rate can be measured with a flow meter and controlled by this flow meter.

[0013] For convenience we will call the process of regulating the humidity of the gas at the inlet "bubbler" and the process of regulating the humidity at the outlet "dryer".

[0014] A bubbler consists of a reservoir containing liquid water through which a gas passes in the form of microbubbles. The gas in contact with the water is humidified until it reaches saturation depending on the temperature and pressure conditions in the bubbler.

[0015] A temperature maintenance system is installed between the bubbler and the compressor to avoid cold spots and always remain at a temperature higher than the gas condensation temperature.

[0016] Solutions exist but it is not possible to meet the need with a bubbler sold on the market because it cannot withstand pressures above a few bars.

[0017] Using a dew point controller would allow for precise control of moisture content. However, this solution is much more expensive and complex and cannot accommodate pressures above a few bars.

[0018] To overcome this problem, manufacturers who do not want to invest in a dew point controller and want to use less expensive and more robust equipment, maintain the temperature of their bubbler using an electrical resistance: electric heating cables are placed along the gas lines to avoid cold spots between the bubbler and the system. The objective is to maintain a sufficient temperature and avoid condensation.

[0019] There are many gas drying solutions that can achieve 5 ppm for flow rates of 200 to 2,000 NL / h: - The desiccant dryer allows operation up to 1,000 bar and has a very good drying capacity, the disadvantage is that it requires replacement or regeneration of the desiccant when it is saturated with water. Custom-modified medium-pressure enclosures (up to 700 bar) are now used, which contain the desiccant as well as the condensed water. The compressed gas and the condensate are in the same enclosure. During condensate purges, some of the gas is lost, as it is evacuated at the same time as the water. They are made of massive and expensive stainless steel parts. Each maintenance requires replacement of the seal providing sealing. The design of these enclosures generally makes this procedure delicate.- The permeation drying solution has the same regeneration problem and uses part of the dried hydrogen to absorb the moisture accumulated on the membranes, so there are significant gas losses. Another disadvantage is the operating pressure which does not accept pressures higher than 35 bar for small installations and therefore low flow rate.- The drying solution by refrigeration unit available on the market allows to reach a dew point temperature close to 0°C but does not accept pressure higher than a few bars. It is therefore not possible to reach 5 ppm under these pressure and temperature conditions.- The coalescence phase separation solution allows to separate the liquid and vapor water phases. This solution does not allow to achieve sufficient drying. Presentation of the invention

[0020] The present invention aims to overcome these drawbacks with a completely innovative approach.

[0021] More specifically, the invention aims to:- Guarantee that the incoming gas is saturated with humidity, i.e. 70% ≤ RH ≤ 99%;- Guarantee that the outgoing gas carries a water concentration of less than 5 ppm.

[0022] Another objective is to ensure that the gas is saturated with humidity regardless of the operating temperature.

[0023] In particular, one objective of the invention is to provide such a technique making it possible to do away with any other complex adjustment system.

[0024] Another objective of the invention is to provide such a technique which is inexpensive to implement and which does not require any particular maintenance.

[0025] These objectives, as well as others which will appear subsequently, are achieved, according to a first aspect, using a method for regulating the humidity of a gas, remarkable in that it comprises the following steps: - a first step of regulating the humidity of a gas entering a bubbler at a flow rate of between 200 NL / h and 2000 NL / h and the relative humidity of the gas entering the compressor is between 70% and 99%, said bubbler comprises the following elements: - a bubbler tank comprising an inlet and an outlet, - a thermoregulation tank which surrounds said bubbler tank, - a volume of thermoregulation water contained in said thermoregulation tank, - a thermoregulation water circulation pump; - said bubbler tank comprises a first porous matrix located at the bottom of the bubbler tank near the inlet;the gas entering the bubbler through the inlet of the bubbler tank passes through the first porous matrix positioned in a volume of water contained in the bubbler tank, the humidified gas exits through the outlet of the bubbler tank and circulates towards a compressor; the volume of thermoregulation water circulates in a closed circuit passing through the thermoregulation tank, the circulation pump and the compressor; - a second stage of drying the gas from the first stage, the gas leaving the compressor passes through a T-shaped tube comprising an inlet and two outlets, one of the outlets is vertical and by gravity allows the liquid phase of the gas to flow creating a condensate, the other outlet is connected to the level of the bottom of a desiccant tank; at the outlet of the desiccant tank the dried gas is stored towards a tank and has a humidity lower than a predetermined threshold.;

[0026] Thanks to these provisions, the gas entering the compressor is saturated with humidity, i.e. 70%≤HR≤99% and optimizes its operation; and after the dryer stage, the gas leaving carries a water concentration of less than 5ppm which allows for various applications.

[0027] There are other advantages such as the need for less cooling compared to other processes, a process where the conditions of the outgoing gas are ensured and respected.

[0028] The internal volume of the bubbler is also used as a shock absorber for variations in the pressure of the incoming gas, thus allowing simplified management of the compressor.

[0029] The bubbler maintains an optimal water level using an automated purge and refill system.

[0030] A single temperature regulator installed around the bubbler allows the temperatures of the bubbler and the associated compressor to be adjusted.

[0031] By separating the condensate upstream of the gas dryer, gas losses during condensate purges are minimized.

[0032] The design of a dryer based on standard components allows for reduced costs, simplified maintenance and greater modularity.

[0033] The invention is advantageously implemented according to the embodiments and variants set out below, which are to be considered individually or in any technically effective combination.

[0034] In one embodiment, during the first stage the incoming gas comes from an electrolyser and has a relative humidity of less than 50%.

[0035] In one embodiment, during the first step, the temperature of the thermoregulation water is ensured by a thermoregulation element.

[0036] In one embodiment, the first stage thermoregulation element comprises fins placed around the thermoregulation reservoir.

[0037] In one embodiment, the first stage thermoregulation element comprises a fan configured to provide circulation of air in contact with the fins.

[0038] In one embodiment, during the first step, a second porous matrix is ​​located in the upper part of the bubbler tank near the outlet of the bubbler tank, the humidified gas passes through the second porous matrix before exiting the bubbler tank. It is used as a safety element preventing the passage of liquid water.

[0039] In one embodiment, during the first stage the relative humidity of the gas entering the compressor is between 70% and 99%, preferably between 95% and 99%.

[0040] In one embodiment, said method comprises a third shutdown step to purge the volume of water contained in the bubble tank and then fill it with a new volume of water.

[0041] In one embodiment, during the third shutdown step, the condensate contained in one of the outlets of the T-shaped tube is purged.

[0042] In one embodiment, when the humidity level of the gas is higher than the predetermined threshold, preferably when it exceeds the threshold of 5 ppm, said method comprises a step of visual, audible or terminal alert indicating the need to replace the desiccant. Brief description of the figures

[0043] Other advantages, aims and characteristics of the present invention emerge from the following description, given for explanatory and non-limiting purposes, with reference to the appended drawings, in which:

[0044] The figure represents a schematic diagram of the invention, the subject of the present invention;

[0045] The represents the steps of the regulation method, the subject of the present invention.

[0046] Incoming gas:

[0047] To achieve a relative humidity of the incoming gas between 70 and 100% at the inlet, the bubbler is maintained at a temperature close to the temperature of the incoming gas.

[0048] An identical temperature allows 100% relative humidity to be reached.

[0049] The bubbler must therefore be kept at a temperature a few degrees lower than the temperature of the incoming gas to keep the relative humidity level within the required range (70% ≤ RH ≤ 99%).

[0050] If the bubbler temperature is higher than the incoming gas temperature, condensation will occur, which can affect overall operation.

[0051] To do this, the incoming gas is temperature-regulated using a thermoregulator. Thermoregulation is carried out at the bubbler using a finned tube and a fan.

[0052] The solution is to encapsulate the bubbler and incoming gas assembly in the same thermoregulated circuit. This avoids electrical consumption for temperature maintenance (heating resistors and cables). The bubbler and the coaxial tube containing the incoming gas contribute to heat dissipation in the event that the system produces an exothermic reaction requiring cooling.

[0053] As a result, the sizing of the thermoregulator is slightly lower than the initial configuration required for the same quantity of incoming gas.

[0054] Outgoing gas:

[0055] The object of the invention for the drying part takes up the characteristic of drying by desiccation, but modifies its architecture. This new architecture makes it possible to collect the liquid phase before passing into the desiccant. The separation of these two phases allows a simplification of the assembly as well as greatly limiting gas losses at each purge.

[0056] It represents a schematic diagram of the invention.

[0057] Bubbler B consists of an enclosure containing a volume of water 5 sized according to the needs of the quantity of gas to be treated, accepting pressures of a few tens of bar, made of a material that is a good thermal conductor and resistant to corrosion. The incoming gas comes from an electrolyzer 1. In the example, the incoming gas is hydrogen. The flow rate is between 200 and 2000 NL / h, having insufficient relative humidity (<50%) under the pressure and temperature conditions present in the system. For example 35°C at 35 bar. The flow rate is linked by the operating power of the electrolyzer.

[0058] A stainless steel bubbler tank 3 combines all these features. The microbubbles are created by inserting a first porous matrix 4. A porous matrix is ​​a solid material containing small pores or cavities that leave space for the flow of a fluid. This material can be made of different materials: metal, ceramic, carbon, plastic, etc.

[0059] The bubbler tank 3 has an inlet and an outlet.

[0060] The cylinder-shaped bubbler tank 3 fits into the thermoregulation tank 6 in which the thermoregulation water 7 circulates. The thermoregulation water 7 is in a closed circuit; it cannot under any circumstances be in the bubbler tank 3.

[0061] This thermoregulation water 7 also circulates in a coaxial tube 9 to the tube transporting the hydrogen between the bubbler and the compressor 18.

[0062] According to another variant, the compressor 18 is a device requiring a gas saturated with humidity.

[0063] During operation, the gas not saturated with moisture, coming from the electrolyser enters the bubbler tank 3 and passes through the first porous matrix 4 itself placed in the volume of water 5. The first porous matrix 4 is located at the bottom of the bubbler tank 3 near the inlet of the thermoregulation tank 6.

[0064] The humidified gas passes through a second porous matrix 9 which prevents any rise of liquid water and only allows the gaseous phase to pass through.

[0065] A humidity measurement is carried out using a dew point sensor 17, this sensor ensures that the humidity content is between 70% and 99%.

[0066] When stopped, a purge of the remaining volume of water 5 is carried out via a first solenoid valve 22, followed by automatic filling using a second solenoid valve 11; the water coming from a filtration system 12. This makes it possible to restore a sufficient quantity of water for the duration of an operating session. The water is injected directly into the bubbler using a tube 13 coaxial with the tube 15 allowing the circulation of the gas. A non-return valve 16 protects the filtration system 12 from the gas pressure when the system is restarted. During filling, the pressure sensor 14 allows management of the quantity of water injected. Indeed, the addition of water in the bubbler reduces the volume available for the gas, leading to an increase in the pressure thereof.

[0067] Fins 27 are placed around the thermoregulation tank, they allow to maximize the heat exchange with the outside air. If necessary, a fan 8 allows better circulation of the air in contact with the fins and precise control of the cooling temperature. An alternative solution is to replace this thermoregulation system integrated into the bubbler by an independent system.

[0068] According to an exemplary embodiment, the temperature of the thermoregulation tank is close to the temperature of the compressor with a difference between -1°C and -10°C.

[0069] According to another embodiment, the temperature of the thermoregulation tank is identical to the temperature of the compressor.

[0070] After passing through compressor 18, the gas is dried in two stages.

[0071] The first step consists of separating the liquid phase from the gaseous phase. A T-shaped tube 19 crossed by a thin tube placed vertically will allow a separation of the two phases by gravity. The speed of the fluid is sufficiently low (approximately 1 cm / sec) so that the water flows and is not carried away by the gas during its rise towards the T-shaped tube 19. The liquid water 20 is stored in a tube for the duration of the operating session. This water is evacuated at the same time as the water from the bubbler at the end of the session using the first solenoid valve 22. Before this, an expansion is carried out using a pressure reducer 21. This expansion makes it possible to equalize the outlet pressures of the dryer and the bubbler and avoids a purge at more than 300 bar, which would pose a safety risk for the user, as well as alterations to the equipment operating at low pressure 1 and 3.

[0072] One of the advantages of separating the condensate 20 (liquid water) from the desiccant tank 24 using a check valve 23 is that it is no longer necessary to purge the entire tank at the end of each cycle. Only the condensate portion is purged. The resulting gain is significant. For example, with a 1L desiccant tank and an operating pressure of 400bar, this represents 400NL of avoided gas losses, or approximately one hour of operation per cycle, compared to a solution mixing condensate and desiccant.

[0073] Once separated from the liquid phase, the hydrogen gas is led into the bottom of a desiccant tank 24. As it rises towards the outlet at the neck of the desiccant tank 24, the moisture in the form of vapor contained in the gas is absorbed by the desiccant beads. The effectiveness of this absorption is ensured until the capacity of the desiccant is completely saturated. Once saturated, the desiccant is replaced or regenerated. The volume of the tank determines the quantity of desiccant and therefore the maintenance frequency. For example, to meet the treatment needs of a gas with a flow rate of 5000 NL / day, a tank with a capacity of 1 L of desiccant is sufficient to space out the maintenance periods by one year.

[0074] The dry gas is stored in a pressurized tank 26. This gas is subsequently consumed through various applications. According to another variant, the tank 26 is a device or a capacity requiring a gas with a very low humidity content. The dew point sensor 25 makes it possible to monitor the residual humidity level in the outgoing gas flow. Depending on the objective, for example 5 ppm, exceeding this value will initiate an alert for the replacement of the desiccant.

[0075] Shows the steps of the method for regulating the relative humidity of a gas, the subject of the present invention.

[0076] A first step 101 of regulating the humidity of a gas entering a bubbler B, said bubbler B is contained in a thermoregulation tank 6 in which thermoregulation water 7 circulates in a closed circuit. The humidified gas leaves the bubbler B to arrive at a compressor 18. The water circulation pump 2 is used to circulate around the bubbler B water which has a certain temperature and which prevents the whole from heating up.

[0077] A second step 102 of drying the gas from the first step, said drying separates the liquid phase of the gas from the gaseous phase by a T-shaped tube comprising an inlet and two outlets, one of the outlets is vertical and by gravity allows the liquid phase of the gas to flow, the other outlet is connected to the level of the bottom of a desiccant tank 24; at the outlet of the desiccant tank the dried gas is stored in a tank 26.

[0078] A third step 103 of shutdown to purge the volume of water 5 from the bubbler and the condensate from the dryer 20 then the filling of a new volume of water 5.

[0079] ReferencesDesignations1Electrolyzer2Circulation pump3Bubble tank4First porous matrix5Water6Thermoregulation tank7Thermoregulation water8Fan9Second porous matrix10Coaxial tube containing the thermoregulation water11Second solenoid valve12Water filter13Water filling tube14Temperature sensor15Hydrogen tube16Non-return valve17Dew point sensor18Compressor19T-shaped tube20Condensate21Expansion valve22First solenoid valve23Non-return valve24Desiccant tank25Dew point sensor26Tank27FinsBBubble partSDryer part

Claims

A method for regulating the humidity of a gas, characterized in that it comprises the following steps: - a first step (101) of regulating the humidity of a gas entering a bubbler (B) at a flow rate between 200 NL / h and 2000 NL / h and the relative humidity of the gas entering the compressor is between 70% and 99%, said bubbler (B) comprises the following elements: - a bubbler reservoir (3) having an inlet and an outlet, - a thermoregulation reservoir (6) which surrounds said bubbler reservoir (3), - a volume of thermoregulation water (7) contained in said thermoregulation reservoir (6), - a circulation pump (2) for thermoregulation water (7); - said bubbler reservoir (3) comprises a first porous matrix (4) located at the bottom of the bubbler reservoir (3) near the inlet;the gas entering the bubbler (B) through the inlet of the bubbler reservoir (3) passes through the first porous matrix (4) positioned in a volume of water (5) contained in the bubbler reservoir (3), the humidified gas exits through the outlet of the bubbler reservoir (3) and circulates to a compressor (18); the volume of thermoregulation water (7) circulates in a closed circuit passing through the thermoregulation reservoir (6), the circulation pump (2) and the compressor (18);- a second stage (102) of drying the gas from the first stage, the gas exiting the compressor (18) passes through a T-shaped tube (19) having one inlet and two outlets, one of the outlets is vertical and by effect of gravity allows the liquid phase of the gas to flow out creating a condensate (20), the other outlet is connected to the bottom of a desiccant tank (24);at the outlet of the desiccant tank (24) the dried gas is stored in a tank (11) and has a moisture content below a predetermined threshold. A process according to claim 1, wherein in the first step the incoming gas is from an electrolyzer (1) and has a relative humidity of less than 50%. Method according to claim 1, wherein in the first step, the temperature of the thermoregulation water (7) is ensured by a thermoregulation element. Method according to claim 3, wherein the thermoregulation element of the first stage comprises fins (27) placed around the thermoregulation reservoir (6). Method according to claim 4, wherein the thermoregulation element of the first stage comprises a fan (8) configured to ensure the circulation of air in contact with the fins (27). Method according to claim 1, wherein in the first step, a second porous matrix (9) is located in the upper part of the bubbler reservoir (3) near the outlet of the bubbler reservoir (3), the moistened gas passes through the second porous matrix (9) before exiting the bubbler reservoir (3). A method according to claim 1, wherein in the first step the relative humidity of the gas entering the compressor is between 95% and 99%. Method according to claim 1, wherein said method includes a third step (103) of stopping to purge the volume of water (5) contained in the bubbler tank (3) and then filling it with a new volume of water. Method according to claim 8, wherein during the third shutdown step (103), the condensate (20) contained in one of the outlets of the T-shaped tube (19) is purged. A method according to claim 1, wherein when the moisture content of the gas is above the predetermined threshold, preferably when it exceeds the threshold of 5 ppm, said method includes a visual, audible or terminal alert step indicating the need to replace the desiccant.