Cable arrangements for offshore windfarms
The midwater power hub configuration for offshore windfarms reduces the length and cost of dynamic cables by anchoring them at a midwater hub, addressing the economic viability issues of deepwater installations and minimizing exposure to sea dynamics, thereby enhancing the economic viability and efficiency of inter-array cable systems.
Patent Information
- Application Number
- GB2023006550
- Authority / Receiving Office
- GB · GB
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-03
- Publication Date
- 2024-11-06
AI Technical Summary
The high cost of dynamic cables used in offshore windfarms, particularly in deeper waters, threatens the economic viability due to their increased expense and susceptibility to sea dynamics, making conventional inter-array cable arrangements economically unviable.
A midwater power hub is introduced, supported by buoyancy, which connects dynamic cables from wind turbines to a substation, reducing the length and cost of dynamic cables by anchoring one end at the hub, thus minimizing exposure to sea motions and using non-dynamic feeder cables for connections.
This configuration significantly reduces the length and cost of dynamic cables, enhances the economic viability of deepwater offshore wind farms, and reduces susceptibility to local current effects by anchoring one end of the cable, thereby improving the overall efficiency and cost-effectiveness of inter-array cable systems.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
This invention relates to offshore windfarms, and particularly to inter-array cable arrangements for interconnecting the wind turbines and other elements of such windfarms. Conventionally, the wind turbines of offshore windfarms are connected to an electrical substation that may be located onshore or offshore. The substation transforms electrical energy generated by the wind turbines and conveys that energy toward a power grid on land. In view of their size and complexity, offshore substations are located either at the surface, for example on a fixed or floating platform as shown in CN 114475943, or on the seabed as shown in US 7989984. Inter-array cables connect the turbines to the substation either directly or via an offshore hub that may also be located on a fixed or floating platform. Commonly, as exemplified in WO 2021 / 045627, much of the overall length of an interarray cable is laid on the seabed. However, a portion of the cable must then extend from the seabed to the surface to connect to a turbine, hub or substation at a surface location. That portion, at least, comprises what is known in the art as a dynamic cable, being a cable that is reinforced and armoured to withstand fatigue caused by sea motions at or near to the surface. This is in contrast to what is known in the art as a static cable, being a less robust cable that is suitable to lie on the seabed, away from the worst effects of sea motions. The offshore energy industry is in the early stages of establishing an industry standard relating to dynamic cables for floating offshore windfarms. Specifically, DNV (Det Norske Veritas) recently launched a joint industry project entitled Floating Wind Reliability that aims to optimise design requirements for mooring and dynamic interarray cable systems applicable to commercial-scale floating wind projects. In radially inward succession, a dynamic cable typically comprises an outer protective sheath, multiple contra-helical wire armour layers and an inner sheath containing a set of twisted electrical cores bundled with optical fibres, together with a filler. In contrast, the outer and inner sheaths of a static cable typically comprise merely light rovings with only an intermediate single layer of wire reinforcement between them. Length-for-length, therefore, dynamic cables are far more expensive than equivalent static cables. This becomes a major problem in deeper waters to be exploited by floating wind turbines. This is not only because longer cables are required to reach from the seabed to the surface, but also because dynamic cables for use in deeper waters are likely to be more expensive for a given length than those for use in shallower waters. In this respect, dynamic cables for use in deeper waters must be specified to withstand the more severe ocean dynamics that can be expected further offshore. Whilst it would be possible, in principle, to transition from dynamic cable to static cable for short sections of inter-array cables laid on the seabed between turbines, this is not anticipated to be cost effective or widely adopted. Also, joints and connectors between dynamic and static portions of an inter-array cable would introduce additional potential points of failure into the system. The cost of dynamic cables is such a major part of the cost of installing wind farms in deep water as to threaten the economic viability of such installations. Consequently, the invention contemplates inter-array cable solutions that reduce not only the length of dynamic cables but potentially also the cost per unit length of such cables. CN 216002988U discloses the use of an anchored buoy to support a cable extending between two offshore wind turbines. However, the cable extends continuously between the turbines and is not connected electrically to the buoy; also, both ends of the cable are exposed to sea motions at or near to the surface. Midwater arches are known in the subsea oil and gas industry to support pipeline risers. In some cases, subsea processing equipment is added to an arch, for example as shown in CN 108533232. Similarly, US 2019 / 360319 shows hydrocarbon processing equipment located partially underwater. In both cases, pipelines transport fluids directly between the seabed and the surface; in neither case are high-voltage electrical connections effected or located underwater. Against this background, the invention resides in a cable arrangement for an offshore windfarm. The windfarm comprises: a substation that may be at the surface or on the seabed; a hub at a midwater location connected to the substation; and at least two wind turbines at surface locations connected to the hub. The cable arrangement comprises: dynamic cables that extend from the turbines and are electrically connected to the hub; and a feeder cable that extends from the hub to the substation and that could be a non-dynamic cable. The hub is apt to be supported at the midwater location by buoyancy, which may itself be at a subsurface location. For example, the hub may be tethered to a seabed foundation by one or more tensile members that are placed under tension by the buoyancy acting on the hub. At least one of the dynamic cables could hang with a catenary configuration between the hub and the associated turbine. Alternatively, at least one of the dynamic cables could have a wave configuration that includes a hogbend disposed at a midwater location between the hub and the associated turbine. Such a hogbend may be supported by buoyancy, which is itself apt to be at a subsurface location. The hub may conveniently be disposed between the turbines, for example so that the turbines are substantially equidistant from the hub. The dynamic cables extending from the turbines can be electrically connected to the hub by wet-mate connectors or by drymate connectors. The inventive concept embraces an offshore windfarm including the cable arrangement of the invention, and extends to a method of installing an offshore windfarm that comprises a substation, a hub connected to the substation and at least two wind turbines at surface locations connected to the hub. That method comprises: lowering the hub to a midwater location; supporting the hub at the midwater location; effecting connection of dynamic cables between the turbines and the hub; and effecting connection of a feeder cable between the substation and the hub. Dry connection of the dynamic cables to the hub may be performed at an abovesurface location before lowering the hub. Alternatively, wet connection of the dynamic cables to the hub may be performed at a subsurface location after lowering the hub. Similarly, dry connection of the feeder cable to the hub may be effected at an above surface location or wet connection of the feeder cable to the hub may be effected at a subsurface location. The hub can be docked to a subsurface support such as a buoy or to a fixed structure that is pre-installed at the midwater location. Where the subsurface support is a buoy, sufficient buoyancy is provided to support the hub at the midwater location. Thus, in preferred embodiments, the invention contemplates a midwater power hub for a deepwater offshore wind farm comprising floating wind turbines or FWTs. The FWTs are tied back to a floating or subsea offshore substation via a midwater high-voltage hub. The hub may be landed and locked onto midwater buoyancy that may be tethered to the seabed, for example using a suction pile foundation. The depth of the hub can be set according to the field water depth and dynamic cable lengths. Cables for conveying electrical power from the FWTs can be dry- or wet-mated to the power hub. In the dry-mate option, the FWT cables may be connected to the hub on the surface on-deck before overboarding the hub or otherwise before the hub is submerged. In the wet-mate option, the FWT cables may be connected to receptacles of the hub when the hub has been installed on the midwater buoyancy, either using an ROV or bespoke connection tooling. Examples of the invention to be described therefore involve various options for connecting dynamic cable arrays to the midwater power hub. In one option involving wet-mate submersible connectors, the hub is installed with, or landed and locked to, midwater buoyancy before connecting the dynamic cables to the hub. Here, lower ends of the dynamic turbine cables are terminated with wet-mate submersible plugs that connect to receptacles mounted on the hub. Similarly, the lower end of a feeder cable is terminated with a wet-mate submersible high power plug that connects to a corresponding receptacle mounted on the hub. In another option involving dry-mate submersible connectors, the hub is docked or landed and locked to midwater buoyancy after connecting the dynamic cables to the hub. In this case, lower ends of the dynamic turbine cables are terminated with drymate submersible plugs that connect to receptacles mounted on the hub. Similarly, the lower end of a feeder cable is terminated with a dry-mate submersible high power plug that connects to a corresponding receptacle mounted on the hub. The invention allows dynamic cables to be significantly shorter than in conventional FWT solutions, hence improving the economic viability of deepwater locations for offshore wind farms. Also, unlike a conventional W-configuration dynamic cable, one end of the cable is anchored at the hub and only the other end of the cable is exposed to dynamic conditions. Additionally, as one end of the cable is fixed or held relatively stationary at the hub, the cable as a whole is less susceptible to local current effects. Embodiments of the invention provide an inter-array cable arrangement for an offshore windfarm that comprises at least two wind turbines and a substation, the cable arrangement comprising: at least one midwater hub located between the wind turbines and the substation, preferably as close as possible to the wind turbines; dynamic cables between the wind turbines and the midwater hub; and a cable between the midwater hub and the substation. The dynamic cables could, for example, be in a catenary arrangement, in a catenary arrangement supported by buoys, or in a lazy wave arrangement. The midwater hub may comprise a buoy, an electrical hub supported by the buoy, and a buoy anchoring system extending to the seabed. The anchoring system of the hub may, for example, be a taut mooring such as a tension leg mooring. The wind turbines and the substation may float or the substation may be installed on the seabed. The midwater hub may be located at least 100m beneath the surface. The hub may be located approximately equi-distantly from the wind turbines to which it is connected. In summary, an offshore windfarm of the invention comprises a substation, a hub at a midwater location connected to the substation and at least two wind turbines at surface locations connected to the hub. A cable arrangement of the windfarm comprises dynamic cables extending from the turbines that are electrically connected to the hub and a further cable extending from the hub to the substation. The dynamic cables can be wet-mated to the hub underwater or can be connected to the hub in a dry environment, for example aboard an installation vessel that then lowers the hub to the midwater location. In order that the invention may be more readily understood, reference will now be made, by way of example, to the accompanying drawings in which: Figure 1 is a schematic side view of an offshore windfarm comprising a cable arrangement of the invention, the windfarm including a substation floating at the surface and floating wind turbines that are electrically connected to a floating midwater hub by wave-configuration cables; Figure 2 corresponds to Figure 1 with the exception that the substation is located at the seabed; Figure 3 corresponds to Figure 1 with the exception that the wind turbines are connected to the hub by catenary-configuration cables; Figure 4 corresponds to Figure 1 with the exception that the wind turbines, the hub and the substation are supported by structures fixed to the seabed; Figure 5 is a schematic side view showing the cable arrangement of Figure 3 being installed by wet-mating cables to the hub in accordance with the invention; and Figures 6a and 6b are a sequence of schematic side views showing the cable arrangement of Figure 3 being installed by mating cables to the hub in a dry environment in accordance with the invention. Like numerals are used for like features in the drawings, which are not to scale. In each drawing, an offshore windfarm 10 comprises a midwater high-voltage power hub 12 disposed in the water column between the surface 14 and the seabed 16. The hub 12 is held at a sufficient depth beneath the surface 14 as to minimise the effect of sea dynamics, for example at a depth of at least 30 metres and possibly up to 100 metres or more. Offshore wind turbines 18 are disposed at respective locations on the surface 14 to form an array with the hub 12 lying between them in plan view but beneath them in side view. Two such turbines 18 are shown in these simplified examples but in practice there could be several more turbines 18 arrayed around the hub 12, preferably in a symmetrical arrangement in plan view. Each turbine 18 is electrically connected to the hub 12 by a respective turbine cable 20. Preferably, the turbines 18 are substantially equidistant from the hub 12 to balance the lateral forces that they exert on the hub 12 via their turbine cables 20. Each turbine cable 20 is connected at one end to the associated turbine 20 via a receptacle 22 mounted on the turbine 20. In embodiments that have floating turbines 20, the receptacles 22 are submersible. At the other end, each turbine cable 20 is terminated with a submersible plug that connects to a respective submersible receptacle 24 mounted on the hub 12. The hub 12 is electrically connected to a substation 26 by a feeder cable 28. The feeder cable 28 is connected at one end to the substation 26 via a high-power receptacle 30 mounted on the substation 26. In embodiments in which the substation 26 is floating at the surface 14 or on the seabed 16, the receptacle 30 is submersible. At the other end, the feeder cable 28 is terminated with a submersible high-power plug that connects to a submersible high-power receptacle 32 mounted on the hub 12. An export cable 34 shown in dashed lines extends from the substation 26 to export electrical power generated by the array of turbines 18 to an onshore grid or consumer. The export cable 34 is connected to the substation 26 at one end via an export receptacle 36 mounted on the substation 26. In embodiments in which the substation 26 is floating at the surface 14 or on the seabed 16, the receptacle 36 is submersible. At least a majority of the length of each cable 20, 28, 34 is submerged. The turbine cables 20, at least, are dynamic cables or comprise dynamic cables. The feeder cable 28 and / or the export cable 34 could also be, or may comprise, dynamic cables. By way of example, the turbine cables 20 and the feeder cable 28 may typically operate at 66kV AC. Conversely, in view of step-up transformation performed in the substation 26, the export cable 34 may typically operate at 220kV AC. In the embodiment shown in Figure 1, the turbines 18 and the substation 26 float at respective locations at the surface 14, moored to the seabed 16 by conventional moorings 38 such as catenary moorings, shown here in dotted lines. The hub 12 is also moored to the seabed 16, in this case by taut moorings such as tension legs 40 that extend upwardly from a subsea foundation 42 to a midwater buoy 44 that supports the hub 12. The foundation 42 may, for example, comprise one or more suction piles. Similar taut moorings comprising one or more tension legs 40 extending upwardly from respective subsea foundations 42 could be used to moor the turbines 18. In this example, each turbine cable 20 adopts a lazy-wave configuration by virtue of buoyancy modules 46 that support a hogbend 48 at an intermediate location between the ends of the turbine cable 20. This configuration minimises the length of each turbine cable 20 and helps to decouple the lower end of each cable 20 adjoining the hub 12 from sea motions experienced by the upper end of the cable 28 adjoining the turbine 20. Similarly, in this example, the feeder cable 28 adopts a lazy-wave configuration by virtue of buoyancy modules 50 that support a hogbend 52 at an intermediate location between the ends of the feeder cable 28. Again, this configuration minimises the length of the feeder cable 28 and helps to decouple the lower end of the cable 28 adjoining the hub 12 from sea motions experienced by the upper end of the cable 28 adjoining the substation 26. Figure 2 shows a variant of the embodiment of Figure 1 in which the substation 26 is instead located on the seabed 16. Thus, the feeder cable 28 hangs as a catenary between the high-power receptacle 32 on the hub 12 and the seabed 16, and then extends across the seabed 16 to connect to the high-power receptacle 32 on the substation 26. Figure 3 shows a further variant of the embodiment of Figure 1 in which the turbine cables 20 and the feeder cable 28 hang in the water column as catenaries extending between the turbines 18 and the hub 12 and between the hub 12 and the substation 26. The substation 26 is again shown as floating at the surface 14 in this example but could instead be located on the seabed 16 as shown in Figure 2. Figure 4 shows that, in principle, it would be possible for any or all of the hub 12, the turbines 18 and the substation 26 to be supported in fixed relation to the seabed 16. In this example, the hub 12, the turbines 18 and the substation 26 surmount jacket foundations 54 that are shown schematically in dotted lines. Other fixed foundation types such as monopiles are possible but sometimes only in shallower inshore waters where the invention may have less benefit. As fixed foundations such as the jackets 54 of Figure 4 allow the turbines 18 and the substation 26 to be supported above the surface 14, their receptacles 22, 32, 36 and complementary plugs of the associates cables 20, 28, 34 are not necessarily submersible in this instance. Whilst Figure 4 shows the turbine cables 20 and the feeder cable 28 in lazy-wave configurations, catenary configurations such as those shown in Figure 3 are also possible. Similarly, the substation 26 shown held above the surface 14 in Figure 4 could instead be located on the seabed 16 as shown in Figure 2. Figures 5, 6a and 6b show techniques for installing windfarm and cable arrangements like those shown in Figures 1 to 4. Whilst these examples show the hub 12 supported in midwater by a buoy 44 like that shown in Figures 1 to 3, it will be apparent that similar techniques could be used to install the hub 12 atop a fixed foundation like the jacket 54 of Figure 4. In Figure 5, the hub 12 is shown pre-installed in midwater on the buoy 44. The first of the turbines 18 has already been connected to the hub 12 via a turbine cable 20 that has been wet-mated to a receptacle 22 of the hub 12. In this example, the turbine cable 20 is supported in a lazy-wave configuration like that of Figures 1,2 and 4 but it could instead hang in a catenary configuration like that of Figure 3. The substation 26 has been installed in Figure 5 but the feeder cable 28 and the export cable 34 have not yet been installed. Figure 5 shows the second of the turbines 18 in the process of being connected to the hub 12. Specifically, the upper end of its turbine cable 20 is already connected to the receptacle 22 of the second turbine 18 whereas the lower end of its turbine cable 20 is shown being carried by an ROV 56 toward the appropriate receptacle 24 on the hub 12. For this purpose, the receptacle 24 is configured to cooperate with a wet-mate plug 58 at the lower end of the turbine cable 20. Turning finally to Figures 6a and 6b, these drawings show the alternative of dry-mating the lower ends of the turbine cables 20 and the feeder cable 28 to the receptacles 22, 24 of the hub 12 when the hub 12 is above the surface 14 aboard an installation vessel 60 as shown in Figure 6a. In Figures 6a and 6b, the buoy 44 is preinstalled at a midwater location below the vessel 60. It will be noted that the buoy 44 has an upwardly-facing supporting formation 62 onto which the hub 12, with the lower ends of the turbine cables 20 and the feeder cable 28 already attached, is lowered by a crane 64 of the vessel 60. On landing on the buoy 44, the hub 12 is locked to the buoy 44 and installation is completed. The lower ends of the turbine cables 20 and the feeder cable 28 can be coupled to the hub 12 before or after their upper ends are coupled to the turbines 18 and the substation 26 respectively. Whilst Figures 6a and 6b show the turbine cables 20 hanging as catenaries, buoyancy could be attached to the turbine cables 20 beforehand or subsequently to impart a wave configuration as shown in Figures 1,2,4 and 5. Many other variations are possible within the inventive concept. For example, the substation could be connected to more than one hub and hence to more than one array of turbines. Similarly, the substation could be connected to one or more other substations. Whilst the substation will usually export AC power, provision may be made, in the substation or elsewhere, for conversion to DC power for long-distance transmission to shore. Various buoy configurations can be adopted for windfarms of the invention. For example, the turbines and / or the substation, when floating, may be supported by semisubmersible buoys, by spar buoys or by other floating platforms or hulls.
Claims
1. A cable arrangement for an offshore windfarm that comprises a substation, a hub at a midwater location connected to the substation and at least two wind turbines at surface locations connected to the hub, the cable arrangement comprising dynamic cables extending from the turbines and electrically connected to the hub and a feeder cable extending from the hub to the substation.
2. The cable arrangement of Claim 1, wherein the substation is located at a surface location or at a seabed location.
3. The cable arrangement of Claim 1 or Claim 2, wherein the feeder cable extending from the hub to the substation is a non-dynamic cable.
4. The cable arrangement of any preceding claim, wherein at least one of the turbines is a floating turbine.
5. The cable arrangement of any preceding claim, wherein the hub is supported at the midwater location by buoyancy.
6. The cable arrangement of Claim 5, wherein the buoyancy that supports the hub is at a subsurface location.
7. The cable arrangement of Claim 6, wherein the hub is tethered to a seabed foundation by one or more tensile members placed under tension by the subsurface buoyancy.
8. The cable arrangement of any preceding claim, wherein the midwater location of the hub is at a depth of at least 30 metres.
9. The cable arrangement of any preceding claim, wherein at least one of the dynamic cables hangs with a catenary configuration between the hub and the associated turbine.
10. The cable arrangement of any preceding claim, wherein at least one of the dynamic cables has a wave configuration including a hogbend disposed at a midwater location between the hub and the associated turbine.
11. The cable arrangement of Claim 10, wherein the hogbend is supported by buoyancy.
12. The cable arrangement of Claim 11, wherein the buoyancy that supports the hogbend is at a subsurface location.
13. The cable arrangement of any preceding claim, wherein the hub is disposed between the turbines.
14. The cable arrangement of any preceding claim, wherein the turbines are substantially equidistant from the hub.
15. The cable arrangement of any preceding claim, wherein the dynamic cables extending from the turbines are electrically connected to the hub by wet-mate connectors.
16. The cable arrangement of any of Claims 1 to 14, wherein the dynamic cables extending from the turbines are electrically connected to the hub by dry-mate connectors.
17. An offshore windfarm including the cable arrangement of any preceding claim.
18. A method of installing an offshore windfarm that comprises a substation, a hub connected to the substation and at least two wind turbines at surface locations connected to the hub, the method comprising: lowering the hub to a midwater location; supporting the hub at the midwater location; effecting connection of dynamic cables between the turbines and the hub; and effecting connection of a feeder cable between the substation and the hub.
19. The method of Claim 18, comprising effecting dry connection of the dynamic cables to the hub at an above-surface location before lowering the hub.
20. The method of Claim 18, comprising effecting wet connection of the dynamic cables to the hub at a subsurface location after lowering the hub.
21. The method of any of Claims 18 to 20, comprising effecting dry connection of the 5 feeder cable to the hub at an above-surface location.
22. The method of any of Claims 18 to 20, comprising effecting wet connection of the feeder cable to the hub at a subsurface location.10 23. The method of any of Claims 18 to 22, comprising docking the hub with asubsurface support pre-installed at the midwater location.
24. The method of Claim 23, wherein the subsurface support comprises buoyancy sufficient to support the hub at the midwater location.
Citation Information
Patent Citations
Electrical interconnection system between at least one electricity generator and one electricity transfer system, in a marine environment
EP2518310A1
Wind turbine array
GB2611369A
Power cable unit and power transmission system
JP2016149868A
Connection substation for wave energy converters in a wave power station
US20180312224A1
Plant for exploiting wind energy at sea
WO2007009464A1