Rust prevention performance management system
A divided system architecture for rust prevention performance management ensures transparency and quality by separating evaluation and construction method processes, enabling accurate prediction and reliable construction planning for metal products.
Patent Information
- Application Number
- JP2023045582
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-22
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2043-03-22
AI Technical Summary
Existing rust prevention performance management systems lack transparency and quality assurance in evaluating and improving the rust prevention performance of coating films on metal products, as they often integrate multiple processes within a single system, leading to potential underestimation or excessive/insufficient construction methods.
A divided system architecture where a first system evaluates rust prevention performance and predicts deterioration, and a second system provides construction methods independently, ensuring transparency and quality of each process, with features like multiple construction plan creation and warranty information generation.
Ensures transparency and quality in rust prevention performance evaluation, deterioration prediction, and construction methods, allowing users to select optimal plans and ensuring reliable construction history management.
Smart Images

Figure 2024135071000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a rust-preventive performance management system for managing the rust-preventive performance of a coating film provided on the surface of a metal product. [Background technology]
[0002] Conventionally, there are known techniques for evaluating the rust-preventive performance of a coating film provided on the surface of a metal product. For example, Patent Document 1 describes a technique in which a voltage is applied to the surface of a coating film (insulating surface treatment film) of a metal product while the coating film is in contact with a corrosion factor, and a current is detected by applying the voltage to the surface, and the rust-preventive performance (defect occurrence status) of the coating film is evaluated based on the change in the current over time. For example, the rust-preventive performance of the coating film can be evaluated from the shape of the peaks in the detected current waveform, the number of peaks, the voltage value at which the peaks occur, the current value at the peak, etc.
[0003] On the other hand, it would be good to have a rust-preventive performance management system that can manage the rust-preventive performance of the coating film evaluated as described above in association with the user who uses the metal product, and can provide the user with the rust-preventive performance and information related to the rust-preventive performance. Technology related to such a system is described, for example, in Patent Document 2. Patent Document 2 describes a degradation diagnosis system that performs degradation diagnosis of various devices, which includes a user client operated by a user, multiple diagnostic clients operated by a diagnostic service provider, and a degradation diagnosis mediation device connected to the user client and the multiple diagnostic clients via a network. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 7088396 [Patent Document 2] Patent No. 4184613 Summary of the Invention [Problem to be solved by the invention]
[0005] By the way, it is considered that a user who uses the above-mentioned rust-preventive performance management system, after obtaining the evaluated rust-preventive performance of the coating film of the metal product, will then carry out construction (maintenance) to improve the rust-preventive performance of the coating film. Therefore, if the rust-preventive performance management system provides a construction method for improving the rust-preventive performance of the coating film, it can be said that the convenience of this system is further improved. In this case, if the rust-preventive performance management system is configured to separate a system for evaluating the rust-preventive performance of the coating film, a system for providing a construction method, and a system for carrying out construction, it is considered that the transparency and quality of these processes can be ensured. This is because, for example, if these processes are carried out by only one system (in one example, a system used by a metal product retailer), the evaluation of the rust-preventive performance may be lenient, an excessive or insufficient construction method may be provided, or the quality of construction may not be ensured, and further, if there is only one system, it is difficult to accurately correct such problems even if they occur.
[0006] The present invention has been made to solve the above-mentioned problems, and aims to ensure transparency and quality in the evaluation of rust-preventive performance and construction according to the rust-preventive performance in an anti-rust performance management system that manages the rust-preventive performance of a coating film applied to the surface of a metal product. [Means for solving the problem]
[0007] In order to achieve the above-mentioned object, the present invention provides an anti-rust performance management system for managing the anti-rust performance of a coating film applied to the surface of a metal product used by a user, the anti-rust performance management system having a first system and a second system connected to each other so as to be able to communicate with each other, the first system having an anti-rust performance evaluation unit that evaluates the anti-rust performance of the coating film based on measurement results of the coating film on the metal product, a deterioration prediction information generation unit that generates deterioration prediction information that predicts future deterioration of the coating film on the metal product based on the anti-rust performance evaluated by the anti-rust performance evaluation unit, and a transmission unit that transmits the deterioration prediction information generated by the deterioration prediction information generation unit, and the second system having a receiving unit that receives the deterioration prediction information transmitted by the transmission unit of the first system, an application method information generation unit that generates application method information including an application method for improving the anti-rust performance of the coating film on the metal product based on the deterioration prediction information received by the receiving unit, and a transmission unit that transmits the application method information so that application is carried out based on the application method information generated by the application method information generation unit.
[0008] In the rust prevention performance management system according to the present invention thus configured, a system (first system) that performs rust prevention performance evaluation and deterioration prediction, and a system (second system) that provides an application method are separate. In other words, the second system that provides an application method is independent of the first system that performs rust prevention performance evaluation and deterioration prediction. This ensures the transparency of each of the rust prevention performance evaluation, deterioration prediction, and provision of the application method, and ensures the quality of these, as well as the quality of subsequent application.
[0009] In the present invention, preferably, the first system further has a receiving unit that receives construction method information transmitted by a transmitting unit of the second system, a construction plan creation unit that creates multiple construction plans based on the construction method information received by the receiving unit, and a presentation unit that presents the multiple construction plans created by the construction plan creation unit to a user. According to the present invention configured as described above, the first system can create a plurality of construction plans with different contents to be presented to the user by editing the construction method information, which allows the user to select a preferred construction plan according to the contents of each construction plan.
[0010] In the present invention, preferably, the second system further has a warranty information generation unit that receives, by a receiving unit, the rust-preventive performance of the coating on the metal product evaluated after construction has been carried out based on the construction method information, confirms the rust-preventive performance received by the receiving unit, and generates warranty information for guaranteeing the rust-preventive performance, and transmits the warranty information generated by the warranty information generation unit by a transmitting unit, and the first system further has a receiving unit that receives the warranty information transmitted by the transmitting unit of the second system and a management unit that manages user information of users who use the metal product, and the user information includes a construction history indicating the history of construction carried out on the metal product, and the management unit of the first system updates the construction history included in the user information when the warranty information is received by the receiving unit. According to the present invention configured in this manner, it is possible to ensure the reliability of the construction history of the user information managed in the first system.
[0011] In the present invention, the application method information preferably also includes information indicating the rust-preventive performance of the coating film obtained when application is carried out based on the application method included in the application method information. According to the present invention thus configured, by including the rust-preventive performance after application in the application method information, the convenience of this application method information can be improved.
[0012] In the present invention, preferably, the metal product includes a plurality of parts, and the form of the coating film applied to each of the plurality of parts is different, and in the first system, the rust prevention performance evaluation unit evaluates the rust prevention performance for each of the plurality of parts, and the deterioration prediction information generation unit generates deterioration prediction information for each of the plurality of parts, and in the second system, the construction method information generation unit generates construction method information for each of the plurality of parts. According to the present invention configured in this manner, it is possible to provide rust prevention performance evaluation, deterioration prediction, and application methods appropriate for each of a plurality of portions.
[0013] In the present invention, preferably, the deterioration prediction information generation unit of the first system refers to environmental information defined for each of a plurality of regions and generates deterioration prediction information for the coating of the metal product based on the environmental information corresponding to the region in which the metal product for which the deterioration prediction information is being generated was used, and the environmental information is information that corresponds, for each of a plurality of regions, one or more environmental factors that affect the rust-prevention performance of the metal product and information indicating the degree of influence of the environmental factors on the rust-prevention performance. According to the present invention configured as described above, deterioration of a coating film can be predicted with high accuracy by taking into consideration the degree of deterioration that differs depending on the environment of each region.
[0014] In the present invention, preferably, the metal product includes a plurality of portions, the form of the coating film provided differs in each of the plurality of portions, and environmental information is defined for each of the plurality of portions. According to the present invention configured as described above, by using environmental information defined for each of a plurality of portions, it is possible to accurately predict deterioration of the coating film at each portion.
[0015] In the present invention, the deterioration prediction information generation unit of the first system preferably generates deterioration prediction information for the coating of the metal product for which the deterioration prediction information is generated based on initial information regarding the coating of the metal product, in addition to environmental information. According to the present invention configured as described above, by using the initial information of the coating of the metal product in addition to the environmental information, it is possible to predict the deterioration of the coating with higher accuracy. In other words, by comparing the initial coating state with the current coating state, the deterioration trend of the coating state can be obtained, and the accuracy of the deterioration prediction of the coating can be improved based on this deterioration trend.
[0016] In a preferred embodiment of the present invention, the metal product is a steel component for a vehicle. Effect of the Invention
[0017] According to the present invention, in an anti-rust performance management system that manages the anti-rust performance of a coating film applied to the surface of a metal product, it is possible to ensure transparency and quality in the evaluation of anti-rust performance and application according to the anti-rust performance. [Brief description of the drawings]
[0018] [Figure 1] 1 is a block diagram showing a schematic configuration of a rust prevention performance management system according to an embodiment of the present invention. FIG. [Diagram 2] FIG. 2 is a block diagram showing an outline of information stored in the automobile manufacturer system according to the embodiment; [Diagram 3] 2 is a block diagram illustrating the functional units and stored information of the dealer system according to the present embodiment. FIG. [Figure 4] 1 is a block diagram illustrating functional units and stored information of a construction method providing system according to an embodiment of the present invention. [Diagram 5] 4 is a flowchart showing a process performed in the rust prevention performance management system in the first embodiment. [Figure 6] 11 is a table showing an example of environmental information defined for each region in the present embodiment. [Figure 7] 4 is a table showing an example of environmental information defined for each of a plurality of parts of a vehicle in the present embodiment. [Figure 8] FIG. 2 is an explanatory diagram showing an example of a method for generating deterioration prediction information according to the present embodiment. [Figure 9] 10 is an explanatory diagram showing another example of a method for generating deterioration prediction information according to the present embodiment. FIG. [Figure 10] 10 is a flowchart showing a process performed in the rust prevention performance management system in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] Hereinafter, a rust prevention performance management system according to an embodiment of the present invention will be described with reference to the accompanying drawings. Note that, in the following, an embodiment in which the rust prevention performance management system according to the present invention is applied to a vehicle (steel member for a vehicle) as a metal product will be described.
[0020] [System Configuration] First, the configuration of the rust prevention performance management system according to the present embodiment will be described with reference to Fig. 1 to Fig. 4. Fig. 1 is a block diagram showing a schematic configuration of the rust prevention performance management system according to the present embodiment. Fig. 2 is a block diagram showing a schematic view of stored information of an automobile manufacturer system according to the present embodiment. Fig. 3 is a block diagram showing a schematic view of functional units and stored information of a dealer system according to the present embodiment. Fig. 4 is a block diagram showing a schematic view of functional units and stored information of a construction method providing system according to the present embodiment.
[0021] 1, the rust prevention performance management system 100 includes a vehicle manufacturer system 10 used by a vehicle manufacturer (automobile manufacturer), a dealer system 20 used by a dealer that sells vehicles, a construction method providing system 30 used by an organization that provides construction methods (maintenance methods) for improving the rust prevention performance of vehicle paint films, and a contractor system 40 used for information processing by contractors who improve the rust prevention performance of vehicle paint films. In the rust prevention performance management system 100, these systems 10, 20, 30, 40 are connected via a communication line 50.
[0022] In this embodiment, the rust prevention performance management system 100 is a system that manages information on the rust prevention performance of a coating film (insulating surface treatment film such as a resin coating film (electrodeposition coating film)) provided on the surface of a vehicle as a metal product used by a user, specifically, a steel member for a vehicle used in each of a plurality of parts of the vehicle. In this rust prevention performance management system 100, the application method providing system 30 is a system used in an analysis institution or research institution that provides an application method for improving the rust prevention performance of a coating film of a vehicle based on the latest material data (see FIG. 4). Such a specialized institution can provide a high-quality application method. On the other hand, the construction company system 40 is a system used, for example, by a construction company (a company that performs maintenance of a vehicle) that has a contract / affiliation with the rust prevention performance management system 100. Note that, although only one construction company system 40 is shown in FIG. 1, in reality, since there are a plurality of construction companies, there are a plurality of construction company systems 40.
[0023] Specifically, the vehicle manufacturer system 10, the dealer system 20, the construction method providing system 30 and the construction company system 40 each include an information processing device 11, 21, 31, and 41, respectively. Each of these information processing devices 11, 21, 31, 41 mainly has a processor 11a, 21a, 31a, 41a such as a CPU that executes various processes, a memory 11b, 21b, 31b, 41b (such as a ROM, RAM, or hard disk) that stores programs to be executed by the processor 11a, 21a, 31a, 41a and various data necessary for executing the programs, a communication device 11c, 21c, 31c, 41c for communicating via a communication line 50, an input device 11d, 21d, 31d, 41d such as a mouse, keyboard, or touch panel for inputting various information to the information processing device 11, 21, 31, 41, and an output device 11e, 21e, 31e, 41e such as a display, speaker, or printer for outputting various information from the information processing device 11, 21, 31, 41.
[0024] The dealer system 20 and the contractor system 40 also have measuring devices 22 and 42. The measuring devices 22 and 42 are devices for measuring the rust-preventive performance of a coating film provided on a steel component for a vehicle using various known methods (such as the method described in the above-mentioned Patent Document 1). For example, the measuring devices 22 and 42 detect a current by applying a voltage to the surface of the steel component for a vehicle on which the coating film is provided. In this case, the rust-preventive performance of the coating film can be evaluated from the shape of the peaks in the detected current waveform (change in current over time), the number of peaks, the voltage value at which the peaks occur, the current value at the peak, and the like. The measuring device 42 provided in the contractor system 40 is sold or loaned to the contractor when the contractor enters into a contract / joins the anticorrosive performance management system 100 as described above. Also, the measuring devices 22, 42 are not limited to detecting a current by applying a voltage, and may detect a voltage by applying a current (the same applies below).
[0025] Here, the vehicle manufacturer system 10 and the dealer system 20 constitute a first system 101 in the present invention, and the construction method providing system 30 constitutes a second system 102 in the present invention. Only the dealer system 20 may constitute the first system 101 (basically, in this embodiment, only the dealer system 20 constitutes the first system 101). In the dealer system 20, the communication device 21c corresponds to the "transmitting unit" and the "receiving unit" in the present invention, and the output device 21e corresponds to the "presenting unit" in the present invention. In the construction method providing system 30, the communication device 31c corresponds to the "transmitting unit" and the "receiving unit" in the present invention.
[0026] Next, as shown in FIG. 2, the vehicle manufacturer system 10 stores in the memory 11b environmental information and new vehicle information used to predict future deterioration of the paint film from the rust-preventive performance. The environmental information is information in which a plurality of environmental factors (such as airborne salt, deicing salt, and soil) that affect the rust-preventive performance of the steel members for the vehicle are associated with information indicating the degree of influence of each of the plurality of environmental factors on the rust-preventive performance for each of a plurality of regions. Furthermore, this environmental information is defined for each of a plurality of parts of the vehicle (large parts such as the chassis and body, as well as parts further divided into these). Furthermore, the new vehicle information is information including the thickness and film quality of the paint film and the type (steel type) of the steel members at the time of the new vehicle, and is defined for each of a plurality of parts. The new vehicle information corresponds to the "initial information" in the present invention.
[0027] 3, the dealer system 20 stores user information on the user who uses the vehicle in the memory 21b. This user information includes area information related to the user and a history of evaluation of the rust prevention performance by the measurement by the measuring device 22. The area information related to the user may include the user's address and the main place where the vehicle is used (such as a storage place), and may also include the user's moving history.
[0028] In addition, in the dealer system 20, the processor 21a functions as a rust prevention performance evaluation unit, a deterioration prediction information generation unit, a work plan creation unit, and a management unit. Specifically, the rust prevention performance evaluation unit evaluates the rust prevention performance of the coating film for each of the multiple parts of the vehicle based on the measurement results by the measurement device 22. In addition, the deterioration prediction information generation unit acquires environmental information and new car information from the vehicle manufacturer system 10 (received by the communication device 21c of the dealer system 20), and generates deterioration prediction information that predicts future deterioration of the coating film for each of the multiple parts of the vehicle based on the rust prevention performance evaluated by the rust prevention performance evaluation unit based on this information. The deterioration prediction information thus generated is transmitted to the work method providing system 30. In addition, the management unit performs a process of managing the above-mentioned user information (for example, a process of updating the user information). The work plan creation unit will be described later.
[0029] Next, as shown in FIG. 4, in the application method providing system 30, the memory 31b stores the latest material data for the coating, and the processor 31a functions as an application method information generating unit and a warranty information generating unit. The application method information generating unit acquires deterioration prediction information from the dealer system 20 (received by the communication device 31c of the application method providing system 30), and generates application method information including an application method for improving the rust prevention performance of the coating for each of a plurality of parts of the vehicle based on the deterioration prediction information. This application method information also includes information indicating the rust prevention performance of the coating for each of a plurality of parts, which is obtained when application is performed based on the application method included in the application method information. The application method information generated in this manner is transmitted to the outside. The warranty information generating unit will be described later.
[0030] Next, in the dealer system 20, when the construction method information is acquired from the construction method providing system 30 (received by the communication device 21c of the dealer system 20), the construction plan creation unit creates a plurality of construction plans based on the construction method information. In the dealer system 20, the plurality of construction plans are presented to the user by the output device 21e, and the construction plan selected by the user from the plurality of presented construction plans is acquired by the input device 21d. Then, when construction is carried out at the dealer based on this construction plan, in the dealer system 20, measurements are carried out by the measuring device 22 for each of the plurality of parts after construction. After this, the above-mentioned rust prevention performance evaluation unit evaluates the rust prevention performance of the coating film based on the measurement results. The rust prevention performance thus evaluated is transmitted to the construction method providing system 30.
[0031] On the other hand, the construction method information generated in the construction method providing system 30 may be provided directly to the contractor system 40. Basically, the communication device 41c of the contractor system 40 receives the construction method information transmitted from the construction method providing system 30. In such a case, the contractor performs construction based on the construction method information. After the contractor performs construction in this manner, the contractor system 40 measures each of the multiple sites after construction using the measuring device 42, and evaluates the rust-preventive performance of the coating film based on the measurement results. The evaluated rust-preventive performance is transmitted to the construction method providing system 30.
[0032] Then, in the application method providing system 30, when the rust-preventive performance of the coating film transmitted from the dealer system 20 or the contractor system 40 as described above is received (received by the communication device 31c of the application method providing system 30), the warranty information generation unit checks the rust-preventive performance and generates warranty information that guarantees the rust-preventive performance. The generated warranty information is then transmitted to the dealer system 20. Then, when the dealer system 20 receives the warranty information transmitted from the application method providing system 30 (received by the communication device 21c of the dealer system 20), the management unit updates the application history of the vehicle on which application was performed, and manages this application history by including it in the corresponding user information.
[0033] [System Processing] Next, embodiments (first and second embodiments) of the processing performed in the above-mentioned rust prevention performance management system 100 will be described.
[0034] (First embodiment) First, the system processing according to the first embodiment will be described with reference to Fig. 5. Fig. 5 is a flowchart showing the processing performed in the rust prevention performance management system 100 in the first embodiment. Note that, in explaining the flowchart of Fig. 5, the processing included in this flowchart is actually executed by the information processing device 21 (representatively, the processor 21a in the information processing device 21) of the dealer system 20 and the information processing device 31 (representatively, the processor 31a in the information processing device 31) of the work method providing system 30, but for convenience, it will be described as being executed by the dealer system 20 and the work method providing system 30.
[0035] 5 is executed, for example, when a user requests a dealer to inspect the vehicle. First, in step S101, the dealer system 20 reads out user information of the user of the vehicle being processed from the memory 21b. The user information includes area information related to the user (the user's address, the main place where the vehicle is used (such as a storage place), and the user's moving history), evaluation history of rust prevention performance, construction history, etc.
[0036] Next, in step S102, the dealer system 20 receives new car information and environmental information from the vehicle manufacturer system 10 via the communication device 21c. The new car information includes the coating thickness, coating quality, and type (steel type) of the steel member at the time of the new car, and is specified for each of the multiple parts of the vehicle. For example, such new car information may include data measured in the development process of the vehicle and data obtained by performing a predetermined simulation (water damage simulation) on 3D data of the vehicle. The environmental information is information in which multiple environmental factors (such as scattered salt, antifreeze salt, and soil) that affect the rust prevention performance of the steel member for the vehicle are associated with information indicating the degree of influence of each of the multiple environmental factors on the rust prevention performance for each of multiple regions. In addition, this environmental information is specified for each of the multiple parts of the vehicle.
[0037] Here, an example of the environmental information will be described with reference to FIG. 6. FIG. 6 shows an example of the environmental information defined for each region. In the environmental information shown in FIG. 6, a coefficient according to the amount of dispersed salt (a value of 1 to 3 (hereinafter the same) indicating the degree of influence on the rust-preventive performance), a coefficient according to the amount of antifreeze purchased or spread by each organization, a coefficient according to the ease of adhesion of the antifreeze to the soil, a coefficient according to the pH of the soil, and the total of these coefficients are defined for each region of the main use place (such as a storage place) of the vehicle. Such environmental information is created in advance from publicly available information such as the amount of dispersed salt for each region, the amount of antifreeze purchased by each organization, the amount of antifreeze spread by each region, and data on soil components and pH for each region. In addition, in the environmental information shown in FIG. 6, a correction coefficient according to the total of the coefficients is further defined. This correction coefficient is used to generate deterioration prediction information taking into account the environmental information (details will be described later). For example, it is used to correct the number of years predicted for a steel member for a vehicle to start rusting. The environmental information is not limited to the general area information as shown in FIG. 6, but may be more detailed area information based on the user's address, map data, or the like.
[0038] Further, with reference to FIG. 7, another example of the environmental information will be described. FIG. 7 shows an example of the environmental information defined for each of a plurality of parts of a vehicle. As shown in FIG. 7, this environmental information defines the influence of a plurality of environmental factors that affect the rust prevention performance, such as snow melting salt, flying sea salt, crushed stone, mud, and rainfall, for each of a plurality of parts of a vehicle, such as flat parts, welded parts, edges, and inside the bag of the chassis, the outer plate, the semi-outer plate, the floor underside (inside the undercover and outside the undercover), the inside of the bag, and the interior of the vehicle (floor). In the example of the environmental information shown in FIG. 7, the environmental factors that may affect each of the plurality of parts are specified (specified by "○" in the figure). The reason why the environmental information is defined in this way is that the degree of influence of the environmental factors on the rust prevention performance varies depending on the part of the vehicle. The environmental information as shown in FIG. 7 is also used to generate deterioration prediction information (details will be described later). For example, for parts that are affected by environmental factors, the number of years that are predicted for the vehicle steel member to start rusting is corrected.
[0039] Returning to FIG. 5, in step S103 after step S102, the dealer system 20 evaluates the rust-preventive performance of the coating film for each of a plurality of parts of the vehicle based on the measurement results by the measuring device 22. Specifically, the dealer system 20 evaluates the rust-preventive performance of the coating film using various known methods (such as the method described in the above-mentioned Patent Document 1) based on the change over time of the current (current waveform) detected by the measuring device 22. For example, the dealer system 20 evaluates the film thickness and film quality (presence or absence of defects, effective film thickness at the defect positions, defect occurrence status such as the number of defects per unit area) as the rust-preventive performance of the coating film based on the shape of the peak in the detected current waveform, the number of peaks, the voltage value at which the peak occurs, the current value at the peak, and the like. After evaluating the rust-preventive performance in this way, the dealer system 20 updates the evaluation history included in the user information of the corresponding vehicle.
[0040] Next, in step S104, the dealer system 20 generates deterioration prediction information that predicts future deterioration of the paint film for each of multiple parts of the vehicle based on the environmental information and new vehicle information received in step S102 and the rust prevention performance evaluated in step S103.
[0041] Here, an example of a method for generating deterioration prediction information will be described with reference to Fig. 8. Fig. 8 is an explanatory diagram showing an example of a method for generating deterioration prediction information. Here, an example is given in which the voltage value at which a peak of current detected by measuring device 22 occurs is used as the rust-preventive performance of the coating film. This voltage value means the voltage value at the time when the paint breaks down electrically, and basically, the higher the voltage value, the higher the rust-preventive performance of the coating film. In Fig. 8, the horizontal axis shows the age of the vehicle, and the vertical axis shows the voltage value corresponding to the rust-preventive performance.
[0042] In FIG. 8, "V11" is the voltage value at a certain part of the vehicle when it was new (included in the new car information), and "V12" is the voltage value detected by the measuring device 22 in the dealer system 20 for the part "Y11" years after it was new. From this, "(V12-V11) / Y11" is obtained as the rate of change (rate of decrease) of the voltage value (the slope of the line L11), and this rate of change can be considered as the deterioration tendency of the paint film. From such a deterioration tendency, it is possible to predict the deterioration of the paint film in the future. That is, by using the line L12 (in other words, the line L12 extended from the line L11) with the same slope as the line L11, it is possible to obtain the number of years Y12 until the voltage value Vt corresponding to the deterioration of the paint film (specifically, the voltage value when rust begins to occur on the steel member for the vehicle) is reached. This number of years Y12 is the number of years when it is predicted that the steel member for the vehicle will begin to rust, and is used as deterioration prediction information.
[0043] Also, in the present embodiment, the number of years Y12 obtained as described above is corrected based on environmental information. Specifically, the number of years Y12 is corrected by the correction coefficient included in the environmental information as shown in FIG. 6. In this case, the environmental information defined for the region corresponding to the vehicle for which the deterioration prediction information is to be generated is used. For example, the number of years Y12 is divided by the correction coefficient included in the environmental information. In this example, when the correction coefficient is greater than 1, as shown by the arrow in FIG. 8, instead of the straight line L12, the straight line L13 is used, and the number of years Y12 is corrected to the number of years Y13 (Y13 < Y12). Further, in the present embodiment, correction is also performed based on the environmental information defined by the vehicle part as shown in FIG. 7. Specifically, for the part identified as being affected by environmental factors (identified by "○" in FIG. 7), the number of years Y12 (or Y13 if Y12 has been corrected) is corrected to be shorter.
[0044] Note that in the above, a method for generating deterioration prediction information for the vehicle of a user who purchased a new car has been described. However, in other examples, it is also possible to generate deterioration prediction information for the vehicle of a user who purchased a used car. This will be described with reference to FIG. 9. FIG. 9 is an explanatory diagram showing another example of the method for generating deterioration prediction information. Here, only the differences from the method for generating deterioration prediction information described with reference to FIG. 8 will be described. For a used car, there may be a case where the voltage value V11 at the time of a new car as described above does not exist. In this case, instead of the voltage value V11 at the time of a new car, the voltage value V2 detected by the measuring device 22 in the dealer system 20 may be used. For example, this voltage value V2 is detected by the measuring device 22 when the dealer purchases a used car from another user. In yet another example, for a used car, there may be a case where the voltage value V12 detected by the measuring device 22 in the dealer system 20 does not exist after Y11 years have passed. In this case, the voltage value detected for another vehicle (preferably of the same vehicle type) after Y11 years have passed may be used.
[0045] 5, in step S104, the dealer system 20 transmits the deterioration prediction information generated as described above to the construction method providing system 30 via the communication device 21c. Then, in step S201, the construction method providing system 30 receives the deterioration prediction information from the dealer system 20 via the communication device 31c.
[0046] Next, in step S202, the application method providing system 30 refers to the latest material data stored in the memory 31b and generates application method information including an application method for improving the rust-preventive performance of the coating film for each of the multiple parts of the vehicle based on the deterioration prediction information received in step S201. Specifically, the application method providing system 30 generates application method information including the type of coating material (paint, undercoat, wax), the product number of the coating material, the film thickness, etc. to be applied to each of the multiple parts. For example, the application method providing system 30 generates application method information including the type of coating material corresponding to the part of the vehicle, the product number, and the film thickness corresponding to the number of years that are predicted to cause rust on the steel member for the vehicle, which is included in the deterioration prediction information (if this number is short, the film thickness applied by application is made larger), etc. In addition, the application method providing system 30 also includes in the application method information information indicating the rust-preventive performance of the coating film for each of the multiple parts (such as the magnitude of the voltage value that will be detected by the measuring device 22 for each part), which is obtained when application is performed based on the application method included in the application method information. Then, the construction method providing system 30 transmits the construction method information thus generated to the dealer system 20 via the communication device 31c.
[0047] Next, in step S105, the dealer system 20 receives the application method information from the application method providing system 30 via the communication device 21c. Then, in step S106, the dealer system 20 creates a plurality of application plans based on the received application method information. Specifically, the dealer system 20 creates a plurality of different application plans according to the type of coating material (paint, undercoat, wax), the product number of the coating material, the film thickness (corresponding to the degree of application amount) and the like to be applied to each part, which are included in the application method information as described above. For example, the dealer system 20 creates a plurality of application plans that have different costs according to the number of years for which the coating film is maintained after application (the shorter the number of years for which the coating film is maintained (corresponding to the amount of application) the lower the cost). Then, the dealer system 20 presents such a plurality of application plans to the user via the output device 21e (typically, the plurality of application plans are displayed on a display, but the plurality of application plans may be printed out). This allows the user to select a preferred application plan according to the content and cost of each application plan. Then, in step S107, the dealer system 20 acquires, from the input device 21d, the construction plan selected by the user from among the presented construction plans.
[0048] Next, after the dealer carries out the work based on the work plan selected as above, in step S108, the dealer system 20 measures each of the multiple sites after work using the measuring device 22, and evaluates the rust-preventive performance of the coating film based on the measurement results. The method of evaluating the rust-preventive performance is the same as in step S103. After evaluating the rust-preventive performance in this way, the dealer system 20 updates the evaluation history included in the user information of the corresponding vehicle. Then, in step S109, the dealer system 20 transmits the evaluated rust-preventive performance to the work method providing system 30 via the communication device 21c.
[0049] Next, in step S203, the construction method providing system 30 receives the rust-preventive performance from the dealer system 20 via the communication device 31c. Then, in step S204, the construction method providing system 30 checks the rust-preventive performance, generates warranty information that guarantees the rust-preventive performance, and transmits the warranty information to the dealer system 20 via the communication device 31c. Note that if there is a defect in the received information on the rust-preventive performance, the construction method providing system 30 does not generate or transmit the warranty information.
[0050] Next, in step S110, when the dealer system 20 receives the warranty information from the construction method providing system 30 via the communication device 21c, the dealer system 20 updates the construction history included in the user information of the vehicle on which construction was performed. That is, the dealer system 20 reflects the updated construction history in the user information including the construction history.
[0051] Second embodiment Next, the system processing according to the second embodiment will be described with reference to Fig. 10. Fig. 10 is a flowchart showing the processing performed by the rust prevention performance management system 100 in the second embodiment. The second embodiment differs from the first embodiment in that the construction according to the construction method information is performed by a construction contractor instead of a dealer. That is, in the second embodiment, the construction is performed by a construction contractor instead of a dealer, and therefore, part of the processing shown in the first embodiment is performed in the construction contractor system 40 instead of the dealer system 20. Note that only configurations different from the first embodiment will be described here, and explanations of configurations similar to the first embodiment will be omitted (that is, configurations for which explanations are omitted will be considered to be similar to the first embodiment).
[0052] In the second embodiment, when construction method information is transmitted from the construction method providing system 30 in step S202, the construction contractor system 40 receives the construction method information from the construction method providing system 30 via the communication device 41c in step S301. In principle, the construction contractor system 40 receives the construction method information from the construction method providing system 30, but when the construction method information is provided from the construction method providing system 30 to a user's smartphone, the construction contractor system 40 may receive the construction method information via the smartphone (and in another example, the construction method information may be presented to the construction contractor from the user's smartphone).
[0053] Next, after the contractor performs the work based on the work method information received as described above, in step S302, the contractor system 40 measures each of the multiple sites after work using the measuring device 42, and evaluates the rust-preventive performance of the coating film based on the measurement results. The method of evaluating the rust-preventive performance is as explained in step S103 of Fig. 5. Then, in step S303, the contractor system 40 transmits the evaluated rust-preventive performance to the work method providing system 30 via the communication device 41c.
[0054] [Action and Effects] Next, the operation and effects of the rust prevention performance management system 100 according to the present embodiment described above will be described.
[0055] In the rust prevention performance management system 100 of this embodiment, the dealer system 20 as the first system 101 evaluates the rust prevention performance of the coating based on the measurement results of the coating on the steel components of the vehicle, generates deterioration prediction information that predicts future deterioration of the coating based on this rust prevention performance, and transmits this deterioration prediction information, while the construction method providing system 30 as the second system 102 receives the deterioration prediction information transmitted from the dealer system 20, generates construction method information including a construction method for improving the rust prevention performance of the coating on the steel components of the vehicle based on this deterioration prediction information, and transmits the construction method information so that construction is carried out based on this construction method information.
[0056] In this rust prevention performance management system 100, the system for performing rust prevention performance evaluation and deterioration prediction is separate from the system for providing the application method. In other words, the system for providing the application method is independent from the system for performing rust prevention performance evaluation and deterioration prediction. This ensures the transparency of each of the rust prevention performance evaluation, deterioration prediction, and provision of the application method, and ensures the quality of these, as well as the quality of subsequent application.
[0057] According to this embodiment, the dealer system 20 receives the construction method information transmitted from the construction method providing system 30, creates a plurality of construction plans based on the construction method information, and presents the plurality of construction plans to the user. This allows the user to select a preferred construction plan according to the contents and cost of each construction plan.
[0058] According to this embodiment, the application method providing system 30 receives the rust-preventive performance of the coating film evaluated after application based on the application method information, checks the rust-preventive performance, and generates and transmits warranty information for guaranteeing the rust-preventive performance, and the dealer system 20 manages user information including an application history showing the history of application, and updates the application history included in the user information when the warranty information is received. This ensures the reliability of the application history included in the user information managed in the dealer system 20.
[0059] According to the present embodiment, the application method information also includes information indicating the rust-preventive performance of the coating film obtained when application is performed based on the application method included in the application method information. By including the rust-preventive performance after application in the application method information in this manner, the convenience of the application method information can be improved.
[0060] According to this embodiment, the dealer system 20 evaluates the rust-preventive performance of each of the multiple parts of the vehicle and generates deterioration prediction information, and the application method providing system 30 generates application method information for each of the multiple parts of the vehicle. This makes it possible to perform rust-preventive performance evaluation, deterioration prediction, and application method provision according to each of the multiple parts.
[0061] Furthermore, according to this embodiment, the dealer system 20 refers to environmental information in which one or more environmental factors that affect the rust-preventive performance of the vehicle steel members are associated with information indicating the degree of influence of the environmental factors on the rust-preventive performance for each of a plurality of regions, and generates deterioration prediction information based on the environmental information corresponding to the region in which the vehicle for which the deterioration prediction information is generated was used. This allows for accurate prediction of deterioration of the coating film by taking into account the degree of progression of deterioration that differs depending on the environment of each region.
[0062] According to the present embodiment, the environmental information is defined for each of the plurality of parts of the vehicle. By using such environmental information, deterioration of the coating film of each part can be predicted with high accuracy.
[0063] Furthermore, according to this embodiment, the dealer system 20 generates deterioration prediction information based on, in addition to environmental information, information about the new vehicle of the vehicle for which the deterioration prediction information is to be generated. In this way, by using the new vehicle information in addition to environmental information, deterioration of the paint film can be predicted with higher accuracy.
[0064] [Variations] In the above embodiment, the dealer system 20 generates the deterioration prediction information, but in a modified example, the vehicle manufacturer system 10 may generate the deterioration prediction information. In this modified example, the vehicle manufacturer system 10 receives the rust-preventive performance evaluated by the dealer system 20, and generates the deterioration prediction information based on the environmental information and new vehicle information stored from this rust-preventive performance. Then, the vehicle manufacturer system 10 transmits the generated deterioration prediction information to the dealer system 20 or the application method providing system 30. In such a modified example, the vehicle manufacturer system 10 and the dealer system 20 correspond to the "first system" in the present invention.
[0065] In addition, in the above-described embodiment, an example of applying the present invention to a vehicle (specifically, a steel component for a vehicle) is shown, but the present invention can be applied to various metal products (e.g., building materials, home appliances, etc.) having a coating film on the surface. [Explanation of symbols]
[0066] 10 Vehicle manufacturer system 11, 21, 31, 41 Information processing equipment 20 Dealer System 22, 42 Measuring equipment 30 Construction method provision system 40 Contractor System 100 Anti-rust performance management system 101 System 1 102 Second System
Claims
1. A rust prevention performance management system for managing the rust prevention performance of a coating film provided on a surface of a metal product used by a user, comprising: The rust prevention performance management system includes a first system and a second system communicatively connected to each other, The first system comprises: a rust-preventive performance evaluation unit that evaluates the rust-preventive performance of the coating film based on the measurement results of the coating film of the metal product; a deterioration prediction information generating unit that generates deterioration prediction information that predicts future deterioration of the coating film of the metal product based on the rust prevention performance evaluated by the rust prevention performance evaluating unit; a transmission unit that transmits the deterioration prediction information generated by the deterioration prediction information generation unit; having The second system is a receiving unit that receives the deterioration prediction information transmitted by the transmitting unit of the first system; a construction method information generating unit that generates construction method information including a construction method for improving the rust prevention performance of the coating film of the metal product based on the deterioration prediction information received by the receiving unit; and A transmission unit that transmits the construction method information generated by the construction method information generation unit so that construction is performed based on the construction method information; having A rust prevention performance management system characterized by the above.
2. The first system comprises: A receiving unit that receives the construction method information transmitted by the transmitting unit of the second system; A construction plan creation unit that creates a plurality of construction plans based on the construction method information received by the receiving unit; A presentation unit that presents the plurality of construction plans created by the construction plan creation unit to a user; Further comprising The rust prevention performance management system according to claim 1.
3. The second system is The rust prevention performance of the coating film on the metal product evaluated after construction based on the construction method information is received by the receiving unit, a warranty information generating unit that confirms the rust-preventive performance received by the receiving unit and generates warranty information for guaranteeing the rust-preventive performance, The assurance information generated by the assurance information generating unit is transmitted by the transmitting unit; The first system comprises: a receiving unit that receives the assurance information transmitted by the transmitting unit of the second system; A management unit that manages user information of users who use the metal products; and The user information includes a construction history indicating a history of construction performed on the metal product, and when the warranty information is received by the receiving unit, the management unit of the first system updates the construction history included in the user information. The rust prevention performance management system according to claim 1 or 2.
4. The application method information also includes information indicating the rust-preventive performance of the coating film obtained when application is performed based on the application method included in the application method information. The rust prevention performance management system according to claim 1 or 2.
5. The metal product includes a plurality of portions, and a coating film is provided in a different manner in each of the plurality of portions; In the first system, the rust prevention performance evaluation unit evaluates the rust prevention performance for each of the plurality of portions, and the deterioration prediction information generation unit generates the deterioration prediction information for each of the plurality of portions; In the second system, the construction method information generation unit generates the construction method information for each of the plurality of parts. The rust prevention performance management system according to claim 1 or 2.
6. the deterioration prediction information generating unit of the first system refers to environmental information defined for each of a plurality of regions, and generates the deterioration prediction information of the coating film of the metal product based on the environmental information corresponding to the region in which the metal product for which the deterioration prediction information is generated was used; The environmental information is information in which one or more environmental factors that affect the rust-preventive performance of the metal product are associated with information indicating the degree of influence of the environmental factors on the rust-preventive performance for each of the multiple regions. The rust prevention performance management system according to claim 1 or 2.
7. The metal product includes a plurality of portions, and a coating film is provided in a different manner in each of the plurality of portions; The environmental information is defined for each of the plurality of parts. The rust prevention performance management system according to claim 6.
8. The deterioration prediction information generating unit of the first system generates the deterioration prediction information of the coating of the metal product based on initial information on the coating of the metal product for which the deterioration prediction information is generated, in addition to the environmental information. The rust prevention performance management system according to claim 6.
9. The metal product is a steel member for a vehicle. The rust prevention performance management system according to claim 1 or 2.
Citation Information
Patent Citations
Device, method and program for building construction contract, recording medium written with this program, and building construction contract server
JP2005071005A
Coating film diagnosis system
JP2014081388A
System and method for assessing damage to structure and determining repair information
JP2018106681A
Car washing machine
JP2022100855A
Construction method for quality database for vessel, construction program for quality database, integrated data platform, and use method for integrated data platform
JP2022103101A
