Column support structure, construction method for column support structure, and roof structural body

The column support structure with embedded bases and anchoring parts in concrete phases minimizes excavation and streamlines construction, enhancing stability and efficiency in roof structure building.

JP2024137123APending Publication Date: 2024-10-07YKK AP INC
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023048516
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-24
Publication Date
2024-10-07

AI Technical Summary

Technical Problem

Conventional roof structure construction methods require extensive ground excavation and soil removal, leading to increased labor and time, as well as the need to support columns with buried materials, which complicates the construction process.

Method used

A column support structure with a base and anchoring parts that are embedded in foundation and earthen floor concrete, allowing for minimal ground excavation and continuous construction phases, including precast concrete options to streamline the process.

Benefits of technology

This approach reduces labor and time required for construction, stabilizes column support, and maintains the structure during prolonged construction phases, improving workability and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024137123000001_ABST
    Figure 2024137123000001_ABST
Patent Text Reader

Abstract

To improve construction workability of support structure of a column installed in concrete covering a foundation.SOLUTION: A column 5 is installed in concrete 10 covering a foundation 4 in a state of being supported with a support member 7. The support member 7 comprises a base part 20 placed on the foundation 4, a support fixation part 30 projecting upward from the based part 20, on which the column 5 is fixed, and an anchorage part 40 projecting upward from the based part 20 to be anchored in the concrete 10. The concrete 10 is provided on the foundation 4, comprising a base concrete part 12 in which the base part 20 and a lower part 42 of the anchorage part 40 are buried, and a floor concrete part 13 covering the base concrete part 12, in which an upper part 43 of the anchorage part 40 is buried.SELECTED DRAWING: Figure 6
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a support structure for a pillar in which a pillar is installed in concrete, a construction method for the support structure for a pillar, and a roof structure equipped with the support structure for a pillar. [Background technology]

[0002] A roof structure such as a carport has multiple pillars that are installed on the concrete covering the ground. The pillars are supported by a support structure for the pillars to support the roof covering the concrete. In such a support structure for the pillars, various forces are applied to the pillars, so it is necessary to stably support the pillars. Therefore, a roof structure and a construction method for a roof structure are known in which supporting materials are buried in the ground below the concrete floor and the lower ends of the pillars are supported by the supporting materials (see Patent Document 1).

[0003] In the conventional roof structure and construction method of the roof structure described in Patent Document 1, the support material and the pillars are supported by the weight of the soil, roadbed, and floor concrete placed on the plate-shaped part of the support material. However, in the conventional roof structure and construction method of the roof structure, the support material needs to be buried to a depth that can support the pillars, and there is a concern that the workload of construction of the roof structure, including excavation of the ground, will be large. In addition, it is necessary to dispose of the removed soil resulting from the excavation of the ground. There is also a concern that the time from excavation of the ground to pouring of the floor concrete will be long, which will lengthen the construction period of the roof structure. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2021-38588 Summary of the Invention [Problem to be solved by the invention]

[0005] The present invention has been made in consideration of the above-mentioned problems in the conventional art, and its object is to improve the workability in constructing a support structure for pillars that are installed in concrete covering the ground. [Means for solving the problem]

[0006] (First Invention) A support structure for a support pillar that is installed in concrete covering the ground with the support pillar supported by a support material, The support material has a base portion to be placed on the ground, a support fixing portion protruding upward from the base portion to which the support is fixed, and a fixing portion protruding upward from the base portion to be fixed to the concrete, The concrete is a support structure for a pillar, which has a foundation concrete portion provided on the ground and in which the base and the lower portions of the fixing portion are buried, and a floor concrete portion covering the foundation concrete portion and in which the upper portions of the fixing portion are buried. (Second Invention) A roof structure comprising the pillar support structure of the first invention and a roof attached to the pillar and supported by the pillar. (Third Invention) A construction method for a support structure for a support pillar, in which the support pillar is installed on concrete covering the ground while being supported by a support material, comprising the steps of: placing a base of the support on the ground; Fixing the support to a support fixing portion of the support material that protrudes upward from the base; A step of pouring a foundation concrete portion of the concrete on the ground and embedding the base and a lower portion of the fixing portion of the support material protruding upward from the base in the foundation concrete portion; A step of pouring a concrete floor portion of the concrete to cover the foundation concrete portion and embedding an upper portion of the fixing portion in the concrete floor portion; A construction method for a support structure for a pillar having the above structure. (Fourth Invention) A construction method for a support structure for a support pillar, in which the support pillar is installed on concrete covering the ground while being supported by a support material, comprising the steps of: A step of producing a foundation concrete portion of the concrete, which is precast concrete in which a base portion of the support material and a lower portion of an anchoring portion of the support material protruding upward from the base are embedded; placing the foundation concrete portion on the ground; a step of fixing the support to a support fixing portion of the support material that protrudes upward from the base portion and protrudes upward from the foundation concrete portion; A step of pouring a concrete floor portion of the concrete to cover the foundation concrete portion and embedding an upper portion of the fixing portion in the concrete floor portion; A construction method for a support structure for a pillar having the above structure. Effect of the Invention

[0007] According to the present invention, it is possible to improve the workability of constructing a support structure for a pillar that is installed in concrete covering the ground. [Brief description of the drawings]

[0008] [Figure 1] FIG. 2 is a side view showing the roof structure of the first embodiment. [Diagram 2] FIG. 2 is a front view showing the roof structure of the first embodiment as viewed in the direction of the arrow X1 in FIG. [Diagram 3] FIG. 2 is a plan view showing the roof structure of the first embodiment as viewed in the direction of the arrow X2 in FIG. [Figure 4] FIG. 2 is a diagram showing a support material according to the first embodiment. [Diagram 5] FIG. 2 is a diagram showing a support material and a column according to the first embodiment. [Figure 6] 4A to 4C are diagrams showing a construction procedure for the support structure of the pillars and the roof structure of the first embodiment. [Figure 7] 11A to 11C are diagrams showing a procedure for installing the support material of the second embodiment on the ground. [Figure 8] FIG. 11 is a side view showing a roof structure according to a third embodiment. [Figure 9] 9 is a front view showing a roof structural body of a third embodiment as seen in the direction of arrow X7 in FIG. 8. [Figure 10] 9 is a plan view showing a roof structure according to a third embodiment as viewed in the direction of an arrow X8 in FIG. 8. [Figure 11] FIG. 13 is a side view showing a roof structure according to a fourth embodiment. [Figure 12] 12 is a front view showing a roof structural body of a fourth embodiment as seen in the direction of arrow X9 in FIG. 11. [Figure 13] 12 is a plan view showing a roof structural body of a fourth embodiment as viewed in the direction of arrow X10 in FIG. [Figure 14] FIG. 13 is a diagram showing a support material and a foundation concrete part of the fourth embodiment. [Figure 15] 13A to 13C are diagrams showing a construction procedure for the support structure of the pillars and the roof structure of the fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] An embodiment of a support structure for a pillar, a construction method for the support structure for a pillar, and a roof structure of the present invention will be described with reference to the drawings. The support structure for the pillars of this embodiment is constructed by the construction method for the support structure for the pillars of this embodiment to form a part of the roof structure. The roof structure of this embodiment is an outdoor structure having a roof, constructed by the construction method for the roof structure, and installed outside the building. The roof structure is installed on the concrete covering the ground, independent of the building.

[0010] (First embodiment) Fig. 1 is a side view showing a roof structural member 1 of the first embodiment, and Fig. 2 is a front view showing the roof structural member 1 of the first embodiment as viewed from the direction of arrow X1 in Fig. 1. Figs. 1 and 2 show a schematic cross section of an underground portion of an installation location 3 of the roof structural member 1 and the structure of the underground portion of the roof structural member 1. Fig. 3 is a plan view showing the roof structural member 1 of the first embodiment as viewed from the direction of arrow X2 in Fig. 1.

[0011] As shown in the figure, the roof structure 1 includes a support structure 2 for columns provided at one or more locations (four locations in this example), and concrete 10 provided at an installation location 3. The roof structure 1 and the support structure 2 for columns are installed at the installation location 3, and the installation location 3 is covered from above by the roof structure 1. The concrete 10 is a concrete floor body (concrete floor) provided on the ground 4, and forms a floor surface 11 of the roof structure 1. The concrete 10 is a flat concrete layer that is poured on the ground 4 and covers the ground 4 from above. The ground 4 is made of, for example, crushed stone that is laid and compacted on the earth ground (not shown) at the installation location 3. A reinforcing material (not shown) for reinforcing is buried inside the concrete 10. The reinforcing material of the concrete 10 is steel bars that are arranged inside the concrete 10.

[0012] The roof structure 1 is a roof unit installed on concrete 10 at an installation location 3, and is self-supporting at the installation location 3. The roof structure 1 also includes a plurality of supports 5 erected on the concrete 10, a roof 6 supported by the plurality of supports 5, and a plurality of support materials 7 supporting each of the plurality of supports 5. The roof 6 is a roof body covering the concrete 10 at the installation location 3 of the roof structure 1, and is attached to the supports 5. Here, the roof structure 1 is a carport, and each of the supports 5 is supported by four supports 7, and the four supports 5 support the square-shaped roof 6. The roof 6 has a lattice-shaped roof frame 6A supported by the supports 5, and a plurality of plate-shaped roof materials 6B that fill voids in the roof frame 6A, and is attached to the upper ends of the supports 5.

[0013] The support structure 2 of the support pillar includes concrete 10 covering the ground 4 at the installation location 3, a support material 7 arranged on the ground 4, and a support pillar 5 supported by the support material 7. The support pillar 5 is installed on the concrete 10 while being supported by the support material 7, and extends in the vertical direction. The support pillar 5 is supported by the support structure 2 of the support pillar and provided on the roof structure 1. The support pillar 5 is installed in an upright state and protrudes upward from the concrete 10. The roof 6 is supported by four support pillars 5 at two edge portions 6C and 6D that are spaced apart from each other among the four edge portions 6C, 6D, 6E, and 6F of the roof 6. At each of the edge portions 6C and 6D, the two support pillars 5 are arranged spaced apart from each other in the extension direction of the edge portions 6C and 6D. The edge portions 6C and 6D of the roof 6 are each attached to two support pillars 5 and supported by two support pillars 5.

[0014] The supports 7 are metal (steel in this case) supports (support brackets) and are provided at the installation positions of the four pillars 5 at the installation position 3 of the roof structural body 1. The four pillars 5 are fixed to different supports 7. The supports 7 are arranged from a position below the lower ends 5A of the pillars 5, through the lower ends 5A of the pillars 5, to a position above the lower ends 5A of the pillars 5, and are held at the installation position 3. The lower ends 5A of the pillars 5 are attached and fixed to the supports 7, and the supports 7 support the lower ends 5A of the pillars 5. The pillars 5 are maintained in a state of being installed on the concrete 10 by the support of the supports 7, and support the roof 6.

[0015] The concrete 10 has a foundation concrete portion 12 provided on the ground 4, and a concrete floor portion 13 provided on the ground 4 and the concrete foundation portion 12. The concrete foundation portion 12 is the portion that forms the foundation of the concrete 10, and the concrete floor portion 13 is the portion that forms the floor of the concrete 10. The concrete foundation portion 12 is a lower concrete portion located below the concrete floor portion 13, and is provided in a part of the installation location 3 of the roof structure 1. The concrete floor portion 13 is an upper concrete portion located above the concrete foundation portion 12, and is provided in the entire installation location 3 of the roof structure 1 to cover the ground 4 and the concrete foundation portion 12. The floor surface 11 of the concrete 10 is the upper surface of the concrete floor portion 13.

[0016] The foundation concrete portion 12 is not provided over the entire area of ​​the ground 4 covered by the concrete 10, but is provided on a portion of the area of ​​the ground 4 covered by the concrete 10, including the location where the support material 7 is arranged (the location where the support pillar 5 is installed). The floor concrete portion 13 is provided on the area of ​​the ground 4 covered by the concrete 10 and on the foundation concrete portion 12. The foundation concrete portion 12 is provided in each of the locations where the four support materials 7 are arranged, and the floor concrete portion 13 covers the four foundation concrete portions 12 from above.

[0017] Fig. 4 is a diagram showing a support member 7 of the first embodiment. Fig. 4A is a side view of the support member 7, and shows one of the support members 7 shown in Fig. 1. Fig. 4B is a front view of the support member 7 as viewed from the direction of the arrow X3 in Fig. 4A, and shows one of the support members 7 shown in Fig. 2. Fig. 4C is a plan view of the support member 7 as viewed from the direction of the arrow X4 in Fig. 4A, and shows one of the support members 7 shown in Fig. 3.

[0018] As shown in the figure, the support 7 has a rectangular base 20, a pillar fixing part 30 fixed to the base 20, and a plurality of anchoring parts 40 attached to the base 20. The base 20 and the anchoring parts 40 are embedded in the concrete 10 and anchored to the concrete 10. The base 20 is a plate-shaped base plate part that supports the support 7, and is located below the pillar 5. When the roof structure 1 is viewed from above (see FIG. 3), the base 20 is formed larger than the pillar 5, and the pillar 5 is disposed at a position within the base 20. The base 20 also protrudes outward from the entire outer periphery of the pillar 5. The pillar fixing part 30 and the anchoring parts 40 are each located above the base 20 and are disposed along the vertical direction.

[0019] The pole fixing part 30 is a cylindrical fixed pole, welded and fixed to the base 20, and protrudes upward from the base 20. The pole fixing part 30 has a plurality of screw holes 31 formed at a distance from each other. The base 20 has one pair of edges 21, 22 and the other pair of edges 23, 24 among the four edges 21-24 (first to fourth edges 21-24). The one pair of edges 21, 22 and the other pair of edges 23, 24 are located on one side and the other side of the pole fixing part 30, with the pole fixing part 30 sandwiched between them. The pole fixing part 30 is located at the center of the base 20, away from each of the four edges 21-24 of the base 20. The central portion of the base 20 is a portion that is located in the middle between one pair of edges 21, 22 and also in the middle between the other pair of edges 23, 24.

[0020] The multiple fixing parts 40 of the support material 7 are rod-shaped fixing protrusions, and are arranged around the column fixing part 30, surrounding the column fixing part 30. The fixing parts 40 are arranged apart from the column fixing part 30, provided at four locations on the base 20, and protrude upward from the base 20. Here, the fixing parts 40 are bolts, and are attached to the base 20 by screwing into screw holes formed in the base 20. The four fixing parts 40 are provided at positions adjacent to the four corners of the base 20, and are arranged apart from each other.

[0021] The fixing portion 40 has a head 41 which is the upper end of the fixing portion 40, a lower portion 42 which connects to the base 20, an upper portion 43 which is located above the lower portion 42, and a groove portion (not shown) formed on at least one of the outer periphery of the lower portion 42 and the outer periphery of the upper portion 43. The base 20 and the lower portion 42 of the fixing portion 40 are embedded in the foundation concrete portion 12, and the upper portion 43 of the fixing portion 40 is embedded in the concrete floor portion 13. The lower portion 42 is a portion which is located on the lower side (the side of the base 20) of the fixing portion 40, and includes the lower end of the fixing portion 40 which connects to the base 20. The upper portion 43 is a portion which is located on the upper side (the side opposite the base 20) of the fixing portion 40, and includes the upper end (head 41) of the fixing portion 40, and is continuous with the upper side of the lower portion 42.

[0022] The groove of the fixing part 40 is formed on either or both of the outer periphery of the lower part 42 and the outer periphery of the upper part 43. Here, the groove of the fixing part 40 is a spiral screw groove formed on the screw part of the fixing part 40, and is formed on both the outer periphery of the lower part 42 and the outer periphery of the upper part 43. That is, the upper part 43 and the lower part 42 excluding the head 41 are the screw part of the fixing part 40, and the groove of the fixing part 40 is formed continuously on the outer periphery of the lower part 42 and the outer periphery of the upper part 43. The foundation concrete part 12 enters into the groove of the lower part 42, and the groove of the lower part 42 bites into the foundation concrete part 12. Also, the floor concrete part 13 enters into the groove of the upper part 43, and the groove of the upper part 43 bites into the floor concrete part 13.

[0023] FIG. 5 is a diagram showing the support material 7 and the support column 5 of the first embodiment, and shows the support column 5 fixed to the support material 7. FIG. 5A is a side view of the support material 7 and the support column 5, and shows the support material 7 shown in FIG. 4A. FIG. 5B is a front view of the support material 7 and the support column 5 as viewed from the direction of the arrow X5 in FIG. 5A, and shows the support material 7 shown in FIG. 4B. FIG. 5C is a plan view of the support material 7 and the support column 5 as viewed from the direction of the arrow X6 in FIG. 5A, and shows the support material 7 shown in FIG. 4C. In FIGS. 5A and 5B, the support column fixing portion 30 of the support material 7 housed inside the support column 5 is shown by a chain line.

[0024] As shown in the figure, the pillar fixing part 30 of the support material 7 is inserted from below into the inside of the cylindrical pillar 5 and disposed inside the pillar 5. In this state, the pillar 5 is fixed to the pillar fixing part 30 by a plurality of bolts 5B. The bolts 5B are inserted through insertion holes (not shown) of the pillar 5 from the outside of the pillar 5 and screwed into screw holes 31 of the pillar fixing part 30, and are attached to the pillar fixing part 30. The pillar 5 surrounds the pillar fixing part 30 and accommodates the pillar fixing part 30 inside. The pillar fixing part 30 is a holding part connected to the pillar 5 by the bolts 5B, and holds the pillar 5 via the bolts 5B.

[0025] FIG. 6 is a diagram showing the procedure for constructing the support structure 2 for the pillars and the roof structural body 1 of the first embodiment, and similarly to FIG. 2, shows a cross section of the underground of the installation location 3 of the roof structural body 1 and a support material 7. As shown in the figure, when constructing the support structure 2 for the pillars and the roof structural body 1, the ground 4 at the installation location 3 of the roof structural body 1 is leveled (see FIG. 6A). In addition, a recess 4A is formed in the ground 4 at the location where the support material 7 will be placed. The recess 4A is a depression with a depth equal to the thickness in the vertical direction of the foundation concrete portion 12, and is formed large enough to accommodate the entire base 20 of the support material 7. Next, the support material 7 is placed on the ground 4 at each of the locations where the four support materials 7 will be placed. At that time, the base 20 is placed in the recess 4A from above, and the base 20 is placed on the ground 4.

[0026] Within the recess 4A of the ground 4, the base 20 of the support material 7 is placed directly on the ground 4 or indirectly via another member. Here, the underside of the base 20 is brought into contact with the ground 4 and the base 20 is placed directly on the ground 4. Furthermore, the pillar fixing part 30 and the anchoring part 40 are disposed within the recess 4A, and are disposed from the inside of the recess 4A to the upper side of the recess 4A. The lower part 42 of the anchoring part 40 is disposed within the recess 4A, and the upper part 43 and the head 41 of the anchoring part 40 are disposed above the recess 4A.

[0027] For each of the four supports 7, a support 5 is fixed to the support fixing portion 30 of the support 7 that protrudes upward from the base 20 (see FIG. 6B). The lower end 5A of the support 5 is fixed to the support fixing portion 30 inside and above the recess 4A. Then, before pouring the foundation concrete portion 12 of the concrete 10, the roof 6 (see FIGS. 1 and 2) is attached to the support 5 fixed to the support fixing portion 30. The roof 6 is attached to the four supports 5 and supported by the four supports 5.

[0028] With the roof 6 attached to the columns 5 and supported by them, the foundation concrete portion 12 of the concrete 10 is poured on the ground 4 and the base 20 of the support material 7, and the base 20, the lower portion 42 of the fixing portion 40 protruding upward from the base 20, and the lower end 5A of the column 5 are embedded in the foundation concrete portion 12 (see FIG. 6C). As a result, the base 20, the lower portion 42 of the fixing portion 40, and the lower end 5A of the column 5 are embedded and fixed in the foundation concrete portion 12. At that time, a part or the whole of the base 20 is embedded in the foundation concrete portion 12. Here, the base 20 is placed on the ground 4, covered by the foundation concrete portion 12 together with the ground 4, and embedded in the foundation concrete portion 12 and between the ground 4 and the foundation concrete portion 12.

[0029] With the lower end 5A of the pillar 5 fixed to the pillar fixing part 30, the foundation concrete part 12 is poured into the recess 4A of the ground 4, and the recess 4A is filled with the foundation concrete part 12. Within the recess 4A, the base 20 of the support material 7 is sandwiched between the ground 4 and the foundation concrete part 12 and buried in the installation location 3 of the roof structure 1. The upper part 43 of the fixing part 40, the pillar fixing part 30, and the lower end 5A of the pillar 5 protrude upward from the recess 4A and the foundation concrete part 12, and the upper part 43 and the head part 41 of the fixing part 40 are located above the recess 4A and the foundation concrete part 12. In this state, the foundation concrete part 12 is hardened.

[0030] Before pouring the concrete floor portion 13 of the concrete 10, the concrete foundation portion 12 acts as a weight, and the support material 7, the pillars 5, and the roof structural body 1 are temporarily and stably installed at the installation location 3 by the concrete foundation portion 12. Next, the concrete floor portion 13 is poured to cover the concrete foundation portion 12, and the upper portion 43, the head portion 41, and the lower end portion 5A of the pillars 5 are embedded in the concrete floor portion 13 (see FIG. 6D). As a result, the upper portion 43, the head portion 41, and the lower end portion 5A of the pillars 5 of the fixing portion 40 are embedded in the concrete floor portion 13 and fixed therein.

[0031] The support material 7 is provided with a plurality of fixing portions 40 protruding upward from the base 20. Above the base 20, lower portions 42 of the plurality of fixing portions 40 are embedded in the foundation concrete portion 12 and fixed to the foundation concrete portion 12. Additionally, upper portions 43 and heads 41 of the plurality of fixing portions 40 are embedded in the floor concrete portion 13 and fixed to the floor concrete portion 13. As a result, the lower portions 42 of the fixing portions 40 are held in the foundation concrete portion 12, and the upper portions 43 and heads 41 of the fixing portions 40 are held in the floor concrete portion 13.

[0032] The head 41 of the fixing part 40 is embedded in the center in the thickness direction (here, the up-down direction) of the concrete floor part 13. Between the base 20 and the floor surface 11 of concrete 10, the fixing part 40 and the lower end 5A of the support 5 are embedded in the concrete foundation part 12, the concrete floor part 13, and the concrete 10, and are fixed to the concrete foundation part 12, the concrete floor part 13, and the concrete 10.

[0033] In the first embodiment described above, when constructing the support structure 2 for the pillars and the roof structural body 1, there is no need to excavate the ground at the installation location 3 of the roof structural body 1, which reduces the effort and workload involved in constructing the support structure 2 for the pillars and the roof structural body 1, and improves the efficiency of the construction of the support structure 2 for the pillars and the roof structural body 1. In addition, the work from placing the support material 7 on the ground 4 to pouring the foundation concrete portion 12 can be performed in one go. The construction period for the support structure 2 for the pillars and the roof structural body 1 can be shortened, and the amount of soil removal required for excavating the ground can also be reduced.

[0034] During the period from pouring of the foundation concrete section 12 to pouring of the floor concrete section 13, the foundation concrete section 12 can stably hold the support material 7 and the pillars 5. Furthermore, even if the period from pouring of the foundation concrete section 12 to pouring of the floor concrete section 13 becomes long, the foundation concrete section 12 can maintain the pillars 5 and roof structural body 1 in the installed state. Therefore, the workability of constructing the support structure 2 for the pillars and the roof structural body 1 can be improved.

[0035] The base 20 of the support material 7 is buried between the ground 4 and the foundation concrete part 12 of the concrete 10, and the support material 7 can be held by the ground 4 and the concrete 10. In addition, various forces acting on the support material 7 from the support pillar 5 can be borne by the ground 4 and the concrete 10 via the base 20. Therefore, the support material 7 can be supported by the ground 4 and the concrete 10, and the support pillar 5 can be stably supported by the support material 7.

[0036] The anchoring portion 40 of the supporting material 7 can be anchored to both the foundation concrete portion 12 and the floor concrete portion 13, and the anchoring portion 40 can increase the anchoring strength of the supporting material 7 to the concrete 10. This allows the supporting material 7 to be firmly fixed to the concrete 10, and the supporting material 7 can be stably supported by the concrete 10.

[0037] The grooves of the fixing portion 40 allow the fixing portion 40 to be stably fixed to the concrete 10. Furthermore, the plurality of fixing portions 40 allow the supporting material 7 to be firmly fixed to the concrete 10. By embedding the lower end portion 5A of the pillar 5 in the foundation concrete portion 12 and the floor concrete portion 13, the lower end portion 5A of the pillar 5 can be fixed to the concrete 10 while being fixed to the pillar fixing portion 30 of the supporting material 7, and the lower end portion 5A of the pillar 5 can be supported by the concrete 10.

[0038] When the support 5 is installed at a position near the periphery of the installation location 3 of the support structure 2 for the support and the roof structural body 1, it is considered that the base 20 of the support material 7 protrudes from the periphery of the installation location 3 to the outside of the installation location 3. In this case, the support fixing part 30 of the support material 7 is provided at a position shifted from the center of the base 20 toward the edge side of the base 20, and the edge of the base 20 is arranged toward the periphery side of the installation location 3. The edge of the base 20 is any edge of the four edges 21 to 24. This allows the base 20 to be located inside the installation location 3, while the support fixing part 30 and the support 5 fixed to the support fixing part 30 can be arranged at a position near the periphery of the installation location 3. In addition, even when the installation location 3 is close to the boundary with the neighboring land, the support structure 2 for the support and the roof structural body 1 can be easily installed at the installation location 3.

[0039] One or more anchoring parts 40 may be provided on the support material 7. The roof 6 may be supported by one or more pillars 5. Only one edge of the roof 6 may be attached to the pillars 5, and the roof 6 may be supported by the pillars 5 in a state where it overhangs the pillars 5. In this case, before pouring the foundation concrete part 12, for example, the roof 6 is temporarily supported by a support member at a location other than the pillars 5, and the roof 6 is attached to the pillars 5. The present invention is not limited to carports, and can be applied to roof structures other than carports (for example, cycle ports, terraces, sunrooms), and can also be applied to roof structures attached to the wall of a building. The present invention is not limited to the support structure of the pillars of the roof structure, and can be applied to various support structures of the pillars.

[0040] Next, other embodiments of the present invention will be described. In each of the following embodiments, the description of the same matters as in the first embodiment will be omitted, and the description will be mainly focused on the matters different from the first embodiment. In addition, in each of the following embodiments, the same names and symbols as in the first embodiment will be used for the configurations corresponding to those in the first embodiment.

[0041] Second embodiment FIG. 7 is a diagram showing a procedure for installing the support material 7 of the second embodiment on the ground 4. As shown in FIG. As shown in the figure, in the second embodiment, the support material 7 has, in addition to the base 20, the pillar fixing portion 30, and the plurality of anchoring portions 40, a plurality of plate-shaped lower members 50 located below the base 20, and a plurality of displacement mechanisms 51 that respectively displace the lower members 50. The lower members 50 are lower plates (mounting plates) that are placed on the ground 4, and are in contact with the ground 4 and supported by the ground 4. The base 20 is placed on the ground 4 via the lower members 50, with the lower members 50 sandwiched between the base 20 and the ground 4.

[0042] The multiple lower members 50 are provided at four locations surrounding the position of the pillar fixing part 30 on the support material 7, and are arranged at a distance from the pillar fixing part 30. The four lower members 50 are provided at positions adjacent to the four corners of the base 20, and are arranged at a distance from one another. The displacement mechanism 51 is composed of the fixing part 40 and a screw hole formed in the base 20. Here, the fixing part 40 is a cut bolt (full thread) without a head 41, and is composed of a screw part having a spiral groove. The lower member 50 is fixed to the lower end surface of the fixing part 40 by welding.

[0043] The fixing portion 40 of the displacement mechanism 51 is attached by screwing into the screw hole of the base 20 from below the base 20, and protrudes upward from the screw hole of the base 20. The displacement mechanism 51 connects the lower material 50 to the base 20 by the fixing portion 40 so that the lower material 50 can be displaced in the vertical direction. By rotating the fixing portion 40 to one side and the other side about the axis, the fixing portion 40 and the lower material 50 are displaced in the vertical direction relative to the screw hole of the base 20 by the screw action. As a result, the displacement mechanism 51 displaces the lower material 50 and changes the distance between the base 20 and the lower material 50, displacing the base 20 in the vertical direction relative to the lower material 50.

[0044] The fixing part 40 has two nuts 44, 45 and a fixing plate 46 held between the two nuts 44, 45. The nuts 44, 45 are attached by being screwed into the threaded part of the fixing part 40, and move up and down along the threaded part by rotation. The fixing plate 46 has an insertion hole (not shown) through which the threaded part of the fixing part 40 is inserted, and is sandwiched between the two nuts 44, 45 and tightened by the two nuts 44, 45. The fixing plate 46 is held by the threaded part of the fixing part 40 by the two nuts 44, 45 and protrudes outward from the fixing part 40. In addition, the vertical position of the fixing plate 46 is changed by moving the two nuts 44, 45 up and down along the threaded part of the fixing part 40. In this way, the fixing plate 46 is provided in the fixing part 40 so that its vertical position can be changed.

[0045] When constructing the support structure 2 of the support column and the roof structural body 1, the base 20 is placed on the ground 4 via the under-material 50 of the support material 7 (see FIG. 7A). When the ground 4 on which the base 20 is placed is horizontal and there is no need to adjust the position of the base 20, the construction of the support structure 2 of the support column and the roof structural body 1 is continued without displacing the base 20 by the displacement mechanism 51. On the other hand, when the ground 4 on which the base 20 is placed is not horizontal, for example, when the ground 4 is inclined with respect to the horizontal (see FIG. 7B), the displacement mechanism 51 displaces the base 20 in the vertical direction with respect to the under-material 50 and the ground 4 at the location of the under-material 50 to adjust the vertical position of the base 20 with respect to the ground 4 (see FIG. 7C). In addition, the vertical positions of the base 20 at the respective connection points of the under-material 50 are adjusted by the multiple displacement mechanisms 51 and the under-materials 50. This adjusts the horizontality of the base 20 to arrange the base 20 horizontally.

[0046] Next, the pillars 5 are fixed to the pillar fixing parts 30 of the support material 7, and the roof 6 is attached to the pillars 5 (see FIG. 6). Furthermore, after the foundation concrete part 12 is poured, the concrete floor part 13 is poured. The position of the fixing plate 46 of the fixing part 40 can be changed in the thickness direction (up and down direction) of the concrete floor part 13 in accordance with the thickness of the concrete floor part 13. By changing the position of the fixing plate 46 in the up and down direction, the fixing plate 46 is disposed at any position in the thickness direction of the concrete floor part 13. As a result, the fixing plate 46 is embedded in a predetermined position in the thickness direction of the concrete floor part 13 (here, the center part in the thickness direction).

[0047] In the second embodiment, the vertical position of the base 20 with respect to the ground 4 can be easily adjusted by the displacement mechanism 51 and the base material 50. Furthermore, when the ground 4 is not horizontal, the horizontality of the base 20 can be adjusted to easily position the base 20 horizontally.

[0048] Third embodiment Fig. 8 is a side view showing the roof structural body 1 of the third embodiment, and Fig. 9 is a front view showing the roof structural body 1 of the third embodiment as viewed from the direction of arrow X7 in Fig. 8. Figs. 8 and 9 show a cross section of the underground of the installation location 3 of the roof structural body 1 and the structure of the underground portion of the roof structural body 1. Fig. 10 is a plan view showing the roof structural body 1 of the third embodiment as viewed from the direction of arrow X8 in Fig. 8.

[0049] As shown in the figure, in the third embodiment, two pillars 5 are installed at a distance from each other on each of two edges 6C, 6D of the roof 6 that are spaced apart from each other, and one support member 7 supports the two pillars 5. The support member 7 has a long base portion 20 that extends along the upper surface of the ground 4. The base portion 20 is disposed across the two pillars 5 and extends between the lower ends 5A of the two pillars 5. The pillar fixing portions 30 of the support member 7 are provided at two locations spaced apart in the longitudinal direction of the base portion 20, and the pillars 5 are fixed to each of the two pillar fixing portions 30.

[0050] The fixing portions 40 are provided at a plurality of locations in the longitudinal direction of the base 20 between one end and the other end of the base 20 in the longitudinal direction. The plurality of fixing portions 40 are arranged at intervals from one another in the longitudinal direction of the base 20. The fixing portions 40 are also provided on one edge side and the other edge side in the width direction of the base 20 with intervals in the width direction perpendicular to the longitudinal direction of the base 20.

[0051] When constructing the support structure 2 for the pillars and the roof structural body 1, the base 20, which is disposed across the two pillars 5, is placed on the ground 4 at each location where the two support materials 7 are to be placed. Next, the pillars 5 are fixed to each of the pillar fixing parts 30 provided at two locations on the base 20, and the roof 6 is attached to the pillars 5. In addition, after the foundation concrete part 12 is poured, the floor concrete part 13 is poured.

[0052] In the third embodiment, the base 20 of the support 7 can stably support the pillars 5 and the roof structural body 1. It is also possible to improve the workability of constructing the roof structural body 1. Note that one support 7 may support three or more pillars 5. In this case, the pillars 5 are installed at intervals from each other, and the base 20 is disposed across the pillars 5. Pillar fixing parts 30 are provided at multiple locations in the longitudinal direction of the base 20, and the pillars 5 are fixed to each of the pillar fixing parts 30. The support 7 of the third embodiment may be provided with the under member 50 and the displacement mechanism 51 of the second embodiment.

[0053] (Fourth embodiment) FIG. 11 is a side view showing the roof structure 1 of the fourth embodiment, and FIG. 12 is a front view showing the roof structure 1 of the fourth embodiment as viewed from the direction of the arrow X9 in FIG. 11. FIG. 11 and FIG. 12 are schematic diagrams showing a cross section of the underground of the installation site 3 of the roof structure 1 and the structure of the underground part of the roof structure 1. FIG. 13 is a plan view showing the roof structure 1 of the fourth embodiment as viewed from the direction of the arrow X10 in FIG. 11. FIG. 14 is a diagram showing the support material 7 and the foundation concrete part 12 of the fourth embodiment. FIG. 14A is a side view of the support material 7 and the foundation concrete part 12. FIG. 14B is a front view of the support material 7 and the foundation concrete part 12 as viewed from the direction of the arrow X11 in FIG. 14A, and FIG. 14C is a plan view of the support material 7 and the foundation concrete part 12 as viewed from the direction of the arrow X12 in FIG. 14A.

[0054] As shown in the figure, in the fourth embodiment, the foundation concrete part 12 of the concrete 10 is precast concrete 14, and the support material 7 is embedded in the precast concrete 14 and the foundation concrete part 12 in advance. The foundation concrete part 12 is not cast at the installation location 3, but the base 20 and the lower part 42 of the fixing part 40 of the support material 7 are embedded in the precast concrete 14 to fabricate the foundation concrete part 12, which is the precast concrete 14, in advance. At that time, the base 20, the lower part 42 of the fixing parts 40, and the lower part 32 of the support column fixing part 30 are embedded in the precast concrete 14 and fixed. As a result, the base 20, the lower part 42 of the fixing parts 40, and the lower part 32 of the support column fixing part 30 are embedded in the precast concrete 14 and fixed.

[0055] FIG. 15 is a diagram showing the construction procedure for the support structure 2 for the pillars and the roof structural body 1 of the fourth embodiment, and similarly to FIG. 12, shows the underground cross section and support material 7 at the installation location 3 of the roof structural body 1. As shown in the figure, at each of the locations where the four supporting materials 7 are to be placed, the foundation concrete part 12, which is precast concrete 14, is placed in the recess 4A of the ground 4 from above, and the foundation concrete part 12 and the base 20 of the supporting material 7 are placed on the ground 4 (see FIG. 15A). Within the recess 4A, the foundation concrete part 12 and the base 20 are placed on the ground 4, and the foundation concrete part 12 is contained within the recess 4A. A part or the whole (here, a part) of the recess 4A is filled with the foundation concrete part 12.

[0056] Next, the pillar 5 is fixed to the pillar fixing part 30 of the support material 7 (see FIG. 15B). The pillar fixing part 30 protrudes upward from the base 20 and also protrudes upward from the foundation concrete part 12. The lower end part 5A of the pillar 5 is fixed to the pillar fixing part 30 above the recess 4A and the foundation concrete part 12. Next, before pouring the floor concrete part 13 of the concrete 10 that covers the foundation concrete part 12, the roof 6 (see FIGS. 11 and 12) is attached to the pillar 5 fixed to the pillar fixing part 30.

[0057] With the lower end 5A of the pillar 5 fixed to the pillar fixing part 30, and with the roof 6 attached to the pillar 5 and supported by the pillar 5, the concrete floor part 13 is poured and the upper part 43, the head part 41 and the lower end 5A of the pillar 5 are embedded in the concrete floor part 13 (see FIG. 15C). The concrete floor part 13 is also poured around the concrete foundation part 12 in the recess 4A of the ground 4. As a result, the concrete foundation part 12 is embedded in the concrete floor part 13, and the recess 4A is filled with the concrete foundation part 12 and the concrete floor part 13.

[0058] In the third embodiment, there is no need to pour the foundation concrete part 12 on the ground 4 at the installation location 3 of the support structure 2 for the pillars and the roof structural body 1, and the construction work of the support structure 2 for the pillars and the roof structural body 1 can be easily performed. In addition, it is possible to eliminate the preparation and work for pouring the foundation concrete part 12 at the installation location 3, and by placing the foundation concrete part 12, which is precast concrete 14, on the ground 4, the support material 7 can be stably provided on the ground 4. This makes it possible to improve the workability of the construction of the support structure 2 for the pillars and the roof structural body 1.

[0059] As described above, this embodiment discloses the support structure for the pillars described in (1) to (5), the roof structure described in (6), and the construction method for the support structure for the pillars described in (7) to (9) below.

[0060] (1) A support structure for a pillar in which the pillar is supported by a support material and installed in concrete covering the ground, The support material has a base portion to be placed on the ground, a support fixing portion protruding upward from the base portion to which the support is fixed, and a fixing portion protruding upward from the base portion to be fixed to the concrete, The concrete is a support structure for a pillar, which has a foundation concrete portion provided on the ground and in which the base and the lower portions of the fixing portion are buried, and a floor concrete portion covering the foundation concrete portion and in which the upper portions of the fixing portion are buried. The support structure for the pillar described in (1) can improve the workability of constructing the support structure for the pillar that is installed in the concrete covering the ground.

[0061] (2) In the support structure of the pillar described in (1), The support material is a support structure for a pillar that has a lower material located below the base and supported by the ground, and a displacement mechanism that displaces the base in the vertical direction relative to the lower material. In the support structure of the pillar described in (2), the displacement mechanism and the base material make it easy to adjust the vertical position of the base relative to the ground.

[0062] (3) In the support structure of the pillar described in (1), The foundation concrete section is a support structure for a pillar in which the base and the lower portion of the anchoring section are buried in precast concrete. In the support structure for the pillars described in (3), there is no need to pour foundation concrete on the ground at the installation location of the support structure for the pillars, and construction work for the support structure for the pillars can be easily carried out.

[0063] (4) In the support structure of the pillar described in any one of (1) to (3), The anchoring portion is a support structure for a support pillar having a groove portion formed on at least one of the outer periphery of the lower portion and the outer periphery of the upper portion. In the support structure of the pillar described in (4), the groove portion allows the anchoring portion to be stably fixed to the concrete.

[0064] (5) In the support structure of the pillar described in any one of (1) to (4), The pillar fixing portion is a support structure for a pillar that is provided at a position shifted from the center of the base toward the edge of the base. In the support structure for the pillar described in (5), the base can be positioned inside the installation location of the support structure for the pillar, while the pillar fixing portion and the pillar fixed to the pillar fixing portion can be positioned near the periphery of the installation location.

[0065] (6) A roof structure comprising a support structure for pillars described in any one of (1) to (5) and a roof attached to and supported by the pillars. The roof structure described in (6) can improve the workability of constructing the support structure for the pillars and the roof structure.

[0066] (7) A construction method for a support structure for a pillar in which the pillar is supported by a support material and installed in concrete covering the ground, comprising the steps of: placing a base of the support on the ground; Fixing the support to a support fixing portion of the support material that protrudes upward from the base; A step of pouring a foundation concrete portion of the concrete on the ground and embedding the base and a lower portion of the fixing portion of the support material protruding upward from the base in the foundation concrete portion; A step of pouring a concrete floor portion of the concrete to cover the foundation concrete portion and embedding an upper portion of the fixing portion in the concrete floor portion; A construction method for a support structure for a pillar having the above structure. The construction method for the support structure of a pillar described in (7) can improve the workability of constructing the support structure of a pillar that is installed in the concrete covering the ground.

[0067] (8) In the construction method of the support structure of the pillar described in (7), A construction method for a support structure for a pillar, comprising a step of adjusting the vertical position of the base relative to the ground by displacing the base in an upward and downward direction using a displacement mechanism of the support material relative to the lower material of the support material, which is located below the base and supported by the ground. In the construction method of the support structure of the pillar described in (8), the vertical position of the base relative to the ground can be easily adjusted by using the displacement mechanism and the base material.

[0068] (9) A construction method for a support structure for a pillar in which the pillar is supported by a support material and installed in concrete covering the ground, comprising the steps of: A step of producing a foundation concrete portion of the concrete, which is precast concrete in which a base portion of the support material and a lower portion of an anchoring portion of the support material protruding upward from the base are embedded; placing the foundation concrete portion on the ground; a step of fixing the support to a support fixing portion of the support material that protrudes upward from the base portion and protrudes upward from the foundation concrete portion; A step of pouring a concrete floor portion of the concrete to cover the foundation concrete portion and embedding an upper portion of the fixing portion in the concrete floor portion; A construction method for a support structure for a pillar having the above structure. The construction method for the support structure of a pillar described in (9) can improve the workability of constructing the support structure of a pillar that is installed in the concrete covering the ground. [Explanation of symbols]

[0069] 1 Roof structure, 2 Support structure for pillars, 3 Installation location, 4 Ground, 4A Recess, 5 Pillar, 5A Lower end, 5B Bolt, 6 Roof, 6A Roof frame, 6B Roof material, 6C Edge, 6D Edge, 6E Edge, 6F Edge, 7 Support material, 10 Concrete, 11 Floor, 12 Foundation concrete, 13 Concrete floor base part, 14...precast concrete, 20...base, 21...first edge, 22...second edge, 23...third edge, 24...fourth edge, 30...post fixing part, 31...screw hole, 32...lower part, 40...anchoring part, 41...head, 42...lower part, 43...upper part, 44...nut, 45...nut, 46...anchoring plate, 50...base material, 51...displacement mechanism.

Claims

1. A support structure for a support pillar that is installed in concrete covering the ground with the support pillar supported by a support material, The support material has a base portion to be placed on the ground, a support fixing portion protruding upward from the base portion to which the support is fixed, and a fixing portion protruding upward from the base portion to be fixed to the concrete, The concrete is a support structure for a pillar, which has a foundation concrete portion provided on the ground and in which the base and the lower portions of the fixing portion are buried, and a floor concrete portion covering the foundation concrete portion and in which the upper portions of the fixing portion are buried.

2. The support structure for a support column according to claim 1, The support material is a support structure for a pillar that has a lower material located below the base and supported by the ground, and a displacement mechanism that displaces the base in the vertical direction relative to the lower material.

3. The support structure for a support column according to claim 1, The foundation concrete section is a support structure for a pillar in which the base and the lower portion of the anchoring section are buried in precast concrete.

4. The support structure for a support column according to any one of claims 1 to 3, The anchoring portion is a support structure for a support pillar having a groove portion formed on at least one of the outer periphery of the lower portion and the outer periphery of the upper portion.

5. The support structure for a support column according to any one of claims 1 to 3, The pillar fixing portion is a support structure for a pillar that is provided at a position shifted from the center of the base toward the edge of the base.

6. A roof structure comprising: a support structure for a pillar according to any one of claims 1 to 3; and a roof attached to the pillar and supported by the pillar.

7. A construction method for a support structure for a support pillar, in which the support pillar is installed on concrete covering the ground while being supported by a support material, comprising the steps of: placing a base of the support on the ground; Fixing the support to a support fixing portion of the support material that protrudes upward from the base; A step of pouring a foundation concrete portion of the concrete on the ground and embedding the base and a lower portion of the fixing portion of the support material protruding upward from the base in the foundation concrete portion; A step of pouring a concrete floor portion of the concrete to cover the foundation concrete portion and embedding an upper portion of the fixing portion in the concrete floor portion; A construction method for a support structure for a pillar having the above structure.

8. The method for constructing a support structure for a pillar according to claim 7, A construction method for a support structure for a pillar, comprising a step of adjusting the vertical position of the base relative to the ground by displacing the base in an up-down direction using a displacement mechanism of the support material relative to the lower material of the support material, which is located below the base and supported by the ground.

9. A construction method for a support structure for a support pillar, in which the support pillar is installed on concrete covering the ground while being supported by a support material, comprising the steps of: A step of producing a foundation concrete portion of the concrete, which is precast concrete in which a base portion of the support material and a lower portion of an anchoring portion of the support material protruding upward from the base are embedded; placing the foundation concrete portion on the ground; a step of fixing the support to a support fixing portion of the support material that protrudes upward from the base portion and protrudes upward from the foundation concrete portion; A step of pouring a concrete floor portion of the concrete to cover the foundation concrete portion and embedding an upper portion of the fixing portion in the concrete floor portion; A construction method for a support structure for a pillar having the above structure.

Citation Information

Patent Citations

  • The building foundation-dependent

    JP1983115532U

  • Foundation structure of building and its construction method

    JP2003232088A

  • Column leg structure

    JP2011032726A

  • Support structure made of precast concrete

    US20120047825A1

  • Roof structure, and construction method of the same

    JP2021038588A