AI Technical Summary
The construction of seismic isolation foundations requires significant labor and costs due to the need for large cross-sectional areas of PC steel bars to bear horizontal shear and pull-out forces, limiting the ability to reduce materials and costs.
A method involving a recess in the lower structure to accommodate the seismic isolation foundation, with grout material filled between the foundation and the recess to distribute forces, reducing the need for large PC steel bars and allowing separate construction of the seismic isolation foundation and substructure.
This method reduces labor and costs by minimizing the materials required for constructing the seismic isolation structure, while effectively distributing horizontal shear forces through grout material, thereby reducing the cross-sectional area needed for PC steel bars.
Smart Images

Figure 2024137338000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a construction method for a seismic isolation structure and a seismic isolation structure. [Background technology]
[0002] Seismic isolation devices are widely used as devices to suppress the vibrations that propagate from the ground to buildings during earthquakes. Seismic isolation devices are generally installed on a seismic isolation foundation that is integrated with the substructure (building foundation, underground beams, piles, mat slab, etc.). The seismic isolation foundation is constructed in a protruding position above the substructure.
[0003] The construction of such a seismic isolation foundation that protrudes above the substructure is carried out, for example, in the following procedure: First, the substructure is constructed first by simultaneously arranging the reinforcement for the seismic isolation foundation and the substructure, assembling the formwork for the substructure, and pouring concrete. Next, the base plate of the seismic isolation device is placed on top of the reinforcement for the seismic isolation foundation, and then the formwork for the seismic isolation foundation is assembled and concrete is poured to construct the seismic isolation foundation.
[0004] This procedure requires a lot of on-site work to build the seismic isolation foundation, and requires high-quality construction, which results in a lot of labor and cost. Therefore, a construction method has been proposed in which the seismic isolation foundation is constructed using PCa and then tensioned and fixed to the substructure using PC steel bars. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2011-32759 A [Patent Document 2] JP 2011-47201 A Summary of the Invention [Problem to be solved by the invention]
[0006] However, because the PCa seismic isolation foundation is directly installed on the unprocessed substructure, the PC steel bars bear both the horizontal shear force and the pull-out force of the external forces acting on the seismic isolation foundation. This increases the required cross-sectional area of the PC steel bars, limiting the reduction in labor and costs.
[0007] The present invention aims to provide a construction method for a seismic isolation structure that can reduce labor and costs by reducing the materials required to build the seismic isolation structure. [Means for solving the problem]
[0008] Some embodiments of the present invention are a construction method for a seismic isolation structure having a superstructure, a substructure, a seismic isolation device installed between the superstructure and the substructure, and a seismic isolation foundation on which the seismic isolation device is supported, wherein the substructure has a recess to accommodate a lower part of the seismic isolation foundation, the construction method for a seismic isolation structure comprising the following steps: a grout material pouring step in which grout material is poured into the bottom surface of the recess; a bottom grout material filling step in which the grout material is pressed downward by the underside of the seismic isolation foundation, thereby filling the space between the underside of the seismic isolation foundation and the bottom surface of the recess; and a side grout material filling step in which the grout material flows between the side of the lower part of the seismic isolation foundation and the side of the recess, and is pushed upward, thereby filling the space between the side of the lower part of the seismic isolation foundation and the side of the recess.
[0009] Some embodiments of the present invention are a seismic isolation structure having an upper structure, a lower structure, a seismic isolation device installed between the upper structure and the lower structure, and a seismic isolation foundation on which the seismic isolation device is supported, wherein the lower structure has a recess for accommodating a lower part of the seismic isolation foundation, and has a bottom grout material filled between the underside of the seismic isolation foundation and the bottom surface of the recess, and a side grout material filled between the side of the lower part of the seismic isolation foundation and the side of the recess, wherein the bottom grout material is pressed downward by the underside of the seismic isolation foundation, and the side grout material is pushed upward by the flow of the bottom grout material between the side of the lower part of the seismic isolation foundation and the side of the recess.
[0010] Other features of the present invention will become apparent from the following specification and drawings. Effect of the Invention
[0011] Some embodiments of the present invention can reduce labor and costs by reducing the materials required to construct a seismic isolation structure. [Brief description of the drawings]
[0012] [Figure 1] Fig. 1A is an explanatory diagram of a seismic isolation structure 100 according to a first embodiment. Fig. 1B is an enlarged view of a portion enclosed by a dashed line in Fig. 1A. [Diagram 2] FIG. 2 is an explanatory diagram showing the state of installation of members within a formwork 5 in the construction of the seismic isolation foundation 10 according to the first embodiment. [Diagram 3] FIG. 3 is an explanatory diagram showing the pouring of concrete 9 in the construction of the seismic isolation foundation 10 according to the first embodiment. [Figure 4] FIG. 4 is an explanatory diagram showing the state of inversion of the seismic isolation foundation 10 in the construction of the seismic isolation foundation 10 according to the first embodiment. [Diagram 5] FIG. 5 is an explanatory diagram showing a state after the PC steel rods 40 have been embedded in the construction of the substructure 20 according to the first embodiment. [Figure 6] FIG. 6 is an explanatory diagram showing a state after the level spacer 30 is attached in the construction of the lower structure 20 according to the first embodiment. [Figure 7] FIG. 7 is an explanatory diagram showing how the grout material 50 is poured. [Figure 8] Fig. 8A is an explanatory diagram showing a state in which the seismic isolation base 10 is installed on the substructure 20. Fig. 8B is an explanatory diagram of the side interval retaining mechanism. [Figure 9] FIG. 9 is an explanatory diagram showing the filling operation of the grout material 50 and the tensioning operation of the PC steel rods 40. As shown in FIG. [Figure 10]10A and 10B are explanatory diagrams showing how the seismic isolation base 10 is installed on the substructure 20 in the construction of the seismic isolation structure 100A of the first modified example. [Figure 11] 11A is a perspective view of upper plate 12, FIG. 11B is a cross-sectional view of upper plate 12, FIG. 11C is a perspective view of lower plate 13, and FIG. [Figure 12] 12A and 12B are explanatory diagrams showing how the seismic isolation base 10 is installed on the substructure 20 in the construction of a seismic isolation structure 100B of the second modified example. [Figure 13] 13A is a perspective view of the horizontal spacer 22, and FIG. 13B is a perspective view of the foundation upper and lower restraint fittings 19. As shown in FIG. [Figure 14] 14A and 14B are explanatory diagrams showing how the seismic isolation base 10 is installed on the substructure 20 in the construction of a seismic isolation structure 100C of the third modified example. [Figure 15] FIG. 15 is an explanatory diagram of an installation structure 200 according to the second embodiment. [Figure 16] FIG. 16A is an explanatory diagram of an installation structure 200A of a fourth modified example, and FIG. 16B is an explanatory diagram of an installation structure 200B of a fifth modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] At least the following points will become apparent from the following specification and drawings.
[0014] The present invention clarifies a construction method for a seismic isolation structure having an upper structure, a lower structure, a seismic isolation device installed between the upper structure and the lower structure, and a seismic isolation foundation on which the seismic isolation device is supported, wherein the lower structure has a recess for accommodating the lower part of the seismic isolation foundation, the construction method comprising the steps of: a grout material pouring step in which grout material is poured into the bottom surface of the recess; a bottom grout material filling step in which the grout material is pressed downward by the underside of the seismic isolation foundation, thereby filling the space between the underside of the seismic isolation foundation and the bottom surface of the recess; and a side grout material filling step in which the grout material flows between the side of the lower part of the seismic isolation foundation and the side of the recess, and is pushed upward, thereby filling the space between the side of the lower part of the seismic isolation foundation and the side of the recess.
[0015] According to this construction method for a seismic isolation structure, the amount of materials required to build the seismic isolation structure can be reduced, thereby reducing labor and costs.
[0016] In a construction method for such a seismic isolation structure, it is desirable to resist horizontal shear forces from external forces by using the side surfaces of the lower part of the seismic isolation foundation, the side surfaces of the recess, and the grout material filled between the side surfaces of the lower part of the seismic isolation foundation and the side surfaces of the recess.
[0017] This makes it possible to reduce the horizontal shear force of external forces borne by other members.
[0018] In such a construction method for a seismic isolation structure, it is preferable that the seismic isolation foundation has a horizontal surface that supports the seismic isolation device horizontally, and the seismic isolation structure has a horizontal holding mechanism that holds the horizontal surface horizontal.
[0019] This allows the seismic isolation device to be held horizontally.
[0020] In such a construction method for a seismic isolation structure, it is desirable that the downward pressure on the grout material by the underside of the seismic isolation foundation is regulated by the horizontal retention mechanism.
[0021] This allows a sufficient amount of grout material to be filled between the underside of the seismic isolation foundation and the bottom surface of the recess in the substructure.
[0022] In such a construction method for a seismic isolation structure, it is desirable to have a side spacing retaining mechanism that retains the spacing between the side of the lower part of the seismic isolation foundation and the side of the recess.
[0023] This allows a sufficient amount of grout material to be filled between the side of the lower part of the seismic isolation foundation and the side of the recess in the substructure.
[0024] In such a construction method for a seismic isolation structure, it is desirable that the seismic isolation foundation is formed using PCa or site PC, and that the seismic isolation structure has a PC steel rod that penetrates the seismic isolation foundation in the vertical direction and has its lower end buried in the substructure.
[0025] This allows the seismic isolation foundation to be constructed using PCa and then secured in place by tensioning the substructure and PC steel bars.
[0026] In a construction method for such a seismic isolation structure, it is desirable that the seismic isolation foundation is formed using PCa or site PC, the seismic isolation structure has a PC steel rod that penetrates the seismic isolation foundation in the vertical direction and has its lower end embedded in the substructure, and the horizontal retention mechanism is a horizontal retention material attached to the PC steel rod and supports the underside of the seismic isolation foundation.
[0027] This allows the seismic isolation foundation to be constructed using PCa and secured in place by tensioning the substructure and PC steel bars, while also holding the seismic isolation device horizontally.
[0028] In such a construction method for a seismic isolation structure, it is desirable that the horizontal retention mechanism is a horizontal retention material installed between the bottom surface of the recess and the lower surface of the seismic isolation foundation.
[0029] This allows the seismic isolation device to be held horizontally.
[0030] In such a construction method for a seismic isolation structure, it is desirable that the horizontal retention mechanism is a horizontal retention material installed between the side of the upper part of the seismic isolation foundation and the upper surface of the substructure excluding the recessed portion.
[0031] This allows the seismic isolation device to be held horizontally.
[0032] In such a construction method for a seismic isolation structure, it is desirable to carry out a filling determination step of determining whether or not the grout material pushed upward is protruding upward from the recess.
[0033] This makes it possible to determine whether a sufficient amount of grout material has been filled between the seismic isolation foundation and the substructure.
[0034] A seismic isolation structure is revealed that has an upper structure, a lower structure, a seismic isolation device installed between the upper structure and the lower structure, and a seismic isolation foundation on which the seismic isolation device is supported, wherein the lower structure has a recess for accommodating the lower part of the seismic isolation foundation, and has bottom grout material filled between the underside of the seismic isolation foundation and the bottom surface of the recess, and side grout material filled between the side of the lower part of the seismic isolation foundation and the side of the recess, wherein the bottom grout material is pressed downward by the underside of the seismic isolation foundation, and the side grout material is pushed upward by the flow of the bottom grout material between the side of the lower part of the seismic isolation foundation and the side of the recess.
[0035] Such a seismic isolation structure can reduce the amount of materials required to construct the structure, thereby reducing labor and costs.
[0036] Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings. The same or equivalent components, members, etc. shown in each drawing are designated by the same reference numerals, and duplicated descriptions will be omitted as appropriate.
[0037] ===First embodiment=== <Outline of Seismic Isolation Structure 100> Fig. 1A is an explanatory diagram of a seismic isolation structure 100 according to a first embodiment. Fig. 1B is an enlarged view of a portion enclosed by a dashed line in Fig. 1A.
[0038] The seismic isolation structure 100 includes a superstructure 1, a seismic isolation device 2, a base plate 3, a seismic isolation foundation 10, a substructure 20, PC steel bars 40, and a grout material 50. The superstructure 1 is, for example, an architectural structure constructed from reinforced concrete (RC), steel reinforced concrete (SRC), or the like, or another structure.
[0039] The seismic isolation device 2 is a device that supports the superstructure 1 so as to be movable relative to the superstructure 1 in the horizontal direction. The seismic isolation device 2 is installed (interposed) between the superstructure 1 and the substructure 20 via the seismic isolation foundation 10. In the seismic isolation structure 100 of this embodiment, the seismic isolation device 2 is a spherical sliding bearing, as shown in Fig. 1A. The spherical sliding bearing is composed of upper and lower spherical sliding plates and a slider that slides freely between the upper and lower sliding plates.
[0040] The seismic isolation device 2 may be a laminated rubber. However, when a laminated rubber is used as the seismic isolation device 2, the horizontal shear force is concentrated on the lower part of the seismic isolation foundation 10 and on the side part of the recess 21 of the substructure 20 facing the lower part of the seismic isolation foundation 10, so the seismic isolation foundation 10 and the substructure 20 need to have sufficient strength. In the seismic isolation structure 100 of this embodiment, by using a spherical sliding bearing as the seismic isolation device 2, it is possible to reduce the horizontal shear force acting on the lower part of the seismic isolation foundation 10 and on the side part of the recess 21 of the substructure 20 facing the lower part of the seismic isolation foundation 10, and it is possible to relax the strength requirements required for the seismic isolation foundation 10 and the substructure 20.
[0041] The base plate 3 is a member that supports the seismic isolation device 2. As shown in FIG. 1A, the base plate 3 is installed on the upper surface of the seismic isolation foundation 10. The base plate 3 has anchor bolts 4 embedded in the seismic isolation foundation 10. As a result, the base plate 3 is fixed to the upper part of the seismic isolation foundation 10. The base plate 3 is adjusted so that the surface that supports the seismic isolation device 2 is a horizontal plane. As a result, the base plate 3 has a horizontal plane that supports the seismic isolation device 2 horizontally. In the seismic isolation structure 100 of this embodiment, the surface of the base plate 3 that supports the seismic isolation device 2 is kept horizontal by a horizontal holding mechanism (specifically, a level spacer 30) described later.
[0042] The seismic isolation foundation 10 is a member that supports the seismic isolation device 2. In the seismic isolation structure 100 of this embodiment, the base plate 3 that supports the seismic isolation device 2 is installed on the upper surface of the seismic isolation foundation 10, so that the seismic isolation foundation 10 supports the seismic isolation device 2 via the base plate 3. The seismic isolation foundation 10 is formed of PCa (Precast Concrete). However, the seismic isolation foundation 10 may be formed of site PC. Note that site PC is also called site PCa, and refers to the fabrication of PCa on site. By forming the seismic isolation foundation 10 from PCa or site PC, the seismic isolation foundation 10 and the substructure 20 can be constructed separately.
[0043] When the seismic isolation foundation 10 is not formed by PCa or site PC and the seismic isolation foundation 10 and the substructure 20 are constructed as an integrated unit, the reinforcement of the seismic isolation foundation 10 and the substructure 20 must be performed simultaneously. In this case, the need for complex reinforcement requires a large number of on-site work steps and high-quality construction. In addition, the need for complex reinforcement can cause poor filling of the concrete due to obstacles such as reinforcing bars.
[0044] Therefore, by forming the seismic isolation foundation 10 using PCa or on-site PC, the seismic isolation foundation 10 and the substructure 20 can be constructed separately, eliminating the need for such complex reinforcement arrangement and preventing poor filling due to obstacles such as reinforcing bars.
[0045] As shown in Fig. 1A, the lower part of the seismic isolation foundation 10 is housed in a recess 21 (described later) of the substructure 20. In the following description, the "lower part of the seismic isolation foundation" refers to the part of the seismic isolation foundation that is housed in the recess of the substructure. Specifically, the lower part of the seismic isolation foundation 10 is the part of the seismic isolation foundation 10 that is located below the upper surface of the substructure 20 when viewed in the horizontal direction shown in Fig. 1A.
[0046] The lower structure 20 is, for example, a foundation structure portion for the upper structure 1 as an architectural structure. The lower structure 20 is, for example, a building foundation, an underground beam, a pile, a mat slab, etc. As shown in FIG. 1A, the lower structure 20 has a recess 21 formed on its upper surface. The recess 21 houses the lower part of the seismic isolation foundation 10. For this reason, the width of the recess 21 is formed to be slightly larger than the width of the seismic isolation foundation 10. The recess 21 is also the portion into which grout material 50 is filled.
[0047] A horizontal shear force acts on the seismic isolation structure 100 as shown by the horizontal white arrow in Fig. 1A. In the seismic isolation structure 100 of this embodiment, the PC steel rods 40 resist the horizontal shear force, and the horizontal shear force is also resisted by the side of the lower part of the seismic isolation foundation 10, the side of the recess 21 of the substructure 20 facing the lower part of the seismic isolation foundation 10, and the grout material 50 (described later) filled between the side of the lower part of the seismic isolation foundation 10 and the side of the recess 21. This makes it possible to reduce the horizontal shear force borne by the PC steel rods 40, and to reduce the required cross-sectional area of the PC steel rods 40. Therefore, the materials required for constructing the seismic isolation structure 100 can be reduced, thereby reducing labor and costs.
[0048] In the seismic isolation structure 100 of this embodiment, the distance between the side of the lower part of the seismic isolation foundation 10 and the side of the recess 21 is smaller than the depth at which the lower part of the seismic isolation foundation 10 is accommodated in the recess 21. In other words, the lower part of the seismic isolation foundation 10 is accommodated in the recess 21 so that the lower surface of the seismic isolation foundation 10 is located deeper than the same depth as the distance between the side of the lower part of the seismic isolation foundation 10 and the side of the recess 21. This is because, when the horizontal shear force acting on the seismic isolation foundation 10 is transmitted to the grout material 50, as shown in FIG. 1B, the shear stress may be transmitted along the shear stress boundary surface S, which is assumed to be at a predetermined elevation angle θ from the lower end of the seismic isolation foundation 10. Here, the predetermined elevation angle θ is usually estimated to be 45°. In the seismic isolation structure 100 of this embodiment, the above-mentioned shear stress can be received by the substructure 20 at the location where the above-mentioned shear stress flowing along the shear stress boundary surface S is transmitted from the grout material 50 to the substructure 20. This can reduce the risk of the grout material 50 breaking.
[0049] However, if the elevation angle θ of the shear stress boundary surface S can be specified by structural analysis or the like and safety can be confirmed, the elevation angle θ is not limited to 45° and may be, for example, 40°, which is smaller than 45°. In this way, as a result of relaxing the elevation angle θ in accordance with the results of the structural analysis, the distance between the side surface of the lower part of the seismic isolation foundation 10 and the side surface of the recess 21 may be larger than the depth at which the lower part of the seismic isolation foundation 10 is stored in the recess 21.
[0050] The PC steel rod 40 is a member that bears the pull-out force acting on the seismic isolation foundation 10, as indicated by the vertical white arrow in Fig. 1A. As shown in Fig. 1A, the PC steel rod 40 penetrates the seismic isolation foundation 10 in the vertical direction. The upper end of the PC steel rod 40 is fastened to the upper surface of the seismic isolation foundation 10, and the lower end of the PC steel rod 40 is embedded in the substructure 20. Therefore, the PC steel rod 40 can secure the seismic isolation foundation 10 together with the substructure under tension.
[0051] 1A, a level spacer 30 having a mechanism for finely adjusting the level is attached to the PC steel bar 40. The level spacer 30 is a horizontal retention material that supports the underside of the seismic isolation foundation 10, and functions as a horizontal retention mechanism that keeps the surface of the base plate 3 that supports the seismic isolation device 2 horizontal. The level spacer 30 also supports the underside of the seismic isolation foundation 10, thereby restricting the downward pressing of the grout material 50 by the underside of the seismic isolation foundation 10, as described below.
[0052] The grout material 50 is a filler that is filled between the seismic isolation foundation 10 and the substructure 20 and in through holes 23 (described later) formed in the seismic isolation foundation 10. By filling the grout material 50 between the seismic isolation foundation 10 and the substructure 20 and in the through holes 23 formed in the seismic isolation foundation 10, the seismic isolation foundation 10 and the substructure 20 are closely attached to each other and are substantially integrated.
[0053] In the seismic isolation structure 100 of this embodiment, the grout material 50 is, for example, a non-shrink cement, more specifically, a non-shrink cement that has thixotropy and exhibits high fluidity under pressure. Here, thixotropy (also called thixotropic property) refers to a property that does not have fluidity in a stationary state, but becomes fluid when stirred or shaken. Therefore, based on the thixotropy, even when the grout material 50 is piled up in a mountain shape, the spread of the grout material 50 to the surroundings is suppressed, and the mounded shape is generally maintained.
[0054] In the following description, the grout material 50 filled between the lower surface of the seismic isolation foundation 10 and the bottom surface of the recess 21 of the substructure 20 may be referred to as the "bottom grout material", and the grout material 50 filled between the bottom grout material and the side surface of the recess 21 of the substructure 20 may be referred to as the "side grout material". In the seismic isolation structure 100 of this embodiment, the side grout material is filled between the side surface of the lower part of the seismic isolation foundation 10 and the side surface of the recess 21 of the substructure 20 facing the side surface of the lower part of the seismic isolation foundation 10.
[0055] In the seismic isolation structure 100 of this embodiment, the bottom grout material is pressed downward by the lower surface of the seismic isolation foundation 10, and the side grout material is pushed upward by the bottom grout material flowing between the side surface of the lower part of the seismic isolation foundation 10 and the side surface of the recess of the substructure 20 facing the side surface of the lower part of the seismic isolation foundation 10. This point will be described in detail later.
[0056] <Construction procedure for the 100th seismic isolation structure> The construction procedure for the seismic isolation structure 100 of this embodiment will be described below with reference to FIGS.
[0057] According to this construction procedure, the seismic isolation structure 100 is constructed through the following eight operations. (1) Installation of components within formwork 5 in the construction of seismic isolation foundation 10 (Fig. 2) (2) Pouring concrete 9 in the construction of the seismic isolation foundation 10 (Figure 3) (3) Reversing the seismic isolation base 10 (Fig. 4) (4) Burying the PC steel rods 40 in the construction of the substructure 20 (FIG. 5) (5) Installation of the level spacer 30 in the construction of the substructure 20 (FIG. 6) (6) Pouring grout material 50 (Figure 7) (7) Installation of the seismic isolation foundation 10 on the substructure 20 (FIG. 8A) (8) Filling the grout material 50 and tensioning the PC steel rod 40 (Figure 9) Each task will be described in detail below.
[0058] (1) Installation of components within formwork 5 in the construction of seismic isolation foundation 10 FIG. 2 is an explanatory diagram showing the state of installation of members within a formwork 5 in the construction of the seismic isolation foundation 10 according to the first embodiment.
[0059] As described above, the seismic isolation foundation 10 is formed by PCa or on-site PC. That is, the seismic isolation foundation 10 is manufactured in a factory or on-site. First, the formwork 5 is prepared, and considering that the seismic isolation foundation 10 will be turned upside down in the work (3) described later, the formwork 5 is installed so that the seismic isolation foundation 10 will be constructed in an upside-down state. Then, as shown in FIG. 2, the base plate 3 is installed on the bottom surface of the formwork 5, and then the reinforcing bars 8 are arranged. Note that, in the construction procedure of the seismic isolation structure 100 of this embodiment, the grout material filling hose 6, the sleeve 7, and the jig 11 are installed when the reinforcement is arranged.
[0060] The grout filling hose 6 is a pipe member for sending grout material 50 into the gap between the PC steel rod 40 and the through hole 23 (see Figs. 8A and 8B) when the seismic isolation foundation 10 is installed in the recess 21 of the substructure 20 with the PC steel rod 40 inserted therethrough. The sleeve 7 is a member for forming the through hole 23 (see Figs. 8A and 8B) through which the PC steel rod 40 is inserted. The jig 11 is a member for attaching a hanging bolt for hoisting the seismic isolation foundation 10 in the work of turning over the seismic isolation foundation 10 in work (3) and in the work of installing the seismic isolation foundation 10 on the substructure 20 in work (7).
[0061] (2) Pouring concrete 9 in the construction of seismic isolation foundation 10 FIG. 3 is an explanatory diagram showing the pouring of concrete 9 in the construction of the seismic isolation foundation 10 according to the first embodiment.
[0062] Next, concrete 9 is poured into the formwork 5 in which the reinforcement and the above-mentioned components have been installed. As a result, the seismic isolation foundation 10 is constructed within the formwork 5. In the construction procedure for the seismic isolation structure 100 of this embodiment, the seismic isolation foundation 10 is constructed separately from the substructure 20. As described above, in the construction procedure for the seismic isolation structure 100 of this embodiment, complex reinforcement is not required, and poor filling caused by obstacles such as reinforcing bars can be suppressed.
[0063] Furthermore, in the construction procedure for the seismic isolation structure 100 of this embodiment, the anchor positions of the PC steel bars 40 (fastening positions in the seismic isolation foundation 10) can be freely designed, making it possible to prevent interference between the reinforcing bars 8 and the anchor bolts 4 of the base plate 3. This eliminates the need for complex pouring work of the concrete 9 that constructs the seismic isolation foundation 10, improving workability and facilitating construction management. Furthermore, the reliability of filling the concrete 9 to construct the seismic isolation foundation 10 is improved, and complex construction management can be prevented.
[0064] (3) Reversing work for seismic isolation base 10 FIG. 4 is an explanatory diagram showing the state of inversion of the seismic isolation foundation 10 in the construction of the seismic isolation foundation 10 according to the first embodiment.
[0065] Next, after the concrete 9 of the seismic isolation foundation 10 has hardened, the formwork 5 is dismantled, and the seismic isolation foundation 10 is turned upside down as shown in Fig. 4. When turning the seismic isolation foundation 10 upside down, the turning is performed while lifting the seismic isolation foundation 10 using a hanging bolt attached to a jig 11.
[0066] (4) Burying the PC steel rods 40 in the construction of the substructure 20 FIG. 5 is an explanatory diagram showing a state after the PC steel rods 40 have been embedded in the construction of the substructure 20 according to the first embodiment.
[0067] After the seismic isolation foundation 10 is constructed, the substructure 20 is subsequently constructed. In constructing the substructure 20, a formwork for the substructure 20 (not shown) is installed and reinforcing bars 8 are arranged, similarly to the seismic isolation foundation 10. When arranging the reinforcement, as shown in Fig. 5, PC steel bars 40 are installed so that their lower ends are embedded in the concrete 9 of the substructure 20. Next, concrete 9 is poured into the formwork in which the reinforcement and PC steel bars 40 have been installed, thereby constructing the substructure 20.
[0068] (5) Installation of the level spacer 30 in the construction of the substructure 20 FIG. 6 is an explanatory diagram showing a state after the level spacer 30 is attached in the construction of the lower structure 20 according to the first embodiment.
[0069] Next, the level spacer 30 is attached to the PC steel rod 40. As described above, the level spacer 30 is a horizontal retention material that supports the lower surface of the seismic isolation foundation 10, and functions as a horizontal retention mechanism that keeps the surface of the base plate 3 that supports the seismic isolation device 2 horizontal. For this reason, the position of the level spacer 30 is marked out so that it is horizontal, and the level spacer 30 is then installed.
[0070] (6) Pouring grout material 50 FIG. 7 is an explanatory diagram showing how the grout material 50 is poured.
[0071] Next, the grout material 50 is poured into the recess 21 of the substructure 20. Specifically, as shown in Fig. 7, the grout material 50 is piled up in a mountain shape on the bottom surface of the recess 21. As described above, since the grout material 50 is a non-shrink cement having thixotropy, the spread of the grout material 50 to the surroundings is suppressed and the mounded shape is generally maintained.
[0072] As described above, the bottom grout material is pressed downward by the underside of the seismic isolation foundation 10 in the next operation (7), and the side grout material is pushed upward by the bottom grout material flowing between the side surface of the lower part of the seismic isolation foundation 10 and the side surface of the recess of the substructure 20 facing the side surface of the lower part of the seismic isolation foundation 10. For this reason, it is desirable to pour a sufficient amount of grout material 50 into the recess 21 of the substructure 20.
[0073] (7) Installation of seismic isolation foundation 10 on substructure 20 FIG. 8A is an explanatory diagram showing how the seismic isolation foundation 10 is installed on the substructure 20. As shown in FIG.
[0074] As shown in FIG. 8A, the seismic isolation foundation 10 has a through hole 23 that penetrates in the vertical direction by using the sleeve 7. The seismic isolation foundation 10 is installed in the recess 21 of the substructure 20 while inserting the PC steel rod 40, the lower end of which is embedded in the substructure 20, into the through hole 23. At this time, the grout material 50 is pressed downward by the lower surface of the seismic isolation foundation 10. As a result, the grout material 50 (bottom grout material) is filled between the lower surface of the seismic isolation foundation 10 and the bottom surface of the recess 21 of the substructure 20. Furthermore, the grout material 50 flows into the gap between the side surface of the lower part of the seismic isolation foundation 10 and the side surface of the recess 21 of the substructure 20, and is pushed upward, and the grout material 50 (side grout material) is also filled between the side surface of the lower part of the seismic isolation foundation 10 and the side surface of the recess 21 of the substructure 20.
[0075] As described above, the grout material 50 is a non-shrink cement that exhibits high fluidity under pressure. Therefore, when the grout material 50 is pressed downward on the underside of the seismic isolation base 10, the high fluidity of the grout material 50 allows the grout material 50 to flow between the side of the lower part of the seismic isolation base 10 and the side of the recess 21 of the substructure 20, and the grout material 50 is easily pushed upward.
[0076] As described above, the level spacer 30, which functions as a horizontal retention mechanism, is attached to the PC steel rod 40 and supports the underside of the seismic isolation foundation 10. This allows the vertical position of the seismic isolation foundation 10 to be adjusted. Therefore, the level spacer 30 allows the surface on which the base plate 3 fixed to the seismic isolation foundation 10 supports the seismic isolation device 2 to be kept horizontal. In addition, the level spacer 30 restricts the downward pressure of the grout material 50 by the underside of the seismic isolation foundation 10.
[0077] FIG. 8B is an illustration of a side spacing mechanism.
[0078] In the construction procedure of the seismic isolation structure 100 of this embodiment, not only the vertical position of the seismic isolation foundation 10 is adjusted, but also the horizontal position of the seismic isolation foundation 10 can be adjusted. As shown in FIG. 8B, the through hole 23 of the seismic isolation foundation 10 into which the PC steel rod 40 is inserted is designed to be slightly larger than the diameter of the PC steel rod 40. In other words, the through hole 23 is designed to have a gap around the PC steel rod 40 inserted into the through hole 23. By adjusting the size of this gap, it is possible to ensure the accuracy of the relative positional relationship in the horizontal direction between the seismic isolation foundation 10 in which the through hole 23 is formed and the substructure 20 to which the PC steel rod 40 is fixed. Specifically, by reducing the gap, it is possible to reduce the relative positional relationship in the horizontal direction between the seismic isolation foundation 10 in which the through hole 23 is formed and the substructure 20 to which the PC steel rod 40 is fixed.
[0079] Therefore, in the seismic isolation structure 100 of this embodiment, the PC steel rod 40 and the through hole 23 function as a lateral spacing retaining mechanism that maintains the spacing between the side of the lower part of the seismic isolation base 10 and the side of the recess 21 of the substructure 20.
[0080] (8) Filling of grout material 50 and tensioning of PC steel rod 40 FIG. 9 is an explanatory diagram showing the filling operation of the grout material 50 and the tensioning operation of the PC steel rods 40. As shown in FIG.
[0081] Next, the grout material 50 is filled into the gap between the PC steel bar 40 and the through hole 23 using the grout material filling hose 6 until it is confirmed that the grout material 50 overflows from the upper surface of the through hole 23. In addition, the grout material 50 pushed up between the side surface of the lower part of the seismic isolation foundation 10 and the side surface of the recess 21 of the substructure 20 does not reach the upper surface of the substructure 20, and the grout material 50 is poured in from above to fill the gap. Here, it may be determined whether the grout material 50 pushed up upward (side grout material) overflows upward from the recess 21 of the substructure 20. This makes it possible to determine whether a sufficient amount of grout material 50 has been filled between the seismic isolation foundation 10 and the substructure 20.
[0082] Finally, by fastening the PC steel rods 40 to the upper surface of the seismic isolation foundation 10, the PC steel rods 40 tension and fix the seismic isolation foundation 10 together with the substructure 20. This allows the PC steel rods 40 to bear the pull-out force acting on the seismic isolation foundation 10.
[0083] <First Modification> In the seismic isolation structure 100 of the present embodiment described above, the level spacer 30 attached to the PC steel rod 40 constitutes the horizontal retention mechanism, and the PC steel rod 40 and the through hole 23 of the seismic isolation base 10 constitute the side spacing retention mechanism. However, the aspects of the horizontal retention mechanism and the side spacing retention mechanism are not limited to these.
[0084] 10A and 10B are explanatory diagrams showing how the seismic isolation base 10 is installed on the substructure 20 in constructing the seismic isolation structure 100A of the first modified example. Fig. 11A is a perspective view of the upper plate 12, Fig. 11B is a cross-sectional view of the upper plate 12, Fig. 11C is a perspective view of the lower plate 13, and Fig. 11D is a cross-sectional view of the lower plate 13.
[0085] The seismic isolation structure 100A of the first modified example differs from the seismic isolation structure 100 of the present embodiment described above in that it does not have a level spacer 30, but has a plate set 30A instead, as shown in Figures 10A and 10B. Also, in the seismic isolation structure 100 of the present embodiment described above, the PC steel rod 40 was installed in the recess 21 of the substructure 20 (i.e., it penetrated the seismic isolation base 10 in the vertical direction). However, in the seismic isolation structure 100A of the first modified example, the PC steel rod 40 is installed outside the recess 21 of the substructure 20.
[0086] The plate set 30A is composed of an upper plate 12 and a lower plate 13. The upper plate 12 is a plate member attached to the lower surface of the seismic isolation base 10, and has a ring plate 14 and a cap nut 16 formed on the ring plate 14, as shown in Figures 11A and 11B. The lower plate 13 is a plate member attached to the bottom surface of the recess 21 of the substructure 20, and has a ring plate 15, a guide pin 17 formed on the ring plate 15, and a level adjustment nut 18, as shown in Figures 11C and 11D.
[0087] The lead-in pin 17 of the lower plate 13 is adjusted to fit into the cap nut 16 of the upper plate 12. In the seismic isolation structure 100A of the first modification, the height of the lead-in pin 17 can be adjusted by adjusting the level adjustment nut 18 of the lower plate 13, and the relative positional relationship between the upper plate 12 and the lower plate 13 in the vertical direction can be adjusted. Therefore, by installing the seismic isolation foundation 10 on the substructure 20 so that the lead-in pin 17 of the lower plate 13 fits into the cap nut 16 of the upper plate 12, the relative positional relationship between the seismic isolation foundation 10 and the substructure 20 in the vertical direction can be adjusted. In other words, the upper plate 12 and the lower plate 13 constituting the plate set 30A function as a horizontal holding mechanism.
[0088] In addition, the relative lateral positional relationship between the seismic isolation foundation 10 and the substructure 20 can also be adjusted by installing the seismic isolation foundation 10 on the substructure 20 so that the guide pin 17 of the lower plate 13 fits into the cap nut 16 of the upper plate 12. In other words, the upper plate 12 and the lower plate 13 that constitute the plate set 30A also function as a lateral spacing retaining mechanism that retains the spacing between the side surface of the lower part of the seismic isolation foundation 10 and the side surface of the recess 21 of the substructure 20.
[0089] In the seismic isolation structure 100A of the first modified example, the PC steel rods 40 are fastened to the side surfaces of the seismic isolation foundation 10 by upper and lower foundation restraint fittings 19, as shown in Fig. 10B. By fastening the PC steel rods 40 to the side surfaces of the seismic isolation foundation 10, the PC steel rods 40 tension and fix the seismic isolation foundation 10 together with the substructure 20. This allows the PC steel rods 40 to bear the pull-out force applied to the seismic isolation foundation 10. Details of the foundation upper and lower restraint fittings 19 will be described later.
[0090] <Second Modification> Another embodiment of the horizontal holding mechanism will be described below.
[0091] 12A and 12B are explanatory diagrams showing how the seismic isolation foundation 10 is installed on the substructure 20 in constructing the seismic isolation structure 100B of the second modified example. Fig. 13A is a perspective view of the horizontal spacer 22, and Fig. 13B is a perspective view of the foundation upper and lower restraint fittings 19.
[0092] The seismic isolation structure 100B of the second modification has a horizontal spacer 22 instead of the plate set 30A. The horizontal spacer 22 is a temporary material, and is a horizontal retention material that is installed between the side surface of the upper part of the seismic isolation foundation 10 and the upper surface of the substructure 20 excluding the recess 21. In the seismic isolation structure 100B of the second modification, the horizontal spacer 22 can adjust the relative positional relationship in the vertical direction between the seismic isolation foundation 10 and the substructure 20. In other words, the horizontal spacer 22 functions as a horizontal retention mechanism. After the relative positional relationship in the vertical direction between the seismic isolation foundation 10 and the substructure 20 has been adjusted, the horizontal spacer 22 can be removed.
[0093] <Third Modification> Another embodiment of the horizontal holding mechanism will be described below.
[0094] 14A and 14B are explanatory diagrams showing how the seismic isolation base 10 is installed on the substructure 20 in the construction of a seismic isolation structure 100C of the third modified example.
[0095] In a seismic isolation structure 100C of the third modified example, as shown in Figs. 14A and 14B, the relative positional relationship in the up-down direction between the seismic isolation base 10 and the substructure 20 is adjusted with a crowbar or the like.
[0096] ===Second embodiment=== <Overview of installation structure 200> FIG. 15 is an explanatory diagram of an installation structure 200 according to the second embodiment.
[0097] In the seismic isolation structure 100 of the present embodiment described above, the seismic isolation device 2 is supported on the seismic isolation foundation 10 via the base plate 3. The seismic isolation foundation 10 is stored in the recess 21 of the substructure 20, and the grout material 50 is filled between the seismic isolation foundation 10 and the substructure 20. The side of the lower part of the seismic isolation foundation 10, the side of the recess 21 of the substructure 20 facing the lower part of the seismic isolation foundation 10, and the grout material 50 (described later) filled between the side of the lower part of the seismic isolation foundation 10 and the side of the recess 21 counteract the horizontal shear force. This makes it possible to reduce the horizontal shear force borne by the PC steel rod 40, and to reduce the necessary cross-sectional area of the PC steel rod 40. Therefore, the material required for constructing the seismic isolation structure 100 can be reduced, thereby reducing labor and costs.
[0098] Incidentally, the same aspect as the seismic isolation structure 100 of the first embodiment may be applied to the installation of an object that does not require the base plate 3. In the following, an installation structure 200 for an upper object will be described, with an object corresponding to the seismic isolation base 10 in the seismic isolation structure 100 of the first embodiment being regarded as an "upper object." The installation structure 200 of this embodiment can improve practicality and reduce costs when installing an upper object on a lower structure.
[0099] The installation structure 200 includes an upper object 101 , a lower structure 120 , a level spacer 130 , a fixing member 140 , and a grout material 150 .
[0100] The upper object 101 is an object formed by PCa or a site PC. In the installation structure 200 of this embodiment, the upper object 101 is not limited to the seismic isolation foundation in the seismic isolation structure 100 of the first embodiment described above, and may be, for example, a PCa foundation. Moreover, the upper object 101 does not have to be an object formed by PCa or a site PC.
[0101] The lower structure 120 is a structural portion on which the upper object 101 is placed via the grout material 150. The lower structure 120 is, for example, a building foundation, an underground beam, a pile, a mat slab, etc. As shown in Fig. 15, the lower structure 120 has a storage portion 123 on the upper surface. The storage portion 123 is a portion in which the grout material 150 is stored. The storage portion 123 is formed to be slightly larger than the upper object 101.
[0102] In the installation structure 200 of this embodiment, the lower structure 120 has a concrete body 124 with a recess 121 formed on the upper surface, thereby forming a storage section 123. Specifically, the concrete body 124 surrounds the storage section 123 with a rising section 122 having a rising surface rising from the bottom surface of the recess 121. This allows the lower structure 120 to store the grout material 150 in the storage section 123. Also, the storage section 123 can store the lower part of the upper object 101.
[0103] The level spacer 130 is a horizontal holding member that supports the lower surface of the upper object 101. As shown in Fig. 15, the level spacer 130 is installed around the fixed member 140 on the bottom surface of the storage section 123. The level spacer 130 is installed so as to support the lower surface of the upper object 101, thereby adjusting the level of the upper object 101 to a target position. Note that the level spacer 130 may be provided with a mechanism that allows fine adjustment of the level, and may be attached to the fixed member 140, similar to the level spacer 30 according to the first embodiment described above.
[0104] When the upper object 101 is, for example, the seismic isolation foundation in the seismic isolation structure 100 of the first embodiment described above, the level spacer 130 functions as a horizontal holding mechanism that holds horizontally the surface of the base plate installed on the upper surface of the seismic isolation foundation that supports the seismic isolation device. The level spacer 130 supports the lower surface of the upper object 101, thereby restricting the downward pressing of the grout material 150 by the lower surface of the upper object 101, similar to the level spacer 30 according to the first embodiment described above.
[0105] Other aspects of the horizontal holding mechanism of the level spacer 130 are the same as those of the modified example of the first embodiment described above. The installation structure 200 of this embodiment may have a plate set instead of the level spacer 130, similar to the seismic isolation structure 100A of the first modified example described above. The installation structure 200 of this embodiment may have a horizontal spacer, which is a temporary material, instead of the level spacer 130, similar to the seismic isolation structure 100B of the second modified example described above. In the installation structure 200 of this embodiment, the relative positional relationship in the vertical direction between the upper object 101 and the lower structure 120 may be adjusted with a crowbar or the like, similar to the seismic isolation structure 100C of the third modified example described above.
[0106] The fixing member 140 is a member that fixes the upper object 101 and the lower structure 120. As shown in FIG. 15, the fixing member 140 penetrates the upper object 101 in the up-down direction. The upper end of the fixing member 140 is fastened to the upper surface of the upper object 101, and the lower end of the fixing member 140 is embedded in the lower structure 120. For example, when the upper object 101 is the seismic isolation foundation in the seismic isolation structure 100 of the first embodiment described above, the fixing member 140 is a PC steel rod that bears the pull-out force applied to the upper object 101. However, the fixing member 140 may be an anchor bolt. Other features of the fixing member 140 are the same as those described for the PC steel rod 40 in the seismic isolation structure 100 of the first embodiment described above.
[0107] The grout material 150 is a filler filled between the upper object 101 and the lower structure 120. By filling the gap between the upper object 101 and the lower structure 120 with the grout material 50, the upper object 101 and the lower structure 120 are in close contact with each other and are substantially integrated. In the installation structure 200 of this embodiment, the bottom grout material is filled between the lower surface of the upper object 101 and the bottom surface of the storage section 123, and the side grout material is filled between the bottom grout material and the side surface of the storage section 123. Other features of the grout material 150 are the same as those of the grout material 50 in the seismic isolation structure 100 of the first embodiment described above.
[0108] <Construction procedure for installation structure 200> The construction procedure of the installation structure 200 of this embodiment is generally similar to the construction procedure of the seismic isolation structure 100 of the above-mentioned first embodiment. In the following, particular points regarding the construction procedure of the seismic isolation structure 100 of this embodiment will be described.
[0109] In the installation structure 200 of this embodiment, the upper object 101 is installed on the grout material 150, so that the lower surface of the upper object 101 presses the grout material 150 downward. As a result, the grout material 150 (bottom grout material) is filled between the lower surface of the upper object 101 and the bottom surface of the storage section 123 of the lower structure 120. Furthermore, the grout material 150 flows up to the side surface of the storage section 123, so that the grout material 150 (side grout material) is filled in the storage section 123 above the lower surface of the upper object 101, as shown in FIG. 15. That is, in the installation structure 200 of this embodiment, the side surface of the storage section 123 functions as a retaining frame for the grout material 150.
[0110] 15, in the installation structure 200 of this embodiment, the height of the lower surface of the upper object 101 is lower than the height of the side surface of the storage section 123 of the lower structure 120. That is, the lower part of the upper object 101 is stored in the storage section 123.
[0111] <Fourth and Fifth Modifications> FIG. 16A is an explanatory diagram of an installation structure 200A of a fourth modified example, and FIG. 16B is an explanatory diagram of an installation structure 200B of a fifth modified example.
[0112] In the installation structure 200 of the present embodiment described above, the side surface of the storage section 123 functions as a retaining frame for the grout material 150. However, the structure of the retaining frame for the grout material 150 is not limited to the example of the installation structure 200 of the present embodiment. As in the installation structure 200A of the fourth modified example shown in Fig. 16A, the structure 125 may be used as a retaining frame for the grout material 150.
[0113] The installation structure 200A, like the installation structure 200 of this embodiment, has an upper object 101, a lower structure 120, a level spacer 130, a fixing member 140, and a grout material 150. In the installation structure 200A of the fourth modified example, the lower structure 120 has a concrete body 124 and a structure 125 fixed to a side surface of the concrete body 124. The structure 125 has a dam portion 126 with a protruding surface that protrudes from the upper surface of the concrete body 124, and the dam portion 126 surrounds the storage portion 123.
[0114] In the installation structure 200A of the fourth modification, when the upper object 101 is installed on the grout material 150, the lower surface of the upper object 101 presses the grout material 150 downward. As a result, the grout material 150 (bottom grout material) is filled between the lower surface of the upper object 101 and the bottom surface of the storage section 123 of the lower structure 120. Furthermore, when the grout material 150 flows up to the side surface of the storage section 123, the grout material 150 (side grout material) is filled above the lower surface of the upper object 101 in the storage section 123 as shown in FIG. 16A. That is, in the installation structure 200A of the fourth modification, the protruding surface of the dam section 126 of the structure 125 functions as a retaining frame for the grout material 150.
[0115] 16A, the concrete body 124 and the structure 125 are fixed by a fixing member 141 and structurally integrated. This allows the side surface of the lower part of the upper object 101, the side surface (specifically, the dam part 126) of the storage part 123 of the lower structure 120 facing the lower part of the upper object 101, and the grout material 150 filled between the side surface of the lower part of the upper object 101 and the side surface of the storage part 123 to resist the horizontal shear force.
[0116] Also, in the installation structure 200A of the fourth modified example, when the upper object 101 is installed on the lower structure 120, practicality can be improved and costs can be reduced.
[0117] In the installation structure 200A of the fourth modified example shown in Fig. 16A, the structure 125 surrounds the concrete body 124. However, the structure of the concrete body 124 and the structure 125 is not limited to this, and the structure 125 may be disposed on the upper surface of the concrete body 124, as in the installation structure 200B of the fifth modified example shown in Fig. 16B.
[0118] 16B, the concrete body 124 and the structure 125 are fixed by a fixing member 141 and structurally integrated. This allows the side surface of the lower part of the upper object 101, the side surface (specifically, the dam part 126) of the storage part 123 of the lower structure 120 facing the lower part of the upper object 101, and the grout material 150 filled between the side surface of the lower part of the upper object 101 and the side surface of the storage part 123 to resist horizontal shear force. Also, in the installation structure 200B of the fifth modified example, it is possible to improve practicality and reduce costs when installing the upper object 101 on the lower structure 120.
[0119] ===Other=== The above-described embodiment is for the purpose of facilitating understanding of the present invention, and is not intended to limit the present invention. The present invention may be modified or improved without departing from the spirit thereof, and it goes without saying that the present invention includes equivalents thereof. [Explanation of symbols]
[0120] 1 Superstructure 2. Seismic isolation device 3 Base plate 4 Anchor bolts 5. Formwork 6 Grout filling hose 7 Sleeve 8. Steel Bars 9. Concrete 10 Seismic isolation foundation 11 Jig 12 Upper Plate 13 Lower Plate 14,15 Ring plate 16 Cap nut 17 Lead-in pin 18 Level adjustment nut 19 Foundation upper and lower restraint brackets 20,120 Undercarriage 21 Recess 22 Horizontal spacer 23 Through hole 30,130 Level Spacer 30A Plate Set 40 PC Steel Bar 50,150 Grout material 100,100A~100C Earthquake-proof structure 101 Upper object 121 Recess 122 Rising part 123 Storage Section 124 Concrete Body 125 Structure 126 Weir 140,141 Fixing member 200,200A,200B installation structure
Claims
1. The superstructure and The substructure and A seismic isolation device installed between the upper structure and the lower structure; A seismic isolation base on which the seismic isolation device is supported; A construction method for a seismic isolation structure having the following features: The substructure includes a recess for accommodating a lower portion of the seismic isolation foundation, A grout material pouring step of pouring a grout material onto a bottom surface of the recess; By pressing the grout material downward on the lower surface of the seismic isolation foundation, A bottom grout filling step in which the grout material is filled between the lower surface of the seismic isolation foundation and the bottom surface of the recess; A side grout filling step in which the grout material flows into between the side surface of the lower portion of the seismic isolation foundation and the side surface of the recessed portion, and is pushed upward, filling the space between the side surface of the lower portion of the seismic isolation foundation and the side surface of the recessed portion; This is a construction method for a seismic isolation structure.
2. The side surface of the lower part of the seismic isolation foundation, the side surface of the recess, and the grout material filled between the side surface of the lower part of the seismic isolation foundation and the side surface of the recess are used to resist horizontal shear forces of external forces. A construction method for the seismic isolation structure according to claim 1.
3. The seismic isolation base has a horizontal surface that horizontally supports the seismic isolation device, The seismic isolation structure has a horizontal holding mechanism that holds the horizontal plane horizontal. A method for constructing the seismic isolation structure according to claim 1.
4. The downward pressure of the grout material by the lower surface of the seismic isolation foundation is regulated by the horizontal retention mechanism. A method for constructing the seismic isolation structure according to claim 3.
5. A side spacing retention mechanism that maintains a spacing between a side surface of the lower portion of the seismic isolation base and a side surface of the recess, A construction method for the seismic isolation structure according to claim 1.
6. The seismic isolation foundation is formed by PCa or site PC, The seismic isolation structure has a PC steel rod that penetrates the seismic isolation foundation in the vertical direction and has a lower end embedded in the substructure. A construction method for the seismic isolation structure according to claim 1.
7. The seismic isolation foundation is formed by PCa or site PC, The seismic isolation structure has a PC steel rod that penetrates the seismic isolation foundation in the vertical direction and has a lower end embedded in the substructure, The horizontal retention mechanism is a horizontal retention member attached to the PC steel rod and supporting the lower surface of the seismic isolation foundation. A method for constructing the seismic isolation structure according to claim 3.
8. The horizontal retention mechanism is a horizontal retention member installed between the bottom surface of the recess and the lower surface of the seismic isolation foundation. A method for constructing the seismic isolation structure according to claim 3.
9. The horizontal retention mechanism is a horizontal retention member installed between the side surface of the upper portion of the seismic isolation foundation and the upper surface of the substructure excluding the recessed portion. A method for constructing the seismic isolation structure according to claim 3.
10. A filling determination step is performed to determine whether or not the grout material pushed upward protrudes upward from the recessed portion. A construction method for the seismic isolation structure according to claim 1.
11. The superstructure and The substructure and A seismic isolation device installed between the upper structure and the lower structure; A seismic isolation base on which the seismic isolation device is supported; A seismic isolation structure having The substructure includes a recess for accommodating a lower portion of the seismic isolation foundation, A bottom grout material is filled between the lower surface of the seismic isolation foundation and the bottom surface of the recess; A side grout material filled between a side surface of the lower portion of the seismic isolation foundation and a side surface of the recess; having The bottom grout material is pressed downward by the lower surface of the seismic isolation foundation, and the side grout material is pushed upward by the flow of the bottom grout material between the side surface of the lower part of the seismic isolation foundation and the side surface of the recess. Earthquake-resistant structure.
Citation Information
Patent Citations
Base isolation foundation structure, and installation method for base isolation device
JP2011032759A
Method of constructing base isolation structure
JP2011047201A