Spring water observation system and spring water observation method

The spring water observation device and method address the safety and efficiency issues of manual packer installation by using a packer device and moving device to safely and efficiently measure spring water conditions during tunnel construction.

JP2024139111AActive Publication Date: 2024-10-09TAISEI CORP +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023049913
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09
Estimated Expiration
2043-03-27

AI Technical Summary

Technical Problem

Existing methods for observing spring water conditions during tunnel construction are unsafe and inefficient, requiring manual installation and retrieval of packers in boreholes, and pose risks due to high water pressure and difficult drilling conditions.

Method used

A spring water observation device and method that uses a packer device, double pipe rod, flow path switching adapter, and water pressure measuring device, allowing for safe and efficient observation without manual installation or retrieval of packers, by using a moving device to insert and retrieve the shaft-like unit from the borehole.

Benefits of technology

Enables safe and efficient measurement of spring water conditions, including pressure and quality, without manual handling of packers, improving construction safety and efficiency by allowing continuous observation and data transmission.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024139111000001_ABST
    Figure 2024139111000001_ABST
Patent Text Reader

Abstract

To provide a spring water observation system and a spring water observation method which can unnecessitate setting and recovery of a packer done by man power to / from a borehole enabling safe and efficient grasping of the conditions of the spring water at the forward point of a working face.SOLUTION: A spring water observation system 100 is set in a borehole B arranged at a working face K to perform spring water observation by taking spring water W from the borehole B, comprising: a flow-path-changing adapter 40 that includes a packer device 20, a double-tubing rod 30 and an observation meter 48; a water-pressure-measuring device 90; a first check valve 50; a shifting device 17 that pulls out a shaft-like unit 60 that is formed with these aforesaid items; a first flow path to make the conveyed water reach the inner side face of a packer 26; and a second flow path to make the spring water W that was taken in with the packer device 20 reach the observation meter 48. The water-pressure-measuring device 90 at least measures the water pressure inside the first flow path. The first check valve 50 opens the first flow path 53 when water is conveyed to the packer device 20, and closes the first flow path 53 when the returning water returns from the packer device 20.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a spring water observation device and a spring water observation method. [Background technology]

[0002] When constructing mountain tunnels, it is essential to understand the conditions of the spring water, such as the amount and pressure of the spring water in the spring water section ahead of the tunnel face, and to take measures against the spring water in advance. The commonly used method for understanding the condition of the seepage water is to drill a borehole (advance borehole) at the face, manually insert a rod equipped with a packer (packer rod) into the depths of the hole while adding more packers, measure the amount of seepage water and the seepage pressure, and then manually pull out and recover the packer rod. However, this method has safety issues because personnel must enter directly under the face. In addition, when water is being drained from the borehole, the work of inserting the packer and the work of pulling it out and retrieving it require a lot of labor, and this can be even more difficult for boreholes located at high altitudes, such as near the top of the face, because the work must be done on the man cage of the drilling machine or the bucket of an aerial work vehicle. In addition, when the spring water pressure is high, there is a risk that the packer will erupt from the borehole, which requires the installation of packer holding equipment to prevent the packer from erupting, which takes time and effort to grasp the state of the spring water.

[0003] For these reasons, there is a need for a water-seeking observation device and method that can safely and efficiently grasp the state of the water seeping out in front of the drilling face (water volume, water pressure, water quality, etc.) without the need for manual installation and retrieval of packers in the borehole.

[0004] Here, Patent Document 1 proposes a double-pipe double-packer method in which drilling and injection are performed using a drill jumbo and a packer. Specifically, an inner rod equipped with a drilling bit that transmits impact and rotational force received from a single-pipe drilling machine capable of single-pipe drilling to the ring bit is inserted into a casing with multiple injection holes provided in the peripheral wall and a ring bit attached to the tip, the natural ground is excavated using the inner rod connected to the single-pipe drilling machine and the casing, the inner rod and the drilling bit are then pulled out of the casing, a pipe with a discharge hole is inserted into the casing, and a sealing material is filled in the gap between the casing and the pipe. An injection pipe equipped with a pair of packers that separate the space within the pipe and an ejection hole provided between the packers is inserted into the pipe, and with the casing placed in the natural ground, injection material is supplied from the rear end of the injection pipe and the injection material is injected from the injection hole through the ejection hole and ejection hole into the natural ground. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2006-274562 A Summary of the Invention [Problem to be solved by the invention]

[0006] According to the double-tube double packer method described in Patent Document 1, it is possible to fix a sleeve pipe inserted into a hole formed in the ground and an injection pipe inserted into the sleeve pipe via a packer, but it does not propose a technology that solves the above-mentioned problem, i.e., a technology that eliminates the need to manually install and retrieve packers in a borehole and safely and efficiently grasps the state of the spring water in front of the face.

[0007] The present invention aims to provide a water spring observation device and a water spring observation method that can safely and efficiently grasp the state of water springing up in front of the drilling face, eliminating the need to manually install and retrieve packers in a borehole. [Means for solving the problem]

[0008] In order to achieve the above object, one aspect of the spring water observation device according to the present invention is to A spring water observation device that is installed in a borehole provided in a face and takes in spring water from the tip of the borehole to observe spring water, A packer device having a packer, a double-tube rod attached to one end of the packer device, a flow path switching adapter attached to one end of the double-tube rod and having an observation meter, and a first check valve attached to one end of the flow path switching adapter. A water pressure measuring device interposed between the flow path switching adapter and the first check valve; A moving device that inserts at least a portion of a shaft-shaped unit, in which the packer device, the double pipe rod, the flow path switching adapter, the water pressure measuring device, and the first check valve are connected to each other, into the borehole and pulls out the shaft-shaped unit from the borehole; A first flow path provided inside the shaft-shaped unit and allowing the water to reach the inner surface of the packer; A second flow path is provided inside the packer device, the double tube rod, and the flow path switching adapter, and causes the spring water taken in by the packer device to reach the observation meter. The water pressure measuring device measures the water pressure in at least the first flow path, The first check valve opens the first flow path when water is sent to the packer device, and closes the first flow path when return water returns from the packer device. The water pressure measuring device includes a main flow path that forms the first flow path and a branch flow path that branches off from the main flow path, A second check valve is interposed in the middle of the branch flow path, and the second check valve closes the branch flow path when water is supplied to the packer device. A check valve is attached to the branch flow path, and the water pressure in the first flow path is measured.

[0009] According to this embodiment, a packer device, a double pipe rod, a flow path switching adapter equipped with an observation meter, a water pressure measuring device, and at least a part of an axial unit consisting of an axial unit connected to each other is provided with a moving device for inserting it into a borehole and withdrawing it from the borehole, and two water flow systems are provided: a first flow path for delivering the delivered water to the inner surface of the packer, and a second flow path for delivering the taken-in spring water to the observation meter, and by measuring physical quantities indicating the state of the spring water with the observation meter, it is possible to safely and efficiently grasp the state of the spring water in front of the face, eliminating the need to manually install (insert and expand) and retrieve the packer in the borehole. In addition, the first check valve opens the first flow path when water is supplied to the packer device and closes the first flow path when return water returns from the packer device, thereby making it possible to both supply the required amount of water to the packer device and maintain packer pressure after the packer opens. In addition, by interposing a water pressure measuring device between the flow path switching adapter and the first check valve, which measures the water pressure in at least the first flow path, it is possible to measure the water pressure in the first flow path and the water pressure in the packer connected to the first flow path (both of the same value), and to confirm whether the packer is maintaining the desired water pressure (pressing force on the wall surface). Furthermore, the water pressure measuring device is equipped with a main flow path forming the first flow path and a branch flow path branching off from the main flow path, and a second check valve is interposed midway through the branch flow path so that the second check valve closes the branch flow path when water is supplied to the packer device, thereby ensuring the liquid-tightness of the first flow path when water is supplied to the packer device.

[0010] Here, the physical quantities indicating the state of the spring water include the spring water volume and the spring water pressure. In addition to measuring the physical quantities of the spring water that has reached the observation meter, in this embodiment, the "observation" also includes water quality observation such as the turbidity of the spring water and groundwater level observation, and therefore the physical quantities and water quality of the spring water are the objects of observation. The observation data (measurement data) by the observation meter may be acquired after the shaft-shaped unit is collected, or may be transmitted in real time from the observation meter to various portable terminals and computers, such as a portable terminal in the operator's cabin of a cart equipped with a moving device, a portable terminal carried by the measurement implementer, or a computer in a management facility outside the tunnel, by wireless communication. Furthermore, the double-tube rod may be one or more, and depending on the length of the borehole, for example, multiple double-tube rods may be added in sequence. In addition, the moving device may be a hydraulic cylinder mounted on a dump truck or aerial work vehicle, or a drilling machine for drilling a borehole, and various forms can be applied that can eliminate the need for manual installation of double-tube rods or packers in a borehole. In addition, "inserting at least a part of the axial unit into the borehole" means not only inserting the entire axial unit, but also inserting only the packer device and (a part of) the double-tube rod, although the latter is generally applied in actual operations.

[0011] In addition, the spring water observation device of this embodiment can be applied to boreholes of various lengths, such as ultra-long boreholes of about 1000 m in length, medium-length boreholes of about 100 m in length, and short boreholes of about 30 m in length.

[0012] Another aspect of the spring water observation device according to the present invention is The present invention is characterized in that the drilling machine comprises a carriage, a boom rotatably attached to the carriage, a guide shell attached to the end of the boom, a drifter sliding along the guide shell, a shank rod attached to the end of the drifter, and a water supply means for supplying water to the shank rod, wherein the drifter and the shank rod form the moving device, the axial unit is directly or indirectly connected to the shank rod, and water is supplied from the water supply means to the first flow path.

[0013] According to this aspect, the guide shell, drifter and shank rod of the drilling machine form a moving device, and the drifter slides along the guide shell to insert the axial unit into the borehole, so that the axial unit can be stably inserted into the borehole and stably retrieved from the borehole after observation. Also, for example, after drilling a borehole with the drilling machine, the axial unit can be continuously placed in the borehole with the drilling machine to efficiently measure physical quantities related to the state of the spring water. Furthermore, the drilling machine is equipped with its own water supply means including a water pump, water tank, water supply pipes, etc., and the water supply means is operated when drilling a borehole to supply water appropriately. Therefore, by utilizing the water supply means provided by this drilling machine, it is possible to eliminate the need for water supply means specific to the spring water observation device, which is preferable. As a drilling machine, a Drill Jumbo (registered trademark) having multiple booms that are rotatable and extendable at the front of a cart can be applied. In addition, "the axial unit is directly or indirectly connected to the shank rod" includes not only the first check valve forming the axial unit being directly connected to the shank rod, but also the push-in tube or irregular connector connected to the first check valve being connected to the shank rod, and therefore the axial unit being indirectly connected to the shank rod.

[0014] Where the wellhead pressure is relatively small and the axial unit can be maintained in place within the borehole solely by the pressing force of the packer against the borehole wall, the first check valve can be detached from the shank rod and the drilling machine can be used for other purposes (such as drilling other boreholes). On the other hand, if the seepage pressure is relatively large and the packer's pressing force against the borehole wall alone is not enough to keep the axial unit installed in the borehole, it is advisable to keep the drilling machine waiting in front of the face until the seepage observation is completed, and hold the axial unit from the rear with the drifter and shank rod.

[0015] Another aspect of the spring water observation device according to the present invention is a recess is provided in an outer surface of the water pressure measuring device at a position corresponding to the branch flow path, and an opening of the branch flow path faces the recess; a height of the check valve when attached to the opening is set to be equal to or less than a depth of the recess, The water pressure measuring device is characterized in that the check valve is attached to the water pressure measuring device so that at least one of additional water supply to the first flow path or drainage from the first flow path is further performed.

[0016] According to this embodiment, a recess is provided on the outer surface of the water pressure measuring device at a position corresponding to the branch flow path, the opening of the branch flow path faces the recess, and the height (projection height) of the check valve when attached to the opening is set to be less than the depth of the recess, so that when the axial unit is inserted into the borehole, the check valve attached to the opening can pass through without interfering with the centralizer.

[0017] In addition, by attaching a check valve to the water pressure measuring device and attaching a pressure gauge to the check valve to measure the water pressure in the first flow path, additional water can be supplied to the first flow path and water can be drained from the first flow path, thereby giving the water pressure measuring device various functions. For example, if the measurement of the water pressure in the first flow path indicates that the water pressure required by the packer is insufficient, a water supply means can be connected to the check valve and additional water can be supplied to the first flow path to increase the water pressure in the packer. In addition, after the spring water observation is completed, when the packer is drained to deflate the packer and the packer device is removed from the borehole, the second check valve inside the check valve installed in the recess can be opened, allowing the water to be drained through the branch flow path and the check valve.

[0018] Another aspect of the spring water observation device according to the present invention is The first check valve and the water pressure measuring device are integrally configured, and the branch flow passage is provided on the flow passage switching adapter side of the first check valve.

[0019] According to this aspect, the first check valve and the water pressure measuring device are integrally configured, which is preferable because it is possible to enjoy various functions provided by the water pressure measuring device while reducing the number of parts.

[0020] Another aspect of the spring water observation device according to the present invention is The valve further includes a variant connector interposed between the shank rod and the first check valve.

[0021] According to the present embodiment, a non-standard connector (or a diameter conversion connector) is interposed between the shank rod of the drilling machine and the first check valve, making it possible to connect the first check valve according to the diameter of the shank rod specific to the model of the drilling machine.

[0022] In another aspect of the spring water observation device according to the present invention, A front centralizer and a rear centralizer are attached to the front end and the rear end of the guide shell, respectively; A push-in tube is provided between the connector and the first check valve. The first check valve is located closer to the face than the front centralizer.

[0023] According to this aspect, by interposing a push-in pipe between the irregular connector and the first check valve, the first check valve and flow path switching adapter can be positioned in front of the forward centralizer on the guide shell, and the first check valve and flow path switching adapter can be positioned near the face, in other words, the axial unit can be installed in the borehole so that no long members protrude from the face, thereby preventing interference with other face work.

[0024] Here, the guide shell of the drilling machine is generally equipped with two centralizers (a front centralizer and a rear centralizer) equipped with hydraulic clamps, which have the function of centering the drilling rod, etc., and the function of gripping the drilling rod, etc. with the hydraulic clamps equipped on the centralizers.

[0025] In this embodiment, the two centralizers are used to grasp the axial unit and insert it into the borehole while centering it, and by using a pushing pipe such as a steel pipe, it is possible to position the first check valve and flow path switching adapter behind the axial unit closer to the face than the forward centralizer.

[0026] In addition, one aspect of the spring water observation method according to the present invention includes: A method for observing spring water by taking in spring water from the tip of a borehole provided in a face of a tunnel, comprising the steps of: a packer device having a packer, a double pipe rod, a flow path switching adapter having an observation meter, a water pressure measuring device, and a first check valve, and a first flow path through which water fed inside the axial unit reaches the inner surface of the packer, and a second flow path through which spring water taken in by the packer device reaches the observation meter inside the packer device, the double pipe rod, and the flow path switching adapter, the device installation process includes inserting at least a part of the axial unit into the borehole by a moving device, disposing the packer device at or near the tip of the borehole, and inflating the packer with water fed through the first flow path to press the packer against the wall of the borehole; a first flow path observation step of observing the first flow path with the water pressure measuring device; A spring water observation process for taking in spring water from the tip of the borehole through the second flow path, allowing it to reach the observation meter, and performing spring water observation; The method is characterized by having an equipment recovery process in which drainage is performed through the first flow path to deflate the packer, and the axial unit is pulled out of the borehole by the moving device and recovered.

[0027] According to this aspect, at least a part of an axial unit consisting of a packer device, a double pipe rod, a flow path switching adapter equipped with an observation meter, a water pressure measuring device, and a first check valve connected to each other is inserted into a borehole using a mobile device, the packer is inflated to install the axial unit in the borehole, and then spring water is taken in from the tip of the borehole and observed using the observation meter. After observation, the axial unit is pulled out of the borehole and retrieved using the mobile device, thereby eliminating the need to manually install and retrieve the packer in the borehole, and making it possible to safely and efficiently grasp the condition of the spring water in front of the face.

[0028] In addition, the water pressure measuring device measures the water pressure in the first flow path and the water pressure in the packer communicating with the first flow path, making it possible to confirm whether the packer is maintaining the desired water pressure.

[0029] In another aspect of the spring water observation method according to the present invention, In the device installation step, A drilling machine is used, the drilling machine comprising a carriage, a boom rotatably attached to the carriage, a guide shell attached to the tip of the boom, a drifter that slides along the guide shell, a shank rod attached to the tip of the drifter, and a water supply means for supplying water to the shank rod, The guide shell, the drifter and the shank rod form the moving device, and the shaft-shaped unit is directly or indirectly connected to the shank rod; The drifter is advanced toward the face side to push in the packer device and the double-tube rod, the drifter is retreated to add a new double-tube rod, and the drifter is advanced toward the face side again.

[0030] According to this embodiment, a moving device is formed by the guide shell, drifter and shank rod provided on the drilling machine, and the axial unit is inserted into the borehole by sliding the drifter along the guide shell, so that the axial unit can be stably inserted into the borehole and stably removed from the borehole after observation, and the double tube rod can also be smoothly extended. Furthermore, for example, after drilling a borehole with a drilling machine, an axial unit can be continuously installed in the borehole with the drilling machine, and physical quantities and water quality related to the state of the spring water can be efficiently observed. Effect of the Invention

[0031] The spring water observation device and spring water observation method of the present invention eliminate the need to manually install and retrieve packers in a borehole, and can safely and efficiently grasp the state of the spring water in front of the face. [Brief description of the drawings]

[0032] [Figure 1] FIG. 2 is a perspective view of an example of a drilling machine equipped with a moving device, which forms a spring water observation device according to an embodiment. [Diagram 2] FIG. 1 is a perspective view of an example of a spring water observation device according to an embodiment. [Diagram 3] This is an exploded longitudinal cross-sectional view of a packer device, a double-tube rod, a flow path switching adapter equipped with an observation meter, and a first check valve, which constitute the spring water observation device of the embodiment, and shows both the flow of water in the first flow path and the flow of spring water in the second flow path. [Figure 4] 4 is a view taken along the line IV-IV in FIG. 3, showing a cross-sectional view of the arrangement of the first flow path and the second flow path in the flow path switching adaptor. [Figure 5A] FIG. [Figure 5B] FIG. 2 is an enlarged view of a check valve with a socket and a flow path release valve attached thereto. [Figure 6] FIG. 2 is a process diagram of an example of a spring water observation method according to an embodiment. [Figure 7] Continuing from FIG. 6, this is a process diagram of an example of a spring water observation method according to an embodiment. [Figure 8] 7, which is a process diagram of an example of a spring water observation method according to an embodiment. [Figure 9] 8, a process diagram of an example of a spring water observation method according to an embodiment of the present invention. [Figure 10] Continuing from FIG. 9, this is a process diagram of an example of a spring water observation method according to an embodiment. [Figure 11] 10, a process diagram of an example of a spring water observation method according to an embodiment of the present invention. [Figure 12] 11, a process diagram of an example of a spring water observation method according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0033] Hereinafter, a spring water observation device and a spring water observation method according to an embodiment will be described with reference to the accompanying drawings. In this specification and the drawings, substantially identical components are designated by the same reference numerals, and duplicated explanations may be omitted.

[0034] [Spring water observation device according to the embodiment] First, an example of a spring water observation device according to an embodiment will be described with reference to Figs. 1 to 5. Here, Fig. 1 is a perspective view of an example of a drilling machine equipped with a moving device forming a spring water observation device according to the embodiment, and Fig. 2 is a perspective view of an example of a spring water observation device according to the embodiment. Fig. 3 is an exploded vertical cross-sectional view of a packer device, a double tube rod, a flow path switching adaptor equipped with an observation meter, and a first check valve, which constitute the spring water observation device according to the embodiment, and shows both the flow of water in the first flow path and the flow of spring water in the second flow path. Fig. 4 is a view taken along the arrow IV-IV in Fig. 3, showing the arrangement of the first flow path and the second flow path in the flow path switching adaptor in a cross section. Fig. 5A is an enlarged view of a check valve, and Fig. 5B is an enlarged view of a check valve to which a socket and a flow path opening valve are attached.

[0035] The spring water observation device and spring water observation method described below are devices and methods for grasping the state of spring water, such as the amount and pressure of spring water in the spring water section ahead of the tunnel face during construction of a mountain tunnel, and are intended to obtain observation results that can be used to determine whether or not to implement measures against spring water in advance of the next tunnel excavation based on the observation results, and to consider the impact on the surrounding environment. For example, if a large amount of high-pressure spring water occurs during construction of a mountain tunnel, it can have a significant impact on the surrounding environment (land subsidence, lowering of the groundwater level, etc.) as well as on tunnel construction, including the collapse of the tunnel face, and therefore it is essential to take necessary measures.

[0036] The advance boreholes constructed at the tunnel face for spring water observation include ultra-long boreholes of about 1000 m in length, medium-length boreholes of about 100 m in length, and short-length boreholes of about 30 m in length, but any of these types may be applied to the boreholes constructed during the spring water observation method of the embodiment.

[0037] Here, in spring observation using an ultra-long borehole, the presence or absence of spring water as well as its location are investigated, but it can take several months to approach the spring water zone and large-scale equipment is required for the investigation.

[0038] In contrast, in spring water observation using medium-length or short-length boreholes, the packer provided in the spring water observation device of the embodiment can be used to accurately measure the spring water pressure and spring water volume, making it possible to confirm the permeability of the ground and predict the spring water volume when the face arrives.

[0039] Furthermore, in the case of seepage monitoring using short boreholes, as described below, seepage monitoring can be carried out using a drilling machine that is permanently stationed at the face, which reduces the cost of seepage monitoring and takes only about 1 to 2 hours to drill one borehole, making it possible to drill multiple boreholes quickly.

[0040] For these reasons, the spring water observation device and the spring water observation method according to the embodiment are preferably used for spring water observation using medium-length boreholes and short-length boreholes, and are particularly preferably used for spring water observation using short-length boreholes. Note that the only method currently available for measuring spring water pressure using short-length boreholes is to manually install a packer device, and as already explained, there is room for improvement in terms of safety and efficiency in observation construction. Therefore, the spring water observation device and the spring water observation method according to the embodiment described below can be a technology that improves construction safety and construction efficiency in spring water observation construction using short-length boreholes.

[0041] The drilling machine 10 shown in Figure 1 is a drill jumbo, and has a carriage 11 equipped with a cabin, a traveling mechanism, and a water supply means (not shown) (consisting of a water supply pump, a water tank, a water supply pipe, etc.), and multiple booms 12 (five in the illustrated example) attached to the front of the carriage 11 so as to be freely rotatable in the horizontal X1 direction (around the yaw axis) and the vertical X2 direction (around the pitch axis), and each boom 12 is freely extendable and retractable in its axial direction, the X3 direction.

[0042] Of the multiple booms 12, a man cage 13 is rotatably attached to the tip of boom 12B, and the work platform of the man cage 13 is always in a horizontal position in response to the rotation of boom 12B.

[0043] On the other hand, a guide shell 14 is attached to the tip of the other boom 12A, and a drifter 15 is slidably attached to the guide shell 14. A shank rod 16 is attached to the tip of the drifter 15, and water is supplied to a flow path (not shown) inside the shank rod 16 from a water supply means (not shown) equipped on the carriage 11.

[0044] In addition, an annular front centralizer 18A is attached to the tip of the guide shell 14, and an annular rear centralizer 18B is attached to the rear of it, and a shank rod 16 is inserted slidably through the insides of the two centralizers 18A, 18B.

[0045] The guide shell 14, the drifter 15, and the shank rod 16 constitute a moving device 17. Here, the drifter 15 can not only slide on the guide shell 14, but also rotate around its axis.

[0046] As shown in Fig. 2, the packer device 20 having the packer 26, the double-tube rod 30 attached to the rear end of the packer device 20, the flow path switching adapter 40 attached to the rear end of the double-tube rod 30, the water pressure measuring device 90 attached to the rear end of the flow path switching adapter 40, and the first check valve 50 attached to the rear end of the water pressure measuring device 90 form an axial unit 60. An observation meter 48 is attached to the flow path switching adapter 40 via an introduction pipe 46 as shown in Fig. 3. In addition, a separate double-tube rod may be added to the rear end of the double-tube rod 30 as an extension pipe depending on the length of the borehole.

[0047] Here, in the illustrated example, the water pressure measuring device 90 and the first check valve 50 are separate components, but for example, the water pressure measuring device and the first check valve may be integrally configured and both may be the same component.

[0048] An irregular connector 80 is attached to the tip of the shank rod 16 that forms the moving device 17, a push-in tube 70 is attached to the tip of the irregular connector 80, and the rear end of the first check valve 50 is connected to the tip of the push-in tube 70 to form a spring water observation device 100.

[0049] Since the diameter of the shank rod 16 varies depending on the model of the drilling machine 10, the presence of the irregular connector 80 makes it possible to connect the first check valve 50 according to the diameter of the shank rod 16.

[0050] As will be explained in detail below, when inserting the packer unit 20 and double tube rod 30 (part or all), which are part of the axial unit 60, into a borehole formed in the natural ground, the drilling machine 10 is aligned in front of the face, the boom 12A is aligned in front of the borehole, and then the drifter 15 slides in the X5 direction along the guide shell 14 that constitutes the moving device 17, thereby inserting the packer unit 20 and double tube rod 30 into the borehole in the X6 direction.

[0051] Water is supplied into the inside of the axial unit 60 via the water supply means equipped on the trolley 11, causing the packer 26 of the packer device 20 to inflate and press against the wall of the borehole, thereby completing the installation of the axial unit 60 in the borehole.

[0052] A portion of the sampling pipe 22 extends from the tip of the packer device 20, and spring water from within the borehole is drawn into the inside of the axial unit 60 through this sampling pipe 22.

[0053] The pressure applied by the packer device 20 to the wall of the borehole is measured by a pressure gauge attached to the water pressure measuring device 90, and if the measured data is lower than a predetermined water pressure, the packer 26 can be inflated further by supplying additional water via the water pressure measuring device 90, thereby increasing the water pressure to a predetermined water pressure (pressing force for pressing the wall surface). When the spring water observation is completed and a part of the axial unit 60 is pulled out and recovered from the borehole, the packer 26 can be deflated by draining water from the packer device 20 via the water pressure measuring device 90.

[0054] In other words, the water pressure measuring device 90 has multiple functions, such as measuring the pressing force (water pressure) applied by the packer 26 to the wall surface, supplying additional water to the packer 26 if necessary, and draining the water that inflates the packer 26 when the axial unit 60 is pulled out and recovered.

[0055] In addition, by inserting the push-in pipe 70 for fully inserting the axial unit 60 into the borehole through the front centralizer 18A and the rear centralizer 18B, the first check valve 50, the water pressure measuring device 90 and the flow path switching adapter 40 which form the axial unit 60 can be positioned closer to the face than the front centralizer 18A. After a part of the axial unit 60 has been installed in the borehole, for example, the push-in pipe 70 and the special connector 80 can be disconnected, and the drilling machine 10 can be used for another purpose.

[0056] Here, a recess 94 is provided on the outer surface of the water pressure measuring device 90, and a check valve 96 is attached to the recess 94. This check valve 96 does not protrude outward beyond the recess 94, and therefore, with the check valve 96 attached to the recess 94, it can also be inserted through the front centralizer 18A and the rear centralizer 18B.

[0057] In addition, the illustrated example of the spring water observation device 100 is configured to have a guide shell 14 and a drifter 15, etc., which are equipped on the drilling machine 10, as a moving device 17, but it may also be configured so that the moving device is a hydraulic cylinder, etc., mounted on an aerial work vehicle, etc.

[0058] Next, the specific configuration of each of the components that make up the shaft-shaped unit 60 will be described with reference to FIGS.

[0059] The packer device 20 is formed by fitting left and right annular main pipes 21B, 21C to both ends of a central annular main pipe 21A. A seal material 24 such as an O-ring is interposed between the main pipe 21A and the left and right main pipes 21B, 21C, and the main pipes 21B, 21C are connected to the left and right ends of the main pipe 21A while sliding against the seal material 24.

[0060] The main body pipe 21A is divided into two parts, a left and a right, and a packer attachment opening 21c is provided between the two. The packer 26 is disposed in the packer attachment opening 21c, and the left and right ends of the packer 26 are fitted into the attachment grooves 21d at the ends of the left and right main body pipes 21A and fixed so as to be freely slidable. That is, when the packer 26 expands to the side, the end of the packer 26 is pulled and slides within the attachment grooves 21d, but the packer 26 does not come off because of the grooves.

[0061] Sampling pipe 22 is inserted into main pipes 21A, 21B, and 21C, and a part of sampling pipe 22 protrudes from tip 21a of main pipe 21C. Second flow path 23 is provided inside sampling pipe 22, and spring water is taken in the Y10 direction from the tip of second flow path 23. The taken-in spring water flows through second flow path 23 in the Y11 direction and is sent to double-tube rod 30.

[0062] Between the main pipe 21 and the sampling pipe 22, a first annular flow path 25 is provided, and the water conveyed from the double pipe rod 30 flows through the first flow path 25 in the Y6 direction and reaches the packer mounting opening 21c, and presses the inner surface of the packer 26 sideways, causing the packer 26 to expand in the Y7 direction. The packer 26 expanding sideways presses the wall of the borehole with a predetermined pressing force, making it possible to maintain the installation position of the axial unit 60 in the borehole even when subjected to the spring water pressure from the spring water. If the spring water pressure is too large, the moving device 17 of the drilling machine 10 may be left attached to the axial unit 60 to maintain the installation position of the axial unit 60 in the borehole.

[0063] A tip end 31a of an outer tube 31 constituting a double tube rod 30 is fitted into a rear end 21b of the main body tube 21B.

[0064] The double-tube rod 30 has an outer tube 31 and an inner tube 32, and a ring-shaped first flow passage 35 is provided between the outer tube 31 and the inner tube 32, which is connected to the first flow passage 25 of the packer device 20. A second flow passage 33 is provided inside the inner tube 32, which is connected to the second flow passage 23 of the packer device 20.

[0065] A seal 34 consisting of an O-ring is provided on the tip side of the outer pipe 31, and the rear end 21b of the packer device 20 is fitted into the tip 31a of the outer pipe 31, and the two are connected together while being in sliding contact with the seal 34.

[0066] The spring water flowing through the second flow path 23 of the packer device 20 flows into the second flow path 33 of the inner pipe 32 in the Y12 direction and flows through the second flow path 33 in the Y13 direction. On the other hand, the water sent from the flow path switching adapter 40 flows through the first flow path 35 in the Y5 direction and is sent to the first flow path 25 of the packer device 20.

[0067] The tip 41a of the main body pipe 41 constituting the flow path switching adapter 40 is fitted into the rear end 31b of the outer pipe 31. Although not shown, in the case where a separate double-tube rod is further added to the double-tube rod 30 as an extension pipe, the tip of the extension pipe is connected to the rear end 31b of the double-tube rod 30 shown in the figure.

[0068] The flow path switching adapter 40 has a main pipe 41. As shown in Figures 3 and 4, a second flow path 43 is provided in the center of the main pipe 41, and a plurality of first flow paths 45 (seven in the illustrated example) are provided around the second flow path 43. The second flow path 43 communicates with the second flow path 33 of the double-tube rod 30, and the plurality of first flow paths 45 communicate with the annular first flow path 35 of the double-tube rod 30.

[0069] A seal 44 made of an O-ring is provided on the tip side of the main tube 41, and the rear end 31b of the double tube rod 30 is fitted into the tip 41a of the main tube 41, and the two are connected together while being in sliding contact with the seal 44.

[0070] In main body pipe 41, second flow path 43 is bent at its end to form an attachment port 43a facing a part of the side surface of main body pipe 41. One end of introduction pipe 46 is attached to this attachment port 43a, and observation meter 48 is attached to the other end of introduction pipe 46.

[0071] The spring water flowing into the second flow path 43 through the second flow path 33 of the double-tube rod 30 flows through the second flow path 43 in the Y14 direction, is introduced into the inlet pipe 46 in the Y15 direction, and then reaches the observation meter 48. The observation meter 48 is a pressure meter that measures the spring water pressure, a flow meter that measures the spring water volume, etc., and measures physical quantities such as the spring water pressure and the spring water volume of the inlet spring water. Although not shown, for example, a spring water outlet may be provided midway through the inlet pipe 46, and the spring water may be discharged to visually check the water quality including the turbidity.

[0072] If the observation meter 48 is equipped with a communication means not shown, the observation data is transmitted in real time via the communication means to a mobile terminal in the operator's cabin of the drilling machine 10 or to a computer in a management facility outside the tunnel.

[0073] Meanwhile, water supplied from the water pressure measuring device 90 flows into multiple first flow paths 45 in the main pipe 41, flows through each first flow path 45 in the Y4 direction, and is sent to the first flow path 35 of the double pipe rod 30.

[0074] A tip 91a of a main body pipe 91 constituting a water pressure measuring device 90 is fitted into a rear end 41b of the flow path switching adapter 40.

[0075] The water pressure measuring device 90 has a main body pipe 91. A seal material 95 made of an O-ring is provided on the tip side of the main body pipe 91, and the rear end 41b of the flow path switching adapter 40 is fitted into the tip 91a of the main body pipe 91, and the two are connected while being in sliding contact with the seal material 95.

[0076] The water pressure measuring device 90 has a main flow path 92 forming a first flow path inside a main pipe 91, and a branch flow path 93 branching off from the main flow path 92.A recess 94 is provided on the outer surface of the main pipe 91 at a position corresponding to the branch flow path 93, and an opening 93a of the branch flow path 93 faces the recess 94.

[0077] As shown in Fig. 3, a check valve 96 is attached to the opening 93a. Here, the depth of the recess 94 is t1, and the height t2 of the check valve 96 is set to be equal to or less than the depth t1. As a result, when the axial unit 60 is inserted into the borehole B, even in a state in which the check valve 96 is attached to the opening 93a, the check valve 96 can be inserted without interfering with the centralizers 18A, 18B.

[0078] 5A, the check valve 96 attached to the opening 93a of the branch flow path 93 includes a second check valve 96c that is normally biased by a spring 96e in a direction that closes the flow path 96b (upward in the illustrated example) in a flow path 96b that penetrates a valve body 96a. A sealant 96d made of an O-ring is attached to the outer periphery of the second check valve 96c, and the sealant 96d comes into contact with the wall surface of the flow path 96b to close the flow path 96b.

[0079] When the water pressure measuring device 90 does not measure the water pressure inside the packer 26 (pressing force on the wall surface), does not supply additional water to the packer 26, and does not drain water from the packer 26, and instead inflates the packer 26 by supplying water from a water supply means not shown, the branch flow path 93 is blocked by the check valve 96, thereby ensuring the liquid-tightness of the first flow path, of which the main flow path 92 is a component, and water can be supplied in the Y3 direction to the packer 26.

[0080] On the other hand, when measuring the water pressure inside the packer 26, supplying additional water to the packer 26, or draining water from the packer 26, as shown in FIG. 5B, a socket 97 is fitted into the check valve 96 and a flow path open valve 98 is attached to the socket 97, thereby opening the blockage caused by the sealing material 96d of the flow path 96b of the check valve 96 and allowing water to flow in the direction Y16.

[0081] More specifically, a push-in pin 98a is attached to the tip of the flow path open valve 98, and when the flow path open valve 98 is attached to the socket 97, the push-in pin 98a pushes the second check valve 96c, which is biased by a spring 96e, in the Z1 direction against the bias of the spring 96e, causing the second check valve 96c to move in the Z2 direction toward the main flow path 92 and open the flow path 96b of the check valve 96, thereby establishing fluid communication between the main flow path 92, the flow path 96b of the check valve 96, the inside of the socket 97, and the inside of the flow path open valve 98.

[0082] When measuring the water pressure inside the packer 26, a pressure gauge (not shown) is attached to the flow path open valve 98. When additional water is to be supplied to the packer 26, additional water is supplied from a water supply means (not shown) via the flow path open valve 98. When draining water from the packer 26, the water flowing through the main flow path 92 is drained in the Y16 direction via the flow path open valve 98.

[0083] The tip 51a of the main body pipe 51 constituting the first check valve 50 is fitted into the rear end 91b of the water pressure measuring device 90.

[0084] The first check valve 50 has a main pipe 51. A valve seat 52 with a hollow space 52b therein is provided in the center of the main pipe 51, and a first flow path 53 communicating with an opening 52a of the hollow space 52b communicates with a tip 51a of the main pipe 51.

[0085] A sealing material 51c consisting of an O-ring is provided on the tip side of the main pipe 51, and the rear end 91b of the water pressure measuring device 90 is fitted into the tip 51a of the main pipe 51, and the two are connected together while being in sliding contact with the sealing material 51c.

[0086] A spring 54 is provided on the outer periphery of the first flow passage 53, and the spring 54 biases the rubber ball 55 so as to close the opening 52a of the valve seat 52. The first flow passage 53 is connected to the hollow 52b of the valve seat 52, and a hollow push-in tube 70 or the like is connected to the rear end 51b of the first check valve 50. Water delivered from a water delivery means (not shown) flows through the hollows of the shank rod 16, the odd-shaped connector 80, and the push-in tube 70, and flows into the first flow passage 53 of the first check valve 50 in the Y1 direction.

[0087] When the water pressure of the flowing in water exceeds the biasing force of the spring 54, the rubber ball 55 moves in the Y2 direction and the opening 52a opens, and the water flows through the first flow path 53 on the water pressure measuring device 90 side in the Y2 direction through the opening 52a and flows into the first flow path 92 of the water pressure measuring device 90.

[0088] When the packer 26 has fully expanded in the borehole and the installation of the axial unit 60 in the borehole is complete, the water supply from the water supply means is stopped. This cessation of water supply removes the force pushing the rubber bulb 55 from the rear, and the rubber bulb 55 moves under the biasing force of the spring 54, closing the opening 52a of the valve seat 52.

[0089] By blocking this opening 52a, return water in the Y17 direction is prevented from being drained through the opening 52a, so that the water filling the first flow path of each component can be retained and the pressing force of the packer 26 which expands and presses against the wall of the borehole can be maintained.

[0090] According to the spring water observation device 100, the moving device 17 is formed by the guide shell 14 etc. that is pre-installed on the boom 12A of the drilling machine 10, and further, by utilizing the water supply means that is pre-installed on the cart 11 to inflate the packer 26 of the packer device 20, there is no need to prepare a moving device and water supply means specific to the spring water observation device 100.

[0091] In addition, since the drilling machine 10 can install a part of the axial unit 60 in the borehole continuously from the drilling machine 10, it becomes possible to carry out a series of operations from drilling the borehole to observing the spring water extremely efficiently.

[0092] Furthermore, with the operator on board the drilling machine 10, the axial unit 60 can be installed in the borehole, the subsequent water seepage observation, and the axial unit 60 can be retrieved from the borehole after the water seepage observation, eliminating the need to manually install and retrieve packers in the borehole and making it possible to safely grasp the condition of the water seepage in front of the face.

[0093] [Spring water observation method according to the embodiment] Next, an example of a spring water observation method according to the embodiment will be described with reference to Fig. 6 to Fig. 12. Here, Fig. 6 to Fig. 12 are process diagrams of an example of a spring water observation method according to the embodiment. In the following description, the packer device 20 and the like are inserted into the borehole B using the moving device 17 of the drilling machine 10 shown in Fig. 1, but the carriage 11 of the drilling machine 10 and the like are not shown.

[0094] First, as shown in Fig. 6, a borehole B is drilled by the drilling machine 10 shown in Fig. 1 at a tunnel face K of a tunnel such as a mountain tunnel constructed in natural ground G. The illustrated advance borehole B will be described below as a short borehole with a length of about 30 m.

[0095] The moving device 17 is composed of the guide shell 14, drifter 15, and shank rod 16, and an irregular connector 80 is attached to the tip of the shank rod 16. A flow path switching adapter 40 is attached to the tip of the irregular connector 80, and in front of that, the double tube rod 30 and packer device 20 are connected in that order.

[0096] The packer device 20 and the double-tube rod 30 are inserted through the front centralizer 18A and the rear centralizer 18B on the guide shell 14, and the double-tube rod 30 etc. are gripped and centered by these centralizers 18A, 18B and inserted into the borehole B.

[0097] Next, as shown in FIG. 7, the drifter 15 is slid along the guide shell 14 toward the face side in the X5 direction, so that the packer device 20 and the double tube rod 30 are inserted in that order into the borehole B in the X6 direction.

[0098] Here, in the illustrated example, when the length of the double-tube rod 30 is short relative to the length of the borehole B, the drifter 15 is slid away from the face when the double-tube rod 30 is inserted into the borehole B, forming a gap between the rear end of the double-tube rod 30 and the flow path switching adapter 40. Next, an extension pipe 30A made of a separate double-tube rod is inserted into this gap, and both ends of the extension pipe 30 are connected to the double-tube rod 30 and the flow path switching adapter 40. Then, the drifter 15 is slid back toward the face in the X5 direction, so that the extension pipe 30A is also inserted into the borehole B in the X6 direction as shown in FIG.

[0099] For example, for a borehole B having a length of about 30 m, it is preferable that the double-tube rod 30 and extension pipe 30A are available in various lengths, such as 0.5 m, 1 m, 1.5 m, and 3 m.

[0100] When extending the extension pipe 30A, the centralizers 18A, 18B hold the double tube rod 30, and the extension pipe 30A inserted behind it can be rotated by the rotational action of the drifter 15 to connect (screw) the two.

[0101] As shown in Figure 7, even when the guide shell 14 is brought as close as possible to the face K and the drifter 15 is slid as far as possible toward the face side, it may often be impossible to insert the packer device 20 near the tip of the borehole B.

[0102] Therefore, as shown in Figure 8, the connection between the flow path switching adapter 40 and the odd-shaped connector 80 is disconnected, and first, a water pressure measuring device 90 is connected to the flow path switching adapter 40, a first check valve 50 is connected to the water pressure measuring device 90, and a push-in pipe 70 is connected to both the first check valve 50 and the odd-shaped connector 80.

[0103] This connection forms an axial unit 60 consisting of the packer device 20, double pipe rod 30, extension pipe 30A, flow path switching adapter 40, water pressure measuring device 90, and first check valve 50, and the packer device 20 can be inserted to a predetermined position near the tip of the borehole B by the pushing pipe 70.

[0104] As shown in Figure 8, after the packer device 20, the double tube rod 30, and a part of the extension pipe 30A (part of the axial unit 60) are inserted into the borehole B, the packer 26 is inflated in the Y7 direction by supplying water from a water supply means not shown, and the inflated packer 26 presses against the hole wall of the borehole B with a predetermined pressing force, thereby completing the installation of the axial unit 60 in the borehole B.

[0105] As already explained with reference to Figure 3, a check valve 96 with a protruding length less than the depth of the recess 94 is attached to the recess 94 on the outer periphery of the water pressure measuring device 90, so that when the axial unit 60 is inserted into the borehole B, the check valve 96 can be inserted without interfering with the centralizers 18A, 18B.

[0106] 9, the connection between the pushing pipe 70 and the irregular connector 80 is released, and the drilling machine 10 including the moving device 17 is withdrawn. The withdrawn drilling machine 10 is used for another purpose, such as drilling a separate borehole B.

[0107] The illustrated example is a case in which the expected water pressure is relatively small, and the axial unit 60 can be maintained in its installed state within the borehole B by the pressing force of the packer 26 against the wall of the borehole B alone.

[0108] Therefore, for example, in a case where the expected spring water pressure is relatively large and the pressing force of the packer 26 against the wall of the borehole B alone is not enough to maintain the axial unit 60 installed in the borehole B, it is advisable to have the drilling machine 10 wait in front of the face K until the spring water observation is completed, and to hold the axial unit 60 from the rear with the drifter 15 and shank rod 16 (this concludes the equipment installation process).

[0109] After the device is installed, as shown in Fig. 9, a socket 97 is attached to a check valve 96 attached to a water pressure measuring device 90, a flow path opening valve 98 is attached to the socket 97, and a pressure gauge 49 is attached to the flow path opening valve 98, and the pressure of the first flow path and the pressure inside the packer 26, which is the same value as the pressure of the first flow path (pressing force pressing against the wall surface), are observed with the pressure gauge 49 (first flow path observation process). Note that this first flow path observation process may be performed continuously during the spring water observation process described below, or may be performed intermittently at intervals.

[0110] During the spring water observation process, if the measurement data (pressing force by the packer 26) becomes lower than the specified water pressure (pressing force that can hold the axial unit 60 within the hole wall of the borehole B), additional water can be supplied via the water pressure measuring device 90 to further expand the packer 26 and increase the water pressure to the specified water pressure, thereby maintaining the installation posture of the axial unit 60 against the hole wall of the borehole B.

[0111] Next, as shown in Fig. 10, an observation meter 48 is attached to the flow path switching adapter 40, and the spring water W that has seeped into the borehole B is taken in and guided to the observation meter 48 to observe the spring water pressure and spring water volume of the spring water W. Here, the objects of observation include not only physical quantities such as the spring water pressure, but also the water quality of the spring water and the groundwater level.

[0112] The observation data (measurement data) from the observation meter 48 may be acquired after the axial unit 60 is recovered, or if the observation meter 48 is equipped with wireless communication means, it is transmitted in real time via wireless communication to a mobile terminal in the operator's cabin of the carriage 11 of the drilling machine 10, or to a computer in a management facility outside the tunnel (this is the spring water observation process).

[0113] After the spring water observation is completed, as shown in Figure 11, the drilling machine 10 is brought close, a special connector 80 is connected to the pushing pipe 70, and the water that had been inflating the packer 26 is drained in the Y17 direction through the flow path release valve 98 attached to the water pressure measuring device 90, thereby deflating the packer 26 in the Y8 direction.

[0114] Next, as shown in Figure 12, the drifter 15 is slid along the guide shell 14 in the X7 direction opposite the face K, thereby pulling out and recovering the packer device 20, double tube rod 30, etc. from the borehole B in the X8 direction (this concludes the equipment recovery process).

[0115] The spring water observation method shown in the figure eliminates the need to manually install and retrieve packers in boreholes, and makes it possible to safely and efficiently grasp the state of the spring water in front of the face.In particular, this can be a technology that dramatically improves construction safety and efficiency in spring water observation work using short boreholes to measure spring water pressure, etc.

[0116] In addition, the present invention is not limited to the configuration shown here, and may be implemented in other embodiments in which other components are combined with the configurations and the like of the above-mentioned embodiment. In this regard, the present invention may be modified within the scope of the gist of the present invention, and may be appropriately determined according to the application form. [Explanation of symbols]

[0117] 10: Drilling machine 11: Cart 12, 12A, 12B: Boom 13: Mancage (workbench) 14: Guide Shell 15: Drifter 16: Shank rod 17: Mobile device 18A: Front centralizer (Centralizer) 18B: Rear centralizer (centralizer) 20: Packer device 21, 21A, 21B, 21C: Main body tube 21a: Tip 21b: Rear end 21c: Packer installation opening 21d: Mounting groove 22: Collection tube 23: Second flow path 24: Sealing material 25: First flow path 26: Packer 30: Double tube rod 30A: Double tube rod (extension tube) 31:Outer tube 31a: Tip 31b: Rear end 32: Inner tube 33: Second flow path 34: Sealing material 35: First flow path 40: Stream switching adapter 41: Main tube 41a: Tip 41b: Rear end 43: Second flow path 43a: Mounting port 44: Sealing material 45: First flow path 46:Introduction tube 48: Observation instrument 49: Pressure gauge 50: First check valve 51: Main tube 51a: Tip 51b: Rear end 51c: Sealing material 52: Valve seat 52a:Aperture 52b:Hollow 53: First flow path 54: Spring 55: Rubber ball 60: Axial unit 70: Push-in tube 80: Irregular connector 90: Water pressure measuring device 91: Main tube 91a: Tip 91b: Rear end 92: Main flow path (first flow path) 93: Branch flow path 93a:Aperture 94: Recess 95: Sealing material 96: Check valve 96a: Valve body 96b: Flow path 96c: Second check valve 96d: Sealing material 96e: Spring 97: Socket 98: Flow path release valve 98a: Push-in pin 100: Spring water observation device G: Natural ground B: Borehole (advanced borehole) K: Face W: Spring water

Claims

1. A spring water observation device that is installed in a borehole provided in a face and takes in spring water from the tip of the borehole to observe spring water, A packer device having a packer, a double-tube rod attached to one end of the packer device, a flow path switching adapter attached to one end of the double-tube rod and having an observation meter, and a first check valve attached to one end of the flow path switching adapter. A water pressure measuring device interposed between the flow path switching adapter and the first check valve; A moving device that inserts at least a portion of a shaft-shaped unit, in which the packer device, the double pipe rod, the flow path switching adapter, the water pressure measuring device, and the first check valve are connected to each other, into the borehole and pulls out the shaft-shaped unit from the borehole; A first flow path provided inside the shaft-shaped unit and allowing the water to reach the inner surface of the packer; A second flow path is provided inside the packer device, the double tube rod, and the flow path switching adapter, and causes the spring water taken in by the packer device to reach the observation meter. The water pressure measuring device measures the water pressure in at least the first flow path, The first check valve opens the first flow path when water is sent to the packer device, and closes the first flow path when return water returns from the packer device. The water pressure measuring device includes a main flow path that forms the first flow path and a branch flow path that branches off from the main flow path, A second check valve is interposed in the middle of the branch flow path, and the second check valve closes the branch flow path when water is supplied to the packer device. A spring water observation device, characterized in that a check valve is attached to the branch flow path and the water pressure in the first flow path is measured.

2. 2. The spring water observation device of claim 1, comprising a drilling machine comprising a carriage, a boom rotatably attached to the carriage, a guide shell attached to the tip of the boom, a drifter sliding along the guide shell, a shank rod attached to the tip of the drifter, and a water supply means for supplying water to the shank rod, wherein the guide shell, the drifter and the shank rod form the moving device, the axial unit is directly or indirectly connected to the shank rod, and water is supplied from the water supply means to the first flow path.

3. a recess is provided in an outer surface of the water pressure measuring device at a position corresponding to the branch flow path, and an opening of the branch flow path faces the recess; a height of the check valve when attached to the opening is set to be equal to or less than a depth of the recess, The spring water observation device described in claim 1 or 2, characterized in that the check valve is attached to the water pressure measuring device so that at least one of additional water supply to the first flow path or drainage from the first flow path is further performed.

4. The spring water observation device according to claim 1 or 2, characterized in that the first check valve and the water pressure measuring device are integrally constructed, and the branch flow path is provided on the flow path switching adapter side of the first check valve.

5. The spring water observation device according to claim 2, further comprising a variant connector interposed between the shank rod and the first check valve.

6. A front centralizer and a rear centralizer are attached to the front end and the rear end of the guide shell, respectively; A push-in tube is provided between the connector and the first check valve. The spring water observation device according to claim 5, wherein the first check valve is located closer to the face than the front centralizer.

7. A method for observing spring water by taking in spring water from the tip of a borehole provided in a face of a tunnel, comprising the steps of: a packer device having a packer, a double pipe rod, a flow path switching adapter having an observation meter, a water pressure measuring device, and a first check valve, a first flow path through which water fed inside the axial unit reaches the inner surface of the packer, and a second flow path through which spring water taken in by the packer device inside the packer device, the double pipe rod, and the flow path switching adapter reaches the observation meter; an apparatus installation process, in which at least a part of the axial unit is inserted into the borehole by a moving device, the packer device is disposed at or near the tip of the borehole, and the packer is inflated by water fed through the first flow path to press the packer against the wall of the borehole; a first flow path observation step of observing the first flow path with the water pressure measuring device; A spring water observation process for taking in spring water from the tip of the borehole through the second flow path, allowing the water to reach the observation meter, and observing the spring water; A method for observing spring water, comprising: draining water through the first flow path to deflate the packer; and using the moving device to pull out and recover the axial unit from the borehole.

8. In the device installation step, A drilling machine is used, the drilling machine comprising a carriage, a boom rotatably attached to the carriage, a guide shell attached to the tip of the boom, a drifter that slides along the guide shell, a shank rod attached to the tip of the drifter, and a water supply means for supplying water to the shank rod, The guide shell, the drifter and the shank rod form the moving device, and the shaft-shaped unit is directly or indirectly connected to the shank rod; The method for observing the spring water according to claim 7, characterized in that the drifter is advanced toward the face side to push in the packer device and the double-tube rod, the drifter is retreated to add a new double-tube rod, and the drifter is advanced toward the face side again.

Citation Information

Patent Citations

  • Double-pipe and double-packer construction method

    JP2006274562A

  • Pipe

    JP2011080238A

  • Groundwater intake method and intake system

    JP2018021315A

  • Inrush water pressure measuring device and inrush water pressure measuring method

    JP2021147751A

  • Packer device and method of measuring inflow water pressure

    JP2022024800A