Finished shape management device and finished shape management method and finished shape management program

The performance management device uses laser scanning and grid-based analysis to accurately determine excavation states, addressing the inaccuracy in existing methods by providing real-time feedback for precise tunnel shape management.

JP2024139389AActive Publication Date: 2024-10-09OKUMURA CORP

Patent Information

Application Number
JP2023050300
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09
Estimated Expiration
2043-03-27

AI Technical Summary

Technical Problem

Existing methods for measuring the finished shape of excavated areas in tunnel excavation work, such as those described in Patent Document 1, fail to accurately calculate the coordinates of intersection points, leading to inaccurate shape measurement and management.

Method used

A performance management device that includes a design data acquisition unit, a point cloud data acquisition unit, a grid generation unit, a difference amount calculation unit, and an excavation state determination unit, which uses laser scanning to divide the excavation area into grids, calculate differences between design and actual shapes, and display the excavation state in a distinguishable manner.

Benefits of technology

Enables accurate measurement and management of the finished product by determining the excavation state for each grid, allowing workers to adjust excavation in real-time without manual intervention, thereby improving accuracy and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024139389000001_ABST
    Figure 2024139389000001_ABST
Patent Text Reader

Abstract

To measure a more precise finished shape and manage the finished shape.SOLUTION: A finished shape management device comprises: a design data acquisition part to acquire design data of an excavation target area during excavation; a point group data acquisition part to acquire point group data by measuring three-dimensional shape of the excavation target area by scanning a laser beam on the excavation target area; a grid generation part to generate a plurality of grids mapped with the excavation target area by dividing the excavation target area into a prescribed mesh size; a difference amount calculation part to calculate difference amount between the design data belonging to the prescribed grid among the plurality of grids and the point group data of the prescribed grid; an excavation state determination part to determine an excavation state of the excavation target area mapped with the prescribed grid based on the calculated difference amount; and a display control part to display the plurality of grids respectively so as to be identifiable based on the determination result by the excavation state determination part.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a completed work progress management device, a completed work progress management method, and a completed work progress management program. [Background technology]

[0002] In the above technical field, Patent Document 1 discloses a technology for measuring the completed shape of an excavation site in tunnel excavation work, in which a contour map is generated from point cloud data and design data acquired by irradiating a laser beam onto the excavation site, the generated contour map is divided into a grid to set multiple regions, and the coordinates of four intersections of each set region are calculated by interpolation from the coordinate data of each point acquired from the point cloud data, thereby measuring the completed shape of the excavation site (paragraphs

[0014] ,

[0028] to

[0029] , etc. of the same document). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2022-151963 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, in the technology described in Patent Document 1, the coordinates of the four intersections used to measure the finished shape were calculated by interpolation from point cloud data, and it was not possible to accurately measure the finished shape and manage it. [Means for solving the problem]

[0005] In order to achieve the above object, the present invention relates to a completed product management device, a design data acquisition unit that acquires design data of an area to be excavated during excavation; a point cloud data acquisition unit that acquires point cloud data obtained by scanning a laser beam over the area to be excavated to measure a three-dimensional shape of the area to be excavated; a grid generating unit that divides the excavation target area into a predetermined mesh size and generates a plurality of grids associated with the excavation target area; a difference amount calculation unit that calculates a difference amount between design data belonging to a predetermined grid among the plurality of grids and point cloud data of the predetermined grid; an excavation state determination unit that determines an excavation state of an excavation target area associated with the predetermined grid based on the calculated difference amount; a display control unit that displays each of the plurality of grids in a distinguishable manner based on a determination result by the excavation state determination unit; Equipped with:

[0006] In order to achieve the above object, the present invention provides a method for managing completed work, A design data acquisition step of acquiring design data of an area to be excavated during excavation; a point cloud data acquisition step of acquiring point cloud data obtained by scanning the area to be excavated with a laser beam to measure a three-dimensional shape of the area to be excavated; a grid generating step of dividing the excavation target area into a predetermined mesh size and generating a plurality of grids associated with the excavation target area; a difference amount calculation step of calculating a difference amount between design data of a predetermined grid among the plurality of grids and point cloud data of the predetermined grid; an excavation state determination step of determining an excavation state of an excavation target area associated with the predetermined grid based on the calculated difference amount; Includes.

[0007] Furthermore, in order to achieve the above object, the present invention provides a completed form management program, A design data acquisition step of acquiring design data of an area to be excavated during excavation; a point cloud data acquisition step of acquiring point cloud data obtained by scanning the area to be excavated with a laser beam to measure a three-dimensional shape of the area to be excavated; a grid generating step of dividing the excavation target area into a predetermined mesh size and generating a plurality of grids associated with the excavation target area; a difference amount calculation step of calculating a difference amount between design data of a predetermined grid among the plurality of grids and point cloud data of the predetermined grid; an excavation state determination step of determining an excavation state of an excavation target area associated with the predetermined grid based on the calculated difference amount; to be executed by the computer. Effect of the Invention

[0008] According to the present invention, the completed form can be measured more accurately and the completed form can be managed. [Brief description of the drawings]

[0009] [Figure 1A] FIG. 2 is a diagram for explaining an overview of finished product management by the finished product management device according to the first embodiment of the present invention. [Figure 1B] 1 is a diagram for explaining an example of an identifiable display by the finished product management device according to the first embodiment of the present invention. FIG. [Diagram 2] 1 is a block diagram for explaining a configuration of a completed form management device according to a first embodiment of the present invention. [Diagram 3] 2 is a diagram for explaining an example of a data table possessed by the completed form management device according to the first embodiment of the present invention. FIG. [Figure 4] 1 is a diagram for explaining a hardware configuration of a completed form management device according to a first embodiment of the present invention. FIG. [Diagram 5] 4 is a flowchart for explaining a processing procedure of the completed form management device according to the first embodiment of the present invention. [Figure 6A] FIG. 4 is a block diagram for explaining the configuration of a completed form management device according to a second embodiment of the present invention. [Figure 6B] FIG. 11 is a diagram for explaining linear interpolation by the finished product management device according to the second embodiment of the present invention. [Figure 7] 11 is a diagram for explaining an example of a data table possessed by the completed form management device according to the second embodiment of the present invention. FIG. [Figure 8]FIG. 11 is a diagram for explaining the hardware configuration of a finished product management device according to a second embodiment of the present invention. [Figure 9] 10 is a flowchart for explaining a processing procedure of a completed form management device according to a second embodiment of the present invention. [Figure 10A] FIG. 11 is a block diagram for explaining the configuration of a completed form management device according to a third embodiment of the present invention. [Figure 10B] FIG. 13 is a diagram for explaining calculation of a difference amount by the completed form management device according to the third embodiment of the present invention. [Figure 11] 13 is a diagram for explaining an example of a data table possessed by the completed form management device according to the third embodiment of the present invention. FIG. [Figure 12] FIG. 11 is a diagram for explaining the hardware configuration of a finished product management device according to a third embodiment of the present invention. [Figure 13] 13 is a flowchart for explaining a processing procedure of a completed form management device according to a third embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, the embodiments of the present invention will be described in detail with reference to the drawings. However, the configurations, numerical values, process flows, functional elements, etc. described in the following embodiments are merely examples, and are free to be modified or changed, and are not intended to limit the technical scope of the present invention to the following description.

[0011] [First embodiment] An as-built management device 100 according to a first embodiment of the present invention will be described with reference to Fig. 1A to Fig. 5. First, an overview of as-built management by the as-built management device 100 according to this embodiment will be described with reference to Fig. 1A and Fig. 1B. Installation of an invert in construction of a mountain tunnel 120 is performed, for example, by closing one lane of traffic, excavating an excavation target area 102 with a backhoe 101 or other heavy excavation equipment, and constructing an invert at the location where excavation has been completed.

[0012] Here, in the excavation of the invert, the construction is carried out while checking the finished shape of the excavated excavation surface 103. To check the finished shape of the excavation surface 103, a worker sets a height standard on the tunnel side wall and measures the height of the excavation surface 103 using a ruler. Then, the measured value is compared with the design value to determine whether or not there is a hit, and if there is a hit, re-excavation is required to get closer to the design value. According to this construction method, the finished shape of the excavation surface 103 of the invert is checked. However, in this construction method, the measurement of the excavation surface 103 is performed manually by a worker, which may result in a lack of accuracy, a long time, and a risk of contact between the worker measuring the excavation surface 103 and the excavation heavy equipment.

[0013] In the completed form management device 100 of this embodiment, for example, a worker can check whether the excavation target area 102 excavated by using an excavation heavy machine such as a backhoe 101 is in the completed form as designed by irradiating the excavation point with a laser beam. In other words, the worker can check whether the excavation point is in the shape as planned by looking at a monitor screen installed in the driver's seat, for example, without getting out of the driver's seat of the backhoe 101.

[0014] The backhoe 101 is equipped with a laser sensor 104, and scans the excavation target area 102 with laser light emitted from the laser sensor 104. Here, the laser sensor 104 is, for example, a LiDAR (Light Detection and Ranging) sensor, which is a measurement technology that uses light. The laser sensor 104 emits pulsed laser light and measures the distance between the target and the laser sensor 104 based on the time difference until the light hits the target and bounces back.

[0015] The completed form management device 100 acquires point cloud data 106, which is a measurement value at each point, using a laser light emitted from a laser sensor 104 mounted on a backhoe 101. Then, the height data at each point obtained from the acquired point cloud data 106 is compared with design data 107 to check the presence or absence of a hit or over-excavation. In this way, in the completed form management device 100 of this embodiment, a worker can proceed with the work while checking the shape of the excavation target area 102 excavated using a laser light.

[0016] In excavating the excavation target area 102, from the viewpoint of facilitating management of the as-built shape, the excavation target area 102 is divided into a predetermined mesh size to generate grids 105, and the as-built shape is managed in units of grids.

[0017] The completed form management device 100 calculates height data from the point cloud data 106 of each of the divided grids 105 and compares it with the design data 107. As a result of the comparison, the completed form management device 100 judges the presence or absence of a collision for each grid 105, and the judgment result is displayed in an identifiable manner, for example, on a monitor in the driver's seat of the backhoe 101. Following the display on the monitor, the worker further excavates the grid 105 where a collision has occurred, so as to approach the design data 107.

[0018] For example, when determining the excavation state of the grid 105, the as-built management device 100 irradiates a laser beam from the laser sensor 104 to acquire point cloud data 106. The as-built management device 100 compares the acquired point cloud data 106 with design data 107 of the grid (predetermined grid 105a) to be subjected to the as-built determination, and calculates a difference amount. Then, as shown in FIG. 1B, the as-built management device 100 makes it easy for a worker to grasp the excavation state by, for example, coloring each of the grids 105 (predetermined grid 105a) based on the calculated difference amount. The worker performs work according to the color state of the grid 105.

[0019] Next, the configuration of the completed form management device 100 according to this embodiment will be described with reference to Figures 2A and 2B. The completed form management device 100 has a design data acquisition unit 201, a point cloud data acquisition unit 202, a grid generation unit 203, a difference amount calculation unit 204, an excavation state determination unit 205, and a display control unit 206.

[0020] The design data acquisition unit 201 acquires design data 107 of the excavation target area 102 being excavated. The design data is data that indicates the completed form of the excavation target area, generated using a three-dimensional CAD (Computer-Aided Design). The design data may be generated in the completed form management device 100, or may be generated by a device different from the completed form management device 100.

[0021] The point cloud data acquisition unit 202 acquires point cloud data 106 obtained by scanning the excavation target area 102 with a laser beam to measure the three-dimensional shape of the excavation target area 102. The laser beam irradiated and scanned on the excavation target area 102 is irradiated from a laser sensor 104 mounted on the backhoe 101. For example, an operator of the backhoe 101 may irradiate the excavation target area 102 with a laser beam during or after excavation of the excavation target area 102, so that the point cloud data acquisition unit 202 can acquire the point cloud data 106. Note that, when multiple point cloud data 106 exist for one grid 105 depending on the timing of measurement of the excavation surface 103, the point cloud data acquisition unit 202 may acquire the latest point cloud data 106.

[0022] Also, during excavation work by the backhoe 101, the laser sensor 104 may irradiate the grid 105 or the like of the excavation target with laser light. In this manner, the timing of scanning with the laser light may be any timing after the start of the excavation work. Note that the laser sensor 104 does not have to be mounted on the backhoe 101, and may be disposed at any position as long as the laser light irradiated from the laser sensor 104 reaches the area 102 to be excavated.

[0023] As described above, the laser sensor 104 is a LiDAR sensor. There are two types of LiDAR, a TOF (Time of Flight) type and an FMCW (Frequency Modulated Continuous Wave) type, which differ in the distance measurement method. However, either type of LiDAR may be used. In addition, in this embodiment, the laser sensor 104 is not limited to a LiDAR sensor as long as it is a sensor capable of measuring distance. Note that the laser light may be scanned in units of grids 105 or the entire excavation target area 102.

[0024] The grid generating unit 203 divides the excavation target area 102 into a predetermined mesh size and generates a plurality of grids 105 (predetermined grids 105a) associated with the excavation target area 102. The grids 105 are generated in a state before excavation of the excavation target area 102 starts, and are therefore generated on a substantially horizontal plane.

[0025] The actual excavation surface 103 has an inverted arch shape (a shape including a curved surface) to prevent ground swelling. Therefore, the shape of the grid on the actual excavation surface 103 is the shape of the generated grid 105 orthogonally projected onto the excavation surface 103. Note that in the example shown in Figure 1, only one side of the tunnel is shown, so only half of the inverted arch shape is shown.

[0026] In addition, the grid generating unit 203 generates a plurality of grids 105 divided by a predetermined mesh size in order to improve the accuracy of the as-built management of the excavation target area 102. The grids 105 to be generated may be square or rectangular. The vertical and horizontal sizes of the grids 105 to be generated can be determined according to the area (size) of the excavation target area 102, the capacity of the bucket of the backhoe 101, and the like. The accuracy of the as-built management can be improved by reducing the size of the grids 105. Furthermore, grids 105 of different mesh sizes may exist in the excavation target area 102. Even in the excavation target area 102, if there are a mixture of places where it is desired to manage the as-built shape in detail with high accuracy and places where a relatively gentle as-built management is sufficient, the size of the grids 105 does not need to be unified. For example, for a portion where the invert slope is large, the mesh size is made finer to generate a small-sized grid 105, and for other portions, the mesh size is set to a normal size to generate a normal-sized grid 105.

[0027] 1A, the grid generating unit 203 generates nine (3×3) grids 105. The grid generating unit 203 may assign an identifier or a unique number to each of the generated grids 105 in order to distinguish them from one another. This makes it easier to manage the grids 105.

[0028] When the design data 107 exists, for example, at a position midway between two grids, the design data acquisition unit 201 acquires the data as the design data 107 belonging to these two grids 105. Similarly, when the design data 107 exists at a position on a lattice point of four grids 105, the design data acquisition unit 201 acquires the data as the design data 107 belonging to these four grids 105.

[0029] The difference amount calculation unit 204 calculates the difference amount between the design data 107 belonging to a predetermined grid 105a among the multiple grids 105 and the point cloud data 106 of the predetermined grid 105a. The predetermined grid 105a is, for example, a place in the excavation target area 102 where the excavation state is to be determined and the completed shape is to be confirmed. Therefore, the difference amount calculation unit 204 first extracts the design data 107 belonging to the predetermined grid 105a. The design data 107 is data regarding the shape of the excavation surface 103, and is, for example, data indicating how far the ground should be excavated in the area of ​​the predetermined grid 105a.

[0030] Next, the difference amount calculation unit 204 extracts point cloud data included in an area where the specified grid 105a is orthogonally projected onto the excavation surface as the point cloud data 106 of the specified grid 105a. The point cloud data 106 is data related to the finished shape actually measured in the specified grid 105a. Then, the difference amount calculation unit 204 calculates the difference amount between the point cloud data 106 and the design data 107.

[0031] The excavation state determination unit 205 determines the excavation state of the excavation target area 102 associated with the predetermined grid 105a based on the calculated difference amount. The difference amount calculated by the difference amount calculation unit 204 indicates the degree of difference between the actually excavated excavation surface 103 and the designed excavation surface. For example, when the difference amount is plus (+), it indicates that the excavation surface 103 is higher than the designed excavation surface (the amount of excavation is insufficient), that is, the excavation surface is in a "hit" state. For example, when the difference amount is minus (-), it indicates that the excavation surface 103 is lower than the designed excavation surface (the amount of excavation is too much), that is, the excavation surface is in a "overexcavation" state. When the difference amount is plus or minus zero (±0), it indicates that the excavation surface 103 is excavated according to the design data.

[0032] The excavation state determination unit 205 determines whether the excavation state for the specified grid 105a is in a hit state. If the excavation state is a hit, the excavation state determination unit 205 must carry out appropriate construction, so the excavation state determination unit 205 determines whether there is a hit, and further determines the amount of the hit if this state is determined. If the amount of the hit is known, it becomes possible to present a specific construction policy to the operator of the backhoe 101. The excavation state determination unit 205 may determine whether there is over-excavation and the amount of over-excavation based on the calculated difference amount.

[0033] The display control unit 206 displays each of the plurality of grids 105 in a distinguishable manner based on the determination result by the excavation state determination unit 205. The display control unit 206 applies coloring to each of the grids 105 including the predetermined grid 105a according to the excavation state, and displays the colored grids 105 on the display mounted on the backhoe 101.

[0034] For example, the display control unit 206 displays the grids 105 before excavation in no color, and displays the grids 105 during excavation that have been hit in red, with a gradation according to the amount of hits. That is, the display control unit 206 displays the gradation so that the color transitions from dark red to light red as the amount of hits shifts from a high to a low state. Then, when the grid is excavated as designed, the display control unit 206 changes the color display from red to green.

[0035] The color display of the grids 105 is not limited to the example shown here. In addition to displaying each of the grids 105 in a different color, the grids 105 may be displayed with characters indicating the excavation state or may be displayed with a blinking light. When the grids 105 are displayed with a blinking light, the excavation state may be expressed by the interval at which the grids 105 blink. Furthermore, in the completed form management device 100, the display control unit 206 may display a grid in blue where overexcavation has occurred. The display control unit 206 may display a gradation from light blue to dark blue as the amount of overexcavation changes from a small amount to a large amount.

[0036] The worker performs excavation while judging the excavation volume of the excavation target area 102 while looking at the gradation display displayed on the monitor of the driver's seat of the backhoe 101. In other words, when the display of the excavation target area 102 on the monitor is, for example, red, and then measured, the display becomes green or blue, and the hit is eliminated.

[0037] An example of the data table 301 of the completed form management device 100 will be described with reference to FIG. 3. The data table 301 stores design data 312 and point cloud data 313 in association with a grid ID (identifier) ​​311. The grid ID 311 is an identifier for identifying each of the generated grids 105. The design data 312 is data indicating the final completed form of the excavation target area 102, and is data that is assigned to each of the generated grids 105. Some of the grids 105 have a plurality of pieces of design data assigned to them. Note that, as for the point cloud data, a plurality of pieces of point cloud data may exist in one grid 105 according to the timing of measurement. When a plurality of pieces of point cloud data exist, the point cloud data acquisition unit 202 acquires the latest point cloud data. Then, the completed form management device 100 refers to the data table 301 to determine the excavation state of the excavation target area 102 (excavation surface 103).

[0038] The hardware configuration of the completed shape management device 100 will be described with reference to FIG. 4. The CPU (Central Processing Unit) 410 is a processor for arithmetic control, and executes a program to realize each functional configuration of the completed shape management device 100 in FIG. 2. The CPU 410 has multiple processors, and may execute different programs, modules, tasks, threads, etc. in parallel. The ROM (Read Only Memory) 420 stores fixed data such as initial data and programs, and other programs. The network interface 430 communicates with other devices via a network. The CPU 410 is not limited to one, and may be multiple CPUs or may include a GPU (Graphics Processing Unit) for image processing. The network interface 430 preferably has a CPU independent of the CPU 410, and writes or reads transmitted / received data in an area of ​​the RAM (Random Access Memory) 440. It is also preferable to provide a DMAC (Direct Memory Access Controller) that transfers data between the RAM 440 and the storage 450 (not shown). The CPU 410 recognizes that data has been received or transferred to the RAM 440, and processes the data. Furthermore, the CPU 410 prepares the processing results in the RAM 440, and leaves the subsequent transmission or transfer to the network interface 430 or DMAC.

[0039] The RAM 440 is a random access memory used by the CPU 410 as a temporary storage work area. A storage area for storing data required for implementing this embodiment is secured in the RAM 440. The design data 441 is data indicating the final shape of the excavation target area 102. The point cloud data 442 is data such as the distance between the excavation surface 103 and the laser sensor 104 measured by irradiating the excavation surface 103 with a laser beam at a predetermined timing. The design height data 443 is data indicating the design height of the excavation surface 103 and is calculated from the design data 441. The measured height data 444 is data indicating the height of the excavation surface 103 belonging to a predetermined grid 105a measured at a predetermined timing and is calculated from the point cloud data 442.

[0040] The transmitted / received data 445 is data that is transmitted and received via the network interface 430. The RAM 440 also has an application execution area 446 for executing various application modules.

[0041] The storage 450 stores a database, various parameters, or the following data or programs required to realize this embodiment. The storage 450 stores a data table 301. The data table 301 is a table that manages the relationship between the grid ID 311 and the design data 312, etc., shown in FIG.

[0042] The storage 450 further stores a design data acquisition module 451, a point cloud data acquisition module 452, a grid generation module 453, a difference amount calculation module 454, an excavation state determination module 455, and a display control module 456. The design data acquisition module 451 is a module that acquires design data 107 of the excavation target area 102 being excavated. The point cloud data acquisition module 452 is a module that acquires point cloud data 106 obtained by scanning the excavation target area 102 with a laser beam to measure the three-dimensional shape of the excavation target area 102. The grid generation module 453 is a module that divides the excavation target area 102 into a predetermined mesh size and generates a plurality of grids 105 associated with the excavation target area 102. The difference amount calculation module 454 is a module that calculates a difference amount between the design data 107 belonging to a predetermined grid 105a among the plurality of grids 105 and the point cloud data of the predetermined grid 105a. The excavation state determination module 455 is a module that determines the excavation state of the excavation target area 102 associated with the predetermined grid 105a based on the calculated difference amount. The display control module 456 is a module that displays each of the multiple grids in an identifiable manner based on the determination result. These modules 451 to 456 are read by the CPU 410 into the application execution area 446 of the RAM 440 and executed. The control program 457 is a program for controlling the entire completed form management device 100.

[0043] The input / output interface 460 interfaces input / output data with input / output devices. A display unit 461 and an operation unit 462 are connected to the input / output interface 460. A storage medium 464 may be further connected to the input / output interface 460. A speaker 463 serving as an audio output unit, a microphone (not shown) serving as an audio input unit, or a GPS position determination unit may be further connected. Note that the RAM 440 and the storage 450 shown in FIG. 4 do not show programs and data related to the general-purpose functions of the completed form management device 100 or other feasible functions.

[0044] Next, a processing procedure of the completed form management device 100 will be described with reference to the flowchart shown in Fig. 5. This flowchart is executed by the CPU 410 in Fig. 4 using the RAM 440, and realizes each functional configuration of the completed form management device 100 in Fig. 2.

[0045] In step S501, the design data acquisition unit 201 acquires design data of the excavation target area 102 being excavated. In step S503, the point cloud data acquisition unit 202 acquires point cloud data obtained by scanning the excavation target area 102 with a laser beam to measure the three-dimensional shape of the excavation target area 102. In step S505, the grid generation unit 203 divides the excavation target area 102 into a predetermined mesh size and generates a plurality of grids 105 associated with the excavation target area 102.

[0046] In step S507, the difference amount calculation unit 204 calculates the difference amount between the design data 107 belonging to a predetermined grid 105a among the multiple grids 105 and the point cloud data 106 of the predetermined grid 105a. In step S509, the excavation condition determination unit 205 determines the excavation condition of the excavation target area 102 associated with the predetermined grid 105a based on the calculated difference amount.

[0047] In step S511, the completed form management device 100 judges whether or not the determination of the excavation state has been completed for all grids 105. If the determination of the excavation state has not been completed (NO in step S511), the completed form management device 100 returns to step S507. If the determination of the excavation state has been completed (YES in step S511), the completed form management device 100 proceeds to step S513. In step S513, the display control unit 206 displays each of the multiple grids 105 in an identifiable manner based on the judgment result in step S509.

[0048] According to this embodiment, the excavation state of the excavation target area can be accurately determined, so that the completed form can be reliably managed. In addition, since the determined excavation state is displayed identifiable for each grid, the backhoe operator does not need to get off the backhoe, and other workers do not need to enter and exit the excavation target area, so that the completed form can be managed safely and reliably.

[0049] [Second embodiment] Next, a completed shape management device 600 according to a second embodiment of the present invention will be described with reference to Figs. 6A to 9. Fig. 6A is a block diagram for explaining the configuration of the completed shape management device 600 according to this embodiment. The completed shape management device 600 according to this embodiment differs from the first embodiment in that it has a design data interpolation unit 601. Since the other configurations and operations are similar to those of the first embodiment, the same configurations and operations are denoted by the same reference numerals and detailed description thereof will be omitted.

[0050] The completed form management device 600 further includes a design data interpolation unit 601. The design data interpolation unit 601 determines whether or not there is design data 107 corresponding to each of the plurality of grids 105, and for a grid 105 for which no corresponding design data 107 exists, interpolates the design data 107 of the grid 105 for which no corresponding design data 107 exists from the design data 107 of the plurality of adjacent grids 105.

[0051] Here, the design data acquisition unit 201 acquires the design data 107 of the excavation target area 102, but in relation to each of the generated grids 105, there may be cases where the design data 107 corresponding to some of the grids 105 does not exist.

[0052] For example, depending on the shape of the excavation target area 102, the shape of the generated grid 105 may not be rectangular, and in such a case, design data 107 may not exist for the grid 105. In addition, since the design data 107 is generated before the grid 105 is generated, for example, the design data 107 may not be generated at equal intervals in accordance with the grid 105, but may be generated randomly regardless of the arrangement of the grid 105. In such a case, even if an attempt is made to determine the excavation state for the grid 105, the excavation state cannot be determined because there is no design data 107 that serves as a basis for determination.

[0053] Therefore, in order to avoid a situation in which the excavation state cannot be determined for some grids for which no design data exists, interpolation is performed using the design data of adjacent grids for which design data 107 exists.

[0054] 6B, the interpolation of design data will be described using an example of an excavation target area 620 in which six grids are arranged in the tunnel axial direction 624 and nine grids are arranged in the tunnel width direction 625. For grid 622, design data 621 exists, and for grid 623, design data 621 does not exist.

[0055] First, the interpolation of the design data of the grid 623a where the design data 621 does not exist and which exists between the grid 622a where the design data 621a exists and the grid 622b where the design data 621b exists will be described. That is, the case where the design data is interpolated in the width direction 625 from the grid 621a to the grid 621b will be described. The height of the excavation surface is designed to increase from the grid 622a to the grid 622e.

[0056] First, the design data 621a of the grid 622a and the design data 621b of the grid 622b are connected by a straight line and interpolated, and the height of the position near the center of the grid 623b is linearly interpolated as the height of the grid 623a to obtain the design data of the grid 623a. The design data of the grids 623b, 623c, and 623d can also be interpolated using the design data 621b, 621c, 621d, and 621e. In this way, the design data of the grids 623a, 623b, 623c, and 623d that are located in the width direction 625 from the grid 622a and have no design data can be interpolated. In the same way, the design data of the grids that are arranged in the width direction 625 from the grid 622f and have no design data can be interpolated. In this way, the design data of the grids in the width direction 625 of the excavation target area 620 can be interpolated.

[0057] Next, the interpolation of the design data in the axial direction 624 of the excavation target area 620 will be described. For example, when the design data is to be interpolated in the axial direction 624 from the grid 621a to the grid 621f, as described above, the design data 621a and the design data 621f are connected with a straight line and interpolated, so that the design data of the grid 623 existing between these two grids can be linearly interpolated. By performing such a procedure on the grids arranged in the axial direction 624 from the grids 623a, 623b, 623c, and 623d, the design data of these grids can be interpolated. In this manner, the design data of the grids in which no design data exists in the excavation target area 620 can be interpolated.

[0058] Here, an example of interpolating design data by interpolation has been described for a case where there are grids with design data on both sides of a grid with no design data. However, even if there is a grid with design data on only one side of a grid with no design data, for example, the design data can be interpolated by extrapolating from the design data of the grid on the other side.

[0059] As described above, the interpolation of design data of a grid where no design data exists can be performed by interpolating or extrapolating using the design data of a grid where design data exists and which is aligned in the width direction 625. Similarly, the interpolation of design data of a grid where no design data exists can be performed by interpolating or extrapolating using the design data of a grid where design data exists and which is aligned in the axial direction 624. Even if there are no grids where design data exists that are aligned in the axial direction 624 and width direction 625 of a grid where no design data exists, linear interpolation can be performed from nearby grids where design data exists.

[0060] Then, the difference amount calculation unit 204 uses the interpolated design data to calculate the difference amount of grids 623 etc. for which no design data exists, and the excavation state determination unit 205 can determine the excavation state of grids 623 etc.

[0061] An example of a data table 701 held by the completed form management device 600 will be described with reference to Fig. 7. The data table 701 stores grid sizes 711 in association with grid IDs (identifiers) 311. The grid sizes 711 indicate the length and width (mesh size) of each of the plurality of grids 105. Some of the plurality of grids 105 have a grid size 711 that differs from the size of the other grids 105 depending on the arrangement position of the grid. The design data interpolation unit 601 then interpolates the design data 107 based on the data table 701.

[0062] The hardware configuration of the completed form management device 600 will be described with reference to Fig. 8. The RAM 840 is a random access memory used by the CPU 410 as a work area for temporary storage. A storage area for storing data required to realize this embodiment is secured in the RAM 840. The mesh interval data 841 is data relating to the length and width of the multiple grids 105.

[0063] The storage 850 stores a database, various parameters, or the following data or programs required to realize this embodiment. The storage 850 stores a data table 701. The data table 701 is a table that manages the relationship between the grid ID 311 and the grid size 711 shown in FIG.

[0064] The storage 850 further stores a design data interpolation module 851. The design data interpolation module 851 is a module that determines whether or not there is design data 107 corresponding to a plurality of grids 105, and, for a grid 105 for which no corresponding design data 107 exists, interpolates the design data 107 of the grid 105 for which no corresponding design data 107 exists from the design data 107 of a plurality of adjacent grids 105. This module 851 is read into the application execution area 446 of the RAM 840 by the CPU 410 and executed.

[0065] Next, a processing procedure of the completed form management device 600 will be described with reference to the flowchart shown in Fig. 9. This flowchart is executed by the CPU 410 in Fig. 8 using the RAM 840, and realizes each functional configuration of the completed form management device 600 in Fig. 6.

[0066] In step S901, the design data interpolation unit 601 judges whether or not there is design data 107 corresponding to each of the plurality of grids 105. If there is no grid in which no design data 107 exists (NO in step S701), the completed form management device 600 proceeds to step S507. If there is a grid 105 in which no design data 107 exists, the completed form management device 600 proceeds to step S903. In step S903, the design data interpolation unit 601 interpolates the design data 107 of the grid 105 in which no corresponding design data 107 exists from the design data 107 of the plurality of adjacent grids 105 for the grid 105 in which no corresponding design data 107 exists, thereby interpolating the design data 107 of the grid 105 in which no corresponding design data 107 exists.

[0067] According to this embodiment, since the design data is interpolated, even if the design data exists randomly in the excavation target area, the excavation state can be determined for all the generated grids 105.

[0068] [Third embodiment] Next, a completed shape management device 1000 according to a third embodiment of the present invention will be described with reference to Figs. 10A to 13. Fig. 10A is a block diagram for explaining the configuration of the completed shape management device 1000 according to this embodiment. Fig. 10B is a diagram for explaining the calculation of the difference amount by the completed shape management device 1000 according to this embodiment. The completed shape management device 1000 according to this embodiment is different from the first embodiment in that it has a point cloud data extraction unit 1001 and an average value calculation unit 1002. Since the other configurations and operations are similar to those of the first embodiment, the same configurations and operations are denoted by the same reference numerals and detailed explanations thereof will be omitted.

[0069] The completed form management device 1000 further includes a point cloud data extraction unit 1001 and an average value calculation unit 1002. The point cloud data extraction unit 1001 selects at least one design data 107 from among the design data 107 belonging to a predetermined grid 105a as selected design data 107a, and extracts point cloud data 106 existing in an inner region of a concentric circle 108 of a predetermined radius centered on the selected selected design data 107a as extracted point cloud data 106a. For example, the point cloud data extraction unit 1001 extracts point cloud data 106 existing in an inner region of the concentric circle 108 of a radius of 5 cm.

[0070] The point cloud data 106 is data obtained by thoroughly scanning the entire excavation target area 102 with a laser beam, and a considerable number of data points are obtained. In such a case, if all the point cloud data 106 existing in one grid 105 is picked up, the number of data points to be picked up becomes too large, and the accuracy of the calculation of the average value described later decreases.

[0071] Therefore, the point cloud data extraction unit 1001 narrows down the point cloud data 106 present in one grid 105 to some data and extracts the point cloud data 106. For example, the point cloud data extraction unit 801 extracts 50 points of point cloud data 106 from the point cloud data 106 present in the inner area of ​​the concentric circle 108 in ascending order of distance from the center as extracted point cloud data 106a.

[0072] Then, the average value calculation unit 1002 calculates the height data average value as the average of the height data, which is data in the height direction, for the extracted point cloud data 106a. This makes it possible to calculate the average value with high accuracy.

[0073] Furthermore, when calculating the height data average value, the average value calculation unit 1002 may calculate the height data average value by weighting the point cloud data 106 closer to the center of the concentric circle more heavily and weighting the points farther away from the center less heavily. This allows the average value to be calculated with higher accuracy.

[0074] Then, the difference amount calculation unit 204 calculates the difference amount between the height data average value and the design height data, which is data in the height direction of the design data 107 of the predetermined grid 105a. The excavation state determination unit 205 determines the excavation state of the excavation target area 102 associated with the multiple grids 105 based on the calculated difference amount.

[0075] An example of a data table 1101 held by the completed form management device 1000 will be described with reference to Fig. 11. The data table 1101 stores a distance 1111 in association with a grid ID (identifier) ​​311. The distance 1111 is a distance from the center of the concentric circle 108 to the point cloud data 106 present in an inner region of the concentric circle 108 having a predetermined radius. Then, the point cloud data extraction unit 1001 extracts the point cloud data 106 based on the distance 1111.

[0076] The hardware configuration of the finished shape management device 1000 will be described with reference to Fig. 12. The RAM 1240 is a random access memory used by the CPU 410 as a temporary storage work area. A storage area for storing data required to realize the present embodiment is secured in the RAM 1240. The distance data 1241 represents the distance from the center of the concentric circle 108 of the point cloud data 106 present in the inner area of ​​the concentric circle 108 of a predetermined radius.

[0077] The storage 1250 stores a database, various parameters, or the following data or programs required to realize this embodiment. The storage 1250 stores a data table 1101. The data table 1101 is a table that manages the relationship between the grid ID 311 and the distance 1111 shown in FIG.

[0078] The storage 1250 further stores a point cloud data extraction module 1251 and an average value calculation module 1252. The point cloud data extraction module 1251 is a module that extracts the point cloud data 106 existing in an inner region of a concentric circle 108 having a predetermined radius centered on the selected design data 107a as the extracted point cloud data 106a. The average value calculation module 1252 is a module that calculates a height data average value as an average of height data, which is data in the height direction, for the extracted point cloud data 106a. These modules 1251 to 1252 are read into the application execution area 446 of the RAM 1240 by the CPU 410 and executed.

[0079] Next, a processing procedure of the completed form management device 1000 will be described with reference to the flowchart shown in Fig. 13. This flowchart is executed by the CPU 410 in Fig. 12 using the RAM 1240, and realizes each functional configuration of the completed form management device 1000 in Fig. 10.

[0080] In step S1301, the point cloud data extraction unit 1001 extracts the point cloud data 106 existing in an inner region of a concentric circle 108 having a predetermined radius centered on the selected design data 107a as the extracted point cloud data 106a. In step S1303, the average value calculation unit 1002 calculates a height data average value as an average of height data, which is data in the height direction, for the extracted point cloud data 106a.

[0081] According to this embodiment, the excavation state is determined using point cloud data within a predetermined range centered on the design data, so that more accurate management of the completed form can be performed.

[0082] Although the present invention has been described above with reference to the embodiments, the present invention is not limited to the above-described embodiments and can be modified as appropriate. Various modifications that can be understood by those skilled in the art can be made to the configuration and details of the present invention within the scope of the present invention. In addition, systems or devices that combine separate features included in each embodiment in any way are also included in the scope of the present invention.

[0083] The present invention may be applied to a system consisting of multiple devices, or to a single device. Furthermore, the present invention may be applied to a case where an information processing program for implementing the functions of the embodiment is supplied to a system or device and executed by a built-in processor. Therefore, the technical scope of the present invention includes a program installed on a computer to implement the functions of the present invention with a computer, a medium storing the program, a WWW (World Wide Web) server that downloads the program, and a processor that executes the program. In particular, at least a non-transitory computer readable medium storing a program that causes a computer to execute the processing steps included in the above-mentioned embodiment is included in the technical scope of the present invention.

Claims

1. a design data acquisition unit that acquires design data of an area to be excavated during excavation; a point cloud data acquisition unit that acquires point cloud data obtained by scanning a laser beam over the area to be excavated to measure a three-dimensional shape of the area to be excavated; a grid generating unit that divides the excavation target area into a predetermined mesh size and generates a plurality of grids associated with the excavation target area; a difference amount calculation unit that calculates a difference amount between design data belonging to a predetermined grid among the plurality of grids and point cloud data of the predetermined grid; an excavation state determination unit that determines an excavation state of an excavation target area associated with the predetermined grid based on the calculated difference amount; a display control unit that displays each of the plurality of grids in a distinguishable manner based on a determination result by the excavation state determination unit; A completed form management device equipped with the above.

2. The finished product management device according to claim 1, further comprising a design data interpolation unit that determines whether or not there is design data corresponding to each of the plurality of grids, and for a grid for which no corresponding design data exists, interpolates or extrapolates from the design data of a plurality of adjacent grids to interpolate the design data of the grid for which no corresponding design data exists.

3. a point cloud data extraction unit that selects at least one piece of design data among the design data belonging to the predetermined grid as selected design data, and extracts, as extracted point cloud data, point cloud data existing in an inner region of a concentric circle having a predetermined radius centered on the selected design data; an average value calculation unit that calculates an average value of height data as an average of height data, which is data in a height direction, for the extracted point cloud data; Further equipped with The finished product management device according to claim 1 or 2, wherein the difference amount calculation unit calculates the difference amount between the height data average value and design height data, which is data in the height direction among the design data of the specified grid.

4. The finished product management device according to claim 3, wherein the point cloud data extraction unit extracts 50 point cloud data points from the point cloud data present in the area inside the concentric circles in order of proximity to the center as the extracted point cloud data.

5. The excavation state determination unit is configured to determine whether or not a hit has occurred as the excavation state, in accordance with the completed form management device according to any one of claims 1 to 4.

6. The completed form management device according to claim 5 , wherein the excavation state determination unit further determines a hit amount when it is determined that there is a hit as the excavation state.

7. A design data acquisition step of acquiring design data of an area to be excavated during excavation; a point cloud data acquisition step of acquiring point cloud data obtained by scanning a laser beam over the area to be excavated to measure a three-dimensional shape of the area to be excavated; a grid generating step of dividing the excavation target area into a predetermined mesh size and generating a plurality of grids associated with the excavation target area; a difference amount calculation step of calculating a difference amount between design data of a predetermined grid among the plurality of grids and point cloud data of the predetermined grid; an excavation state determination step of determining an excavation state of an excavation target area associated with the predetermined grid based on the calculated difference amount; A method for managing completed work, including:

8. A design data acquisition step of acquiring design data of an area to be excavated during excavation; a point cloud data acquisition step of acquiring point cloud data obtained by scanning a laser beam over the area to be excavated to measure a three-dimensional shape of the area to be excavated; a grid generating step of dividing the excavation target area into a predetermined mesh size and generating a plurality of grids associated with the excavation target area; a difference amount calculation step of calculating a difference amount between design data of a predetermined grid among the plurality of grids and point cloud data of the predetermined grid; an excavation state determination step of determining an excavation state of an excavation target area associated with the predetermined grid based on the calculated difference amount; A completed work management program that causes a computer to execute the above.

Citation Information

Patent Citations

  • Execution support system of working machine

    JP2006214246A

  • How to control surface modification machine

    JP2008500471A

  • Method of controlling excavation of inverted section

    JP2010085311A

  • System and method for shaping tunnel face

    JP2013117139A

  • Method and system for inspecting inside of container

    JP2017044657A

Cited By

  • Information processing device

    JP2026114424A