The construction method for seismic isolation structures using a steel pipe column with a parallel superstructure and foundation process reduces pile head reinforcement and shortens construction time, enhancing fire resistance and workability.
Patent Information
- Application Number
- JP2023055105
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
AI Technical Summary
Existing pile cap structures in seismic isolation structures require significant reinforcement of pile heads to manage bending moments during earthquakes, and the construction period is lengthy.
A construction method involving a steel pipe column protruding from concrete piles, filled with concrete, where the superstructure and foundation are constructed in parallel, with the pile head not directly connected to the foundation, and a seismic isolation device is installed on the column head, using higher fluidity concrete for improved workability.
Reduces the need for pile head reinforcement, shortens the construction period, and enhances the fire resistance and corrosion resistance of the pile heads while improving the workability of the seismic isolation device installation.
Smart Images

Figure 2024142785000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a construction method for a seismic isolation structure. [Background technology]
[0002] An inverted construction method for a seismic isolation structure is known (see, for example, Patent Documents 1 and 2).
[0003] Also, a pile head structure is known in which a pile head of a concrete pile and a foundation beam spaced apart from the pile head are connected by a concrete-filled steel pipe (see, for example, Patent Document 3). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2014-118756 A [Patent Document 2] JP 2000-291031 A [Patent Document 3] JP 2019-019503 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the pile head structure disclosed in Patent Document 3, the bending moment acting on the pile head during an earthquake is reduced, so that, for example, the need for reinforcement of the pile head can be reduced. Therefore, there is a demand to apply this pile head structure to seismic isolation structures while shortening the construction period.
[0006] In consideration of the above, the present invention aims to shorten the construction period while reducing the reinforcement required for the heads of concrete piles in seismic isolation structures. [Means for solving the problem]
[0007] The construction method for a seismic isolation structure as described in claim 1 comprises a steel pipe column construction process of constructing a steel pipe column that protrudes upward from the pile head of a concrete pile installed in the ground and has at least the lower part filled with concrete, a superstructure construction process of constructing a superstructure on top of a seismic isolation device installed at the column head of the steel pipe column, and a foundation construction process of constructing a concrete foundation that moves upward from the pile head of the concrete pile and is joined to the steel pipe column, in parallel with the superstructure construction process.
[0008] According to the construction method for a seismic isolation structure of claim 1, in the steel pipe column construction step, a steel pipe column is constructed which protrudes upward from the pile head of a concrete pile installed in the ground and has at least the lower part filled with concrete.
[0009] Next, in the superstructure construction process, the superstructure is constructed on the seismic isolation devices installed at the column heads of the steel pipe columns. In the foundation construction process, in parallel with the superstructure construction process, the concrete foundation is constructed, which is separated upward from the pile heads of the concrete piles and joined to the steel pipe columns.
[0010] Here, the concrete foundation is spaced upward from the head of the concrete pile. In other words, the head of the concrete pile is not directly connected to the concrete foundation. This reduces the bending moment acting on the head of the concrete pile during an earthquake, making it possible to reduce the need to reinforce the head of the pile.
[0011] Furthermore, by carrying out the foundation construction process and the superstructure construction process in parallel, the construction period can be significantly shortened compared to constructing the concrete foundation first and then the superstructure.
[0012] In this way, the present invention makes it possible to reduce the construction period while reducing the reinforcement required for the heads of concrete piles in seismic isolation structures.
[0013] The construction method for a seismic isolation structure described in claim 2 is the construction method for a seismic isolation structure described in claim 1, in which, in the foundation construction process, covering concrete is constructed to cover the column heads of the steel pipe columns protruding from the upper surface of the concrete foundation.
[0014] According to the construction method for a seismic isolation structure according to claim 2, in the foundation construction step, coating concrete is constructed to cover the column heads of the steel pipe columns protruding from the upper surface of the concrete foundation. This improves the fire resistance of the column heads of the steel pipe columns protruding from the upper surface of the concrete foundation and also suppresses corrosion of the pile heads.
[0015] Furthermore, for example, by using concrete having a higher fluidity than the concrete foundation for the covering concrete, the workability of the covering concrete is improved.
[0016] The construction method for a seismic isolation structure as described in claim 3 is the construction method for a seismic isolation structure as described in claim 1 or claim 2, and further includes, after the steel pipe column construction step, a seismic isolation device installation step of forming a scaffolding in a pile hole above the pile head of the concrete pile, or excavating the ground around the steel pipe column protruding from the pile head of the concrete pile to form a scaffolding, and installing the seismic isolation device on the column head of the steel pipe column.
[0017] According to the construction method for a seismic isolation structure according to claim 3, a seismic isolation device installation step is provided after the steel pipe column installation step. In this seismic isolation device installation step, a scaffold is formed in a pile hole above the head of the concrete pile, or a scaffold is formed by excavating the ground around the steel pipe column protruding from the head of the concrete pile, and the seismic isolation device is installed on the head of the steel pipe column.
[0018] By securing the scaffolding in this manner, the ease of installation of the seismic isolation device is improved. Effect of the Invention
[0019] As described above, according to the present invention, in a seismic isolation structure, it is possible to reduce the construction period while reducing the reinforcement required for the heads of concrete piles. [Brief description of the drawings]
[0020] [Figure 1] 1 is an elevational view showing a seismic isolation structure constructed by a construction method for a seismic isolation structure according to one embodiment. FIG. [Diagram 2] 2 is an elevational view corresponding to FIG. 1 showing a construction process of a seismic isolation structure according to one embodiment. [Diagram 3] 2 is an elevational view corresponding to FIG. 1 showing a construction process of a seismic isolation structure according to one embodiment. [Figure 4] 2 is an elevational view corresponding to FIG. 1 showing a construction process of a seismic isolation structure according to one embodiment. [Diagram 5] FIG. 2 is an elevational view corresponding to FIG. 1 and showing a modified example of the concrete pile according to the embodiment. [Figure 6] FIG. 2 is an elevational view corresponding to FIG. 1 and showing a modified example of the concrete pile according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] Hereinafter, one embodiment will be described with reference to the drawings.
[0022] (Seismic isolation structure) The configuration of the seismic isolation structure according to this embodiment will be described.
[0023] 1 shows a seismic isolation structure 10 constructed by the construction method for a seismic isolation structure according to this embodiment. As an example, the seismic isolation structure 10 is a mid-to-high rise structure with a base isolation structure. This seismic isolation structure 10 includes concrete piles 20, steel pipe columns 30, a mat slab 50, a seismic isolation device 60, and an upper structure 70, and is constructed by a top-down construction method.
[0024] The mat slab 50 is an example of a concrete foundation.
[0025] (Concrete piles) The concrete piles 20 are cast-in-place concrete piles, and a plurality of them are provided at intervals in the ground G. In each concrete pile 20, a reinforcing bar cage 22 is embedded.
[0026] The reinforcing bar cage 22 has a plurality of main reinforcements 22A and a plurality of hoops 22B. The main reinforcements 22A extend in the axial direction of the concrete pile 20 and are arranged at intervals in the circumferential direction of the concrete pile 20. A plurality of hoops 22B are arranged around the main reinforcements 22A.
[0027] The multiple hoops 22B are formed in an annular shape and surround the multiple main reinforcements 22A. The multiple hoops 22B are arranged at intervals in the axial direction of the concrete pile 20. In this concrete pile 20, the lower part of a steel pipe column 30 is embedded.
[0028] The configuration of the reinforcing bars such as the reinforcing bar cage 22 can be changed as appropriate. Also, the reinforcing bars such as the reinforcing bar cage may be provided as necessary, and can be omitted as appropriate.
[0029] (Steel pipe column) The steel pipe column 30 functions as a structural column in the inverted construction method. The steel pipe column 30 is formed, for example, of a round steel pipe or a square steel pipe. The inside of the steel pipe column 30 is filled with concrete 32. As an example, the concrete 32 is filled from the base to the head of the steel pipe column 30. In other words, the structural column of this embodiment is a concrete-filled steel pipe column (CFT column) over its entire length.
[0030] The lower part of the steel pipe pole 30 is embedded inside the reinforcing bar cage 22 at the upper part of the concrete pile 20. A plurality of studs (headed studs) 34 are provided at the lower part of the steel pipe pole 30. The studs 34 are an example of a shear force transmission member.
[0031] The multiple studs 34 are arranged at intervals in the axial and circumferential directions of the steel pipe pole 30. The multiple studs 34 also protrude from the outer circumferential surface of the steel pipe pole 30 and are embedded in the upper part of the concrete pile 20. These studs 34 increase the adhesion of the steel pipe pole 30 to the concrete pile 20.
[0032] A bearing plate 36 is provided at the lower end of the steel pipe column 30. The bearing plate 36 is made of a steel plate or the like, and closes the lower end opening of the steel pipe column 30. The weight of the upper structure 70 acting on the steel pipe column 30 is transmitted to the concrete pile 20 as a vertical load by the bearing pressure of this bearing plate 36 and the adhesive force of the multiple studs 34 described above.
[0033] The upper part of the steel pipe column 30 protrudes upward from the pile head of the concrete pile 20 and penetrates the mat slab 50 in the vertical direction.
[0034] (Matte Slab) The mat slab 50 is made of reinforced concrete and has slab reinforcement bars (not shown) buried inside. The mat slab 50 is located above the head of the concrete pile 20 and is joined to the upper part of the steel pipe column 30.
[0035] Specifically, a capital 50A is provided at the joint between the mat slab 50 and the steel pipe column 30. The capital 50A is formed integrally with the mat slab 50 by concrete. The capital 50A protrudes downward from the lower surface of the mat slab 50. The capital 50A reinforces the joint between the mat slab 50 and the steel pipe column 30.
[0036] A plurality of studs (headed studs) 38 are provided on the upper portion of the steel pipe pole 30. The plurality of studs 38 are arranged at intervals in the axial and circumferential directions of the steel pipe pole 30. The studs 38 are an example of a shear force transmission member.
[0037] A plurality of studs 38 protrude from the outer circumferential surface of the steel pipe pole 30 and are embedded in the mat slab 50. These studs 38 increase the adhesion of the steel pipe pole 30 to the mat slab 50. In addition, a vertical load is transmitted from the steel pipe pole 30 to the mat slab 50 via the plurality of studs 38.
[0038] Here, the lower surface 50L of the mat slab 50 (capital 50A) is disposed at a position spaced upward from the upper surface 20U of the concrete pile 20. By adjusting the distance D between the lower surface 50L of the mat slab 50 and the upper surface 20U of the concrete pile 20, the bending moment and shear force acting on the pile head of the concrete pile 20 during an earthquake are adjusted.
[0039] In addition, the steel pipe column 30 only needs to be filled with concrete 32 at least in the portion 30P between the upper surface 20U of the concrete pile 20 and the lower surface 50L of the mat slab 50, and for example, the upper portion of the steel pipe column 30 does not need to be filled with concrete 32. In other words, the structural column of this embodiment only needs to be a concrete-filled steel pipe column (CFT column) at least in the portion 30P of the steel pipe column 30.
[0040] In addition, the distance D between the lower surface 50L of the mat slab 50 and the upper surface 20U of the concrete pile 20 can be changed as appropriate to adjust the bending moment and shear force acting on the concrete pile 20, but is preferably approximately 1.0 times the outer diameter of the steel pipe column 30, for example.
[0041] (Seismic isolation device) The column capital of the steel pipe column 30 protrudes upward from the upper surface 50U of the mat slab 50. A seismic isolation device 60 is installed at the column capital of the steel pipe column 30. Specifically, a base plate 40 is provided at the column capital of the steel pipe column 30.
[0042] The base plate 40 is formed of a steel plate or the like, and closes the upper end opening of the steel pipe column 30. A filling hole 42 for filling concrete into the steel pipe column 30 is formed in the center of this base plate 40. Note that the filling hole 42 may be provided as necessary, and may be omitted as appropriate.
[0043] The outer periphery of the base plate 40 protrudes outward in a flange-like shape from the column head of the steel pipe column 30. This base plate 40 is reinforced by a plurality of reinforcing ribs 44. The plurality of reinforcing ribs 44 are provided across the outer periphery of the column head of the steel pipe column 30 and the lower surface of the base plate 40, and support the base plate 40 from below.
[0044] The configuration of the column head of the steel pipe column 30 supporting the seismic isolation device 60 can be modified as appropriate.
[0045] The outer peripheral surface of the column head of the steel pipe column 30 is covered with a covering concrete 52. The covering concrete 52 is formed by pouring concrete between the upper surface 50U of the mat slab 50 and the lower surface of the base plate 40. This covering concrete 52 prevents the column head of the steel pipe column 30 from rusting.
[0046] As an example, the covering concrete 52 is formed of concrete having higher fluidity than the concrete constituting the mat slab 50. As a result, when the covering concrete 52 is constructed, the concrete is filled between the upper surface 50U of the mat slab 50 and the lower surface of the base plate 40 without any gaps.
[0047] The covering concrete 52 may be the same concrete as that constituting the mat slab 50. The covering concrete 52 may be laid together with the mat slab 50, or may be laid after laying the mat slab 50. The covering concrete 52 may be provided as necessary, and may be omitted as appropriate.
[0048] As an example, the seismic isolation device 60 is a laminated rubber bearing. This seismic isolation device 60 supports the upper structure 70 so as to be displaceable in the horizontal direction relative to the steel pipe column 30. Note that the seismic isolation device 60 is not limited to a laminated rubber bearing, and may be, for example, a sliding bearing or a rolling bearing.
[0049] (superstructure) The upper structure 70 is made of steel, reinforced concrete, steel-reinforced concrete, or the like, and constitutes the floor immediately above the seismic isolation layer in which the seismic isolation device 60 is installed, and the upper floors. The upper structure 70 is composed of columns 72 erected on the seismic isolation device 60, beams 74 joined to the columns 72, and the like.
[0050] (Construction method for seismic isolation structures) Next, an example of a construction method for the seismic isolation structure according to this embodiment will be described.
[0051] The construction method for a seismic isolation structure according to this embodiment uses a reverse construction method to construct the seismic isolation structure 10. This construction method includes a pile construction process, a steel pipe column construction process, a seismic isolation device installation process, a superstructure construction process, and a foundation construction process.
[0052] (Pile construction process) As shown in Fig. 2, before an underground space is excavated in the ground G, first, in a pile construction process, a concrete pile 20 is constructed in the ground G by a cast-in-place construction method. Specifically, for example, a pile hole 12 is drilled in the ground G, and a reinforcing bar cage 22 is installed. In this state, concrete for the concrete pile 20 is poured into the pile hole 12.
[0053] The concrete pile 20 can be constructed by various methods such as the earth drill method, the all-casing method, and the reverse method.
[0054] (Steel pipe column construction process) Next, in the steel pipe column installation process, first, the steel pipe column 30 protruding upward from the pile head of the concrete pile 20 installed in the ground G is installed.
[0055] Specifically, the steel pipe pole 30 is lifted up by a lifting machine (not shown) or the like, and the lower part of the steel pipe pole 30 is dropped onto the upper part of the unhardened concrete pile 20. In this state, the level of the steel pipe pole 30 is adjusted, etc., and the concrete pile 20 is hardened. As a result, the lower part of the steel pipe pole 30 is embedded in the upper part of the concrete pile 20, and the upper part of the steel pipe pole 30 protrudes upward from the pile head of the concrete pile 20.
[0056] In addition, for example, a plurality of studs 34, 38, a support plate 36, and a base plate 40 are attached to the steel pipe column 30 in advance.
[0057] Next, concrete 32 is filled into the steel pipe column 30. Specifically, the concrete 32 is filled (cast) into the steel pipe column 30 through the filling hole 42 (see FIG. 2) of the base plate 40 provided at the column head of the steel pipe column 30, and hardened. At this time, the concrete 32 is filled into the steel pipe column 30 so that the concrete 32 reaches at least the lower surface 50L of the mat slab 50 to be constructed.
[0058] (Seismic isolation device installation process) Next, as shown in FIG. 3, in the seismic isolation device installation process, a scaffold is formed in the pile hole 12 on the pile head of the concrete pile 20, and a seismic isolation device 60 is installed on the column head of a steel pipe column 30 serving as a structural column.
[0059] Specifically, a slope is formed on the inner peripheral surface of the pile hole 12 above the head of the concrete pile 20 by heavy machinery (not shown) to ensure a working space. In addition, a temporary scaffold such as a workbench (not shown) is set up on the upper surface 20U of the concrete pile 20 exposed in the pile hole 12. The slope of the pile hole 12 may be formed as necessary and may be omitted as appropriate.
[0060] Next, the seismic isolation device 60 is lifted up by a lifting machine (not shown) or the like, and placed on the base plate 40 of the steel pipe column 30. At this time, for example, the seismic isolation device 60 is positioned on the base plate 40 of the steel pipe column 30 from a scaffolding temporarily set up on the upper surface 20U of the concrete pile 20, and the lower flange of the seismic isolation device 60 is fixed to the base plate 40 with bolts or the like.
[0061] In this embodiment, the pile hole 12 is not backfilled after the construction of the concrete pile 20. However, if the pile hole 12 is backfilled after the construction of the concrete pile 20, for example, in the seismic isolation device installation process, the ground G around the steel pipe column 30 protruding from the pile head of the concrete pile 20 is excavated, and scaffolding is temporarily installed at the bottom of the excavation. In addition, the configuration and arrangement of the scaffolding for constructing the seismic isolation device 60 can be appropriately changed.
[0062] (Superstructure construction process) Next, as shown in Fig. 4, in the superstructure construction process, the superstructure 70 is constructed on the seismic isolation device 60. Specifically, columns 72 are erected on the seismic isolation device 60, and beams 74 are erected on the columns 72. Thereafter, the upper floors (not shown) of the seismic isolation structure 10 are constructed in sequence.
[0063] (Foundation construction process) In addition, the foundation construction process is carried out in parallel with the superstructure construction process. Here, "parallel" means that the construction periods of the superstructure construction process and the foundation construction process overlap at least partially, regardless of the start time of the superstructure construction process and the foundation construction process. Therefore, for example, after the erection of the steel frame of the columns 72 and beams 74 of the superstructure is completed, the slab of the superstructure 70 and the mat slab 50 may be constructed in parallel.
[0064] In this foundation construction process, a mat slab 50 is constructed, which is disposed upward from the pile head of the concrete pile 20 and joined to the upper part of the steel pipe column 30. Specifically, first, the ground G around the steel pipe column 30 is excavated to form an underground space.
[0065] Next, the bottom of the excavation is prepared, and with slab reinforcement and the like arranged on top of it, concrete for the mat slab 50 is poured up to a predetermined height of the steel pipe column 30 and allowed to harden. As a result, the multiple studs 38 provided on the upper part of the steel pipe column 30 are embedded in the mat slab 50, and the steel pipe column 30 and the mat slab 50 are joined via these studs 38.
[0066] In addition, the mat slab 50 is constructed so that a predetermined distance D is provided between the upper surface 20U of the concrete pile 20 and the lower surface 50L of the mat slab 50. This reduces the bending moment acting on the head of the concrete pile 20 during an earthquake.
[0067] Next, the column head of the steel pipe column 30 protruding upward from the upper surface 50U of the mat slab 50 is covered with covering concrete 52. Specifically, a formwork (not shown) is temporarily installed around the column head of the steel pipe column 30, and concrete for the covering concrete 52 is poured inside the formwork and allowed to harden. In this way, the covering concrete 52 is applied.
[0068] (Action and Effects) Next, the operation and effects of this embodiment will be described.
[0069] As described above, according to the construction method for a seismic isolation structure of this embodiment, in the steel pipe column construction process, a steel pipe column 30 is constructed which protrudes upward from the pile head of a concrete pile 20 installed in the ground G and has at least the lower part filled with concrete 32.
[0070] Next, in the superstructure construction process, the superstructure 70 is constructed on the seismic isolation devices 60 installed at the column heads of the steel pipe columns 30. In addition, in the foundation construction process, in parallel with the superstructure construction process, the mat slab 50 is constructed, which moves upward from the pile heads of the concrete piles 20 and is joined to the steel pipe columns 30.
[0071] Here, the mat slab 50 is spaced upward from the pile head of the concrete pile 20. In other words, the pile head of the concrete pile 20 is not directly joined to the mat slab 50. This reduces the bending moment acting on the pile head of the concrete pile 20 during an earthquake, and therefore reduces the need for reinforcement of the pile head.
[0072] During an earthquake, the portion 30P of the steel pipe column 30 between the upper surface 20U of the concrete pile 20 and the lower surface 50L of the mat slab 50 is deformed, thereby reducing the fixation of the head of the concrete pile 20. Therefore, the bending moment acting on the head of the concrete pile 20 is further reduced.
[0073] Furthermore, by adjusting the distance D (see FIG. 1) between the lower surface 50L of the mat slab 50 and the upper surface 20U of the concrete pile 20, the bending moment and shear force acting on the pile head of the concrete pile 20 during an earthquake can be adjusted.
[0074] Furthermore, by carrying out the foundation construction process and the superstructure construction process in parallel, the construction period can be significantly shortened compared to constructing the mat slab 50 first and then the superstructure 70.
[0075] Furthermore, in the foundation construction process, coating concrete 52 is constructed to cover the column heads of the steel pipe columns 30 protruding from the upper surface 50U of the mat slab 50. As a result, the coating concrete 52 can suppress corrosion of the column heads of the steel pipe columns 30 protruding from the upper surface 50U of the mat slab 50.
[0076] Furthermore, for example, by using concrete having higher fluidity than the mat slab 50 for the covering concrete 52, the workability of the covering concrete 52 is improved.
[0077] In the seismic isolation device installation process, a scaffold is formed in the pile hole 12 on the pile head of the concrete pile 20, and the seismic isolation device 60 is installed on the column head of the steel pipe column 30. By securing the scaffold in this manner, the workability of the seismic isolation device 60 is improved.
[0078] (Modification) Next, a modification of the above embodiment will be described.
[0079] As in the modified example shown in Fig. 5, the concrete pile 80 may be a cast-in-place steel pipe concrete pile. Specifically, a steel pipe 82 is provided around the pile head of the concrete pile 80.
[0080] The steel pipe 82 is joined, for example, by welding to the upper end of the reinforcing bar cage 22. The inside of the steel pipe 82 is filled with concrete 32. By reinforcing the pile head of the concrete pile 80 with this steel pipe 82, for example, it is possible to reduce the pile head reinforcing bar, etc.
[0081] Next, as in the modified example shown in Fig. 6, the concrete pile 20 may be reinforced by a reinforcing plate (reinforcing ring) 90. Specifically, the reinforcing plate 90 is formed into a ring shape by a strip-shaped steel plate or the like. This reinforcing plate 90 is disposed along the inner periphery of the reinforcing bar cage 22 and joined to the reinforcing bar cage 22 by welding or the like.
[0082] A plurality of reinforcing plates 90 are provided at intervals in the axial direction of the concrete pile 20, and surround the steel pipe pole 30. This prevents the concrete pile 20 from being destroyed by punching when the concrete pile 20 is radially supported by the steel pipe pole 30 during an earthquake. The reinforcing plates 90 also function as guide members when the reinforcing cage 22 is manufactured. This improves the manufacturability of the reinforcing cage 22.
[0083] In the above embodiment, the steel pipe column 30 is provided with a plurality of studs 34, 38 as shear force transmission members. However, the shear force transmission members are not limited to the studs 34, 38, and may be, for example, stud bolts, shear connectors, etc. Also, the shear force transmission members may be provided as necessary and may be omitted as appropriate.
[0084] In the above embodiment, the lower part of the steel pipe pole 30 is buried in the concrete pile 20, and then the steel pipe pole 30 is filled with concrete 32. However, for example, the lower part of the steel pipe pole 30 previously filled with concrete 32 may be buried in the concrete pile 20.
[0085] In the above embodiment, concrete for the concrete pile 20 is poured into the pile hole 12, and then the lower part of the steel pipe pole 30 is dropped into the concrete pile 20. However, for example, concrete for the concrete pile 20 may be poured into the pile hole 12 while the reinforcing bar cage 22 and the lower part of the steel pipe pole 30 are inserted into the pile hole 12 and the steel pipe pole 30 is held in position.
[0086] In the above embodiment, the steel pipe column 30 is embedded in the concrete pile 20, and then the seismic isolation device 60 is installed on the column head of the steel pipe column 30. However, for example, the lower part of the steel pipe column 30 on whose column head the seismic isolation device 60 has been installed in advance may be embedded in the concrete pile 20.
[0087] In the above embodiment, the concrete foundation is the mat slab 50. However, the concrete foundation is not limited to the mat slab 50, and may be, for example, a concrete foundation beam of reinforced concrete construction or a concrete footing.
[0088] Moreover, the seismic isolation structure 10 according to the above embodiment does not have a basement floor in addition to the seismic isolation layer. However, the seismic isolation structure 10 may have a basement floor, for example, between the seismic isolation device 60 and the mat slab 50. In other words, the seismic isolation structure 10 may have an intermediate floor seismic isolation structure. Also, the seismic isolation structure 10 may have a column capital seismic isolation structure.
[0089] Although one embodiment of the present invention has been described above, the present invention is not limited to such an embodiment, and one embodiment and various modified examples may be used in appropriate combination, and it is of course possible to implement the present invention in various forms without departing from the gist of the present invention. [Explanation of symbols]
[0090] 10 Seismic isolation structures 12 Pilehole 20 Concrete piles 30 Steel pipe column 32 Concrete 50 Mat slab (concrete foundation) 52 Covering concrete 70 Superstructure 80 Concrete piles G. Ground
Claims
1. A steel pipe column construction process for constructing a steel pipe column that protrudes upward from a pile head of a concrete pile installed in the ground and has at least a lower portion filled with concrete; An upper structure construction process of constructing an upper structure on the seismic isolation device installed at the column head of the steel pipe column; A foundation construction process in which a concrete foundation is constructed in parallel with the upper structure construction process, the concrete foundation being moved upward from the pile head of the concrete pile and joined to the steel pipe column; A construction method for a seismic isolation structure comprising:
2. In the foundation construction step, a covering concrete is applied to cover the column capital of the steel pipe column protruding from the upper surface of the concrete foundation. A method for constructing a seismic isolation structure according to claim 1.
3. After the steel pipe column installation process, A seismic isolation device installation process is provided for forming a scaffold in a pile hole on the head of the concrete pile, or for excavating the ground around the steel pipe column protruding from the head of the concrete pile to form a scaffold, and installing the seismic isolation device on the head of the steel pipe column. A method for constructing a seismic isolation structure according to claim 1 or 2.
Citation Information
Patent Citations
Constructing method for base isolation building
JP2001173269A
Base-isolated building and construction method for the same
JP2014118756A
Base-isolated structure and construction method for the same
JP2017089349A
Pile head structure
JP2019019503A
Seismic isolation system between floor and foundation comprising a ball and socket joint and elastic or elastomeric element
US6324795B1