Spray construction device and tunnel spray construction method

The spray construction device with a dual-boom configuration allows for simultaneous, non-interfering operation of spray nozzles, enhancing efficiency and safety by positioning the second boom higher and restricting its movement to prevent interference and tilting.

JP2024143185AActive Publication Date: 2024-10-11TOKYU CONSTR CO LTD +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023055719
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11
Estimated Expiration
2043-03-30

AI Technical Summary

Technical Problem

Existing spray construction devices face inefficiencies due to interference between multiple spray nozzles when used simultaneously, leading to reduced construction efficiency and safety concerns.

Method used

A spray construction device with a first boom and a second boom, each equipped with a spray nozzle, where the second boom is positioned higher and can move in the longitudinal direction, with a swing section located behind the first boom, allowing for non-interfering simultaneous operation of both nozzles.

Benefits of technology

Enables efficient and safe simultaneous spraying on both the upper and lower halves of the tunnel face without interference, reducing working time and maintaining safety by preventing the second boom from tilting towards a depression angle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143185000001_ABST
    Figure 2024143185000001_ABST
Patent Text Reader

Abstract

To provide a spray construction device that can perform efficient spraying work without interference between multiple spray nozzles.SOLUTION: A spraying construction device 1 for spraying a hardening material onto a tunnel excavation face includes a base machine 2 with traveling means, a first boom 3 that has a base 31 attached to the front surface 21 of a base machine, a first spray nozzle 33 attached to the tip 32 of the first boom, a second boom 4 that extends from a swivel part 41 attached to the top surface 22 of the base machine so as to be movable in the fore-and-aft direction of the vehicle, and a second spray nozzle 4 that is attached to the tip 42 of the second boom.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a spraying construction device for spraying a hardening material such as sprayed concrete onto the excavated surface of a tunnel, and a spraying construction method for a tunnel. [Background technology]

[0002] In the construction of mountain tunnels, by spraying quick-setting shotcrete onto the excavation surface at the same time as the excavation work of breaking up the ground with breakers, etc., it is possible to immediately reinforce the face if it falls. In short, it is desirable to carry out excavation work without compromising the stability of the face.

[0003] Therefore, for example, as disclosed in Patent Document 1, the efficiency of spraying work can be improved by using a spraying device in which a nozzle for spraying lining spray material is provided at the tip side of each of three actuators.

[0004] In addition, as disclosed in Patent Document 2, a large-scale tunnel construction spraying work device is also known that has a spray nozzle at the end of a long manipulator so that it can pass over the area above the soil and sand in front of the face generated by excavation. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2019-27117 A [Patent Document 2] Patent No. 6263339 Summary of the Invention [Problem to be solved by the invention]

[0006] However, even if multiple spray nozzles are provided as disclosed in Patent Document 1, if the bases of the booms supporting them are concentrated at the front of the vehicle, for example, when spraying is performed simultaneously using the spray nozzles of both the upper and lower booms, interference as described below may occur, and it cannot necessarily be said that spraying work can be performed efficiently.

[0007] Therefore, an object of the present invention is to provide a spraying construction device and a spraying construction method for tunnels that enable efficient spraying construction without interference between multiple spray nozzles. [Means for solving the problem]

[0008] In order to achieve the above-mentioned object, the spraying construction device of the present invention is a spraying construction device for spraying a hardening material onto the excavated surface of a tunnel, and comprises a base machine having a traveling means, a first boom whose base is attached to the front of the base machine vehicle, a first spray nozzle attached to the tip of the first boom, a second boom extending from a swivel part attached to the upper surface side of the base machine so as to be movable in the fore-and-aft direction of the vehicle, and a second spray nozzle attached to the tip of the second boom, characterized in that the swivel part is positioned at a higher position than the base of the first boom and the second boom is longer than the first boom.

[0009] Here, the swivel section can be positioned at a position more than 2 m higher than the ground surface of the base machine, and the movement of the second boom can be limited to an elevation angle from the horizontal.

[0010] In addition, the invention relates to a tunnel spray construction method, which is a tunnel spray construction method using the above-mentioned spray construction device, and is characterized in that it includes the steps of setting the rotating section behind the base of the first boom and moving the second boom and the first boom toward the elevation angle, and spraying the hardening material onto the excavation surface using both the first spray nozzle and the second spray nozzle facing the excavation surface.

[0011] Another tunnel spray construction method invention is characterized by including a step of setting the movement of the second boom so that it is limited to an elevation angle from the horizontal, and a step of spraying the hardening material onto the excavation surface using both the first spray nozzle and the second spray nozzle facing the excavation surface. Effect of the Invention

[0012] The spray construction apparatus and tunnel spray construction method of the present invention configured in this manner has, in addition to a first boom having a first spray nozzle whose base is attached to the front of the base machine vehicle, a second spray nozzle is also arranged at the tip of a second boom extending from a swivel part attached to the upper surface of the base machine so as to be movable in the fore-and-aft direction of the vehicle.

[0013] Here, if the heights at which the spray nozzle booms are attached to the base machine are different, the two upper and lower booms will not interfere with each other, and spraying can be carried out on specific locations on the upper and lower halves of the face, or on each, simultaneously.

[0014] Furthermore, by retracting the rotating portion of the second boom of the upper second spray nozzle toward the rear of the vehicle, the range of spraying by the first boom of the lower first spray nozzle can be expanded upward. In short, the range and time that can be sprayed by both the first and second spray nozzles can be increased, thereby shortening the work time and enabling more efficient spraying.

[0015] In addition, the two booms are mounted at different heights, with the rotating part of the upper second boom located more than 2m above the ground surface of the base machine. By applying a limiter to prevent the second boom from tilting toward the depression angle from the horizontal, it is possible to prevent a decrease in safety compared to when a single conventional boom is used. [Brief description of the drawings]

[0016] [Figure 1] 1 is an explanatory diagram showing a schematic configuration of a spray application device according to an embodiment of the present invention; [Diagram 2] FIG. 4 is an explanatory diagram illustrating a schematic view of the movable range of the second boom in the up-down direction. [Diagram 3] FIG. 2 is an explanatory diagram showing the spray application situation using two spray nozzles, viewed from the rear side of the spray application device. [Figure 4] FIG. 2 is an explanatory diagram illustrating an example of a spray application situation using two spray nozzles. [Diagram 5] FIG. 2 is an explanatory diagram showing a schematic diagram of the situation in which the upper and lower halves of a tunnel face are sprayed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is an explanatory diagram showing a schematic configuration of a spray application apparatus 1 according to the present embodiment.

[0018] The spraying construction device 1 of this embodiment is used to spray a hardening material such as quick-setting sprayed concrete onto the excavation surface of a tunnel, such as the face. At the excavation site of a mountain tunnel or other such tunnel, the excavation condition of the excavation surface, such as the face, is checked after excavation and blasting, and additional excavation (ground breaking) is performed with an excavator such as a breaker for areas where excavation is insufficient.

[0019] By simultaneously performing the excavation work of breaking up the ground with the breaker and spraying concrete with the spraying construction device 1, even if the face of the tunnel falls off, it can be immediately reinforced. In other words, the excavation work can be performed without compromising the stability of the face of the tunnel.

[0020] As shown in Figure 1, the spray construction device 1 of this embodiment comprises a base machine 2, a first boom 3 having a base 31 attached to the front of the base machine 2, a first spray nozzle 33 attached to the tip 32 of the first boom 3, a second boom 4 extending from a swivel section 41 attached to the upper surface side of the base machine 2 so as to be movable in the fore-and-aft direction of the vehicle, and a second spray nozzle 43 attached to the tip 42 of the second boom 4.

[0021] The vehicle to be used as the base machine 2 is not particularly limited, and can be a general-purpose spray machine with an erector that has a self-propelled running means such as tires or crawlers, which can be modified to be used.

[0022] The base machine 2 is equipped with at least two spray booms. The booms may be the spray booms provided on the base machine 2 or may be modified to use a basket boom.

[0023] Of the at least two spraying booms, the first boom 3 has a base 31 attached, for example, at the center in the vehicle width direction at a low position near the front surface 21 of the base machine 2. The first boom 3 can rotate left and right and move up and down around the base 31.

[0024] When using an erector-equipped sprayer as the base machine 2, the tip 32 of the first boom 3 is provided with a spray nozzle serving as the first spray nozzle 33. From the outlet at the tip of the first spray nozzle 33, sprayed concrete can be discharged forward.

[0025] The second boom 4 of the at least two spraying booms can be, for example, a modified basket boom provided on the base machine 2. The second boom 4 extends from a swivel section 41 that is attached to the upper surface 22 of the base machine 2 so as to be movable in the fore-and-aft direction of the vehicle.

[0026] The second boom 4 must be able to position the outlet of the second spray nozzle 43 at the same position in the fore-and-aft direction of the vehicle as the outlet of the first spray nozzle 33, even when the base swivel section 41 has moved rearward of the base 31 of the first boom 3, so the length of the second boom 4 at its maximum extension is longer than that of the first boom 3.

[0027] The swivel unit 41 may be any mechanism that can swivel the second boom 4 in the left-right direction and raise and lower it in the up-down direction. The swivel unit 41 can be moved to any position along a guide that is extended on the upper surface 22 of the base machine 2 in the vehicle front-rear direction.

[0028] When a basket boom is used, the tip 42 of the second boom 4 is formed into a basket shape, so a spray nozzle that serves as the second spray nozzle 43 is attached, for example, to the underside of the tip. The second spray nozzle 43 is configured similarly to the first spray nozzle 33, and can spray concrete forward from the outlet at the tip.

[0029] The first spray nozzle 33 and the second spray nozzle 43 are supported by a support arm (not shown) that can move the position of the discharge port back and forth and rotate to change the direction of the discharge port.

[0030] 2 is an explanatory diagram showing a schematic diagram of the vertical movable range of the second boom 4. Since the second boom 4 rises and falls around the swivel part 41, the distance from the construction base surface SB when the second boom 4 is horizontal is determined by the height at which the swivel part 41 is disposed.

[0031] For example, if the upper surface 22 of the base machine 2 is located 2 m or more higher than the tire contact surface, the swivel section 41 will be located 2 m or more higher than the construction base surface SB. A mechanical or electronic limiter function can be used to prevent the second boom 4 from moving to the depression angle side, in other words, to limit the movement from the horizontal to the elevation angle side.

[0032] By limiting the range of motion of the second boom 4 in this manner, the worker W can work safely even in front of the base machine 2, since the worker W's height generally does not exceed 2m.

[0033] Next, a tunnel spraying method using the spraying construction device 1 of this embodiment will be described with reference to Figs. Below, we will explain the construction of a mountain tunnel using the NATM method as an example.

[0034] When constructing a tunnel using the NATM method, excavation is carried out while spraying quick-setting sprayed concrete onto soft ground or ground with developed cracks with a spraying construction device 1 from the rear of excavation equipment such as a breaker or backhoe or heavy machinery such as a wheel loader. This makes it possible to safely proceed with excavation while preventing the ground from collapsing.

[0035] Furthermore, if the second boom 4 of the spraying construction device 1 is configured so that the entire boom including the second spray nozzle 43 is positioned 2 m or higher above the construction base surface SB when the second boom 4 is extended horizontally, then by providing a limiter function to prevent the second boom 4 from being tilted downward, it becomes unnecessary to require the clearance of people around the spraying boom. For example, in an emergency when the second boom 4 is extended, the worker W can pass under the second boom 4 and evacuate.

[0036] Furthermore, if the minimum height of the second boom 4, which is one of the two booms (3, 4), is 2 m or more, which exceeds the height of the worker W, the worker W will not be caught between the two booms (3, 4) carrying the spray nozzles (33, 43), and therefore safety will not be reduced compared to the case where one boom is used.

[0037] By the way, in order to increase the speed of spraying work using a spraying machine, such as face spraying and primary and secondary spraying around shoring, it is desirable to add a boom with a spray nozzle. However, simply adding more spray nozzles is not enough, and in the following cases, even if more nozzles are added, it may not lead to an improvement in construction efficiency.

[0038] For example, as disclosed in Patent Document 1, a spraying device is known in which the number of spray nozzles is increased to two by attaching the base of the boom in parallel, either left and right or top and bottom, at the same position in the tunnel excavation direction (front and rear of the vehicle).

[0039] When spraying with such a spraying device, even if the spraying work is performed by dividing the areas above and below or to the left and right of the excavation face, the booms will interfere with each other at the boundaries between the areas, and operations must be performed to avoid the interference, which reduces the efficiency of the work.

[0040] In addition, when performing primary and secondary spraying of tunnel supports, if the booms are lined up on the left and right, it is not possible to work on just the right side or just the left side of the tunnel simultaneously using both spray nozzles, so the effect of additional work cannot be obtained.

[0041] On the other hand, if the booms are lined up one above the other, the lower boom will be blocked by the upper boom, and when spraying work on the right footing (the lower part of the right side of the face) and the left footing (the lower part of the left side of the face), two spray nozzles cannot be used simultaneously, so the benefit of adding more nozzles will not be obtained.

[0042] The spray construction device 1 of this embodiment, which was developed to solve these problems, has booms (3, 4) equipped with spray nozzles (33, 43) arranged in two tiers, approximately one above the other, and the rotating section 41, which forms the base of the upper second boom 4, can be moved further rearward on the vehicle than the base 31 of the lower first boom 3.

[0043] Two booms (3, 4) that can swing up and down and left and right are arranged at different heights on the front surface 21 and the top surface 22 of the spraying construction device 1, so that the left and right footings can be sprayed simultaneously by both of the two booms (3, 4), as shown in Figure 3.

[0044] Figure 3 shows a schematic diagram of the situation where two spray nozzles (33, 43) are being used to spray the left side (left footing) of the lower half T2 (of the upper half T1 and lower half T2) of the tunnel face T, which is the excavation surface. The reason why multiple spray nozzles (33, 43) can be used simultaneously to efficiently perform spraying work in this way is that the heights of the bases (31, 41) of the two booms (3, 4) are separated by H, so that no interference occurs even if they are moved simultaneously.

[0045] Furthermore, as shown in Figure 4, by retracting the rotating section 41, which forms the base of the second boom 4 on the upper surface 22, to the rear of the vehicle, the primary spraying near the top edge of the upper half surface T1 of the working face T can be performed simultaneously using the two upper and lower booms (3, 4).

[0046] In Figure 4, the bases (31, 41) of the two booms (3, 4) are spaced apart by L in the fore-and-aft direction of the vehicle, so not only do they not interfere with each other when the booms (3, 4) are moved at the same elevation angle θ, but the spray nozzles (33, 43) do not interfere with each other even when the elevation angle of the first boom 3 increases by α. Therefore, by simultaneously spraying a narrow area near the top of the upper half surface T1 with the two spray nozzles (33, 43), it becomes possible to ensure the stability of the excavation surface in a short time.

[0047] 5 is an explanatory diagram showing a schematic diagram of a situation in which the upper half T1 and the lower half T2 of a tunnel face T are sprayed by two spray nozzles (33, 43). In the spraying construction device 1 of this embodiment, the heights of the bases (31, 41) of the two booms (3, 4) having the spray nozzles (33, 43) are different, so that the upper half T1 and the lower half T2 can be sprayed without interference from the two booms (3, 4).

[0048] As described above with reference to Figures 3 and 4, the excavation surface can be stabilized in a short time by simultaneously spraying with two spray nozzles (33, 43) facing each other at specific locations. On the other hand, as shown in Figure 5, by moving two non-interfering booms (3, 4) respectively, the upper half T1 and the lower half T2 of the right half or the left half of the face T can be simultaneously sprayed with the spray nozzles (33, 43) facing each other, thereby shortening the work time.

[0049] Next, the operation of the spray construction device and the tunnel spray construction method of this embodiment will be described. The spray construction device 1 configured in this manner has, in addition to a first boom 3 having a first spray nozzle 33 whose base 31 is attached near the front surface 21 at the front of the base machine 2, a second spray nozzle 43 is also arranged at the tip 42 of a second boom 4 extending from a swivel part 41 attached to the upper surface 22 of the base machine 2 so as to be movable in the fore-and-aft direction of the vehicle.

[0050] Here, as shown in Figures 3 and 5, if the mounting positions of the booms (3, 4) of the spray nozzles (33, 43) on the base machine 2 are separated by a distance H, the two booms (3, 4) can simultaneously spray specific locations on the upper half T1 and lower half T2 of the face T, or each of the upper half T1 and lower half T2, without interfering with each other.

[0051] Furthermore, as shown in Figure 4, by retracting the rotating portion 41 of the second boom 4 of the upper second spray nozzle 43 toward the rear of the vehicle and providing a distance L in the fore-and-aft direction of the vehicle between the bases (31, 41), the spraying range of the first boom 3 of the lower first spray nozzle 33 can be expanded upward, for example by an elevation angle α.

[0052] In this way, the area and time during which the first spray nozzle 33 and the second spray nozzle 43 can be simultaneously sprayed is increased, thereby enabling efficient spraying, such as shortening the work time.

[0053] In addition, the mounting heights of the two booms (3, 4) are different, with the swivel section 41 of the upper second boom 4 being located at a position more than 2 m above the ground surface of the base machine 2. As a result, a limiter is applied to prevent the second boom 4 from tilting toward the depression angle from the horizontal, and as a result, one of the two booms (3, 4) will exceed the height of the worker W.

[0054] With this configuration, even if two spray nozzles (33, 43) are installed, there is no risk of being pinched between the two booms (3, 4), and therefore safety is not reduced by the installation compared to the case where a single boom is used.

[0055] Although an embodiment of the present invention has been described in detail above with reference to the drawings, the specific configuration is not limited to this embodiment, and design changes that do not deviate from the gist of the present invention are included in the present invention.

[0056] For example, in the above embodiment, a spray construction device 1 has been described in which a spray nozzle (33, 43) is attached to the tip of each of two booms (3, 4), but this is not limited to this, and the spray construction device may be configured to have three or more booms with spray nozzles attached to a base machine. [Explanation of symbols]

[0057] 1: Spraying equipment 2: Base machine 21: Front (front of vehicle) 22:Top surface 3: First boom 31: Base 32:Tip 33: First spray nozzle 4: Second boom 41: Swivel section 42:Tip 43: Second spray nozzle T: Face (excavation surface)

Claims

1. A spraying construction device for spraying a hardening material onto the excavation surface of a tunnel, A base machine having a traveling means; A first boom having a base portion attached to a vehicle front of the base machine; A first spray nozzle attached to a tip end of the first boom; A second boom extending from a rotating part attached to an upper surface side of the base machine so as to be movable in the front-rear direction of the vehicle; a second spray nozzle attached to a tip of the second boom, A spraying construction device, characterized in that the rotating part is disposed at a higher position than the base part of the first boom, and the second boom is longer than the first boom.

2. The spraying construction device according to claim 1, characterized in that the rotating section is positioned at a position 2 m or more higher than the ground surface of the base machine, and the movement of the second boom is limited to an elevation angle from the horizontal.

3. A tunnel spraying method using the spraying construction device according to claim 1 or 2, setting the rotating section rearward of the vehicle from a base of the first boom and moving the second boom and the first boom toward an elevation angle side; A tunnel spraying construction method, comprising the step of spraying the hardening material onto the excavation surface using both the first spray nozzle and the second spray nozzle facing the excavation surface.

4. A tunnel spraying method using the spraying construction device according to claim 2, A step of setting the second boom so that the movement of the second boom is limited to an elevation angle side from a horizontal direction; A tunnel spraying construction method, comprising the step of spraying the hardening material onto the excavation surface using both the first spray nozzle and the second spray nozzle facing the excavation surface.

Citation Information

Patent Citations

  • - Concrete spraying robot cart

    JP1984074867U

  • Work machine for track