Work machine

The working machine suppresses load swing by calculating and controlling the load's support point movement, improving efficiency by reducing wait times for load swings to stop.

JP2024143627APending Publication Date: 2024-10-11HITACHI CONSTRUCTION MACHINERY CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023056401
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing hydraulic excavator cranes experience reduced work efficiency due to the need to wait for load swings to stop, which prolongs the time required for operations.

Method used

A working machine equipped with an angle sensor, load sensor, and controller that calculates the swing of a suspended load and controls the movement of the load's support point to suppress swing effectively, using actuators to move the load towards a target stop position.

Benefits of technology

The solution allows for more effective suppression of load swing, enhancing work efficiency by minimizing waiting times for load swings to cease.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143627000001_ABST
    Figure 2024143627000001_ABST
Patent Text Reader

Abstract

To provide a work machine capable of more effectively suppressing swing of load.SOLUTION: In a work machine (100) equipped with a vehicle body (101, 102), front work devices (104, 105, 106), and a controller, a controller (110) calculates the amount of swing of suspended load when a suspended load (1) is moved toward a target stop position by at least one of a front operation, a turning operation, and a traveling operation by the front work device, and then temporarily started and stopped just before the target stop position, and executes control to move the load fulcrum of the suspended load toward the target stop position at the timing when the suspended load is displaced toward the target stop position in the swing trajectory of the suspended load.SELECTED DRAWING: Figure 13
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a work machine, and more particularly to a work machine capable of performing load lifting operations. [Background technology]

[0002] In crane work with hydraulic excavators, there is a control technology for suppressing swing of the suspended load by limiting deceleration or operating speed before starting and stopping front and rotating operations. As an example, paragraph 0015 of the specification of Patent Document 1 discloses that "the construction machine vehicle according to the fourth invention is a construction machine vehicle capable of performing load hoisting work, in which a work machine attitude detection means and a load detection means are provided at key points of the load hoisting machine, detection signals from the work machine attitude detection means and the load detection means are transmitted to a control device that controls a drive device of the load hoisting machine to control the load hoisting machine, and a pilot operated valve in a hydraulic circuit constituting the drive device is controlled so as to decelerate or stop the operation speed of the work machine as the load of the suspended load of the work machine approaches the rated load limit."

[0003] Furthermore, paragraph 0016 of the same document states, "When the work machine is operated, signals detected by the work machine attitude detection means and load detection means installed at key points on the hoisting machine detect that the load position approaches the regulated area of ​​the rated load, and the operating speed of the drive unit is slowed down, thereby slowing down the movement speed of the work machine, which has the effect of preventing excessive movement and at the same time reducing the swing of the suspended load, allowing operations such as unloading to be carried out smoothly. In addition, if an attempt is made to operate beyond the regulated area of ​​the rated load, movement is stopped. In this way, overloading can be prevented and safety can be ensured." [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2002-250055 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, with the above-mentioned conventional crane work using hydraulic excavators, when load swing occurs it is necessary to wait for the swing to stop, which poses a problem in that the time spent waiting for the load swing to stop reduces work efficiency.

[0006] SUMMARY OF THE PRESENT EMBODIMENT An object of the present invention is to provide a work machine that more effectively suppresses load sway. [Means for solving the problem]

[0007] In order to solve the above problems, the present invention provides a work machine including a vehicle body, a front working machine attached to the vehicle body, an angle sensor that measures an angle indicating the attitude of the front working machine, a swing angle sensor that measures the swing speed of the vehicle body, a load sensor that measures the load on the front working machine, and a controller, wherein the controller executes a load swing control process that suppresses the swing of a load suspended from the front working machine, and in the load swing control process, detects the attitude of the front working machine based on angle information acquired from the angle sensor. the load sensor detects a load on the load when the load is detected, calculates a weight of the load suspended from the front working machine based on load information acquired from the load sensor, calculates a sway amount of the load when the load is moved toward a target stop position by at least one of a front movement, a turning movement, and a traveling movement by the front working machine, and then performs a temporary start / stop just before the target stop position, and executes control to move a load fulcrum of the load toward the target stop position at a timing when the load is displaced toward the target stop position in the sway trajectory of the load. Effect of the Invention

[0008] According to the present invention, it is possible to provide a work machine that can more effectively suppress load swing. Objects, configurations and effects other than those described above will become apparent from the following description of the embodiments. [Brief description of the drawings]

[0009] [Figure 1] FIG. 2 is a left side view showing the configuration of the hydraulic excavator. [Diagram 2] FIG. 2 is a top view showing the vehicle body configuration of the hydraulic excavator. [Diagram 3] These are enlarged views of the ML hook, where (a) is a side view of the A link, (b) is a front view of the A link, (c) is a front view of the A link with a hook, (d) is a side view with the ML hook attached, (e) is a front view with the ML hook attached, (f) is an enlarged front view with the ML hook attached, (g) is an enlarged side view with the ML hook attached, and (h) is an enlarged oblique view with the ML hook attached. [Figure 4] FIG. 1 is an explanatory diagram of a conventional lifting operation using a hydraulic excavator. [Diagram 5] FIG. 2 is a block diagram showing a hardware configuration of the hydraulic excavator. [Figure 6] FIG. 2 is a functional block diagram of a controller mounted on the hydraulic excavator. [Figure 7] 5 is a flowchart showing a procedure for a suspended load sway suppression process performed by the hydraulic excavator according to the present embodiment. [Figure 8] 5 is a flowchart showing a procedure for a suspended load sway suppression process performed by the hydraulic excavator according to the present embodiment. [Figure 9] FIG. 4 is an explanatory diagram showing a method for determining the working posture of a front working machine. [Figure 10] FIG. 4 is an explanatory diagram of parameters used in sway control of a suspended load. [Figure 11] 10 is an explanatory diagram showing a method for calculating a shake amount B. FIG. [Figure 12] FIG. 4 is an explanatory diagram of a calculation formula for a control distance. [Figure 13] 5A and 5B are explanatory diagrams showing the load sway suppression effect by the hydraulic excavator according to the embodiment, in which (a) shows a conventional example, and (b) shows the load sway suppression effect by the hydraulic excavator according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In all drawings for explaining the embodiment, the same or related reference numerals are used to designate components having the same function, and repeated description thereof will be omitted.

[0011] In the following embodiment, a hydraulic excavator will be described as an example of a work machine having a crane function, but an overhead crane, a rough terrain crane, or a crawler crane may also be used as the work machine according to this embodiment.

[0012] The structure of a hydraulic excavator as a work machine according to this embodiment will be described with reference to Fig. 1 to Fig. 3. Fig. 1 is a left side view showing the configuration of the hydraulic excavator. Fig. 2 is a top view showing the vehicle body configuration of the hydraulic excavator. Fig. 3 is an enlarged view of an ML hook, where (a) is a side view of an A link, (b) is a front view of an A link, (c) is a front view of an A link with a hook, (d) is a side view with an ML hook attached, (e) is a front view with an ML hook attached, (f) is an enlarged side view with an ML hook attached, and (g) is an enlarged perspective view with an ML hook attached.

[0013] 1 includes a lower traveling body 101, an upper rotating body 102 rotatably supported on the traveling body via a center joint 107 with an angle sensor, a cab 103 attached to the upper rotating body 102, and a front working machine connected to the upper rotating body 102 so as to be able to tilt up and down. The lower traveling body 101 and the upper rotating body 102 are collectively referred to as a vehicle body.

[0014] The upper rotating body 102 is configured by mounting an engine, a hydraulic pump, a rotating device, a radiator, a fuel tank, a hydraulic oil tank, and a cab 103 on a main frame.

[0015] The lower traveling body 101 is configured with a sprocket 101s at the front of the inner circumferential surface of each of the left crawler 101L and the right crawler 101R, and an idler 101i at the rear. The left crawler 101L and the right crawler 101R are circulated by the sprocket 101s being driven to rotate.

[0016] The supply of hydraulic oil from the upper rotating body 102 to the lower traveling body 101 is performed via a center joint 107 with an angle sensor disposed at the center of rotation. The center joint 107 with an angle sensor detects the rotation speed of the upper rotating body 102.

[0017] The front working machine includes a boom 104 supported on the upper rotating body 102 so as to be freely raised and lowered, an arm 105 supported on the boom 104 so as to be freely swingable up and down, and a bucket 106 supported on the arm 105 so as to be freely rotatable.

[0018] The hydraulic excavator 100 also includes hydraulic actuators such as hydraulic motors and hydraulic cylinders for performing forward and backward movements using the lower traveling structure 101, for rotating the upper rotating structure 102, and for lifting, swinging, and rotating the boom 104, arm 105, and bucket 106. Specifically, as shown in Fig. 6, which will be described later, the hydraulic excavator 100 includes a boom cylinder, an arm cylinder, and a rotating device as actuators. Note that although a hydraulic system is assumed here, the present invention is not limited to this, and an electric system such as an electric motor or a linear actuator may also be used.

[0019] The hydraulic excavator 100 also includes a boom angle sensor S1, an arm angle sensor S2, a bucket angle sensor S3, which detect the rotation angles of the boom 104, the arm 105, and the bucket 106, and a rotating body inclination angle sensor S4 which detects the inclination angle of the upper rotating body 102.

[0020] A rotation angle sensor S5 attached to the center joint 107 with an angle sensor detects the rotation angle and speed of the upper rotating body 102.

[0021] An ML hook 108 is attached to the bottom of the bucket 106. A load 1 is suspended from the ML hook 108.

[0022] A measurement camera 109 that measures the position and swing period of the suspended load 1 is mounted on the front part of the top surface of the cab 103. The measurement camera 109 detects the swing of the suspended load 1 and measures the distance between the ML hook 108 and the suspended load 1. For this reason, a distance measuring camera is used as the measurement camera 109. Specifically, a camera equipped with a stereo camera having a sensing function or a distance measuring sensor is used as the measurement camera 109.

[0023] As shown in Fig. 3, in this embodiment, an A-link 1056f with a hook (see Fig. 3(c)) is used as the A-link 1056 (see Figs. 3(a) and (b)) that connects the arm 105 and the bucket 106. An ML hook 108 is attached to the A-link 1056f with a hook to perform a load lifting operation (Figs. 3(d) to (h)).

[0024] FIG. 4 is an explanatory diagram of a conventional hoisting operation using a hydraulic excavator.

[0025] The swing of the suspended load 1 is mainly due to the inertial forces generated by the front movement, rotation, and running of the vehicle body. In particular, the inertial forces generated when starting and stopping the lifting operation cause the suspended load 1 to swing significantly (see Figure 4).

[0026] The hydraulic excavator 100 according to this embodiment is characterized in that it performs control to stop the load 1 at a predetermined target stop position while suppressing the sway of the load 1. The suspended load sway control process is realized by a controller 110 (see FIG. 5) mounted on the hydraulic excavator 100 calculating a physical quantity indicating the sway of the load 1, and outputting a command to the relevant actuator to perform at least one of the following: lifting or rotating operation of the front working machine, the rotating operation of the upper rotating body 102, and the traveling operation, which are required to translate the suspension support point of the load 1 in a direction to suppress the sway.

[0027] FIG. 5 is a block diagram showing a hardware configuration of the hydraulic excavator.

[0028] The controller 110 includes a processor 111 consisting of a CPU (Central Processing Unit) or the like, a RAM (Random Access Memory) 112, a ROM (Read Only Memory) 113, a storage device 114, an input I / F 115, and an output I / F 116, which are connected to each other via a bus 117.

[0029] The storage device 114 may be any type of device that can store data in a non-volatile manner, such as a hard disk drive (HDD) or a solid state drive (SSD).

[0030] The input I / F 115 is connected to a boom angle sensor S1, an arm angle sensor S2, a bucket angle sensor S3, a rotating body inclination angle sensor S4, a center joint with angle sensor 107, a boom cylinder pressure sensor S6 (corresponding to a load sensor), and a measurement camera 109, and acquires angle information, boom pressure information (corresponding to load information), and video information.

[0031] The output I / F 116 is connected to the proportional solenoid valve 23 .

[0032] FIG. 6 is a functional block diagram of a controller mounted on the hydraulic excavator.

[0033] The controller 110 includes a signal receiving unit 210, an attitude information calculating unit 220, a suspended load mass calculating unit 230, a suspended load inertia force calculating unit 240, a suspended load support movement direction and speed calculating unit 260, a suspended load sway amount B detecting unit 270, and a command output unit 280.

[0034] These parts are configured by the processor 111 loading a suspended load swing control program stored in the ROM 113 or the storage device 114 into the RAM 112 and executing it, thereby realizing the functions of each part. Details of the functions of each part will be described with reference to the flowcharts of Figs. 7 and 8.

[0035] Fig. 7 and Fig. 8 are flow charts showing the flow of the suspended load sway suppression process performed by the hydraulic excavator according to this embodiment. Fig. 9 is an explanatory diagram of parameters used in the suspended load sway control.

[0036] When the operator of the hydraulic excavator 100 operates the operation input device (not shown) to set the ML crane mode to ON as the operation mode (S01: ON) and sets the suspended load swing control function to ON (S02: ON), the suspended load swing control process is started by the controller 110. In response to this, the signal receiving unit 210 acquires pressure information from the boom cylinder pressure sensor S6, angle information from the boom angle sensor S1, the arm angle sensor S2, the center joint with angle sensor 107, and the rotating body inclination angle sensor S4, and measurement result information and image information from the measurement camera 109.

[0037] When the operator of the hydraulic excavator 100 starts a load lifting operation using the ML hook 108 (S03), the posture information calculation unit 220 calculates the working posture of the front work implement based on the angle information acquired from the boom angle sensor S1 and the arm angle sensor S2 (S04).

[0038] FIG. 9 is an explanatory diagram showing how to determine the working posture of the front working implement.

[0039] As shown in FIG. 9, the coordinates of the starting point A of the boom 104 are (x A , y A ), and the coordinate of the suspension support E is (x E , y E ), point B is the connection point of the boom and the arm, point C is the intersection point of the vertical line passing through point B and the horizontal line passing through point A, point D is the intersection point of the vertical line passing through point B and the horizontal line passing through point E, boom angle θ bm , arm angle θ am , the distance between two points is L. For example, the distance between points A and B is L. AB , the distance between points B and C is L Bc、 When expressed as E(x E , y E The coordinates of are calculated using the following formula (1).

number

[0040] In the above formula 1, the coordinates of the starting point A are (x A , y A ) is the reference point for the suspension support E(x E , y E ) is obtained, the posture information calculation unit 220 calculates the coordinates (x A , y A ) and the suspension support E(x E , y E ) is converted into a coordinate system including the horizontal plane of the upper rotating body 102. Since the rotating body inclination angle sensor S4 is defined as an inclination angle with respect to the horizontal plane, correction and coordinate conversion are performed to convert the coordinate of the suspension support E(x E , y E ) can be converted into an absolute coordinate system corrected by the attitude of the upper rotating body 102.

[0041] The suspended load mass calculation unit 230 calculates the suspended load mass from the working posture of the front working implement and the boom cylinder pressure acquired from the boom cylinder pressure sensor S6 (S05).

[0042] The measurement camera 109 detects the swing of the suspended load 1 and measures the distance between the ML hook 108 and the suspended load 1 (S06).

[0043] Fig. 10 is an explanatory diagram of parameters used for swing control of a suspended load. As shown in Fig. 10, a measuring camera 109 measures the distance from the upper end of the suspended load 1 to the ML hook 108. The measuring camera 109 also measures the distance L from the load support point to the center of gravity of the suspended load 1, which is used in equation (3) described later. AO (See FIG. 12) may also be measured as necessary. In this case, the center of gravity of the suspended load 1 as seen from the measurement camera 109 is regarded as, for example, the center in the height direction and the center in the width direction of the suspended load 1, and the distance L AO may be measured.

[0044] The load inertia force calculation unit 240 determines the amount of sway of the load 1 that occurs when the front work machine starts and stops its operation, its swinging operation, and its traveling operation. Since the amount of sway of the load 1 is mainly caused by the moment of inertia of the load 1, the moment of inertia of the load 1 is calculated as the amount of sway. Specifically, the inertia force of the load 1 is calculated from the position and acceleration of the ML hook 108 calculated by the boom angle sensor S1, angle information from the arm angle sensor S2, the bucket angle sensor S3, and the center joint with angle sensor 107, the distance between the ML hook 108 and the load 1 measured by the measurement camera 109, and the weight of the load 1 calculated from the boom cylinder pressure sensor S6 (S07).

[0045] The load support movement direction and speed calculation unit 260 calculates the load support speed and movement direction from the angle information of the boom angle sensor S1 and the arm angle sensor S2 (S08). The load support movement direction and speed calculation unit 260 measures the rotation angle and speed at the center joint with angle sensor 107, and calculates the distance from the rotation center of the ML hook 108 using the angle information obtained from the boom angle sensor S1, arm angle sensor S2, and bucket angle sensor S3, and calculates the speed of the ML hook 108 during the rotation operation.

[0046] The measurement camera 109 detects the amount of swing A of the load 1 that occurred and remains at the start of startup and during startup (S09). The measurement camera 109 measures the swing amplitude and period of the load 1 that occurred and remains at the start of startup and during startup, and the phase shift between the hook position and the load 1. The measurement camera 109 also measures the distance between the ML hook 108 and the load 1. "Phase shift" refers to the measurement of the swing amplitude and period of the load 1 that occurred and remains at the start of startup, and the phase shift between the position of the ML hook 108 and the load 1.

[0047] When it is determined that the load 1 is swinging (S09: load swinging), the load 1 is temporarily stopped before a preset target stop position for the load 1 (S10).

[0048] The suspended load sway amount B detection unit 270 calculates the sway amount B of the suspended load 1 that occurs during start-up and stop (S11). The sway amount B is the amount of load sway caused by the inertial force during start-up and stop and the remaining sway amount of the suspended load 1. The suspended load sway amount B detection unit 270 detects the sway amount B based on the inertial force calculated by the suspended load inertia force calculation unit 240 and the results calculated by the movement direction and speed calculation unit 260 of the suspension support.

[0049] The command output unit 280 generates a command signal for an operation (FIG. 9) to stop the sway amount B of the load, and outputs it to the actuator (S12). Specifically, the load fulcrum of the load 1 is moved toward the target stop position at the timing when the load 1 is displaced toward the target stop position in the trajectory of the sway of the load 1. Desirably, the load fulcrum is translated from the temporary stop position toward the target stop position by a controlled distance equivalent to the sway amount B. Specific examples of the actuator include a boom cylinder, an arm cylinder, and a rotating device, and a control valve control signal is output to the proportional solenoid valve 23 to operate at least one of these.

[0050] In response to the command signal, at least one of the boom cylinder, arm cylinder, and swivel device are operated to move the load fulcrum to the load target stop position and stop (S13). At least one of the front work equipment operation, the swivel operation, and the travel operation is performed, and control is performed to stop the swing of the load at the start and stop described below. As a result, the swing of the load 1 is stopped by moving the ML hook 108 in parallel to the load target stop position at the same time as the swing of the load occurs.

[0051] The measurement camera 109 detects the swing amounts A and B of the suspended load 1 (S14).

[0052] If there is load sway (S14: load sway), the process returns to step S10, and the measurement camera 109 detects the amount of sway A of the suspended load again.

[0053] If load sway is not detected (S14: no load sway), if the ML crane mode is OFF (S01: OFF), if the suspended load sway prevention mode is OFF (S02: OFF), or if the measurement camera 109 does not detect the amount of suspended load sway A (S09: no load sway), the process is terminated.

[0054] FIG. 11 is an explanatory diagram showing a method for calculating the shake amount B.

[0055] The swing amount B is calculated by the general equation of motion of a pendulum shown in the following formula (2): In the formula below, the mass m of the suspended load 1 is calculated by the boom cylinder pressure sensor S6.

number

[0056] FIG. 12 is a diagram illustrating a calculation formula for the control distance.

[0057] As shown in Fig. 12, the load 1 performs a pendulum motion with the load support point (shown as point O in Fig. 13) as the center. If the trajectory of the pendulum motion of the load 1 is represented as follows: directly below the load support point O in the vertical direction is point C; the maximum displacement point on the start-of-start side is point A; the maximum displacement point on the target stop position side is point B; the intersection point D of the vertical perpendicular line passing through point A with the horizontal plane passing through point C; and the intersection point E of the vertical perpendicular line passing through point B with the horizontal plane passing through point C, then the control distance L by which the load support point is moved in parallel to stop the swing of the load 1 from the temporary start-stop position is CE is calculated by the following formula:

number

[0058] The effects of the hydraulic excavator 100 according to this embodiment will be described with reference to Fig. 13. Fig. 13 is an explanatory diagram of the load swing suppression effect of the hydraulic excavator according to this embodiment, where (a) shows a conventional example, and (b) shows the load swing suppression effect of the hydraulic excavator according to this embodiment.

[0059] In the conventional example shown in Fig. 13(a), a load 1 is suspended and starts to move toward a target stop position, at which point the start is stopped. When the load starts to start, a swing amount A occurs in the load 1, and at the start and stop position a swing amount B occurs. Therefore, when the load starts and stops at the target stop position, it is necessary to wait until the swing amount B of the load 1 settles down.

[0060] In contrast, according to the present embodiment shown in FIG. 13(b), a temporary start / stop is performed before the target stop position, and the swing amount B of the suspended load is calculated. Then, the hook position of the ML hook 108 is moved so as to offset the swing amounts A and B of the suspended load. Specifically, in the phase in which the swing direction of the ML hook 108 is moving from the temporary start / stop position toward the target stop position, the control distance L CE This makes it possible to move the ML hook 108 in the same direction as the swaying direction of the suspended load 1, thereby offsetting the relative displacement of the suspended load 1 with respect to the ML hook 108 and suppressing load sway at the time when the suspended load 1 has been moved to the target stop position.

[0061] The above-described embodiment does not limit the present invention, and any modification that does not depart from the spirit of the present invention is included in the scope of the present invention.

[0062] For example, in the flowcharts of FIG. 7 and FIG. 8, processes that provide the same effects as those of the present invention even when the order of the processes is changed are included in the present invention.

[0063] Also, instead of the measurement camera 109, a known camera that captures image information from a single viewpoint may be used, and the processor 111 may analyze the image information to measure the speed, swing width, and other swing amount of the suspended load 1. [Explanation of symbols]

[0064] 1: Suspended load 23: Proportional solenoid valve 100: Hydraulic excavator 101: Lower running body 101L: Left crawler 101R: Right crawler 101i: Idler 101s: Sprocket 102: Upper rotating body 103: Cab 104: Boom 105: Arm 106: Bucket 107: Center joint with angle sensor 108:ML hook 109: Measurement camera 110: Controller 111: Processor 112: RAM 113: ROM 114: Storage device 115: Input I / F 116: Output I / F 117: Bus 210: Signal receiving unit 220: Posture information calculation unit 230: Suspended load mass calculation section 240: Suspended load inertia force calculation section 260: Calculation of direction and speed of movement of the load support 270: Suspended load swing amount B detection section 280: Command output section 1056 :A Link 1056f: A-link with hook S1: Boom angle sensor S2: Arm angle sensor S3: Bucket angle sensor S4: Rotating body inclination angle sensor S5: Rotation angle sensor S6: Boom cylinder pressure sensor

Claims

1. The car body and A front working machine attached to the vehicle body; an angle sensor that measures an angle indicating the attitude of the front working implement; A turning angle sensor that measures a turning speed of the vehicle body; a load sensor that measures a load on the front working implement; A working machine including a controller, The controller executes a load sway control process for suppressing load sway of a load suspended from the front working machine, and in the load sway control process, Detecting the attitude of the front working implement based on the angle information acquired from the angle sensor; Calculating a weight of a load suspended from the front working machine based on load information acquired from the load sensor; calculating a swing amount of the suspended load when the suspended load is moved toward a target stop position by at least one of a front operation, a rotation operation, and a traveling operation by a front working machine and then temporarily stopped just before the target stop position; executes control to move a load support point of the load toward the target stop position at a timing when the load is displaced toward the target stop position in a trajectory of the swing of the load; A working machine characterized by:

2. 2. The work machine according to claim 1, Further provided with a measurement camera for measuring the distance to the suspended load, the speed, and the period of the load swing; When the measurement camera detects a load swing of the suspended load exceeding a predetermined load swing amount, the load swing control process is executed. A working machine characterized by:

3. 2. The work machine according to claim 1, The controller: execute control to translate the load support point of the load toward the target stop position by a control distance corresponding to the amount of swing of the load when the temporary start and stop is performed; A working machine characterized by:

Citation Information

Patent Citations

  • Crane oscillation preventing device

    JP1999180676A

  • Shovel

    JP2021156085A

  • Lifting assist system, lifting assist method and lifting assist program

    JP2021187604A

  • Construction equipment vehicle and its display device

    JP2002250055A