Cutting waste collector, cutting waste construction system, cutting waste collection method and cutting waste construction method

The cutting waste collection device addresses dust and safety issues in tunnel lining regeneration by using high-pressure water to propel and suction cutting waste, ensuring safe and efficient transport outside the tunnel.

JP2024143910APending Publication Date: 2024-10-11CENT NIPPON EXPRESSWAY CO LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023056855
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-31
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

In tunnel linings constructed using the sheet pile method, cavities and deformities such as cracks and water leaks occur, and the cutting process generates dust, complicates vehicle transport, and poses safety risks.

Method used

A cutting waste collection device using high-pressure water to propel and suction cutting waste, eliminating dust generation and avoiding vehicle complications by transporting waste directly to a safe location outside the tunnel.

Benefits of technology

Eliminates dust generation, improves safety by avoiding vehicle congestion, and enhances working conditions by transporting waste outside the tunnel without the need for additional vehicles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024143910000001_ABST
    Figure 2024143910000001_ABST
Patent Text Reader

Abstract

To provide a device, a system, and a method that can eliminate generation of dust and improve safety by avoiding complication of vehicles.SOLUTION: A cutting waste collector 12 for collecting cutting waste includes: a cutting waste collection hopper 60 for receiving cutting waste generated by cutting with high-pressure water, having an opening 70 at a top and having a cross-section that tapers from the top to a bottom; a jet water nozzle 61 arranged near the bottom in the cutting waste collection hopper 60 and for spraying high-pressure fluid to propel the stored cutting waste in a certain direction; and a vacuum pump 66 connected to the cutting waste collection hopper 60 via a suction hose 64 and for sucking the cutting waste propelled in the certain direction in the cutting waste collection hopper 60.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a cutting chip recovery device, a cutting construction system, a cutting chip recovery method, and a cutting construction method. [Background technology]

[0002] In tunnel linings constructed using the sheet pile method, cavities remain between the lining and the sheet piles, and the lining is insufficiently thick, resulting in noticeable deformations such as cracks and water leakage.As a countermeasure, a tunnel lining restoration method is known in which the existing lining concrete is reinforced with rock bolts or the like, then cut, and if necessary, waterproof sheets are replaced and watertightness is performed, and concrete is poured to restore the lining (see, for example, Patent Document 1).

[0003] In the technology described in the above Patent Document 1, a large amount of dust is generated because the existing lining concrete is cut with a cutter drum, but a dust collector is used to prevent the dust from accumulating. In addition, discharge devices such as a shaft loader and cutting chip carrier are arranged to be able to travel in the working space formed between the inner wall surface of the tunnel and the outer wall surface of the protector, and the cutting chips generated by cutting are discharged. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2021-173093 A Summary of the Invention [Problem to be solved by the invention]

[0005] In the conventional technology, dust collectors can reduce dust to some extent, but workers have to work in a poor environment due to the dust. In addition, when removing cutting chips, vehicles must join general vehicles in a narrow tunnel, causing vehicle congestion and safety issues. [Means for solving the problem]

[0006] The present invention has been made in consideration of the above problems, and provides a device for collecting cutting chips, comprising: A container having an opening at its top and a cross section that decreases from its top to its bottom, for receiving cutting chips generated by cutting with high-pressure water; an ejection means disposed adjacent to the bottom of the container for ejecting high-pressure fluid for propelling the contained cutting chips in a certain direction; a suction means connected to the container via a tube for sucking the cutting chips propelled in a certain direction within the container; A debris collection device is provided, comprising: Effect of the Invention

[0007] According to the present invention, it is possible to eliminate the generation of dust, prevent vehicle entanglement, and improve safety. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a diagram showing an example of the configuration of a cutting construction system. [Diagram 2] FIG. 2 is a cross-sectional view showing an example of the configuration of a cutting device. [Diagram 3] FIG. 2 is a plan view showing a configuration example of a cutting device. [Figure 4] FIG. 1 is a diagram illustrating a water jet method. [Diagram 5] 4A and 4B are diagrams showing an example of the configuration of an XY movement device and an example of the movement direction of a nozzle. [Figure 6] FIG. 11 is a front view showing another example of the configuration of the cutting device. [Figure 7] FIG. 2 is a diagram showing a configuration example of a cutting chip recovery device. [Figure 8] FIG. 4 is a diagram showing a detailed configuration of a cutting chip recovery hopper. [Figure 9] FIG. 4 is a diagram showing an example of the arrangement of a cutting chip recovery hopper. [Figure 10] FIG. 1 is a diagram showing an example of the configuration of a turbid water treatment device. [Figure 11]1 is a flowchart illustrating a cutting process. [Figure 12] 11 is a flowchart illustrating a flow of cutting waste collection. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Linings are constructed to suppress loosening of the ground after excavation of the walls of tunnels and underground structures, and to support the ground. Deformations such as cracks and water leakage have become noticeable in tunnel linings constructed using the sheet pile method. Here, the sheet pile method is a construction method in which wooden or steel sheet piles are driven continuously into the ground, supported by shoring, and concrete is poured into the inner walls to form the lining.

[0010] To improve defects such as cracks and water leakage, for example, a tunnel lining restoration method can be used, in which the existing lining concrete is reinforced with rock bolts or the like, and then the lining is restored. The tunnel lining restoration method is a method in which protectors are used inside existing tunnels to ensure the safety of passing vehicles on the roadway, while the existing lining concrete is cut and new concrete is poured to restore the lining.

[0011] The protector is a tunnel-shaped general vehicle protection work vehicle that protects general vehicles and has wheels for mobility. With the protector installed, general vehicles can pass through the general vehicle lane formed by the protector even during lining restoration work.

[0012] In lining restoration, the existing lining concrete is cut, and if necessary, waterproof sheets are replaced and watertightness is stopped, and concrete is poured to restore the lining. Although the construction location for lining concrete restoration is not limited to inside the tunnel, the following description will be given assuming that the lining concrete is poured inside the tunnel.

[0013] FIG. 1 is a diagram showing a configuration example of a cutting construction system. The cutting construction system includes a cutting device 10 for cutting an existing lining concrete 100, and ancillary equipment for processing cutting chips and the like generated by cutting. Here, the lining concrete 100 indicates a portion of the existing lining concrete that needs to be cut, and may be the entire existing lining concrete, or a portion of the inner wall surface side thereof. In addition, the lining concrete 100 may have reinforcing bars arranged inside.

[0014] The cutting device 10 includes cutting means for cutting the lining concrete 100. In conventional lining restoration, a cutter drum equipped with many metal bits on its circumferential surface is used to remove a predetermined thickness of the tunnel inner wall surface made of the lining concrete 100. When cutting with a cutter drum, a large amount of dust is generated. The generation of a large amount of dust worsens the working environment.

[0015] Cutting with a cutter drum may impact the existing lining concrete 100 during cutting, which may cause cracks or the like in the remaining part of the lining concrete. Furthermore, cutting with a cutter drum generates vibrations during cutting, which are transmitted to the protector 11 and the like. This will affect the passage of general vehicles passing through the general vehicle lane inside the protector 11. Furthermore, when cutting with a cutter drum, it is difficult to cut only the concrete without damaging the reinforcing bars in the lining concrete 100.

[0016] Therefore, the cutting device 10 is a device that cuts the lining concrete 100 by the water jet (WJ) method. The water jet method is a method of partially removing concrete without vibration and without damaging rebars by using high-pressure water of 100 MPa to 250 MPa. The cutting device 10 includes a WJ jet nozzle as a cutting means, and cuts the concrete by colliding high-pressure water (WJ jet) jetted from the WJ jet nozzle with the concrete.

[0017] The cutting device 10 is placed on the protector 11 and is installed so as to surround the periphery of the protector 11. The cutting device 10 is configured so that the cutting means can move in the circumferential direction of the tunnel inner wall surface. Rails are provided on the protector 11, and the cutting device 10 can move in the tunnel axial direction by moving on the rails.

[0018] The cutting chips generated by the cutting means of the cutting device 10 are mainly concrete fragments and powder, and fall through the narrow space between the tunnel inner wall surface and the protector 11. At this time, the sprayed water also falls together with the cutting chips.

[0019] The auxiliary equipment includes a cuttings recovery device 12 that recovers the falling cuttings and water. The cuttings recovery device 12 receives the falling cuttings and water and transports them to a safe place outside the tunnel. Conventionally, cuttings that have fallen into the narrow space between the inner tunnel wall and the protector 11 are loaded by a shaft loader onto a cuttings carrier, which is a transport vehicle, and then transported outside the tunnel.

[0020] However, by using the cuttings collection device 12, the cuttings are received directly below and automatically transported to the outside of the tunnel through a pipe, eliminating the need for a removal vehicle, preventing confusion between the removal vehicle and general vehicles, and improving safety.

[0021] The cuttings recovery device 12 separates the slurry containing the transported cuttings and water into a solid and liquid portion outside the tunnel. The liquid portion after separation is turbid water mixed with mud, etc., and is treated so that it can be discharged into a river or reused as high-pressure water. The ancillary equipment includes a turbid water treatment device 13 for water treatment. The ancillary equipment also includes a water supply device 14 as a high-pressure fluid supply device that supplies high-pressure fluid used by the cuttings recovery device 12, and a high-pressure water generator 15 that generates high-pressure water used to cut the lining concrete 100.

[0022] Some of the components of the cutting debris recovery device 12, the muddy water treatment device 13, the water supply device 14, and the high-pressure water generator 15, are installed in a safe location away from the outside of the tunnel and the cutting area inside the tunnel. In this way, no auxiliary equipment with a power means such as a pump is installed in the narrow space between the inner wall surface of the tunnel and the protector 11, which improves workability and safety.

[0023] Fig. 2 is a cross-sectional view showing an example of the configuration of the cutting device 10, and Fig. 3 is a plan view showing an example of the configuration of the cutting device 10. A protector 11 is placed at the center position in the tunnel. The protector 11 has a general vehicle lane 20, which is a cavity that allows one general vehicle to pass through, and has wheels 21 at the bottom to enable movement in the tunnel axial direction. The protector 11 also has a flat upper surface, and a rail frame 22 is laid on the upper surface so as to extend in the tunnel axial direction.

[0024] The cutting device 10 includes a carriage frame 30 movably mounted on the rail frame 22, an XY frame fixing member 32 provided on the carriage frame 30 via a girder member 31, and an XY movement device 33 attached to the XY frame fixing member 32. The cutting device 10 includes a WJ jet nozzle 34 as cutting means. The XY movement device 33 moves the WJ jet nozzle 34 in the circumferential direction of the tunnel.

[0025] FIG. 4 is a diagram for explaining a water jet method using a WJ jet nozzle 34. As shown in FIG. 4(a), the WJ jet nozzle 34 is composed of two nozzles 41, 42 supported by a support member 40, and the two nozzles 41, 42 are arranged so that the center lines passing through the centers of the nozzles intersect at one point. The point where the center lines of the two nozzles 41, 42 intersect is the collision point, which determines the depth to which the concrete is cut (the chipping depth). If the angle at which the center lines of the two nozzles 41, 42 are parallel is set to 0 degrees, the chipping depth can be controlled by changing the angle of each nozzle 41, 42.

[0026] When cutting with the WJ jet nozzle 34, the area from the WJ jet nozzle 34 to the impact point is considered to be the effective cutting area, and the chipping ability dissipates in the area beyond the impact point where the water disperses. In addition, when cutting with the WJ jet nozzle 34, it is possible to cut concrete without damaging the rebar, so it is possible to cut and remove the concrete behind the rebar as well.

[0027] When cutting with the WJ jet nozzle 34, the concrete lining is scraped off by the jet water as if it were being scratched, as shown in Fig. 4(b). The scraped off concrete falls downward together with the jet water as cutting chips.

[0028] Fig. 5 is a diagram showing an example of the configuration of the XY movement device 33 and an example of the movement direction of the WJ jet nozzle 34. Fig. 5(a) is a diagram showing an example of the configuration of the XY movement device 33. The XY movement device 33 includes two parallel rail members 50, 51, a rod-shaped member 52 that is installed to bridge the rail members 50, 51, and a nozzle support member 53 that is slidable on the rod-shaped member 52 and to which the WJ jet nozzle 34 is attached.

[0029] The XY moving device 33 moves the WJ jet nozzle 34 in the X direction by sliding the nozzle support member 53 on the rod-shaped member 52, and in the Y direction by moving the rod-shaped member 52 in the direction in which the rail members 50, 51 extend.

[0030] FIG. 5(b) is a diagram showing an example of the moving direction of the WJ jet nozzle 34. The WJ jet nozzle 34 moves about 2 m in the X direction (rightward when facing) by sliding the nozzle support member 53, and then moves about 30 mm in the Y direction (downward when facing) in which the rail members 50 and 51 extend, and then moves about 2 m in the X direction (leftward when facing), repeating this process to cut the existing lining concrete. The initial value of the moving speed is 2 m / min, and it can be changed according to the cutting situation. Note that this is just an example, and the moving distance and moving speed are not limited to this.

[0031] The WJ jet nozzle 34 is controlled so that the impact point draws a spiral or the like while moving in the X and Y directions. If the impact point is fixed, the chipping area cannot be cut almost uniformly unless it is moved in the Y direction by a few mm at a time, but with this type of control, the chipping area can be cut almost uniformly even if it is moved in the Y direction by about 30 mm at a time, and the construction time can be shortened.

[0032] 6 is a front view showing another configuration example of the cutting device 10. The cutting device 10 can be provided with a scattering prevention cover 35 that closes the front and rear in the tunnel axial direction between the tunnel inner wall surface and the protector 11 and prevents scattering of cutting chips. The scattering prevention cover 35 can be provided at the front and rear of both sides of the protector 11 in the tunnel axial direction, but may also be provided at the front and rear of the tunnel axial direction above the protector 11.

[0033] The shatterproof cover 35 is a sheet made of a material capable of preventing cutting chips having a diameter of several micrometers to several centimeters from scattering into the inside of the protector 11 or into the tunnel, and examples of the material that can be used include polyvinyl chloride, polyethylene, rubber, polypropylene, etc. The shatterproof cover 35 is preferably transparent or semi-transparent so that the state inside can be confirmed.

[0034] 7 is a diagram showing a configuration example of the cutting chip recovery device 12. The cutting chip recovery device 12 includes a cutting chip recovery hopper 60 as a container for receiving cutting chips generated by cutting with high-pressure water.

[0035] The cutting chip collection device 12 is disposed in a cutting chip collection hopper 60, and includes a jet water nozzle 61 as an injection means for injecting a high-pressure fluid to propel the stored cutting chips in a certain direction. Here, jet water, which is high-pressure water, is used as the high-pressure fluid, but the high-pressure fluid may be high-pressure air or the like.

[0036] A nozzle 62 is provided at the end of the tunnel axial direction in the cuttings collection hopper 60, and a pipe such as a suction hose 63 is connected to the nozzle 62. A slurry containing cuttings and water is collected in the cuttings collection hopper 60. Jet water is sprayed from the jet water nozzle 61 onto the slurry in the cuttings collection hopper 60, and the slurry is propelled toward the nozzle 62. The jet water is supplied to the jet water nozzle 61 from the water supply device 14.

[0037] The cuttings collection device 12 is installed in a safe place away from the cutting site outside the tunnel or inside the tunnel, and includes a collection tank 64 connected to a suction hose 63, a separator 65, and a vacuum pump 66 as a suction means. The vacuum pump 66 reduces the pressure inside the collection tank 64 and transports the slurry by sucking it from the cuttings collection hopper 60 to the collection tank 64 through the suction hose 63. The separator 65 separates the slurry collected in the collection tank 64 into solids and liquids using a sieve or the like. The solids are mainly granular cuttings, and the liquid is muddy water mixed with powdery cuttings and the like. The solids are collected as grit. The liquid is sent to the muddy water treatment device 13 as muddy water.

[0038] The slurry collected in the cuttings collection hopper 60 contains large particles such as fragments of the cut lining concrete, and although it is possible to send it into the suction hose 63 by propulsion with jet water alone, there is a possibility that clogging will occur in the suction hose 63 if the suction hose 63 is long. On the other hand, it is difficult to suck up the large fragments in the cuttings collection hopper 60 by suction only with the vacuum pump 66, and as a result, the large fragments remain in the cuttings collection hopper 60 and accumulate. For these reasons, propulsion with jet water and suction with the vacuum pump 66 are used in combination.

[0039] FIG. 8 is a diagram showing a detailed configuration of the cutting chip collecting hopper 60. FIG. 8(a) shows a front view, FIG. 8(b) shows a plan view, and FIG. 8(c) shows a side view. The cutting chip collecting hopper 60 has an opening 70 at the top and a cross section that narrows from the top to the bottom. The cross section is a substantially inverted triangle. The opening 70 is long in the tunnel axial direction, and its length is approximately the same as the length of the cutting device 10 in the tunnel axial direction, and is a length that allows cutting chips to be appropriately collected. The cutting chip collecting hopper 60 has nozzles 71 and 72 at both ends in the tunnel axial direction. The nozzles 71 and 72 are attached to positions adjacent to the bottom.

[0040] A hard lattice-like structural material such as a grating 73 is installed above the opening 70 to prevent large cutting chips from entering the cutting chip recovery hopper 60. This is because there is a possibility that large cutting chips will not be able to be recovered by the jet water and vacuum suction. Note that if large cutting chips are not generated, the grating 73 does not need to be installed.

[0041] The jet water nozzle 61 is movable and includes a jet nozzle 74, a pipe 75, and a valve 76. The pipe 75 extends, for example, from the nozzle 72 side toward the nozzle 71 side via the valve 76 in the tunnel axial direction and extends toward the bottom of the cuttings recovery hopper 60 just before the nozzle 71 side, with the jet nozzle 74 facing the nozzle 72 side.

[0042] The amount of jet water is adjusted by a valve 76, and the jet water is sprayed from a nozzle 74. Therefore, the slurry collected in the cuttings collection hopper 60 is propelled by the jet water toward the nozzle 72. The slurry is transported to the outside of the tunnel via a suction hose 63 connected to the nozzle 72.

[0043] Since the jet water nozzle 61 is movable, the longitudinal position of the nozzle 74 can be changed as needed within the cuttings collection hopper 60. As shown in Fig. 8(c), the pipe 75 is supported slidably on notches 77 extending from the top to the bottom at both ends of the cuttings collection hopper 60. Therefore, the longitudinal position of the nozzle 74 can be changed by sliding the pipe 75 over the notches 77.

[0044] The tunnel has an entrance and an exit, with nozzle 72 facing the entrance side and nozzle 71 facing the exit side. If the current position is closer to the entrance side, suction hose 63 is connected to nozzle 72, and if the current position is closer to the exit side, suction hose 63 is connected to nozzle 71, and the slurry collected in cuttings collection hopper 60 can be transported outside the tunnel.

[0045] The cuttings recovery hopper 60 is provided with wheels 78 at its bottom so that it can move in the tunnel axial direction. This allows the cuttings recovery hopper 60 to move together with the movement of the cutting device 10 in the tunnel axial direction.

[0046] 9 is a diagram showing an example of the arrangement of the cuttings recovery hopper 60. The cuttings recovery hopper 60 is installed at the bottom of the tunnel inner wall surface, and a recovery plate 79 such as a corrugated sheet is installed between the hopper 60 and the protector 11 at an angle to the ground. The existing lining concrete 100 that constitutes the tunnel inner wall surface is cut by high-pressure water jetted from the WJ jet nozzle 34 of the cutting device 10, and the cuttings 101 and water 102 fall downward. The position where the cuttings 101 etc. fall is not limited to just below the cutting position, and they may also scatter onto the outer wall surface of the protector 11.

[0047] There is also a gap between the cuttings collection hopper 60 and the protector 11, and cuttings 101 and the like scattered toward the outer wall surface of the protector 11 cannot be collected in the cuttings collection hopper 60. Therefore, a collection plate 79 is hung at an angle to the ground so as to bridge between the cuttings collection hopper 60 and the protector 11, so that cuttings 101 that fall onto the collection plate 79 slide down and are properly collected in the cuttings collection hopper 60.

[0048] A collection plate 79 can be installed on the upper surface of the protector 11 so that the cutting chips 101 and the like can slide down to both sides of the protector 11 like the roof of a house.

[0049] 10 is a diagram showing a configuration example of the turbid water treatment device 13. The turbid water treatment device 13 includes a pretreatment device 80, a raw water tank 81, a first reactor 82, a second reactor 83, a granulator 84, a settling tank 85, a treated water tank 86, a discharge tank 87, and a waste sludge tank 88.

[0050] The turbid water separated by the separator 65 is sent to a pretreatment device 80. The pretreatment device 80 is a screen or the like that functions as a second separator. The pretreatment device 80 has many slits that are finer than the separator 65, and removes particles with relatively large diameters from the turbid water. The turbid water after the particles have been removed is sent to a raw water tank 81. The turbid water in the raw water tank 81 is sent to a first reactor 82, where an inorganic flocculant such as polyaluminum chloride (PAC) is added. The suspended components in the turbid water are flocculated by the PAC. The second reactor 83 supplies carbon dioxide gas to adjust the pH. A polymer flocculant is added to the liquid that leaves the second reactor 83.

[0051] The granulator 84 forms flocs, which are lumps of a certain size, from the aggregates, and the flocs settle in a settling tank 85. The supernatant liquid from the settling tank 85 is sent to a treated water tank 86, and the sediment is sent as waste sludge to a waste sludge tank 88. The water from the treated water tank 86 is sent to a discharge tank 87, and after the water quality is checked, it is discharged into a river or the like, and a portion is returned to the raw water tank 81.

[0052] 11 is a flow chart illustrating the flow of cutting work. Cutting work (water jet work) starts with work preparation in step 100. In step 101, as preparation for work, the cutting device 10 is assembled, scaffolding is assembled, and auxiliary equipment is installed.

[0053] The cutting device 10 is assembled on-site. The cutting device 10 is composed of a top member to be installed on the top surface of the protector 11 and side members on the sides of the protector 11. The top member is assembled first, and then the side members are assembled using a chain block or the like. The scaffolding is also assembled at the same time as the side members are assembled.

[0054] In step 102, the assembled scaffolding is used to set up the XY movement device 33 equipped with the WJ jet nozzle 34. The XY movement device 33 is set up on each side of the protector 11. For example, if one side is the left side and the other side is the right side, one is set up on each side. Here, one is set up on each side, but this is not limited to this, and two or more may be set up on each side. In addition, the WJ jet nozzle 34 and the high-pressure water generator 15 are connected by a water supply pipe to enable the supply of high-pressure water.

[0055] In step 103, the cutting position is adjusted and cutting begins. The impact point of the WJ jet nozzle 34 is adjusted, the water pressure is adjusted, and cutting begins. Cutting is performed simultaneously on both the left and right sides while controlling the water pressure. The XY movement device 33 can be operated by an operation panel installed in a remote location. Since the maximum cutting depth using high-pressure water is about 100 mm, for areas requiring cutting of 100 mm or more, the XY movement device 33 is operated two or more times.

[0056] In step 104, the cuttings are collected by the cuttings collection device 12. The cuttings are collected in the cuttings collection hopper 60 of the cuttings collection device 12 and transported by the jet water nozzle 61 and the vacuum pump 66 to the collection tank 64 outside the tunnel.

[0057] In step 105, after cutting and collection of cutting chips, it is confirmed whether there is a next cutting location. If there is, proceed to step 106, move the XY moving device 33 in the tunnel axial direction and install it at the next cutting location. The next cutting location can be a location moved about 2 m in the tunnel axial direction. Movement of the XY moving device 33 in the tunnel axial direction is performed by moving the entire cutting device 10 on rails installed on the upper surface of the protector 11. At this time, the cutting chip collection hopper 60 is also moved in the tunnel axial direction. Then, return to step 103.

[0058] In step 105, if there is no next cutting location, the process proceeds to step 107 and the construction ends.

[0059] Fig. 12 is a flow chart illustrating the flow of cuttings collection, and shows the detailed process flow of step 104 in Fig. 11. In step 200, the cuttings are received in the cuttings collection hopper 60. Since the lining concrete 100 is cut by jet water, water is also collected along with the cuttings. Inside the cuttings collection hopper 60, a slurry containing the cuttings and water exists.

[0060] In step 201, the slurry in the cutting chip recovery hopper 60 is pushed and propelled by jet water toward the nozzle connected to the suction hose 63. In step 202, the slurry is sucked up by the vacuum pump 66 and transported toward the recovery tank 64. Here, it is described that the step of propelling with jet water is followed by the step of sucking with the vacuum pump 66, but these steps may be performed simultaneously.

[0061] In step 203, the slurry sucked by the vacuum pump 66 is collected in the collection tank 64. In step 204, the slurry collected in the collection tank 64 is separated into a solid component and a liquid component by the separator 65. The solid component is mainly cutting chips, and the liquid component is turbid water. In step 205, the separated turbid water is transported to the turbid water treatment device 13. The turbid water is then treated in the turbid water treatment device 13.

[0062] As explained above, cutting with a water jet allows cutting without vibration and without damaging the rebar, and also prevents the generation of dust. In addition, since the material is transported to a safe place outside the tunnel with a suction hose, it is possible to prevent confusion between general vehicles and unloading vehicles inside the tunnel, improving safety.

[0063] The cutting debris recovery hopper 60 and the anti-scattering cover 35 prevent water leakage inside the protector 11, improving safety for general vehicle traffic. In addition, workability and safety can be improved by not installing additional equipment in the narrow space between the protector 11 and the existing concrete lining.

[0064] The cutting chip collection device, cutting construction system, cutting chip collection method, and cutting construction method of the present invention have been described in detail with reference to the embodiments shown in the drawings. However, the present invention is not limited to the above-described embodiments, and can be modified within the scope of what a person skilled in the art can conceive, such as other embodiments, additions, modifications, deletions, etc., and any aspect is within the scope of the present invention as long as it achieves the functions and effects of the present invention. [Explanation of symbols]

[0065] 10...Cutting device 11…Protector 12...Cutting waste collection device 13...Muddy water treatment equipment 14...Water supply device 15…High pressure water generator 20…General vehicle lane 21...Wheel 22…Rail frame 30…Truck frame 31…Beam member 32…XY frame fixing member 33...XY movement device 34…WJ jet nozzle 40...Support member 41, 42…Nozzle 50, 51...Rail members 52... Rod-shaped member 53...Nozzle support member 60…Cutting waste collection hopper 61…Jet water nozzle 62…Nozzle 63…Suction hose 64…Recovery tank 65...Separation device 66…Vacuum pump 70…Aperture 71, 72…Nozzle 73…Grating 74...Injection port 75...tube 76…Valve 77…Notch 78...Wheel 79…Recovery board 80…Water tank 81…Supply pump 82...Pretreatment device 83…Raw water tank 84…First reactor 85…Second reactor 86...Pelletizer 87...Sedimentation tank 88…Treatment tank 89…Discharge tank 90...Waste sludge tank 100...Lining concrete 101...Cutting waste 102…Water

Claims

1. A device for collecting cutting chips, comprising: A container having an opening at its top and a cross section that decreases from its top to its bottom, for receiving cutting chips generated by cutting with high-pressure water; an ejection means arranged adjacent to a bottom of the container for ejecting a high-pressure fluid for propelling the contained cutting chips in a certain direction; a suction means connected to the container via a tube for sucking the cutting chips propelled in a certain direction within the container; A cutting chip recovery device comprising:

2. a collection tank that collects the cutting chips sucked by the suction means; A separation means for separating the drilling cuttings collected in the collection tank; The cutting debris collection device of claim 1 .

3. The cutting chips are chips obtained after cutting the lining concrete covering the inner wall surface of the tunnel, the container has nozzles to which the tubes can be connected at both ends extending in the certain direction, The cutting debris collection device as described in claim 2, wherein the recovery tank, the separation device and the suction means are installed outside the tunnel near the entrance / exit, and the pipe is connected to a nozzle on the side where the recovery tank, the separation device and the suction means are installed.

4. The container is installed between the inner wall surface of the tunnel and a protector for forming a space through which vehicles can pass and for protecting the passing vehicles, The cutting chip recovery device includes: The cutting chip collecting device according to claim 3 , further comprising a collecting plate disposed at an angle with respect to the ground so as to bridge the container and an outer wall surface of the protector.

5. The present invention includes a cutting device that cuts the lining concrete by high-pressure water, and a cutting chip recovery device that recovers cutting chips generated by cutting by the cutting device, A container having an opening at a top and a cross section that decreases from the top to the bottom, for receiving cutting chips generated by cutting with the high-pressure water; an ejection means arranged adjacent to a bottom of the container for ejecting a high-pressure fluid for propelling the contained cutting chips in a certain direction; a suction means connected to the container via a tube for sucking the cutting chips propelled in a certain direction within the container; A cutting construction system including:

6. 6. The cutting construction system according to claim 5, wherein the cutting device is placed on a protector for forming a space through which vehicles can pass and for protecting the passing vehicles, and cuts the lining concrete that covers the inner wall surface of the tunnel.

7. 7. The cutting construction system according to claim 6, further comprising a shatterproof sheet for closing a gap between the protector and the inner wall surface of the tunnel on both sides of the cutting device in the tunnel axial direction.

8. A method for recovering cutting debris, comprising the steps of: A process of receiving the cutting chips generated by cutting with high-pressure water into a container having an opening at the top and a cross section that decreases from the top to the bottom; a step of ejecting a high-pressure fluid from an ejection means disposed adjacent to a bottom of the container to propel the cutting chips contained in the container in a certain direction; a step of sucking the cutting chips propelled in a certain direction in the container by a suction means connected to the container via a tube; A cutting chip recovery method comprising:

9. A cutting method for cutting lining concrete and collecting cutting chips, comprising the steps of: A step of cutting the lining concrete with high-pressure water; A process of receiving the cutting chips generated by cutting with the high-pressure water in a container having an opening at a top and a cross section that decreases from the top to the bottom; a step of ejecting a high-pressure fluid from an ejection means disposed adjacent to a bottom of the container to propel the cutting chips contained in the container in a certain direction; a step of sucking the cutting chips propelled in a certain direction in the container by a suction means connected to the container via a tube; A cutting construction method comprising:

Citation Information

Patent Citations

  • Method for remodeling existing road tunnel lining part and device used therefor

    JP2021173093A