Debris removal system and debris removal method in tunnel construction

The waste removal system enables efficient parallel processing of waste crushing and face maintenance, addressing inefficiencies in tunnel construction by using multiple containers and vehicles, thereby reducing cycle times and costs.

JP2024148781AActive Publication Date: 2024-10-18OOI IND MASCH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023062217
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-06
Publication Date
2024-10-18
Estimated Expiration
2043-04-06

AI Technical Summary

Technical Problem

Conventional waste removal systems in tunnel construction face inefficiencies due to the limitations of crusher capacity and the need for larger equipment, which increases construction costs and cycle times, despite efforts to shorten conveyance distances and speeds.

Method used

A waste removal system utilizing multiple waste containers, vehicles, and equipment that allows parallel processing of waste removal and face maintenance, including a waste loading vehicle, container transport vehicle, crushing equipment, and a belt conveyor, with a configuration that enables efficient waste handling and reduces reliance on crusher capacity.

Benefits of technology

Significantly reduces overall cycle time by up to 20% and construction costs by allowing parallel processing of waste crushing and face maintenance, ensuring construction efficiency without increasing equipment size or cost, and maintaining safety even with conveyor breakdowns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024148781000001_ABST
    Figure 2024148781000001_ABST
Patent Text Reader

Abstract

To provide a debris removal system and a debris removal method capable of achieving rapid construction by early opening of a tunnel face using a debris container.SOLUTION: A debris removal system of the present invention comprises multiple debris containers, one or more debris loading vehicles, one or more debris container transport vehicles, debris crushing equipment located in a debris processing area, a belt conveyor continuing from the debris crushing equipment to the outside of a mine, an empty container storage area, and a loaded container storage area. The empty container storage area is located on a face side of the debris crushing equipment in the debris processing area, and the loaded container storage area is located directly below the belt conveyor in the debris removal area. The debris removal method of the present invention comprises a loading step, a rearward transport step, a crushing step, a forward transport step, a transport step, and a face preservation step. After the loading step and rearward transport step are repeated to remove all debris from a blasting evacuation area, the face preservation step and steps after the crushing step are carried out in parallel.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a system and method for transporting debris in tunnel construction, and more particularly to a system and method for transporting debris that can achieve rapid construction by early opening of a tunnel face using a debris container. [Background technology]

[0002] In mountain tunnel construction, one construction cycle generally consists of blasting the tunnel face, removing debris (opening the tunnel face), spraying mortar on the tunnel face (mirror spraying), erecting supports, laying wire mesh between the supports, spraying mortar on the tunnel walls, and driving rock bolts, and the tunnel face is advanced by repeating this construction cycle. If the cycle time for one construction cycle is taken to be 300 minutes, it is roughly broken down as follows: excavation (70 minutes), debris removal (90 minutes), mirror spraying (20 minutes), erection of support structures (20 minutes), wire mesh laying (10 minutes), mortar spraying (60 minutes), and rock bolt installation (30 minutes), with debris removal taking up approximately 30% of the total cycle time (Figure 7). In the waste disposal process, the waste that has accumulated near the face due to blasting is scooped up by a wheel loader and loaded into a side dump, which then transports it to a crusher at the mine entrance where it is crushed. The crushed waste is then loaded onto a continuous conveyor belt and transported outside the mine. In recent years, with the increase in long-distance mountain tunnel construction, rapid construction is being pursued. However, an urgent issue in construction is how to efficiently process waste, which accounts for more than 30% of the total cycle time, in other words, how to efficiently transport the waste generated from the tunnel face outside the tunnel and open the tunnel face as soon as possible. Patent Document 1 discloses a technology in which a belt conveyor and a mobile crusher are extended daily in accordance with the progress of the face by a sliding and extendable tailpiece cart. According to this invention, by always keeping the face and the crusher close to each other, the distance for transporting the debris from the face to the crusher is shortened, and the debris from the face can be efficiently removed, enabling the face to be opened early. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2022-133560 A Summary of the Invention [Problem to be solved by the invention]

[0004] The conventional technology has the following problems. <1> The technology in Patent Document 1 is an invention that shortens the transport distance from the face to the crusher and increases the transport speed of the debris. However, since there is an upper limit to the crushing capacity of a crusher, even if the debris is transported to the crusher at a speed that exceeds the crushing capacity, the crushing cannot keep up, and waiting time occurs while waiting for the crusher to crush the debris. Therefore, the overall cycle time cannot be significantly shortened. <2> To eliminate the waiting time for crushing, it would be necessary to introduce a large crusher that can handle the transport speed of the rubble, which would increase construction costs. <3> If the crusher is enlarged to increase the crushing capacity, the conveyor belt's transport capacity must also be increased to accommodate the increased amount of crushed rubble. Specifically, the belt width must be increased to increase the driving capacity, which further increases construction costs.

[0005] An object of the present invention is to provide a rubbish removal system and a rubbish removal method for solving the problems of the conventional techniques as described above. [Means for solving the problem]

[0006] The debris removal system of the present invention comprises a plurality of debris containers, one or more debris loading vehicles capable of scooping up debris generated from the mine face and depositing it into the debris containers, one or more debris container transport vehicles capable of transporting the debris containers, debris crushing equipment located in a debris processing area, a belt conveyor connecting the debris crushing equipment to the outside of the mine, an empty container storage area in which a plurality of empty debris containers can be placed, and a loading container storage area in which a plurality of debris containers filled with debris can be placed, and is characterized in that the empty container storage area is located on the face side of the debris crushing equipment in the debris processing area, and the loading container storage area is located directly below the belt conveyor in the debris removal area.

[0007] The debris removal system of the present invention may be a container transport vehicle in which the debris container placed on the ground can be horizontally attached and detached to the rear of the debris container transport vehicle.

[0008] In the muck removal system of the present invention, the container transport vehicle may have a double steering mechanism equipped with a steering wheel and a windshield on both the front and rear sides of the driver's seat.

[0009] The debris removal method of the present invention comprises a loading process of loading debris into a debris container within a blasting evacuation area; a rearward transport process of transporting the debris container loaded with debris to a loading container storage area and placing it there; a crushing process of transporting the debris container to a debris processing area and discharging the debris in the debris container into debris crushing equipment and crushing it; a forward transport process of transporting the emptied debris container to an empty container storage area and placing it there; a transporting process of transporting the crushed debris outside the mine by a conveyor belt; and a face preservation process which includes at least mirror spraying of the face and erecting supports, and is characterized in that after the loading process and the rearward transport process have been repeated to remove all of the debris within the blasting evacuation area, the face preservation process and the processes subsequent to the crushing process are carried out in parallel. Effect of the Invention

[0010] The debris removal system and debris removal method of the present invention have at least one of the following effects. <1> By using multiple debris containers to open the face early, processes after blasting can be carried out in parallel with crushing the debris, which significantly reduces the work time required for debris disposal and shortens the overall cycle time. <2> The overall construction period can be shortened by more than 20% (example), and overhead costs such as rental fees and labor costs can be reduced, allowing for significant reductions in construction costs. <3> Since the time until the tunnel face is released does not depend on the crushing capacity of the crusher, high construction efficiency can be achieved without increasing construction costs by enlarging the size of the crusher or belt conveyor. <4> The crushing and removal of debris can be completed in the time between the face preservation process and the excavation process (70% of the total cycle time), allowing for safe work with ample time. In addition, even if the belt conveyor breaks down, construction can be carried out without stopping the entire construction cycle. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is an explanatory diagram of a waste removal system according to the present invention. [Diagram 2] FIG. 2 is an explanatory diagram of the waste removal system according to the present invention. [Diagram 3] FIG. 3 is an explanatory diagram of the waste removal system according to the present invention. [Figure 4] An explanatory diagram of a method for removing debris according to the present invention. [Figure 5A] Illustration of the loading process [Figure 5B] Illustration of the rear transport process [Figure 5C] Illustration of the crushing process and forward conveying process [Figure 6A] Cycle time comparison diagram (1) [Figure 6B] Cycle time comparison diagram (2) [Figure 6C] Cycle time comparison diagram (3) [Figure 7] Illustration of the prior art DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, the system and method for removing debris in tunnel construction according to the present invention will be described in detail with reference to the drawings. EXAMPLES

[0013] [Muck removal system] <1> Overall structure (Figs. 1-3) The debris removal system 1 is a system for removing debris generated from the tunnel face to the outside of the tunnel. Here, "debris" refers collectively to rocks, earth, sand, etc. generated by blasting at the tunnel face in mountain tunnel construction. The waste removal system 1 at least comprises a plurality of waste containers 10, a waste loading vehicle 20, a waste container transport vehicle 30, waste crushing equipment 40, a belt conveyor 50, an empty container storage area 60, and a loaded container storage area 70. In this example, a combination of ten rubbish containers 10, one rubbish loading vehicle 20, and one rubbish container transport vehicle 30 is used. For convenience, the drawings may show only some of the rubbish containers 10. The number of rubble loading vehicles 20 and rubble container transport vehicles 30 is not limited to this, and any appropriate combination of numbers can be adopted taking into account the bucket capacity of the rubble loading vehicle 20, the capacity of the rubble container 10 transported by the rubble container transport vehicle 30, the efficiency of transporting rubble by the rubble container transport vehicle 30, the crushing capacity of the rubble crushing equipment 40, and the introduction costs, etc.

[0014] <1.1> Construction area In the present invention, the tunnel is divided into a blasting evacuation area A1, a heavy machinery waiting area A2, a debris disposal area A3, and a debris removal area A4, in that order from the face side to the tunnel entrance side. The blasting evacuation area A1 is an area to which people should evacuate to prevent damage from flying stones during blasting excavation. The evacuation area A1 is generally within a range of 60 to 100 m from the face. The heavy equipment waiting area A2 is an area for keeping heavy equipment 80 used for excavation, spraying, shoring, etc., such as drill jumbos, guns, and transformer dollies, on standby during blasting. The heavy equipment waiting area A2 is within a range of about 100 m from the entrance side of the blasting evacuation area A1. The debris disposal area A3 is an area for installing the debris crushing equipment 40. In this example, the debris disposal area A3 is within a range of about 100 m from the entrance side of the heavy equipment waiting area A2. The waste discharge area A4 is an area for discharging the waste crushed in the waste crushing equipment 40 to the outside of the mine on a belt conveyor 50, and is the distance from the mine mouth side of the waste treatment area A3 to the mine mouth. The rubble removal system 1 of the present invention is characterized in that the rubble crushing equipment 40 and the empty container storage area 60 are provided on the pit entrance side of the heavy equipment waiting area A2, and that the loaded container storage area 70 is provided directly below the belt conveyor 50.

[0015] <2> Trash container The debris container 10 is a container for storing debris. The debris container 10 has a space capable of accommodating debris and a structure capable of being transported by a debris container transport vehicle 30. The debris containers 10 are arranged in parallel in the empty container storage area 60 during blasting, and are arranged in parallel in the loaded container storage area 70 after debris is loaded. In this example, the muck container 10 is a 32.5 t (20 m) capacity container that is connected to the rear of a container carrier vehicle, which will be described later. 3 ) steel containers will be used.

[0016] <3> Muck loading vehicle The debris loading vehicle 20 is a construction vehicle that scoops up debris from the ground and deposits it into the debris container 10. The muck loading vehicle 20 is positioned near the face of the blasting evacuation area A1, and waits in the heavy equipment waiting area A2 during blasting. In this example, a wheel loader with a side dump is used as the muck loading vehicle 20. However, the present invention is not limited to this, and a backhoe or other heavy machinery may also be used.

[0017] <4> Trash container transport vehicle The debris container transport vehicle 30 is a construction vehicle that transports the debris container 10. The rubble container transport vehicle 30 travels between the blasting evacuation area A1, the empty container storage area 60, and the loaded container storage area 70, and waits in the heavy equipment waiting area A2 during blasting. In this example, the debris container transport vehicle 30 is a container transport vehicle ("MIWA KIRUNA (registered trademark)" manufactured by Miwa Transport Industry Co., Ltd.) to which the debris container 10 can be horizontally attached and detached at the rear. The container transport vehicle consists of a truck and a trailer chassis that is roughly U-shaped in plan view and is connected to the rear of the truck; it reverses toward the waste container 10 placed on the ground and can load the waste container 10 onto the trailer chassis by inserting both sides of the waste container 10 between the Us of the trailer chassis and lifting it up. In addition, the container transport vehicle is equipped with a double steering mechanism with a steering wheel and a windshield on both sides in front of and behind the driver's seat. By operating the front steering wheel when transporting the waste container 10 from the mine mouth side to the mine face side, and operating the rear steering wheel when transporting the waste container 10 from the mine face side to the mine mouth side, the driver can always face forward while driving without having to turn the vehicle body around inside the mine, resulting in extremely high work efficiency.

[0018] <5> Muck crushing equipment The trash crushing equipment 40 is equipment that crushes trash and supplies it to the belt conveyor 50. The debris crushing equipment 40 is disposed in the debris disposal area A3, closer to the entrance of the mine than the empty container storage area 60, and toward one side in the width direction of the mine (equipment side B). In this example, the rubble crushing equipment 40 is a combination of an input conveyor 41 and a jaw crusher 42 (crushing capacity 300 t / h). The feed conveyor 41 is arranged on the face side of the jaw crusher 42, and the waste discharged from the waste container 10 of the waste container transport vehicle 30 is placed on the inclined conveyor, transported above the jaw crusher 42, and fed into the feed opening of the jaw crusher 42. The jaw crusher 42 crushes the refuse fed from the feeding conveyor 41 and discharges it onto the tail piece 51 of the belt conveyor 50. The rubble crushing equipment 40 is not limited to the above configuration. For example, instead of the input conveyor 41, a self-propelled loading device equipped with an inclined conveyor and a pick-up arm ("Hagloader (trademark)" manufactured by Nishio T&M Co., Ltd.) may be used.

[0019] <6> Conveyor belt The belt conveyor 50 is a device for transporting the crushed waste to the outside of the mine. The belt conveyor 50 continues from the waste discharge area A4 to the outside of the mine. In this example, the belt conveyor 50 is a continuous belt conveyor consisting of a tailpiece 51 for extending the belt in accordance with the progress of the face, and a conveyor body 52. The belt conveyor 50 transports the waste discharged from the jaw crusher 42 onto a tailpiece 51 via a conveyor body 52 to the outside of the mine. The tail piece 51 is disposed close to the facility side B on the wellhead side of the jaw crusher 42. The conveyor body 52 is arranged continuously from the tailpiece 51 to the outside of the mine, close to the equipment side B. In this example, the conveyor body 52 is installed by hanging it from a plurality of anchors arranged on the ceiling of the tunnel along the longitudinal direction of the tunnel. However, this is not limited to this, and it may be supported from below by a plurality of support stands arranged along the longitudinal direction of the tunnel.

[0020] <7> Empty container storage area The empty container storage area 60 is a space for temporarily storing empty rubbish containers 10. The empty container storage area 60 is set on the face side of the debris crushing equipment 40 in the debris disposal area A3, on the equipment side B. The area of ​​the empty container storage area 60 corresponds to the size and number of the waste containers 10, and in this example, is in the range of about 100 m in length and 5 m in width.

[0021] <8> Container storage area The loading container storage area 70 is a space for temporarily storing the trash containers 10 containing trash. The loaded container storage area 70 is set up directly below the belt conveyor 50 in the rubble discharge area A4. In detail, the loaded container storage area 70 is set up at a position directly below the conveyor body 52 of the belt conveyor 50 and close to the tailpiece 51. The area of ​​the loading container storage area 70 corresponds to the size and number of the waste containers 10, and in this example, is in the range of about 100 m in length and 5 m in width.

[0022] <9> How to remove debris (Fig. 4) The debris removal method of the present invention comprises a number of processes subsequent to an excavation process S1 in which the face is blasted and excavated, and at least includes a loading process S2, a rearward transport process S3, a crushing process S4, a forward transport process S51, a transport process S52, and a face preservation process S6. One feature of the debris removal method of the present invention is that after the loading process S2 and the rearward transport process S3 are repeated to remove all debris from the face, the crushing process S4 and subsequent processes (crushing process S4, forward transport process S51, and removal process S52) and the face preservation process S6 are carried out in parallel. The following description will start from the point when the excavation step S1 is completed.

[0023] <9.1> Loading process (Fig. 5A) The loading process S2 is a process of loading the debris generated from the tunnel face into the debris container 10. In detail, the process is carried out, for example, as follows. The debris loading vehicle 20 and the debris container transport vehicle 30 carrying the debris container 10 are moved to the blasting evacuation area A1. The debris container transport vehicle 30 is positioned with its front facing the face side. The bucket of the debris loading vehicle 20 scoops up the debris accumulated on the ground near the face and deposits it into the debris container 10 from the rear of the debris container transport vehicle 30.

[0024] <9.2> Post-transport process (Fig. 5B) The rearward transport process S3 is a process of transporting the waste container 10 loaded with waste to the loading container storage area 70. In detail, the process is carried out, for example, as follows. When the rubbish container 10 is full, the rubbish container transport vehicle 30 is reversed and transported to the loading container storage area 70 via the heavy equipment waiting area A2 and the rubbish processing area A3. In this example, the rubble container transport vehicle 30 has a double steering structure, so that the rubble container transport vehicle 30 can be driven forward by operating the steering wheel at the rear of the vehicle without having to turn around to change direction in a narrow tunnel. This improves work efficiency and increases work safety. When the waste container transport vehicle 30 arrives at the loading container storage area 70, the waste container 10 is removed and placed on the ground. The waste containers 10 are arranged in parallel along the tunnel axial direction on the equipment side B inside the tunnel. In this example, the waste containers 10 are arranged in order from the tunnel mouth side of the loading container storage area 70 to the tunnel face side. In the rubble removal method of the present invention, the loading container site 70 is set on the equipment side B directly below the belt conveyor 50, so that the temporarily stored rubble containers 10 do not obstruct the passage of construction vehicles. In addition, since the container storage area 70 is located close to the invert excavation construction area, the waste generated by the invert excavation can be transported to the container storage area 70 and processed there together.

[0025] <9.3> Repeating the loading and rearward transport processes The loading process S2 and the rearrangement process S3 are repeated until all of the debris in the blasting evacuation area A1 is transported to the loading container storage area 70. In addition, the final debris container 10 transported from the blasting evacuation area A1 may be transported directly to the debris disposal area A3 without being temporarily placed in the loading container storage area 70.

[0026] <9.4> Crushing step (Figure 5C) The crushing step S4 is a step of transporting the rubble container 10 loaded with rubble to the rubble processing area A3 and crushing the rubble. In detail, the crushing step S4 is carried out as follows, for example. At the loading container site 70, the rubbish container transport vehicle 30 is moved backward and the rubbish container 10 is coupled to the rear of the rubbish container transport vehicle 30. The steering of the rubble container transport vehicle 30 is switched forward, and the rubble container transport vehicle 30 is driven forward to the rubble processing area A3 and stopped at the face side of the input conveyor 41. In this example, of the rubble containers 10 arranged continuously in the tunnel axial direction, the rubble containers 10 are transported in order starting from the one on the face side. The rubbish container transport vehicle 30 is dumped up, and the rubbish in the rubbish container 10 is discharged onto the input conveyor 41. After discharging the rubbish, the rubbish container transport vehicle 30 proceeds to a forward transfer step S51, which will be described later. The feed conveyor 41 transports the rubble upward and discharges it into the feed port of the jaw crusher 42. The jaw crusher 42 crushes the waste into a size that can be processed by the belt conveyor 50, and discharges the waste onto a tail piece 51 of the belt conveyor 50. The waste on the tail piece 51 proceeds to a discharge step S52, which will be described later.

[0027] <9.5> Forward transfer process (Fig. 5C) The forward transfer step S51 is a step of transporting the emptied waste container 10 to the empty container storage area 60. In detail, the forward transfer step S51 is carried out, for example, as follows. After the rubbish in the rubbish container 10 is discharged onto the input conveyor 41, the rubbish container transport vehicle 30 is moved forward and transported to the empty container storage area 60. When the waste container transport vehicle 30 arrives at the empty container storage area 60, the waste container 10 is removed and placed on the ground. The waste containers 10 are arranged in parallel along the tunnel axial direction on the equipment side B inside the tunnel. In this example, the waste containers 10 are arranged in order from the tunnel mouth side of the empty container storage area 60 to the tunnel face side. The crushing step S4 and the forwarding step S51 are repeated until all the rubbish containers 10 are emptied.

[0028] <9.6> Unloading process The carrying-out step S52 is a step of carrying out the crushed waste outside the mine. The belt conveyor 50 is driven to move the rubble on the tailpiece 51 onto the conveyor body 52, which then transports it outside the mine.

[0029] <9.7> Face preservation process (Fig. 5C) The face preservation process S6 is a process for preserving the face and the hole wall near the face. The face preservation process S6 specifically includes spraying mirror, erecting supports, laying wire mesh between supports, spraying mortar on the hole wall, installing rock bolts, etc. These processes are well known and will not be described in detail here. The debris removal method of the present invention is configured to concentrate on the loading process S2 and the rearward transport process S3, and after opening the area near the face early, the subsequent crushing process S4 and subsequent processes are carried out in parallel with the face preservation process S6. This eliminates delays in the face preservation process due to waiting for debris to be crushed, and makes it possible to significantly reduce the cycle time related to face construction.

[0030] <10> Cycle time comparison The construction cycle using the rubble removal system 1 of the present invention will be compared with that of the prior art. [Calculation conditions] Excavation waste volume (m 3 ): Face cross-sectional area 85.0m 2 x Excavation length 1.5m x Ground loosening rate 1.6 = 204.0m 3 Excavation volume (t): 204.0m 3 × Apparent specific gravity of debris 1.6 = 326.4t

[0031] <10.1> Conventional technology (Fig. 6A) In conventional technology, the debris from the face is scooped up by a debris loader (wheel loader) and transported to a side dump and then to the debris crusher. The time required for removing the rubble using the conventional technology is as follows: [Calculation conditions] Side dump capacity: 3.0m 3 × volumetric efficiency 0.8 = 2.4m 3 Side dump cycle time: 29.4 seconds / cycle + waiting time 36.4 seconds / cycle = 65.8 seconds / cycle Wheel loader loading times: 204.0m 3 / 2.4m 3 =85 times [Calculation result] Sludge discharge time: 65.8 seconds / time x 85 times / 60 seconds = 93.3 minutes

[0032] <10.2> The present invention (FIG. 6B) The time required for removing the rubble in the present invention is as follows: [Calculation conditions] Container capacity: 32.5t Container cycle time: 2.75 min / cycle Number of times containers were loaded: 326.4t / 32.5t ≒ 10 times [Calculation result] Sludge discharge time: 2.75 minutes / time x 10 times = 27.5 minutes

[0033] <10.3> Calculation of construction period shortening (Fig. 6C) The effect of shortening the construction period due to the present invention will be calculated. [Specifications] Tunnel length: 3,000m Excavation length: 1.5m Number of cycles: 3,000m / 1.5m=2,000 times [Prior Art] Time per cycle: 70 mins drilling + Sludge treatment 93.3 minutes + Mirror spraying 20 minutes + Shoring 20 minutes + Wire mesh 10 minutes + Spraying 60 minutes + Rock bolts 30 minutes = 303.3 minutes / time Total construction time: 2,000 times x 303.3 minutes = 606,600 minutes Total construction months: 606,600 minutes / 60 / 18 hours of operation per day / 22 days of operation per month = 25.May [Present Invention] Time per cycle: 70 mins drilling + Sludge treatment 27.5 minutes + Mirror spraying 20 minutes + Shoring 20 minutes + Wire mesh 10 minutes + Spraying 60 minutes + Rock bolts 30 minutes = 237.5 minutes / time Total construction time: 2,000 times x 237.5 minutes = 475,000 minutes Total construction months: 475,000 minutes / 60 / 18 hours of operation per day / 22 days of operation per month = 20.0 month [Construction period shortening effect] 25.5 months - 20.0 months = 5.5 months (▲21.6%) As described above, by applying the present invention's debris removal system and method, the overall construction period of mountain tunnel construction can be shortened by more than 20%, which reduces indirect costs such as machinery rental fees and labor costs, and significantly reduces construction costs. [Explanation of symbols]

[0034] 1. Muck removal system 10. Waste container 20 Muck loading vehicle 30 Trash container transport vehicle 40 Muck crushing equipment 41 Input conveyor 42 Jaw Crusher 50 Conveyor Belt 51 Tailpiece 52 Conveyor body 60 Empty container storage area 70 Container storage area 80 Heavy Machinery A1 Blasting evacuation area A2 Heavy machinery waiting area A3 Waste disposal area A4 Waste removal area B equipment side S1 Drilling process S2 loading process S3 Post-transfer process S4 Crushing process S51 Advance process S52 Unloading process S6 Face maintenance process

Claims

1. A system for transporting debris in tunnel construction, which is divided into a blasting evacuation area, a heavy machinery waiting area, a debris disposal area, and a debris transport area, in order from the tunnel face to the tunnel entrance, A plurality of waste containers; one or more debris loading vehicles capable of scooping up debris generated from a tunnel face and depositing the debris in the debris container; one or more rubbish container transport vehicles capable of transporting the rubbish container; A waste crushing facility disposed in the waste disposal area; A belt conveyor continuing from the rubble crushing facility to the outside of the mine; an empty container storage area in which a plurality of empty rubbish containers can be placed; a loading container storage area capable of storing a plurality of the trash containers loaded with trash, The empty container storage area is provided on the face side of the debris crushing equipment in the debris processing area, The loading container storage area is provided directly under the belt conveyor in the waste discharge area, Muck removal system.

2. 2. The rubble removal system according to claim 1, wherein the rubble container transport vehicle is a container carrier capable of horizontally attaching and detaching the rubble container placed on the ground to the rear of the rubble container transport vehicle.

3. 3. The shear removal system according to claim 2, wherein the container transport vehicle has a double steering mechanism equipped with a steering wheel and a windshield on both the front and rear sides of the driver's seat.

4. A method for removing debris using the debris removal system according to any one of claims 1 to 3, comprising the steps of: a loading process of loading debris into the debris container in the blasting evacuation area; a rearward transporting step of transporting the trash container loaded with trash to the loading container storage area and arranging the trash container therein; a crushing step of transporting the debris container to the debris processing area and discharging the debris in the debris container into the debris crushing equipment for crushing; a forwarding process of transporting and arranging the emptied waste container in the empty container storage area; a conveying step of conveying the crushed waste to the outside of the mine by the belt conveyor; A face preservation process including at least face spraying and shoring, The method is characterized in that, after removing all the debris in the blasting evacuation area by repeating the loading process and the rearward transport process, the face preservation process and the process after the crushing process are performed in parallel. How to remove debris.