Method for handling formed panel in concrete formwork device and guide device for formed panel

The guide device and winch system facilitate efficient assembly and disassembly of molded panels in concrete formwork devices by allowing vertical movement along the framework, addressing labor-intensive manual handling and reducing construction time.

JP2024149016AActive Publication Date: 2024-10-18SHIMAKOGYO HD CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2023062652
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-07
Publication Date
2024-10-18
Estimated Expiration
2043-04-07

AI Technical Summary

Technical Problem

The assembly and disassembly of molded panels in concrete formwork devices for tunnel construction are labor-intensive and time-consuming due to the narrow gaps between the frame and inner wall surface, making manual handling of heavy steel panels difficult and prolonging construction periods.

Method used

A method involving the use of a guide device and winch system to vertically move molded panels along the arch curve of the framework, allowing panels to be assembled and removed from the outer peripheral side of the framework, eliminating the need for manual handling through narrow gaps.

Benefits of technology

This approach reduces labor and time required for panel assembly and disassembly, shortening tunnel construction periods and minimizing panel handling efforts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024149016000001_ABST
    Figure 2024149016000001_ABST
Patent Text Reader

Abstract

To easily assemble forming panels in a concrete formwork device for forming tunnel lining concrete.SOLUTION: A plurality of formed panels for forming a tunnel lining concrete are arranged side by side on an outer periphery of a framework 14 consisting of a plurality of arch-shaped framework members 15 supported by a gantry. A panel set 25 consisting of formed panels 16, 17 is pulled up by a winch via a rope 23 along the arch curve of the framework 14, whereby the formed panels are assembled to the framework 14 in order from the bottom up.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for handling a formed panel in a concrete formwork device for forming a tunnel lining concrete, and a guide device for the formed panel, in which the formed panel is used to form the shape of the lining concrete on the inner surface of a tunnel. [Background technology]

[0002] Patent Document 1 discloses a metal panel as a forming panel in a center concrete formwork device for forming tunnel lining concrete. The metal panel is attached to the outer surface of the arch-shaped framework of the concrete formwork device. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Utility Model Application Publication No. 56-16700 Summary of the Invention [Problem to be solved by the invention]

[0004] Conventionally, in the construction of a concrete formwork device as disclosed in Patent Document 1, the assembly of the formed panel to the framework of the device relied on the manual labor of workers. In this case, since the framework of the concrete formwork device is close to the inner wall surface of the tunnel, the gap between the framework and the inner wall surface is often narrow. Therefore, it is difficult for workers to enter the narrow gap to assemble the formed panel. Furthermore, it is practically impossible to set up a work scaffold for the assembly work of the formed panel in this gap.

[0005] For this reason, the worker manually inserts the formed panel from the inside of the arch-shaped framework through the gap between the framework to the outside of the framework. The worker then needs to reach through the gap to lift the formed panel to the assembly position of the framework and fix it in the same position while holding it, which is a cumbersome task. In this case, since the formed panels are heavy objects made of steel plates, the assembly work of a large number of formed panels requires a lot of labor and time. When removing the formed panels from the framework during dismantling of the concrete formwork device, the handling of the formed panels is the reverse of the assembly work, but it also requires a lot of labor and time. These factors lead to a prolonged tunnel construction period. [Means for solving the problem]

[0006] The method for handling a formed panel in a concrete formwork apparatus of the present invention is a concrete formwork apparatus in which a plurality of formed panels for forming a tunnel lining concrete are arranged side by side on the outer periphery of a framework made of a plurality of arch-shaped framework members supported by a gantry, and is characterized in that, in handling at least one of assembling and removing the formed panel from the framework, the formed panel is moved vertically along the arch curve of the framework via a rope. Here, handling of the formed panel refers to assembling the formed panel to the framework and removing the formed panel from the framework.

[0007] Therefore, the formed panel can be moved along the framework by the driving device while hanging from the winch rope. This eliminates the need to reach through the gaps between the framework from inside the framework to raise and lower the formed panel or to hold the formed panel, which is inefficient and labor-intensive. This allows the construction period for tunnel construction to be shortened.

[0008] The method of handling a formed panel in a concrete formwork apparatus of the present invention is a concrete formwork apparatus in which a plurality of formed panels for forming tunnel lining concrete are arranged side by side on the outer periphery of a framework consisting of a plurality of arch-shaped framework members supported by a gantry, and is characterized in that, when handling at least one of assembling and removing the formed panels from the framework, a guide device is installed that is positioned in the narrow portion between the inner wall surface of the tunnel and the outer periphery of the framework and extends from the position of the narrow portion in the direction of the tunnel extension, and the formed panel is moved between the narrow portion and the outside by being guided by the guide device.

[0009] Therefore, in the above method, the molded panel can be easily inserted into and removed from the narrow space between the inner wall surface of the tunnel and the framework via the guide device, and the molded panel can be attached to the framework in a short time.

[0010] In the guide device for a formed panel of the present invention, a frame member extending in one direction is provided at its lower part with legs for standing the frame member, and a receiving portion is provided at its upper part for abutting against a wall surface to maintain the frame member in an upright position, and the frame member is provided with a guide portion for guiding a formed panel for forming a tunnel lining concrete so that it can move in the extension direction of the frame member.

[0011] The guide device for such a formed panel may be thin for guiding the formed panel. Therefore, the guide device can be easily installed in the narrow part between the inner wall surface of the tunnel and the framework. And the guide part of this guide device allows the formed panel to be moved with little effort. Effect of the Invention

[0012] The present invention has the effect of shortening the construction period of a tunnel. [Brief description of the drawings]

[0013] [Figure 1]Cross-sectional view showing the pouring state of lining concrete. [Diagram 2] FIG. [Diagram 3] FIG. 4 is a perspective view showing a molded panel assembled to a frame. [Figure 4] (a) is a front view showing the panel assembly, and (b) is a rear view showing two types of molded panels. [Diagram 5] FIG. 2A is a perspective view showing an installation state of a guide device in the first embodiment, and FIG. 2B is an explanatory diagram showing the dimensional relationship between a framework, a molded panel, and an apparatus frame body. [Figure 6] FIG. [Figure 7] FIG. 7 is a perspective view of the device frame as viewed from a different direction than that of FIG. 6. [Figure 8] FIG. [Figure 9] FIG. 4 is a perspective view showing the device frame in a folded state. [Figure 10] Similarly, (a) is an end view of the square bar material, (b) is a front view showing the connection part of the device frame and its surroundings, (c) is a side view showing the sub-leg part, and (d) is a rear view showing the receiving stand part. [Figure 11] FIG. 11 is a perspective view showing the state in which the first molded panel is attached to the lower part of the framework. [Figure 12] FIG. 13 is a perspective view showing the state in which the guide device is installed on the side of the framework. [Figure 13] Similarly, (a) is a front view showing the panel assembly placed on the guide device, (b) is a front view showing the wheels, (c) is a front view showing another wheel, and (d) is a front view showing the hanging hardware. [Figure 14] Similarly, (a) is a partial front view showing the joint of the second molded panel, (b) is a cross-sectional view of the wheel portion, (c) is a cross-sectional view of another wheel portion, and (d) is a side view showing the hanging hardware portion. [Figure 15] FIG. 13 is a perspective view showing a state in which a panel set is placed on a protruding portion of the guide device. [Figure 16] FIG. 13 is a simplified plan view showing the relationship between the winch, rope and panel assembly. [Figure 17]FIG. 11 is a simplified front view showing the relationship between the winch, rope and panel assembly. [Figure 18] Similarly, (a) is a front view showing the panel group before it is pulled up, and (b) is a front view showing the panel group after it is pulled up. [Figure 19] FIG. [Figure 20] FIG. [Figure 21] 10A is a perspective view showing a device frame according to a second embodiment, and FIG. [Figure 22] FIG. 13A is a side view showing the lower part of the guide device, FIG. 13B is a side view showing the lower part of the guide device in a state where the panel assembly is guided, and FIG. [Figure 23] FIG. 4A is a perspective view of the carriage, and FIG. 4B is a cross-sectional view of the carriage. [Figure 24] FIG. 13 is a front view showing the state in which a panel assembly is placed on the guide device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] (First embodiment) A first embodiment of the present invention will now be described with reference to the drawings. <Configuration of the concrete formwork device 11, etc.> First, a description will be given of the configuration of a concrete formwork device (hereinafter, referred to as a formwork device) 11 having a formwork 10 for forming lining concrete C on the inner wall surface of a tunnel T. In this embodiment, the left and right sides of Fig. 1 are the left-right direction, and the direction perpendicular to the paper surface of Fig. 1 is the front-rear direction.

[0015] As shown in FIG. 1, a gantry 12 is installed on rails R on the ground G of a tunnel T. As shown in Figs. 1 and 2, a framework 14 is supported on the gantry 12 via pillars 13 and rod-shaped jacks (not shown). The framework 14 is formed by arranging a plurality of arch-shaped framework members 15 made of H-shaped steel in parallel. As shown in Fig. 3, a plurality of first and second formed panels 16 and 17 made of steel that constitute the formwork 10 are assembled to the outer circumferential surface of the framework 14. These first and second formed panels 16 and 17 are arranged in parallel in the circumferential direction of the framework 14 and in the extension direction of the tunnel T. As shown in Figs. 4(a) and 4(b), the first formed panel 16 is formed with a narrow vertical width. The second formed panel 17 is formed with a wide vertical width. As shown in Figs. 4(a) and 4(b), a panel set 25 is formed by two each of the first and second formed panels 16 and 17. When this panel set 25 is assembled to the framework 14, four sets are joined together and handled as one.

[0016] As shown in FIG. 3 and FIG. 4(a) and (b), the first and second forming panels 16 and 17 have a face plate 18 for forming the lining concrete C, an edge frame 19 around the back surface of the face plate 18, and a reinforcing frame 20 within the edge frame 19. The first and second forming panels 16 and 17 are fixed to the framework 14 by connecting pins (not shown) inserted into holes (not shown) in the edge frame 19, and adjacent first and second forming panels 16 and 17 are connected to each other. In the drawings such as FIG. 3, the face plate 18 is drawn in an arc shape so as to follow the curve of the framework 14. However, the actual face plate 18 has a flat shape before being assembled to the framework 14, and is slightly curved to follow the framework 14 by the force of assembly when assembled to the framework 14. Then, as shown in FIG. 1, the lining concrete C is poured between the inner wall surface of the tunnel T and the face plates 18 of the first and second forming panels 16 and 17. Therefore, the inner peripheral surface of the lining concrete C is formed by the face plate 18.

[0017] 16 and 17, a winch 22 is mounted on the front and rear overhanging parts 12a at the top of the gantry 12. A rope 23 wound around the drum of the winch 22 is wound and unwound. By winding and unwounding the rope 23, a panel set 25 consisting of the first and second formed panels 16, 17 is moved up and down along the outer circumferential surface of the framework 14 via fixed pulleys 24 attached to the pillars 13, framework members 15, etc.

[0018] <Configuration of Guide Device 31> As shown in Figures 5(a) and 17, a guide device 31 having a framework structure extending in one direction is installed on the ground G of the tunnel T in the narrow section K between the inner wall surface of the tunnel T and the outer circumferential surface of the framework 14. The guide device 31 has a protruding portion 31A that protrudes and extends from the portion disposed in the narrow section K to an open area in front, which is outside in the extension direction of the tunnel. The guide device 31 includes a plurality of vertical frames 32 disposed at intervals from each other, and is framed by a lower horizontal frame 33, an intermediate horizontal frame 34, and an upper horizontal frame 35 that constitute a guide portion. The vertical frames 32 are curved so as to follow the arch curve of the framework 14.

[0019] As shown in Figs. 6 to 8, the guide device 31 is configured by connecting a plurality of device frames 41 that constitute a framework member extending in one direction as a whole. The device frame 41 has a pair of intermediate pieces 42 that constitute the intermediate horizontal frame 34, and a lower vertical piece 43 and an upper vertical piece 44 that respectively constitute the pair of vertical frames 32. The pair of intermediate pieces 42 are stacked vertically, and their back surfaces are connected by a hinge 48. The upper end of the lower vertical piece 43 is fixed to the lower intermediate piece 42 via an angle metal fitting 45, and a lower piece 46 that constitutes the lower horizontal frame 33 is hung on the lower end of the lower vertical piece 43 via an angle metal fitting 45. An upper piece 47 that constitutes the upper horizontal frame 35 is hung on the upper end of the upper vertical piece 44 via an angle metal fitting 45. As shown in Fig. 9, the device frame 41 has a lower frame 49 and an upper frame 50 that are each foldable via a hinge 48 and are shaped like a grid. 6 and 7, when the lower framework 49 and the upper framework 50 are unfolded, the side surfaces of the two intermediate pieces 42 abut against each other, and the upper and lower vertical pieces 43, 44 are held so as to be positioned on approximately the same curve. When the lower framework 49 and the upper framework 50 are folded, as shown in Fig. 9, the other side surfaces of the two intermediate pieces 42 abut against each other, and the two intermediate pieces 42 are held in this folded state. In this folded state, the lower framework 49 and the upper framework 50 are almost overlapped, and the entire device frame 41 becomes compact.

[0020] As shown in Figure 5 (b), in this embodiment, the span S of the three frame members 15 sandwiched between them is equal to the width of the first and second molded panels 16, 17 and the device frame body 41.

[0021] 6 and 7, one end of a main leg 52 is connected to the lower end of the lower vertical piece 43 via a hinge portion 51 so as to be rotatable up and down, and this main leg 52 is fixed at a desired angle by fastening a shaft 53 of the hinge portion 51. The main leg 52 extends toward the framework 14 so as to enable the guide device 31 to stand up. The shaft 53 of the hinge portion 51 has a fastening function due to the action of a screw (not shown).

[0022] As shown in Figures 6 and 10(c), a sub-leg 55 is supported at one end of the lower piece 46 via a clamping metal fitting 54, and the vertical position of this sub-leg 55 can be adjusted by loosening a screw 56 of the clamping metal fitting 54. As shown in Figures 6 and 10(d), a receiving stand 57 serving as a receiving part is supported at the upper end of one of the upper pieces 47 via a clamping metal fitting 54. The position of this receiving stand 57 close to or away from the inner wall surface of the tunnel T can be adjusted by loosening the screw 56 of the clamping metal fitting 54.

[0023] 6 and 10(b), a clip metal fitting 58 for holding the device frame body 41 in the opened state is attached between both intermediate pieces 42. This clip metal fitting 58 is intended to make it easier to hold the lower framework 49 and the upper framework 50 so that they do not rotate about the hinges 48 when installing the device frame body 41, etc.

[0024] 6 and 10(b), rollers 59 are attached to the upper intermediate piece 42 and the upper piece 47 as guides for guiding the lateral movement (described later) of the panel set 25. The wheels and rollers in this embodiment, including the rollers 59, are made of synthetic resin.

[0025] As shown in FIG. 10(a), the intermediate piece 42, the lower piece 46, the upper piece 47, the lower vertical piece 43, the upper vertical piece 44, and the main leg 52 are made of an aluminum square bar 60. A mounting groove 63 is formed on each side of the square bar 60, and the mounting groove 63 is provided with a protrusion 62 that forms an opening 61. As shown in FIG. 6 and FIG. 10(b), a joint metal fitting 64 is inserted and fixed at one end of the mounting groove 63 of the intermediate piece 42, the lower piece 46, and the upper piece 47. The other end of the joint metal fitting 64 protrudes outward, and this protrusion is adapted to be inserted into the mounting groove 63 of the intermediate piece 42, the lower piece 46, and the upper piece 47 of another adjacent device frame body 41. Then, when both ends of the joint metal fitting 64 are inserted into the mounting groove 63 of the device frame body 41 adjacent to each other, the screw 65 at both ends of the joint metal fitting 64 is tightened, and the tip of the screw 65 and the joint metal fitting 64 are pressed against the inner side of the mounting groove 63. Therefore, as shown in FIG. 8, the device frames 41 are fixed in a connected state.

[0026] As shown in FIG. 10(b), a pulling handle 67 of a clamp device 66 is attached to the upper surface of one end of the upper intermediate piece 42, and a hook 68 of the clamp device 66 is attached to the upper surface of the other end. The pulling handle 67 is operated with the latch portion 67a of the pulling handle 67 latched to the hook 68 of the adjacent other device frame body 41. In this manner, the adjacent other device frame body 41 is pulled in the connecting direction by the joint metal fitting 64 via the latch portion 67a and the hook 68. Therefore, the mounting groove 63 of the intermediate piece 42 of the other device frame body 41 is joined to the joint metal fitting 64. In this joined state, the pulling handle 67 exceeds the dead point and is locked in the pulled state.

[0027] 10(a) are fixed to the sub-leg 55, the gripping metal fitting 54 of the receiving stand 57, the support metal fitting 59a of the roller 59, the clip metal fitting 58, the support metal fitting 67b of the handle 67 of the clamp device 66, and the hook 68. And, like the joint metal fitting 64, this connecting metal fitting 69 is fixed to the mounting groove 63 of the square bar 60 by a screw 65.

[0028] <Installation method of guide device 31> Next, a method for installing the guide device 31 will be described. As shown in Fig. 5(a), Fig. 12 and Fig. 17, the guide device 31 is installed on the ground G in the narrow section K close to the inner wall surface of the tunnel T and spaced from the framework 14 of the formwork device 11. The protruding portion 31A of the guide device 31 is located beside the open area in front of the gantry 12. In addition, the guide device 31 is connected to an appropriate number of device frames 41 so that the front-to-rear length of the portion in the narrow section K matches the front-to-rear length of the framework 14 and the protruding portion 31A protrudes forward of the framework 14 as described above. That is, various components such as scaffolding (not shown) are often arranged on the front side of the formwork device 11. In addition, the open area in front of the formwork device 11 needs to be wide enough to perform various tasks. For this reason, the protruding portion 31A of the guide device 31 needs to have a length that protrudes further forward from the positions of the components and the open area in order to smoothly load and unload the panel set 25 onto and from the guide device 31.

[0029] The guide device 31 is erected by the main legs 52 and the sub-legs 55. In this case, the angle of the main legs 52 is adjusted so that the curve of the vertical frame 32 of the guide device 31 follows the curve of the framework 14. Furthermore, the projection amount of the receiving stand 57 is adjusted so that part of the load of the guide device 31 can be supported by the inner wall surface of the tunnel T. Also, the ground G of the tunnel T is uneven and has many projections and recesses. Therefore, the vertical position of the sub-legs 55 is adjusted so that they can accommodate the unevenness of the ground G. In this way, the guide device 31 can be installed in a stable state within the narrow section K.

[0030] <How to handle the molded panels 16, 17 when assembling the molded panels 16, 17> Next, a method of assembling the first and second formed panels 16, 17 to the framework 14 of the formwork device 11 will be described.

[0031] First, as shown in Fig. 11, two first formed panels 16, one at the top and one at the bottom, and four at the front and rear, each narrow in width from top to bottom, are fixed to the lower end of the framework 14 on either the left or right side of the framework 14 while the framework 14 is supported on the gantry 12. These two first formed panels 16 are inserted from the inside of the framework material 15 through the gaps between the framework materials 15 to the outside of the framework material 15 by a worker, and are assembled to the outer surface of the framework material 15. In this case, since the first formed panels 16 have a narrow width, they are lightweight and the assembly work is easy. The upper end surface of the upper first formed panel 16 assembled in this way becomes the installation reference surface for the subsequently assembled formed panels 16, 17.

[0032] Thereafter, the guide device 31 is placed at the narrow portion K and in a position forward of the narrow portion K. That is, the guide device 31 is assembled while connecting the device frame body 41, and is installed on the ground surface G of the tunnel T. At this time, in the portion of the guide device 31 located at the narrow portion K, the device frame body 41 is assembled by a worker positioned inside the framework 14 while the worker reaches between the framework members 15. In this case, since the square bar material 60 of the device frame body 41 is made of aluminum material, it is lightweight and easy to work with.

[0033] After the guide device 31 is installed, as shown in Figs. 4(a), 13(a) and 15, a panel set 25, which is a combination of two first formed panels 16 and two second formed panels 17, is placed on the lower horizontal frame 33 of the protruding portion 31A of the guide device 31. The formwork device 11 is constructed to have different sizes and shapes according to the size and cross-sectional shape of the tunnel T. Accordingly, the number of the first formed panels 16 and the second formed panels 17 may be increased or decreased, or the panels may be changed to different sizes. The guide device 31 may also be changed in size, arch curve, etc., as necessary. In this embodiment, the panel sets 25 are four sets in total, and as shown in Figs. 13(a) and 14(a), the panel sets 25 are arranged in parallel in the front-rear direction and are connected to each other by connecting pins (not shown) at the edge frame 19. The panel sets 25 may be multiple sets other than four sets or may be single, depending on the front-rear length of the framework 14. At this time, as shown in Fig. 13(b) and Fig. 14(b), a wheel unit 73 having a pair of wheels 72 is removably attached to the lower end of the lower first molded panel 16 using a pin clip 71. The panel set 25 is placed on the lower horizontal frame 33 at the wheels 72. At this time, the panel set 25 has its face plate 18 supported by the rollers 59 of the guide device 31. Furthermore, as shown in Fig. 13(a), Fig. 13(c) and Fig. 14(c), a wheel unit 75 having wheels 79 is removably attached to the reinforcing frame 20 at the lower end of the lower first molded panel 16 and the reinforcing frame 20 of the upper second molded panel 17 using a pin clip 71. The wheels 79 constitute an avoidance means. The pin clips 71 of both wheel units 73, 75 pass through the holes 76 of the edge frame 19 or the reinforcing frame 20 and the wheel frame 78, and clamp the edge frame 19 or the reinforcing frame 20 and the wheel frame 78.

[0034] 13(a), 13(d) and 14(d), a hanging bracket 74 is attached to the edge frame 19 at the upper end of the panel assembly 25 with screws 80. Wheels 77 are attached to both ends of the hanging bracket 74 as an avoidance means.

[0035] Then, when the worker pushes the panel set 25 towards the framework 14, the panel set 25 is caused to run on the lower horizontal frame 33 by the wheels 72 of the lower wheel unit 73, and is guided by the rollers 59 while running toward the framework 14. In this way, the panel set 25 is introduced from the position of the protruding portion 31A into the narrow portion K, and is positioned next to the framework 14.

[0036] Next, as shown in Fig. 5(a), Fig. 14(d) and Fig. 18(a), the rope 23 of the winch 22 is tied to the loop 74a of the hoisting fitting 74, and the panel set 25 is pulled up along the outer circumferential surface of the framework 14 by the winding operation of the winch 22. Then, as shown in Fig. 17, Fig. 18(b) and Fig. 19, the panel set 25 is lifted up to a position slightly higher than the upper end of the existing formed panel 17. The wheel units 73, 75 attached to the formed panel 17 of the lifted panel set 25 are removed by a worker inside the framework 14. Next, the lower end surface of the panel set 25 is placed on the upper end surfaces of the existing formed panels 16, 17 below, and the hoisting fitting 74 is removed, and then the panel set 25 is fixed to the framework 14. This operation is repeated to assemble the formed panels 16, 17 to one of the left and right sides of the framework 14. When the panel set 25 is pulled up, at least one of the wheels 79 of the upper and lower wheel units 75 of the second molded panel 17 rolls on the face plates 18 of the existing molded panels 16, 17, so that the molded panels 16, 17 can be prevented from rubbing against each other. Also, at least one of the upper and lower wheels 77 of the hanging fitting 74 rolls on the face plates 18 of the molded panels 16, 17, so that that the hanging fitting 74 can be prevented from rubbing against the molded panels 16, 17. Therefore, scratches on the face plates 18 of the existing molded panels 16, 17 can be prevented.

[0037] When the panel set 25 passes over the upper ends of the existing formed panels 16, 17, it may drop into the framework 15, which may cause scratches on the upper ends of the face plates 18 of the existing formed panels 16, 17. Therefore, as shown in Figs. 19 and 20, a roller 81 is attached to the flange 15a of the framework 15 on the upper side of the existing formed panels 16, 17 as an avoidance means. This roller 81 is supported by a pair of fixtures 85 having a handle 82 and a pressing member 84 on its frame 81a, and by operating the handle 82, the pressing member 84 presses the web 15b of the framework 15 in a state where it has passed the dead point. Therefore, the pair of pressing members 84 clamp the framework 15, which causes the roller 81 to be supported by the framework 15. The panel set 25 that has passed over the upper ends of the existing formed panels 16, 17 rides up onto the roller 81. This prevents the panel set 25 from falling onto the existing formed panels 16, 17 after movement is complete, thereby preventing scratches on the face plate 18. After the panel set 25 rides over the rollers 81, the fixing device 85 having the rollers 81 is removed from the framework material 15. The panel set 25 then rests on the upper end surfaces of the existing formed panels 16, 17 in a state where it is aligned substantially along the framework 14. The hanging fittings 74 are removed when the panel set 25 is placed on the upper ends of the existing formed panels 16, 17 and before it is fixed to the framework 14.

[0038] Thereafter, the panel assemblies 25 are assembled to the left and right sides of the framework 14 in the same manner as described above. If a gap is formed at the top of the framework 14 after the assembly of the left and right panel assemblies 25 is completed, the narrow first formed panel 16 is assembled into the gap. In this manner, the formwork 10 consisting of the formed panels 16, 17 is constructed around the outer periphery of the framework 14. Then, the lining concrete C is poured between this formwork 10 and the inner wall surface of the tunnel T.

[0039] <How to handle the molded panels 16, 17 when removing them> When removing the molded panels 16, 17 from the framework 14, the assembly steps are carried out in reverse order.

[0040] When the first formed panel 16 is attached to the top of the framework 14, the first formed panel 16 is removed first. The panel assemblies 25 are removed in order from the top. The hoisting fixture 74 is attached to the panel assembly 25 to be removed. That is, after the upper panel assembly 25 is released from the framework 14, the panel assembly 25 is lifted slightly by the winch 22 via the hoisting fixture 74 and the rope 23, and the wheel units 73, 75 are attached to the panel assembly 25 in this state. In addition, a fixing device 85 having a roller 81 is attached to the framework material 15 between the removed panel assembly 25 and the panel assembly 25 before it is removed. In this state, the winch 22 is slowly reeled back to slowly lower the panel assembly 25, and the wheels 79 of the wheel unit 75 of the panel assembly 25 and the wheels 77 of the hoisting fixture 74 roll on the face plate 18 of the panel assembly 25 before it is removed. The lowered panel set 25 is supported by the guide device 31 at the wheels 72 at the lower end, and is received by the rollers 59 of the guide device 31. Therefore, the removed panel set 25 is guided by the guide device 31 and moved out to the protruding portion 31A in front of the formwork device 11. The moved out panel set 25 is removed from the guide device 31 and sent to the subsequent process.

[0041] In this manner, all panel sets 25 on the framework 14 are removed. Then, the guide device 31 is disassembled and removed. Finally, the first forming panel 16 at the bottom of the framework 14 is removed. Thereafter, the framework 14 and the gantry 12 are disassembled, and the formwork device 11 is dismantled.

[0042] (Effects of the embodiment) This embodiment has the following advantages. (1) When the formed panels 16, 17 are attached to the framework 14 and removed from the framework 14, the formed panels 16, 17 are pulled up on the outer periphery of the framework 14 by the winch 22 mounted on the upper part of the gantry 12. This eliminates the need for workers to assemble the formed panels 16, 17 while supporting them from inside the framework 14. In other words, since the labor of the workers to pull up the formed panels 16, 17 is eliminated, the burden on the workers is reduced and the time required for attaching and removing the formed panels 16, 17 can be shortened, which contributes to shortening the construction period for tunnel construction.

[0043] (2) When the formed panels 16, 17 are raised and lowered, which is the vertical movement of the formed panels 16, 17, the wheels 77, 79 that roll up and down on the existing formed panels 16, 17 are provided on the formed panels 16, 17. This reduces the load of raising and lowering the formed panels 16, 17. This allows the use of a winch 22 that is small and consumes less power. In addition, because the wheels 72, 77 roll on the face plate 18, scratches on the face plate 18 can be avoided. This prevents the accuracy of the formed surface of the lining concrete C from being reduced due to scratches.

[0044] (3) The rollers 81 are attached to the framework 14 at a position above the existing panel set 25. Therefore, it is possible to prevent the face plate 18 of the existing panel set 25 from being scratched by the panel set 25 being pulled up and dropping into the upper end of the existing panel set 25.

[0045] (4) A guide device 31 is installed at a position along the inner wall surface of the tunnel T on the outer periphery side of the framework 14, and extends so as to protrude from the position of the framework 14 along the extension direction of the tunnel T. Then, the panel set 25 is introduced and moved from the front of the framework 14 to the lower part of the framework 14 in the narrow section K while being guided by the guide device 31. Thus, a plurality of sets of panel sets 25 can be moved to the assembly start position for the framework 14. At this time, the movement of the panel set 25 is guided by the wheels 72, so that the panel set 25 can be moved with little effort. Moreover, the guide device 31 has a thin framework configuration, so that it can be arranged even when the narrow section K is particularly narrow.

[0046] (5) The angle of the main legs 52 of the guide device 31 can be adjusted, so that the guide device 31 can be adapted to the ground G of the tunnel T that is uneven and has bumps and other irregularities. In addition, the sub-legs 55 can be adjusted in the vertical position, so that the guide device 31 can be adapted to the ground G that is uneven and has many bumps and irregularities.

[0047] (6) By bringing the receiving stand 57 at the upper end of the guide device 31 into contact with the inner wall surface of the tunnel T, the weight of the guide device 31 can be supported by the inner wall surface. Therefore, the guide device 31 can be maintained in a stable upright state.

[0048] (7) The guide device 31 is constructed of a plurality of device frames 41 that can be connected and separated. Therefore, when separated, the guide device 31 is compact, which makes it easy to transport and store. (8) Since the device frame 41 of the guide device 31 can be folded in half at the hinge 48, the device frame 41 becomes even more compact, which is convenient for transportation and storage.

[0049] (9) The length of the guide device 31 can be adjusted in the extension direction of the tunnel T depending on the number of device frame bodies 41 connected to it. Therefore, it can accommodate frameworks 14 of different sizes and expansion / contraction of the work area. The span S of the device frame body 41 is an integer multiple of the spacing between the framework members 15. In other words, since the span S of the device frame body 41 can be made the same as the front-to-rear width of the formed panels 16, 17, the length of the guide device 31 can be made an integer multiple of the length of the formed panels 16, 17. Therefore, the length of the guide device 31 can be made the minimum length that matches the number of formed panels 16, 17.

[0050] Second embodiment Next, a second embodiment of the present invention will be described, focusing on the differences from the first embodiment. Configuration of the Second Embodiment As shown in Figs. 21 to 24, the second embodiment differs from the first embodiment mainly in the configuration of the main leg 52 and sub leg 55 portions at the bottom of the guide device 31 and the configuration for guiding the bottom of the panel set 25. In this embodiment, the first and second molded panels 16, 17 are wide, and the first molded panel 16 is one piece. Also, there are two panel sets 25. In this case, as in the first embodiment, the first and second molded panels 16, 17 are changed to have different shapes and sizes in accordance with the size and cross-sectional shape of the tunnel T, and the guide device 31 is also changed to have a different size, etc., as necessary.

[0051] As shown in Fig. 21 and Fig. 22(a) and (b), a stay 92 made of a square bar 60 is fixed to the lower end of the lower vertical piece 43 of the device frame 41 via an angle bracket 45. An adjustment member 94 is attached to the upper surface of the main leg 52 with a screw 93. As shown in Fig. 22(c), the adjustment member 94 is attached by fixing a connecting metal fitting 69 similar to the connecting metal fitting 69 (see Fig. 10(a)) of the first embodiment to the mounting groove 63 of the square bar 60 on the inner surface. A connecting link 95 is connected between the tip of the stay 92 and the adjustment member 94 via a shaft 96. By loosening the screw 93, the adjustment member 94 is moved in the length direction of the main leg 52. By tightening the screw 93, the adjustment member 94 is fixed at the moved position. Therefore, the inclination angle of the connecting link 95 is changed depending on the position of the adjustment member 94 in the length direction of the main leg 52. Therefore, the angle of the main leg 52 is changed depending on the position of the adjustment member 94. In other words, the standing angle of the device frame 41 is adjusted via the stay 92. Therefore, when the adjustment member 94 is fixed, the main legs 52 are fixed via the connecting links 95 and the stay 92, and the angular relationship between the device frame 41 and the main legs 52 is fixed.

[0052] In this embodiment, the sub-leg 55 is attached to the main leg 52 via an angle bracket 45 . As shown in Fig. 22(a), (b) and Fig. 23(a), a guide rail 102 is supported on the stay 92 as a guide section extending parallel to the lower horizontal frame 33. The guide rail 102 is supported on the stay 92 via the connecting metal fitting 69 (not shown in Fig. 22(a), (b) and Fig. 23(a)) and a mounting metal fitting 101 fixed to the connecting metal fitting 69. As shown in Fig. 22(a), Fig. 23(a), (b) and Fig. 24, a plurality of carriages 103 are placed on the guide rail 102 in a straddling state. A pair of side plates 104 of the carriage 103 are provided with a pair of main wheels 105 that are capable of rolling on the upper surface of the guide rail 102, and a pair of upper and lower sub-wheels 106 that are capable of rolling on the side surfaces of the guide rail 102. The sub-wheels 106 are engageable with steps 107 on the outer circumferential surface of the guide rail 102, and this engagement prevents the carriage 103 from falling off the guide rail 102 and from rotating in the lying down direction. A placement portion 108 for placing the panel assembly 25 is provided between the side plates 104 of the carriage 103. Hanging holes 109 for hanging connecting ropes 110 are formed at both ends of the side plates 104. Adjacent carriages 103 are connected by the connecting ropes 110, and the connecting ropes 110 hung in the hanging holes 109 at the outer ends of the carriages 103 at the front and rear end positions are extended in the front and rear direction.

[0053] 21(a) and (b), a reinforcing plate 111 for reinforcing the joint state is fixed to the joint fittings 64 connecting the middle piece 42, lower piece 46, and upper piece 47 of adjacent device frames 41 on the outside of the square bars 60. Note that the hinges 48 and clip fittings 58 of the first embodiment are also provided in this embodiment, but are not shown. Also, the form of combination of the vertical pieces 44 differs from that of the first embodiment.

[0054] <Operation of the Second Embodiment> Next, the operation of this embodiment will be described. In the installed state of the guide device 31, as is clear from FIG. 22(a), the rising angle of the device frame body 41 is adjusted by adjusting the position of the adjustment member 94. This rising angle is adjusted according to the positional relationship between the inner wall surface of the tunnel T and the receiving stand 57 in the narrow section K and the size of the arch curve of the framework 14. In this state, by pulling the connecting rope 110 extended forward of the framework 14, the carriage 103 is positioned at the forward protrusion 31A of the framework 14 of the formwork device 11. Then, as shown in FIG. 24, one panel set 25 is placed on the placement portion 108 of a pair (not limited to one pair, but may be multiple) of carriages 103. In this state, the panel set 25 is pushed into the narrow section K by an operator. Thereafter, the panel set 25 is assembled to the framework 14 in the same manner as in the first embodiment. The empty carriage 103 returns to the protruding portion 31A as the connecting rope 110 is pulled forward.

[0055] (Effects of the embodiment) The second embodiment has the following advantages. (1) The panel set 25 that is moved to the narrow section K for assembly to the framework 14 can be placed on the carriage 103. This eliminates the need to attach the carriage 103 to the bottom of each panel set 25 and detach the carriage 103 from the bottom, reducing the amount of work required. This is effective in shortening the construction period for tunnel construction.

[0056] (2) Since the strength of the attachment between the device frame 41 and the main legs 52 can be improved by the connecting links 95 and the like, the first molded panel 16 can be moved stably even if the first molded panel 16 is heavy.

[0057] (Example of change) The present invention is not limited to the first and second embodiments, but can be embodied in the following aspects.

[0058] In the above embodiment, the molded panels 16, 17 are attached to and removed from the framework 14 successively from the left and right sides of the framework 14, but they may be attached to and removed from both sides simultaneously. The panel set 25 is driven into and out of operation by a winch, not by human power. In this configuration, the connecting rope 110 connected to the carriage 103 in the second embodiment can be pulled by a winch. Therefore, this configuration is effective in the second embodiment.

[0059] In the first and second embodiments, the present invention is carried out in either one of assembling the molded panels 16, 17 to the framework 14 and removing the molded panels 16, 17 from the framework 14.

[0060] (Other technical ideas) The technical ideas understood from the above embodiments are as follows. (A) The guide device according to claim 8, which is curved to fit the arch shape of the framework.

[0061] This allows the guide device to be disposed so as to fit snugly into a narrow space, and allows the molded panel to be lifted and lowered smoothly. (B) The guide device according to claim 8, wherein the device frame is foldable.

[0062] This makes the device frame compact, which is convenient for transportation and storage. [Explanation of symbols]

[0063] 11...Concrete formwork equipment 12. Gantry 14...Framework 15…Framework 16…First molding panel 17…Second molding panel 22…Winch 23... 25…Panel set 31...Guide device 31A…Protrusion 33…Lower horizontal frame 34…Middle horizontal frame 35…Upper horizontal frame 41...Device frame 52…Main legs 53…Sub-leg 57…Receiving stand 59…Laura 72...Wheel 77...Wheel 79...Wheel 102...Guide rail C…Lining concrete K...Narrow area S...ground T…Tunnel

Claims

1. A concrete formwork device in which a plurality of forming panels for forming tunnel lining concrete are arranged side by side on the outer periphery of a framework made of a plurality of arch-shaped framework members supported by a gantry, the device comprising: A method for handling a formed panel in a concrete formwork device, comprising: moving the formed panel vertically along the arch curve of the framework via a rope.

2. 2. A method for handling a formed panel in a concrete formwork apparatus according to claim 1, wherein wheels which roll on an existing formed panel are detachably attached to said formed panel when said formed panel is moved up and down.

3. A method for handling a formed panel in a concrete formwork device as described in claim 1, wherein when the formed panel moves in the vertical direction, at least one of the framework and the formed panel being pulled up is provided with an avoidance means for avoiding friction between the existing formed panel and the formed panel being pulled up.

4. A concrete formwork device in which a plurality of forming panels for forming tunnel lining concrete are arranged side by side on the outer periphery of a framework made of a plurality of arch-shaped framework members supported by a gantry, the device comprising: A method for handling a molded panel, comprising installing a guide device that is positioned in the narrow portion between the inner wall surface of the tunnel and the outer periphery of the framework and extends from the position of the narrow portion in the extension direction of the tunnel, and guiding the molded panel with the guide device to move it between the narrow portion and its exterior.

5. A method for handling a formed panel in a concrete formwork device as described in claim 4, wherein the guide device is provided with a protruding portion extending from the position of the framework in the tunnel extension direction, and the formed panel is moved between the protruding portion and the narrow portion.

6. 6. A method for handling formed panels in a concrete formwork apparatus according to claim 5, wherein the movement of said formed panels in said guide apparatus is guided by wheels.

7. A guide device for a formed panel, the guide device comprising: a frame member extending in one direction, at the lower part of which legs are provided for standing the frame member; and a receiving portion is provided at the upper part of which the frame member is abutted against the wall surface of the tunnel to maintain the upright position of the frame member; and the frame member is provided with a guide portion for guiding a formed panel for forming the tunnel lining concrete so that it can be moved in the extension direction of the frame member.

Citation Information

Patent Citations

  • JP1971027565Y1

  • JP1975032740A

  • Tonnerufukukono sekohoho

    JP1976007734A

  • Device and method for conveying panel

    JP1996068208A

  • Tunnel arch part lining form device

    JP1996074500A