Apparatus, system and method for supporting operation improvement, and program
The work improvement support system addresses the challenge of identifying elemental tasks for improvement by calculating and outputting their working times, facilitating targeted enhancements in production processes.
Patent Information
- Application Number
- JP2023063257
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-10
- Publication Date
- 2024-10-23
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technologies struggle to identify which elemental tasks within a production process should be targeted for improvement to enhance workability, as they primarily focus on process work time without considering the specific elemental works that constitute it.
A work improvement support system that utilizes video footage of production processes to calculate and output the working time for each elemental operation, allowing for the identification of tasks that require improvement.
Enables the determination of which elemental works to target for improvement, thereby supporting more effective workability enhancements by rationalizing work division and method proposals.
Smart Images

Figure 2024150035000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to an activity improvement support device, an activity improvement support system, an activity improvement support method, and a program. [Background technology]
[0002] There are known techniques for providing improvement support to improve the workability of production processes. For example, Patent Document 1 discloses a technique for measuring the actual work time from the start to the end of a process, and issuing a warning to a worker if the actual work time is not within a predetermined time. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2005-98755 A Summary of the Invention [Problem to be solved by the invention]
[0004] When improving the workability of a production process, it is desirable to improve not only the process itself but also the elemental tasks that make up the process in order to increase the efficiency of the improvement. In the technology of Patent Document 1, the actual work time of the process is measured, but it is difficult to determine which elemental tasks that make up the process should be the target of improvement. For this reason, support is required to more appropriately determine which elemental tasks should be the target of improvement.
[0005] The present disclosure has been made in consideration of the above-mentioned problems, and aims to provide an work improvement support device, work improvement support system, work improvement support method, and program that support determining which elemental work should be targeted for improvement. [Means for solving the problem]
[0006] In order to achieve the above-mentioned objective, the work improvement support device disclosed herein is a work improvement support device that supports the improvement of work in producing a product, and includes a calculation means that calculates the work time for each of a plurality of elemental tasks included in each of a plurality of processes in producing a product based on a video of the work in the plurality of processes in producing a product, and an output means that outputs the work time calculated by the calculation means. Effect of the Invention
[0007] According to the present disclosure, the task time for each element task constituting a process task is calculated and the calculated task time is output, which helps determine which element tasks are desirable to be improved. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a block diagram showing a configuration example of an operation improvement support system according to a first embodiment of the present disclosure. [Diagram 2] 2 is a flowchart of an operation improvement support process executed by the operation improvement support system shown in FIG. 1. [Diagram 3] A flowchart of the improvement proposal process executed by the work improvement support system shown in FIG. [Figure 4] A flowchart of the improvement plan process executed by the work improvement support system shown in FIG. [Diagram 5] FIG. 2 is a diagram for explaining an improvement plan process executed by the work improvement support system shown in FIG. [Figure 6] FIG. 2 is a graph showing standard work time and actual work time used in the improvement plan process executed by the work improvement support system shown in FIG. 1. [Figure 7] FIG. 2 shows the work allocation determined by the improvement plan processing executed by the work improvement support system shown in FIG. 1. [Figure 8] FIG. 1 is a diagram illustrating an example of a hardware configuration of an operation improvement support device according to a first embodiment of the present disclosure. [Figure 9] A block diagram showing a configuration example of an operation improvement support system according to a second embodiment. [Figure 10]FIG. 1 shows an overview of a neural network according to a second embodiment. [Figure 11] Flowchart of learning process according to the second embodiment [Figure 12] Flowchart of inference processing according to the second embodiment DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, an activity improvement support device, an activity improvement support system, an activity improvement support method, and a program according to embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same reference numerals are used to denote the same or corresponding parts.
[0010] (Embodiment 1) The work improvement support system 1 according to the first embodiment takes videos of work at a production site where various types of work are performed, divides the videos into cycle tasks, further divides the cycle tasks into element tasks, and measures the work time of the element tasks. Here, cycle tasks refer to a series of tasks in a job that is repeatedly performed by a worker. Furthermore, element tasks refer to unit element tasks when a process task of screw installation is divided, for example. In this embodiment, a series of tasks that combines the element tasks, in other words, cycle tasks, are also called process tasks. The work improvement support system 1 presents a rational division of tasks to increase productivity. Furthermore, the work improvement support system 1 proposes a rational work method to increase productivity for slow workers.
[0011] As shown in FIG. 1, the work improvement support system 1 comprises a filming device 100 that films a video of a worker working, a work improvement support device 200 that divides the work video into cycle tasks and further divides it into element tasks, calculates the actual work time of the worker, and makes rational suggestions, and a display device 300 that displays the actual work time of the worker.
[0012] In the following description, there are five work processes, and each process has a different work area and a different worker in charge. One image capture device 100 is placed in each work area. That is, the number of image capture devices 100 is set up to correspond to the number of work areas, five in this embodiment.
[0013] The image capturing device 100 is any image capturing device that captures images of a task including a worker who is performing the task and a work target that is the subject of the task, such as a video camera. The image capturing device 100 is installed above the process work area in a position where it can capture an image of the work target. In this embodiment, five video cameras are installed above each worker in the five process work areas.
[0014] The image capturing device 100 captures images at all times during operation and generates a live view image. The image capturing device 100 stores an image of the worker together with the identification number of the worker in an internal memory. The image capturing device 100 also stores an external shape of the work target together with the identification number of the work target in an internal memory. The image capturing device 100 identifies the worker by features such as the size and position of the eyes, nose, mouth, etc., and the skeleton, for example, using an image recognition technique of a pattern matching method based on the live view image and a previously registered image. The image capturing device 100 also identifies the work target by the external dimensions, the position of parts, etc., based on the live view image and a previously registered image, for example, using an image recognition technique of a pattern matching method. The image capturing device 100 accumulates in its own memory, as an actual work video file, the identification number of the image capturing device 100 installed for each worker, the identification number of the worker, the identification number of the work target, and a video of the actual work recorded together with the time measured by a built-in clock. In addition, the photographing device 100 may simply supply live view images to the work improvement support device 200, and the work improvement support device 200 may perform the above-mentioned processing such as identifying the worker and work object in the live view images and adding identification numbers.
[0015] The photographing device 100 is communicably connected to the work improvement support device 200, and transmits the accumulated actual work video file to the work improvement support device 200 at a predetermined timing. In the first embodiment, the predetermined timing is, for example, when the work manager starts up the work improvement support device 200 at a predetermined time in a day. The predetermined timing may be any timing in a week.
[0016] The work improvement support device 200 includes a calculation processing unit 210 that executes processing to acquire or generate various data based on the video captured by the photography device 100, and a memory unit 220 that stores data necessary for the processing performed by the calculation processing unit 210.
[0017] The arithmetic processing unit 210 is an arbitrary arithmetic processing device, and includes, for example, a CPU (Central Processing Unit). The arithmetic processing unit 210 executes a program stored in the storage unit 220 to function as an actual work video acquisition unit 211 that stores a video file acquired from the image capture device 100 in the storage unit 220, a division unit 212 that divides the video file acquired from the image capture device 100 into videos corresponding to cycle works and divides the divided videos into videos corresponding to element works, a calculation unit 213 that calculates actual work times of element works corresponding to playback times of the videos divided into the videos corresponding to the element works, an improvement plan unit 214 that proposes proposal information representing rational work allocation and work methods, and an output unit 215 that outputs work time information representing standard work time and actual work time, and the proposal information.
[0018] The storage unit 220 includes any storage device, such as a non-volatile semiconductor memory including a flash memory or an EPROM (Erasable Programmable Read Only Memory). The storage unit 220 may also include a non-volatile memory including a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, or a DVD (Digital Versatile Disc).
[0019] The storage unit 220 has a moving image file storage unit 221 for storing an actual work moving image file, a reference image file storage unit 222 for storing an image that is a reference when dividing a moving image, a divided moving image file storage unit 223 for storing divided moving images, a work time information storage unit 224 for storing work times, and an improvement plan information storage unit 225 for storing information related to improvement plans. The storage unit 220 further stores a program executed by the calculation processing unit 210.
[0020] The video file storage unit 221 stores the actual work video file transmitted by the imaging device 100. Specifically, the video file storage unit 221 stores, as an actual work video file, the identification number of the imaging device 100 installed for each worker, the identification number of the worker, the identification number of the work target item, and the video of the actual work recorded together with the time measured by a built-in clock.
[0021] The reference image file storage section 222 stores a reference image that represents an image that serves as a reference when dividing a moving image obtained from an imaging device. The divided moving image file storage unit 223 stores the divided moving images generated by the dividing unit 212 by dividing the actual work moving image.
[0022] The work time information storage unit 224 stores, for each element work, the standard work time and the actual work time calculated by the calculation unit 213. The standard work time means the work time when a worker having a preset standard level of proficiency performs work under standard work procedures, work methods, and work conditions, and is measured in advance by trial operation or the like and stored in the work time information storage unit 224.
[0023] The improvement plan information storage unit 225 stores information necessary for obtaining an improvement plan proposal and the obtained improvement plan proposal, such as the attendance information of workers and the proficiency level of workers.
[0024] The various data in the storage unit 220 of the work improvement support device 200 may be stored in a cloud-type server external to the work improvement support device 200. The files saved in the video file storage unit 221 may be compressed before being saved. The storage capacity of the video file storage unit 221 may be managed by automatically deleting old files after a period determined for each work site.
[0025] The actual work video acquisition section 211 of the calculation processing section 210 acquires the video transmitted by the image capturing device 100 and stores it in a video file storage section 221 in the storage section 220 .
[0026] The division unit 212 divides the captured video stored in the video file storage unit 221 into a plurality of cycle work videos by sequentially cutting out videos corresponding to cycle work, i.e., process work, from the captured video stored in the video file storage unit 221. For example, a cycle work corresponding to a series of work in a work that an operator repeatedly performs is a screw installation work. In this embodiment, the number of screw installation positions of a work is three. In the screw installation work, first, the operator goes to the pre-machined work storage area to pick up the work. Next, the operator places the work on the work placement table. Then, the operator installs a screw in the first screw installation position, then installs a screw in the second screw installation position, and then installs a screw in the third screw installation position. The operator moves the work after the screw installation to the machined work storage area. Each of these operations performed by the operator corresponds to an element work. The video of this series of element work is a video corresponding to a cycle work. In this embodiment, the operator installs the screws in the three screw installation positions in a predetermined order.
[0027] The dividing unit 212 divides the moving image stored in the moving image file storage unit 221 into moving images corresponding to cycle work based on the external shape of the workpiece when no screws are attached to all three of the attachment target locations. Here, an image of the external shape of the workpiece when no screws are attached to all three of the attachment target locations, in other words, an image of the external shape of the workpiece before the screw attachment work, is stored in advance in the reference image file storage unit 222. The dividing unit 212 plays back the moving image stored in the moving image file storage unit 221, and divides the moving image corresponding to cycle work from the time when the external shape of the workpiece when no screws are attached to all three of the attachment target locations is detected as a starting point to the time when the external shape of the workpiece when no screws are attached to all three of the attachment target locations is detected again. The dividing unit 212 stores the divided moving images in the divided moving image file storage unit 223 as moving images corresponding to cycle work.
[0028] The dividing unit 212 divides the divided video, in other words, the video corresponding to the cycle work, into videos corresponding to the element work. Here, an image of the external shape where a screw is attached to one of three attachment target locations, an image of the external shape where screws are attached to two locations, an image of the external shape where screws are attached to all three locations, and an image of the external shape where no work is placed on the mounting table are stored in advance in the reference image file storage unit 222. Note that the order of attachment of the three attachment target locations is determined in advance. The dividing unit 212 plays back the video corresponding to the cycle work, and divides it up to the point in time when the external shape where a screw is attached to one location is detected based on the reference image stored in the reference image file storage unit 222.
[0029] Furthermore, dividing unit 212 divides the remaining played video from the time when an external shape with screws attached in one place is detected to the time when an external shape with screws attached in two places is detected based on the reference image stored in reference image file storage unit 222. Furthermore, dividing unit 212 divides the remaining played video from the time when an external shape with screws attached in two places is detected to the time when an external shape with screws attached in three places is detected based on the reference image stored in reference image file storage unit 222.
[0030] The dividing unit 212 divides the remaining played video from the time when the external shape with screws attached in three places is detected to the time when the external shape with no workpiece placed on the mounting table is detected. The remaining played video corresponds to the video from the time when the external shape with no workpiece placed on the mounting table is detected to the time when the external shape of the workpiece with no screws attached to all three mounting locations is detected. The elemental work corresponding to this last remaining played video is the work of moving the machined workpiece with screws attached to the machined workpiece storage area, going to the unmachined workpiece storage area to retrieve the next workpiece, and placing the workpiece on the mounting table.
[0031] The dividing unit 212 stores the divided videos of the cycle work, in other words, the videos corresponding to each element work, as element work video 1, element work video 2, etc. in the divided video file storage unit 223. The dividing unit 212 is an example of a dividing means according to the present disclosure.
[0032] The calculation unit 213 calculates, as the actual work time of the cyclical work, the difference between the start time and the end time of the video corresponding to the cyclical work stored in the divided video file storage unit 223. The calculation unit 213 stores the calculated actual work time of the cyclical work in the work time information storage unit 224.
[0033] The calculation unit 213 calculates the time from the start point to the end point of the video corresponding to the element work. Specifically, the calculation unit 213 calculates the actual work time of each element work by using the start time and the end time of each element work video stored in the divided video file storage unit 223. The calculation unit 213 calculates the difference between the start time and the end time of each element work video as the actual work time of each element work. The calculation unit 213 stores the calculated actual work time of each element work in the work time information storage unit 224. The actual work time of the element work calculated by the calculation unit 213 is accumulated and stored in the work time information storage unit 224 together with the identification number of the worker, the identification number of the element work, and the video of the element work. The calculation unit 213 is an example of a calculation means according to the present disclosure.
[0034] The improvement plan unit 214 obtains a work allocation plan representing a reasonable work allocation plan based on the production plan, the information of the workers who are working, and the preset conditions stored in the improvement plan information storage unit 225. The improvement plan unit 214 also obtains a reasonable work method plan based on the actual work time stored in the work time information storage unit 224. The improvement plan unit 214 stores the obtained work allocation and work method plan in the improvement plan information storage unit 225. A reasonable work allocation is, for example, a work allocation that shortens the cycle time of the work time. A reasonable work method plan is, for example, a plan to present the location of a video with the shortest actual work time of the element work to be improved to the worker, and a plan to present past improvement execution cases. Details will be described later. The improvement plan information storage unit 225 also stores information related to the improvement plan including past improvement execution cases. The improvement plan unit 214 is an example of a suggestion means according to the present disclosure. The improvement plan unit 214 is an example of a selection means according to the present disclosure.
[0035] The output unit 215 outputs the standard work time and the actual work time stored in the work time information storage unit 224 to the display device 300. The output unit 215 may also display a proposal for work allocation or work method on the display device 300. The output unit 215 is an example of an output means according to the present disclosure.
[0036] The display device 300 displays the information output by the arithmetic processing unit 210. The display device 300 includes, for example, a liquid crystal display.
[0037] Next, the task improvement support process for calculating the actual task time will be described with reference to Fig. 2. For example, when a task manager starts up the task improvement support device 200 at a predetermined time in a day, the task improvement support process shown in Fig. 2 is executed.
[0038] When the process starts, the actual work video acquisition unit 211 of the work improvement support device 200 acquires an actual work video file from the photography device 100 and additionally stores it in the video file storage unit 221 (step S201). As a result, the identification number of the photography device 100, the identification number of the worker, the identification number of the work target item, the measurement date and time, and the actual work video are additionally stored in the video file storage unit 221 as a video file.
[0039] The dividing unit 212 divides the actual work video additionally stored in the video file storage unit 221 into videos corresponding to cycle work (step S202). In the case of the above-mentioned screw installation work, the dividing unit 212 divides the additionally stored video into videos corresponding to cycle work based on the external shape of the workpiece in which no screws are installed in all three installation target locations. Specifically, the dividing unit 212 plays the actual work video, and divides it into videos starting from the time when an image of the external shape of the workpiece in which no screws are installed in all three installation target locations stored in the reference image file storage unit 222 is detected, and ending from the time when the workpiece placed on the work placement table is moved in the played video and an image of the external shape of the workpiece in which no screws are installed in all three installation target locations is detected. The dividing unit 212 saves the videos obtained by the division in the divided video file storage unit 223 as videos corresponding to cycle work.
[0040] The dividing unit 212 divides the video corresponding to the cycle work stored in the divided video file storage unit 223 into videos corresponding to element works (step S203). The dividing unit 212 plays the video corresponding to the cycle work, and divides the played video when it detects an external shape in which a screw is attached to the first position of the installation target. The video generated by this division is called element work video 1 corresponding to element work 1 indicating the identification number of the element work. Next, the dividing unit 212 divides the remaining played video when it detects an external shape in which a screw is attached to the first and second positions of the installation target. The video generated by this division is called element work video 2 corresponding to element work 2 indicating the identification number of the element work. Next, the dividing unit 212 divides the remaining played video when it detects an external shape in which a screw is attached to all of the first, second, and third positions of the installation target. The video generated by this division is called element work video 3 corresponding to element work 3 indicating the identification number of the element work. Furthermore, the dividing unit 212 divides the remaining played video when it detects an external shape where no workpiece is placed on the mounting table. The video generated by this division is designated as element work video 4, which corresponds to element work 4 indicating the identification number of the element work. Then, the dividing unit 212 divides the remaining played video when it detects an external shape of a workpiece where no screws are attached to all three attachment target locations. The dividing unit 212 divides the remaining played video when it detects an external shape of a workpiece where no screws are attached to all three attachment target locations. The dividing unit 212 saves these element work videos 1 to 5 in the divided video file storage unit 223.
[0041] The calculation unit 213 calculates the actual work time of the worker (step S204). For each of the element work videos 1 to 5 stored in the divided video file storage unit 223, the calculation unit 213 calculates the difference between the start point and end point time of the video to calculate the actual work time of each of the element works 1 to 5. The calculation unit 213 also calculates a total value by adding up the actual work times of each of the element works 1 to 5. The calculation unit 213 saves the calculated actual work times of each of the element works 1 to 5 and the total value in the work time information storage unit 224.
[0042] The calculation unit 213 determines whether or not there is a video corresponding to the next cycle work in the remaining videos after the division (step S205). The calculation unit 213 determines whether or not the remaining played videos after the division process in step S203 correspond to a video for a time period corresponding to the cycle work based on the start time and the end time of the remaining played videos after the division process in step S203. For example, the calculation unit 213 subtracts the start time from the end time of the remaining played videos after the division process. If the time obtained by subtraction is 0.9 times or more the total value of the standard work time for each element work stored in the work time information storage unit 224, the calculation unit 213 determines that there is a video for a time period corresponding to the cycle work in the remaining played videos (step S205: Yes). If the time obtained by subtraction is less than 0.9 times the total value of the standard work time for each element work stored in the work time information storage unit 224, the calculation unit 213 determines that there is no video for a time period corresponding to the cycle work in the remaining played videos (step S205: No).
[0043] If it is determined that the remaining replay moving images include a moving image having a duration equivalent to the cycle work (step S205: Yes), the process returns to step S202.
[0044] If it is determined that the remaining played videos do not include videos with a time equivalent to the cycle work (step S205: No), the calculation unit 213 calculates the average value of the actual work time stored in the work time information storage unit 224 for each element work (step S206). Specifically, the calculation unit 213 adds up the actual work time for each element work, and divides the total value obtained by adding 1 to the number of additions to calculate the average value of the actual work time for each element work. The calculation unit 213 stores the calculated average value in the work time information storage unit 224. The calculation unit 213 also calculates the average actual work time for the cycle work by adding up the average actual work times of all element works, and stores the calculated average actual work time for the cycle work in the work time information storage unit 224.
[0045] The improvement planning unit 214 executes an improvement proposal process based on the average actual work time indicating the average of the obtained actual work times (step S207). Specifically, the improvement proposal process shown in FIG.
[0046] The improvement planning unit 214 determines whether or not there is any element task that shows an average actual work time that is slower than the standard work time corresponding to each element task, in other words, longer than the standard work time, among the average actual work times of the element tasks stored in the work time information storage unit 224 (step S207a).
[0047] If it is determined that there is no task element that shows an average actual work time longer than the standard work time (step S207a: No), it is considered that the worker is progressing all the task elements at or above the standard level. Therefore, the process proceeds to step S208.
[0048] If it is determined that there is an element task whose average actual work time is longer than the standard work time (step S207a: Yes), the improvement planning unit 214 determines whether there are multiple element tasks whose average actual work time is longer than the standard work time (step S207b).
[0049] If it is determined that there are multiple elemental tasks whose average actual work time is longer than the standard work time (step S207b: Yes), the calculation unit 213 calculates an improvement target evaluation value that indicates an evaluation value for selecting an elemental task to be improved (step S207c). The improvement target evaluation value is an evaluation value that indicates the degree of deviation between the actual work time and the standard work time, and when the improvement target evaluation value is large, the degree of deviation of the actual work time from the standard work time is large. Specifically, the calculation unit 213 subtracts the standard work time corresponding to each elemental task from the actual work time of each elemental task that is determined to be multiple. Then, the calculation unit 213 divides the value obtained by the subtraction by the standard work time corresponding to each elemental task, multiplies the obtained quotient by 100, and rounds off to the nearest integer. For example, if the actual work time for element work 2 is 45 seconds and the standard work time for element work 2 is 30 seconds, the improvement target evaluation value is calculated as ((45-30) / 30)×100=50%.
[0050] After the process of step S207c, or after it is determined in step S207b that there is not more than one (step S207b: No), the process proceeds to step S207d. The improvement planning unit 214 selects an element task to be improved based on the calculated work time and preset conditions, and stores the selected element task in the improvement plan information storage unit 225 (step S207d). Specifically, if it is determined in step S207 that there is not more than one (step S207b: No), the improvement planning unit 214 selects an element task that satisfies the preset conditions, specifically, an element task that shows a work time slower than the standard work time, as the element task to be improved, and stores it in the improvement plan information storage unit 225.
[0051] After the process of step S207c, the improvement planning unit 214 selects the element work having the largest improvement target evaluation value from among the multiple element works as the element work to be improved, and stores it in the improvement planning information storage unit 225 (step S207d).
[0052] The improvement planning unit 214 selects the worker who performed the selected element work of the improvement target fastest from the work time information storage unit 224 (step S207e). The improvement planning unit 214 saves a video of the selected worker performing the element work together with the identification number of the selected worker in the improvement plan information storage unit 225 (step S207e). After that, the process proceeds to step S208.
[0053] The improvement planning unit 214 executes an improvement planning process to improve productivity on the next working day of the production site (step S208). Specifically, the improvement planning process shown in FIG. 4 is executed. The improvement planning unit 214 determines whether the improvement planning process for the next working day has been executed (step S208a). If the improvement planning information for the next working day is stored in the improvement planning information storage unit 225 (step S208a: Yes), the process proceeds to step S209 shown in FIG. 2.
[0054] If the improvement plan information for the next working day is not stored in the improvement plan information storage unit 225 (step S208a: No), the improvement plan unit 214 extracts the identification number of the process work for the next working day, the working worker, the standard working time for each process, and the average actual working time for each worker from the working time information storage unit 224 or the improvement plan information storage unit 225 based on the production plan and the information of the working worker stored in the improvement plan information storage unit 225, and stores them in the improvement plan information storage unit 225 in a format with a correspondence relationship as shown in FIG. 5 (step S208b). As shown in FIG. 5, the identification numbers of the process work for the next working day are process 1 to process 5. Also, the working workers for the next working day are five people, workers A to E. Here, worker A corresponds to the category of "highly skilled" with the longest years of experience and the highest level of proficiency. Also, worker B corresponds to the category of "skilled" with a slightly longer years of experience but a level of proficiency that is not as high as highly skilled. The proficiency level of worker C corresponds to the "standard" category, which is a preset standard proficiency level. The proficiency level of worker D corresponds to the "standard" category, but has fewer years of experience than worker C and a lower proficiency level than worker C. Worker E corresponds to the "newbie" category in both proficiency level and years of experience. Note that information on the workers' proficiency levels, years of experience, etc. is stored in advance in the improvement plan information storage unit 225.
[0055] The improvement planning unit 214 selects, from among processes 1 to 5, the bottleneck process with the longest standard work time, i.e., the process with the smallest number of processes per unit time (step S208c). In the example of FIG. 5, the standard work time and the average actual work time of each worker are shown as numerical values, and the numerical values are in seconds. The improvement planning unit 214 selects, from among processes 1 to 5, process 1, which has the longest standard work time of 100 seconds, as the bottleneck process (step S208c). Note that the standard work time shown in FIG. 5 means the standard process work time that represents the work time when a standard worker, who represents a worker with a preset standard proficiency level, performs the process work.
[0056] The improvement planning unit 214 selects the worker with the shortest average actual work time for process 1 selected as the bottleneck process (step S208d). The improvement planning unit 214 judges whether there are multiple workers with the shortest actual work time for process 1 (step S208e). If it is judged that there are multiple workers with the shortest actual work time for process 1 (step S208e: Yes), the improvement planning unit 214 selects the worker with the highest proficiency (step S208f) and identifies the selected worker as the worker for process 1, which is the bottleneck process (step S208g).
[0057] If there are not multiple workers with the shortest average actual work time for process 1, in other words, if it is determined that there is only one worker (step S208e: No), the improvement planning unit 214 specifies the worker selected in step S208d as the worker for process 1, which is the bottleneck process (step S208g). In the example of FIG. 5, the improvement planning unit 214 selects worker A, who has the shortest average actual work time for process 1, 90 seconds, and corresponds to the highly skilled category (step S208d). In this case, it is determined in step S208e that there are not multiple workers (step S208e: No), and the improvement planning unit 214 specifies worker A as the worker for process 1, which is the bottleneck process (step S208g).
[0058] The improvement planning unit 214 judges whether there are multiple other processes to which no worker is assigned (step S208h). If it is judged that there are multiple other processes to which no worker is assigned (step S208h: Yes), the improvement planning unit 214 returns the process to step S208c. In the example of FIG. 5, the processes to which no worker is assigned include process 2 to process 5, so the process returns to step S208c.
[0059] If there are no other processes to which a worker is not assigned, in other words, if it is determined that there is only one process to which a worker is not assigned (step S208h: No), the improvement planning unit 214 assigns a worker to the remaining single process (step S208i). In the example of FIG. 5, the last remaining process is process 4, which shows the shortest standard work time of 60 seconds. The last remaining worker is worker E, which corresponds to the "newbie" category. Therefore, the improvement planning unit 214 assigns worker E as the worker of process 4. According to the work allocation based on this improvement planning process, the cycle time, which shows the slowest work time, is 90 seconds. In the example of FIG. 5, the number of processes and the number of workers are both 5, so the final allocation is 1:1. However, if there is only one remaining process and there are multiple remaining workers, the worker with the highest proficiency among the remaining multiple workers is assigned as the worker of the one remaining process. If there is a worker who is not ultimately assigned to a process, a role other than the process work is assigned. After step S208i, the process proceeds to step S209.
[0060] The output unit 215 outputs to the display device 300 the standard work time, the average value of the actual work time, the identification number indicating the element work to be improved, information indicating the location of the video file of the worker with the shortest actual work time for the element work to be improved, and information indicating the work allocation for the next working day (step S209). The display device 300 displays the standard work time and the actual work time in a table format and a graph format, as illustrated in FIG. 6. Unlike the example shown in FIG. 5, FIG. 6 is merely an example showing how the standard work time and the actual work time are displayed. Therefore, FIG. 6 differs from the workers and numerical values in the above example. In FIG. 6, the process work contents of each worker are different. Therefore, the number of element works differs for each worker. Note that the standard work time shown in FIG. 6 is the work time when the standard worker performs the work, and is not the work time of workers 1 to 5. Also, in FIG. 6, the cycle time representing the bottleneck process that takes the longest work time is the work process performed by worker 1.
[0061] Furthermore, in the improvement proposal process, the display device 300 displays the identification number of the element work to be improved that has been selected as the improvement target, and information indicating the location of the video file of the worker who has the shortest actual work time for the element work to be improved. The information indicating the location of the video file of the worker who has the shortest actual work time for the element work to be improved is, for example, directory information indicating the location of the folder that stores the video file.
[0062] The display device 300 displays information on the work allocation for the next working day. In the example of Fig. 5, the display device 300 displays the work allocation obtained by executing the improvement plan process as shown in Fig. 7.
[0063] Next, an example of the hardware configuration of the work improvement support device 200 will be described with reference to Fig. 8. The work improvement support device 200 in Fig. 8 is realized by a computer such as a personal computer or a microcontroller.
[0064] The work improvement support device 200 comprises a processor 1001 that executes an operation program which is a program for the operation of the work improvement support device 200, a memory 1002 that serves as the main storage area, an interface 1003 that realizes the communication function of the work improvement support device 200, and a secondary storage device 1004 that stores the operation program for executing processing, all of which are connected to each other via a bus 1000.
[0065] The processor 1001 is, for example, a CPU (Central Processing Unit). The processor 1001 loads an operation program stored in a secondary storage device 1004 into a memory 1002 and executes the program, thereby implementing each function of the work improvement support device 200.
[0066] The memory 1002 is a main storage device constituted by, for example, a RAM (Random Access Memory). The memory 1002 stores the operation program read by the processor 1001 from the secondary storage device 1004. The memory 1002 also functions as a work memory when the processor 1001 executes the operation program.
[0067] The interface 1003 is an I / O (Input / Output) interface such as a serial port, a USB (Universal Serial Bus) port, a network interface, etc. The interface 1003 realizes the communication function of the work improvement assistance device 200.
[0068] The secondary storage device 1004 is, for example, a flash memory, a hard disk drive (HDD), or a solid state drive (SSD). The secondary storage device 1004 stores the operating programs executed by the processor 1001.
[0069] As described above, in the task improvement support system 1 according to the first embodiment, the division unit 212 divides the video captured by the imaging device 100 into videos corresponding to the element tasks, and the calculation unit 213 calculates the actual task time of the element task. The improvement planning unit 214 selects an element task to be improved, and selects a worker who has the shortest actual task time for the selected element task and a video of the worker who has the shortest actual task time. The improvement planning unit 214 also calculates a task allocation plan to improve productivity based on the standard task time and the actual task time. The output unit 215 outputs the standard task time and the actual task time for each element task, the identification number of the element task to be improved, location information of the video file of the worker who has the shortest actual task time for the element task to be improved, and task allocation information to improve productivity to the display device 300. The display device 300 displays the information output by the output unit 215. Therefore, the worker can recognize the level of his / her own task speed by comparing the standard task time and the actual task time for each element task.
[0070] Furthermore, by viewing the video of a worker who has performed the elemental work to be improved in the shortest time, the worker can use the video to improve his or her own work.
[0071] Furthermore, the improvement planning unit 214 allocates tasks to workers with the appropriate skill levels based on the standard work time, thereby improving productivity.
[0072] (Modification of the first embodiment) Note that the video captured by the image capture device 100 is divided into videos corresponding to cycle work based on the time of detecting the external shape of the workpiece, but this is merely an example. For example, a barcode may be attached to the left and right hands of a worker, and the image capture device 100 may read the barcode of the worker to recognize the position of the worker, and the video may be divided based on the position of the worker. Also, a barcode may be attached to the top or side of a workpiece, and the image capture device 100 may read the barcode of the workpiece to recognize the position of the workpiece, and the video may be divided based on the position of the workpiece. Also, a barcode may be attached to a tool used in processing, and the video may be divided based on the position of the tool.
[0073] The recorded time of each divided element work may be used as the actual work time of the element work. Also, the element work time may be calculated from the divided video footage using any analysis software.
[0074] Furthermore, the work time information storage unit 224 and the improvement plan information storage unit 225 may be stored in a device that can be shared among multiple departments. For example, by devising a way to hold a work item in each process in a factory, it may be possible to prevent collisions between the work item and factory equipment such as conveyors and work tables, thereby reducing the occurrence of inefficient work. Therefore, by storing the work time and improvement plans in a form that can be shared among multiple departments, effective improvement plans can be deployed throughout the factory, and improvement activities can be carried out efficiently.
[0075] Further, data is output as information indicating the actual work time and the improvement plan, but the information is not limited to data and may be voice data explaining the actual work time and the improvement plan.
[0076] In addition, the dividing unit 212 generates new image files by cutting out and dividing the shot video, but it is not necessary to divide the video physically. Any dividing method can be used as long as the element work time can be specified. For example, the shot video may be divided into videos for each element work by attaching an identification flag to the division position of the element work in the shot video.
[0077] Further, the calculation unit 213 calculates the average values of the actual work times of the cycle tasks and element tasks, respectively, but is not limited to the average values, and may calculate representative values such as the median, maximum value, minimum value, etc.
[0078] The improvement planning unit 214 selects candidates for element work to be improved based on the representative value of the actual work time of the element work and the standard work time, but the preset conditions are arbitrary. For example, the longest representative value of the work time of the same element work by multiple workers may be selected as the improvement target.
[0079] (Embodiment 2) 9 to 12, a task improvement support device 200 according to a second embodiment will be described. The second embodiment differs from the first embodiment in that the task improvement support device 200 presents an improvement target element task that represents an improvement target element task by using AI (Artificial Intelligence) based on the average actual task time of the element task, the improvement target evaluation value, and a trained model. The following describes the second embodiment, focusing on the differences from the first embodiment.
[0080] 9, the work improvement support device 200 according to the present embodiment includes an improvement presentation unit 216 instead of the improvement plan unit 214 of the work improvement support device 200 according to embodiment 1. The improvement presentation unit 216 presents element work to be improved based on the average actual work time, the improvement target evaluation value, and the trained model.
[0081] The memory unit 220 further includes a trained model memory unit 226.
[0082] The trained model storage unit 226 stores trained models. The trained models are generated by, for example, a "supervised learning method" that uses a known machine learning library and trains a set of data with a correct answer label attached to training data. Note that the trained models may be trained and generated by other learning methods such as an "unsupervised learning method," a "reinforcement learning method," or a "semi-supervised learning method."
[0083] The learning algorithm may be a known learning algorithm such as a neural network. The neural network has an input layer composed of a plurality of nodes to which different input parameters are input, an intermediate layer to which signals output from each node of the input layer are input, and an output layer to which signals output from the intermediate layer are input and which outputs output parameters. The intermediate layer of the neural network may be composed of one or more layers.
[0084] The neural network will be outlined with reference to FIG. A neural network is set for each process, and thus a trained model is also generated for each process. As shown in the figure, the neural network is composed of an input layer, a middle layer, and an output layer, each of which includes a plurality of neurons. Here, the middle layer is assumed to be one layer, but the number of middle layers is arbitrary. The number of neurons k in the output layer is the number of element tasks included in the process to be evaluated, where n=2·k, and m is an integer of 3 or more. For example, the average actual work time of the j-th element task j in the process to be evaluated is supplied to the (2j-1)-th neuron X2j-1, and the improvement target evaluation value of the element task j is supplied to the 2j-th neuron X2j in the input layer. j=1 to k. Neurons Z1 to Zk in the output layer are assigned to element tasks 1 to k included in the process to be evaluated, and the element task corresponding to the fired neuron Z becomes a candidate for improvement.
[0085] In this configuration, neurons X1 to Xn in the input layer each output an input value to each of neurons Y1 to Ym in the intermediate layer.
[0086] Each neuron Y1 to Ym in the hidden layer multiplies the input value by weights W11 to Wnm, sums them up, and outputs the sum by applying it to the output function. For example, the i-th neuron Yi in the hidden layer multiplies the input Ij from the j-th neuron Xj in the input layer by a weight Wji to obtain a sum ΣWji·Ij, applies this to the output function φ, and outputs φ(ΣWji·Ij-θ) to each neuron Z1 to Zk in the output layer. Note that i=1 to m and j=1 to n.
[0087] Neurons Z1 to Zk in the output layer also multiply each input value from neurons Y1 to Ym in the intermediate layer by weights V11 to Vmk, add them up, and apply the sum to an output function to output the obtained value. The output results from neurons Z1 to Zk in the output layer vary depending on the values of weights W11 to Wnm and weights V11 to Vmk. In the case of a process including the five element operations mentioned above, n = 10 and k = 5, and the average actual work time of element operation 1 is input to neuron X1 in the input layer, the improvement target evaluation value of element operation 1 is input to neuron X2, the average actual work time of element operation 2 is input to neuron X3, the improvement target evaluation value of element operation 2 is input to neuron X4, .... In addition, one of neurons Z1 to Z5 in the output layer fires, and the element operation corresponding to the fired neuron becomes a candidate for improvement.
[0088] The neurons X1 to X10 in the input layer are supplied with the average actual work time, which is the longest of the average actual work times of the k element tasks normalized to a value of 1, and the k improvement target evaluation values, which is the largest of the improvement target evaluation values of the element tasks normalized to a value of 1.
[0089] The learning data is created based on a combination of the average actual work time and improvement target evaluation value for each element task of an element task by process, which are obtained in advance by an expert or the like through analysis by product, and the element task to be improved. A learning process is performed on the element task to be improved based on the learning data. The structure of the neural network, including the weights W11-Wnm, V11-Vmk, values n, k, etc. obtained by the learning process, is stored in the learned model storage unit 226 as a learned model.
[0090] The improvement presentation unit 216 uses the trained model to present the element work to be improved for each worker.
[0091] As shown in FIG. 9, the improvement presentation unit 216 includes a learning unit 216a that generates a trained model, and an inference unit 216b that infers an element task to be improved using the trained model.
[0092] The learning process by the learning unit 216a will be described below. The learning process shown in Fig. 11 is started when an operation unit (not shown) receives an operation by a user to instruct the execution of the learning process.
[0093] As described above, the learning unit 216a receives training data including a combination of the average actual work time and the improvement target evaluation value of k predesigned element tasks, and a combination of the element tasks to be improved (step S301). The training data is input to the learning unit 216a via an input unit (not shown).
[0094] The learning unit 216a repeatedly uses the teacher data to learn the relationship between the combination of the average actual work time and the improvement target evaluation value of k element tasks and the improvement target element tasks (step S302), and adjusts the weights W11 to Wnm and V11 to Vmk. The learning unit 216a stores the learned model in the learned model storage unit 226 (step S303), and ends the learning process.
[0095] The inference unit 216b uses the trained model to execute the inference process shown in Fig. 12. The inference process is executed at a timing preset by a user. The timing for executing the inference process may be set to, for example, every week or every month.
[0096] The inference unit 216b applies, as input parameters, normalized values of the average actual work time of the k element tasks and the improvement target evaluation value to the trained model (step S401).
[0097] The inference unit 216b uses the trained model to execute inference based on the input parameters (step S402), outputs data indicating the element work to be improved as output parameters (step S403), and ends the inference process.
[0098] The improvement presenter 216 acquires the output parameters output from the inference unit 216b as improvement target element work data. Upon acquiring the improvement target element work data, the improvement presenter 216 stores the improvement target element work data in the improvement plan information storage unit 225 shown in FIG.
[0099] When the improvement presentation unit 216 acquires the improvement target element work data, it presents the improvement target element work to the worker based on the acquired improvement target element work data. Specifically, the improvement presentation unit 216 outputs the improvement target element work data to the display device 300, and the improvement target element work data is displayed on the display device 300, thereby presenting it to the worker.
[0100] The improvement presentation unit 216 may, for example, use an application such as a spreadsheet software based on the improvement target element work data to display the improvement target element work on the display device 300. Furthermore, the output unit 215 may display the improvement execution cases stored in the improvement plan information storage unit 225 together with the improvement target element work data on the display device 300. The improvement execution cases can be utilized as educational materials for new employees.
[0101] As described above, according to the work improvement support device 200 of the second embodiment, the improvement presentation unit 216 presents the element work to be improved to the worker by using a trained model trained with data including the average actual work time, the improvement target evaluation value, and the element work to be improved. The worker can carry out efficient improvement activities by implementing improvements to the element work to be improved presented by the improvement presentation unit 216. As a result, the occurrence of element work with low work efficiency is reduced, and the burden of work improvement support is lightened. Therefore, the efficiency of work improvement support can be improved.
[0102] In the second embodiment, the learning target of the trained model used by the improvement presentation unit 216 may be a plurality of types of products. In addition, the learning unit 216a may learn about actual work performed in one area, or may learn about actual work performed independently in a plurality of different areas.
[0103] In addition, a product to be learned by the trained model may be added or removed from the trained model in the middle of the process. Furthermore, any trained model may be applied to a trained model of another model, and the other model may be retrained based on the trained model. In addition, the training data may be, for example, a combination of the average actual work time and the improvement target evaluation value as input, and an element work that maximizes the product of the combinations as output.
[0104] (Modification of the second embodiment) In the second embodiment, the learning unit 216a uses a neural network as a learning algorithm. However, the learning unit 216a may use other known methods, such as genetic programming, functional logic programming, or a support vector machine, as a learning algorithm.
[0105] In the second embodiment, the learning unit 216a and the inference unit 216b are provided in the task improvement support device 200, but the learning unit 216a and the inference unit 216b may be provided in a device different from the task improvement support device 200. The improvement presentation unit 216 may acquire output parameters output from the inference unit 216b provided in a device different from the task improvement support device 200 as improvement target element task data.
[0106] A trained model resulting from a learning process performed elsewhere may be stored in the trained model storage unit 226, and the learning unit 216a may be configured not to be included in the improvement presentation unit 216.
[0107] In the second embodiment, the learning unit 216a is provided in the work improvement support device 200. However, once a trained model is created, the learning unit 216a may be removed.
[0108] In addition, the improvement presenting unit 216 may use data that combines the average actual work time, the improvement target evaluation value, and the improvement target element work of not only the same model but also similar models. In other words, the improvement presenting unit 216 can also use data that combines the average actual work time, the improvement target evaluation value, and the improvement target element work of similar models as learning data.
[0109] In the second embodiment, the element work to be improved is presented based on the average actual work time and the improvement target evaluation value. However, the present invention is not limited to this, and the most effective improvement viewpoint may be presented based on the average actual work time and the improvement target evaluation value. Both the element work to be improved and the most effective improvement viewpoint may be presented.
[0110] In this case, for example, a combination of the average work time, the evaluation value of the improvement target, the element work to be improved, and the most effective improvement viewpoint is prepared as learning data from an analysis of past performance data. Also, neurons to which each improvement viewpoint is assigned are placed in the output stage of the neural network shown in FIG.
[0111] In the inference stage, a pair of the average actual work time and the evaluation value to be improved is input to the input stage, and the element task to be improved is identified from the firing state of the neuron to which the element task is assigned in the output stage, and the most effective improvement viewpoint is identified from the firing state of the neuron to which the improvement viewpoint is assigned.
[0112] In the second embodiment, the element work to be improved is presented based on the average actual work time and the improvement target evaluation value. However, without being limited to this, a reasonable work allocation may be presented based on the average actual work time of the workers and the work allocation indicating the combination of the process.
[0113] In this case, for example, the task allocation showing the combination of the average work time and process of the workers and the most rational task allocation are prepared as learning data from the analysis of past performance data. Also, neurons that assign the task allocation are placed in the output stage of the neural network shown in Fig. 10.
[0114] In the inference stage, the task allocation, which indicates a combination of processes and average actual work times of workers, is input to the input stage, and the most rational task allocation is identified based on the firing state of the task allocation neurons.
[0115] In the above embodiment, an example was shown in which the work improvement assistance device 200 is configured by a computer equipped with a processor and a memory, but the device configuration is arbitrary. For example, all or part of the processing executed by the processor may be executed by an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or the like.
[0116] Although the preferred embodiments have been described in detail above, the present invention is not limited to the above-described embodiments, and various modifications and substitutions can be made to the above-described embodiments without departing from the scope of the claims.
[0117] Various aspects of the present disclosure are summarized below as appendices.
[0118] (Appendix 1) A work improvement support device that supports improvement of a work for producing a product, a calculation means for calculating an operation time for each of a plurality of elemental operations included in each of the plurality of processes for producing the product based on a video of the operations of the plurality of processes; an output means for outputting the operation time calculated by the calculation means; Equipped with Work improvement support device.
[0119] (Appendix 2) A division means for dividing the captured video into videos corresponding to the steps, and further dividing the divided videos into videos corresponding to the elemental work, the calculation means calculates a time from a start point to an end point of a video corresponding to the element work, thereby calculating a work time of the element work; 2. A work improvement support device according to claim 1.
[0120] (Appendix 3) a selection means for selecting an element work to be improved based on the determined operation time of the element work and a preset condition, the output means outputs information indicating the element work selected by the selection means. 3. A work improvement support device according to claim 1 or 2.
[0121] (Appendix 4) the selection means calculates a representative value of the work time for each elemental work for each worker, calculates an evaluation value indicating the degree to which each elemental work should be improved for each worker based on the calculated representative value and the preset conditions, and selects an elemental work to be improved based on the evaluation value. 4. A work improvement support device according to claim 3.
[0122] (Appendix 5) The selection means selects the element work to be improved using a trained model obtained by learning the relationship between the work time for each element work and the element work to be improved. 5. A work improvement support device according to claim 3 or 4.
[0123] (Appendix 6) The selection means is A learning unit that generates a trained model based on training data including a relationship between the representative value of the task time and the element task to be improved; an inference unit that infers the element work to be improved by applying a representative value of the work time of each element work by each worker to the trained model; having 6. A work improvement support device according to claim 5.
[0124] (Appendix 7) a suggestion unit that makes a preset suggestion for supporting improvement of the element work to be improved selected by the selection unit, The output means outputs information on the proposal made by the proposal means. 7. A work improvement support device according to any one of appendix 3 to 6.
[0125] (Appendix 8) a means for calculating a representative value of the working time for each of the tasks in the process for each worker, and for calculating a work allocation plan for allocating workers to perform each of the tasks in the process based on the calculated representative value and a preset condition, The output means outputs the allocation plan calculated by the calculation means. 8. A work improvement support device according to any one of appendix 1 to 7.
[0126] (Appendix 9) An operation improvement support device according to any one of appendices 1 to 8; An imaging device for imaging the work of the process; a display device that displays the information output by the output means, the calculation means calculates the operation time of the element work based on the captured video representing the video captured by the imaging device; Work improvement support system.
[0127] (Appendix 10) calculating a work time for each of a plurality of elemental works included in the production process based on a video of the work in the production process; Outputting the determined operation time. Work improvement support method.
[0128] (Appendix 11) On the computer, calculating a work time for each of a plurality of elemental works included in the production process based on a video of the work in the production process; Outputting the determined operation time. A program that executes a process. [Explanation of symbols]
[0129] 1 Work improvement support system, 100 imaging device, 200 work improvement support device, 210 calculation processing unit, 211 actual work video acquisition unit, 212 division unit, 213 calculation unit, 214 improvement plan unit, 215 output unit, 216 improvement presentation unit, 216a learning unit, 216b inference unit, 220 memory unit, 221 video file memory unit, 222 reference image file memory unit, 223 divided video file memory unit, 224 work time information memory unit, 225 improvement plan information memory unit, 226 trained model memory unit, 300 display device, 1000 bus, 1001 processor, 1002 memory, 1003 interface, 1004 secondary storage device.
Claims
1. A work improvement support device that supports improvement of a work for producing a product, a calculation means for calculating an operation time for each of a plurality of elemental operations included in each of the plurality of processes for producing the product based on a video of the operations of the plurality of processes; an output means for outputting the operation time calculated by the calculation means; Equipped with Work improvement support device.
2. A division means for dividing the captured video into videos corresponding to the steps, and further dividing the divided videos into videos corresponding to the elemental work, the calculation means calculates a time from a start point to an end point of a video corresponding to the element work, thereby calculating a work time of the element work; The work improvement support device according to claim 1.
3. a selection means for selecting an element work to be improved based on the determined operation time of the element work and a preset condition, the output means outputs information indicating the element work selected by the selection means. The work improvement support device according to claim 1.
4. the selection means calculates a representative value of the work time for each elemental work for each worker, calculates an evaluation value indicating the degree to which each elemental work should be improved for each worker based on the calculated representative value and the preset conditions, and selects an elemental work to be improved based on the evaluation value. The work improvement support device according to claim 3.
5. The selection means selects the element work to be improved using a trained model obtained by learning the relationship between the work time for each element work and the element work to be improved. The work improvement support device according to claim 3.
6. The selection means is A learning unit that generates a trained model based on training data including a relationship between the representative value of the task time and the element task to be improved; an inference unit that infers the element work to be improved by applying a representative value of the work time of each element work by each worker to the trained model; having The work improvement support device according to claim 5.
7. a suggestion unit that makes a preset suggestion for supporting improvement of the element work to be improved selected by the selection unit, The output means outputs information on the proposal made by the proposal means. The work improvement support device according to any one of claims 3 to 6.
8. a means for calculating a representative value of the working time for each of the tasks in the process for each worker, and for calculating a work allocation plan for allocating workers to perform each of the tasks in the process based on the calculated representative value and a preset condition, The output means outputs the determined allocation plan. The work improvement support device according to claim 1.
9. The work improvement support device according to claim 1 ; An imaging device for imaging the work of the process; a display device that displays the information output by the output means, the calculation means calculates the operation time of the element work based on the captured video representing the video captured by the imaging device; Work improvement support system.
10. calculating a work time for each of a plurality of elemental works included in the production process based on a video of the work in the production process; Outputting the determined operation time. Work improvement support method.
11. On the computer, calculating a work time for each of a plurality of elemental works included in the production process based on a video of the work in the production process; Outputting the determined operation time. A program that executes a process.
Citation Information
Patent Citations
Cell line work management system
JP2005098755A
Cited By
Experimental Quality Control System
JP7942462B1
