Lift-up type pier and moving method thereof
The lift-up pier's vertical and horizontal movement capabilities address the installation limitations of conventional piers, ensuring efficient transportation routes by allowing installation opposite a dam's slope, thus reducing construction and transportation costs.
Patent Information
- Application Number
- JP2023065676
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-13
- Publication Date
- 2024-10-25
AI Technical Summary
Conventional lift-up piers can only be installed vertically, limiting their ability to reach the top surface of a dam body when installed on a slope, necessitating costly detours in ready-mixed concrete transportation routes due to insufficient land for installation.
A lift-up pier design that allows vertical and horizontal movement, equipped with a bridge body, moving means, and elevating mechanisms, enabling installation opposite a dam's slope by using guide rails, telescopic jacks, and slope mounts for smooth vehicle access.
Enables installation of the lift-up pier facing a dam's slope, reducing transportation detours and construction costs by allowing direct access from a ready-mixed concrete plant to the dam, maintaining efficient transportation routes.
Smart Images

Figure 2024151888000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a lift-up type pier and a method for moving the same. [Background technology]
[0002] Lift-up type piers are known for ensuring a supply route for construction materials to a dam embankment whose top elevation changes during construction (see, for example, Patent Documents 1 and 2). In a conventional lift-up type pier, the base end is rotatably connected to the road on the plant side with a pin, and the tip is supported by a lifting means (such as a gate-shaped steel frame) so that it can be raised and lowered. With this lift-up type pier, the tip of the pier is raised to connect the elevated top surface of the dam embankment to the road on the plant side. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Japanese Patent Application Publication No. 11-264131 [Patent Document 2] Japanese Utility Model Application Publication No. 63-121608 Summary of the Invention [Problem to be solved by the invention]
[0004] In conventional lift-up type piers, the tip of the bridge can only move up and down, so if it is installed facing the inclined surface of a dam embankment (for example, the downstream surface of a gravity concrete dam), the distance from the lifting means to the top surface of the dam embankment increases as the dam embankment rises, and there is a risk that the tip of the lift-up type pier will not be able to reach the top surface of the dam embankment. For this reason, lift-up type piers used in dam construction are often installed on the upstream surface side, which rises steeper than the downstream surface. On the other hand, in recent dam construction works, it is often difficult to secure a sufficient amount of land, and ready-mixed concrete plants must be installed downstream of the dam construction site. When constructing a dam embankment under such conditions, it is preferable to install a lift-up type pier downstream of the dam construction site, but if a problem occurs in which the tip of the lift-up type pier does not reach the top of the dam embankment, the lift-up type pier must be installed upstream of the dam construction site. If the ready-mixed concrete plant and the lift-up type pier are installed on either side of the dam construction site, the ready-mixed concrete transportation route must be designed to make a large detour around the dam construction site, which causes problems such as increased road construction costs and reduced transportation efficiency. From this perspective, an object of the present invention is to provide a lift-up type pier that can be installed facing an inclined surface and a method for moving the same. [Means for solving the problem]
[0005] The first invention to solve such problems is a lift-up type pier that connects the top surface of a dam embankment, which rises with construction, to an access road, and includes a bridge body that extends from the access road toward the top surface of the dam embankment, a moving means that is installed on the access road side and moves the bridge body toward the top surface, and a lifting means that supports a middle part of the bridge body so that it can be raised and lowered. The base end of the bridge body is supported rotatably by the moving means. According to the lift-up type pier of the present invention, the tip of the bridge body can be raised by the lifting means and moved toward the dam body by the moving means, so that the tip of the bridge body can be connected to the top surface of the dam body even if the distance from the lifting means to the top surface of the dam body increases as the top surface of the dam body rises. In other words, according to the present invention, the lift-up type pier can be installed facing the slope of the dam body.
[0006] In the lift-up type pier of the present invention, the moving means preferably comprises a guide rail laid on the access road side, and a moving device that moves the bridge body along the guide rail, and the moving device preferably comprises a moving support part that can move along the guide rail while rotatably supporting the base end of the bridge body, a fixed part that is detachably fixed to the guide rail, and a telescopic jack that is stretched between the moving support part and the fixed part. With this configuration, the bridge body can be moved with a simple and inexpensive mechanism. In the lift-up type pier of the present invention, it is preferable that the fixed part and the telescopic jack are arranged on both sides of the movable support part, on the approach road side and on the dam body side. With this configuration, it is possible to easily move a heavy bridge structure. In the lift-up type pier of the present invention, it is preferable that a base-end slope platform extending toward the approach road is rotatably provided at the base end of the bridge body. With such a configuration, vehicles can travel smoothly. In the lift-up type pier of the present invention, it is preferable that a tip-side slope platform extending toward the top surface is rotatably provided at the tip of the bridge body. With this configuration, vehicles can travel smoothly.
[0007] The second aspect of the present invention for solving the above-mentioned problems is a method for moving a lift-up type pier, which moves the bridge body toward the dam body side by the moving means of the lift-up type pier, comprising the steps of: The telescopic jack is operated by using the fixed part as a reaction force receiver to move the movable support part. According to the method for moving a lift-up type pier of the present invention, the lift-up type pier can be installed facing the inclined surface of a dam embankment, and the bridge body can be moved reliably using simple procedures.
[0008] The third invention for solving the above-mentioned problems is a method for moving a lift-up type pier, in which the bridge body is moved toward the dam embankment by the moving means of the lift-up type pier, comprising: a forward releasing step of releasing the fixed state of the fixed part on the dam embankment side rather than the mobile support part; an extension step of extending the telescopic jack on the access road side and the telescopic jack on the dam embankment side to push the mobile support part and the fixed part on the dam embankment side forward of the dam embankment side; a forward fixing step of fixing the fixed part on the dam embankment side to the guide rail; a rearward releasing step of releasing the fixed part on the access road side; a retraction step of retracting the telescopic jack on the access road side and the telescopic jack on the dam embankment side to pull the mobile support part and the fixed part on the access road side forward of the dam embankment side; and a rearward fixing step of fixing the fixed part on the access road side to the guide rail. According to the method for moving a lift-up type pier of the present invention, the lift-up type pier can be installed facing the inclined surface of a dam embankment, and the bridge body can be moved reliably using simple procedures. Effect of the Invention
[0009] According to the lift-up type pier and the method for moving the same of the present invention, the pier can be installed facing the inclined face of a dam body. [Brief description of the drawings]
[0010] [Figure 1] 1A and 1B are diagrams showing a lift-up type pier according to an embodiment of the present invention, in which (a) is a side view showing the lift-up type pier in a low position, (b) is a side view showing the lift-up type pier in a middle position, and (c) is a side view showing the lift-up type pier in a high position. [Diagram 2] 1A and 1B are diagrams showing the base end portion of the bridge body of a lift-up type pier according to an embodiment of the present invention and a moving means, where (a) is a plan view and (b) is a side view. [Diagram 3] FIG. 2 is a side view showing the bridge body and the tip side slope platform of the lift-up type pier according to the embodiment of the present invention. [Figure 4] 1A to 1C are diagrams for explaining the moving means and moving method of a lift-up type pier according to an embodiment of the present invention, in which (a) is a side view showing the fixed state, (b) is a side view showing the extension process, and (c) is a side view showing the retraction process. [Diagram 5] FIG. 2 is a perspective view showing a lifting and lowering means for a lift-up type pier according to an embodiment of the present invention. [Figure 6] FIG. 2 is a front view showing the lifting and lowering means and bridge body of the lift-up type pier according to the embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] A lift-up type pier and a moving method thereof according to an embodiment of the present invention will be described with reference to the accompanying drawings. In this embodiment, a lift-up type pier is installed facing the downstream face of a gravity concrete dam. FIG. 1 is a side view showing a lift-up type pier according to an embodiment of the present invention, FIG. 2 is a plan view and a side view showing the base end of the bridge body of the lift-up type pier according to an embodiment of the present invention and the moving means, FIG. 3 is a side view showing the bridge body of the lift-up type pier and the tip side slope platform, and FIG. 4 is a side view showing the moving means of the lift-up type pier.
[0012] As shown in FIG. 1, the lift-up type pier 1 according to this embodiment connects the top surface 3 of a dam body 2, which rises as the dam is constructed, to an access road 4. The dam body 2 is the body of a gravity concrete dam. A gravity concrete dam supports water with the dam's own weight, and is constructed by pouring concrete successively from the bottom to a predetermined height. The top surface 3 of the dam body 2 gradually becomes higher as the dam is constructed. A gravity concrete dam has a cross-sectional shape in which the thickness gradually increases toward the bottom. The upstream surface of the dam body 2 (the surface in contact with the reservoir water) rises almost vertically from the bottom, and the downstream surface of the dam body 2 is an inclined surface that slopes at a gentler gradient than the upstream surface. The approach road 4 is a construction road extending from a ready-mixed concrete manufacturing plant (concrete mixing facility) (not shown) to the downstream side of the dam construction position, and is used by vehicles transporting concrete, etc.
[0013] The lift-up type pier 1 allows not only the bridge body 10 to move vertically, but also to move in the bridge axis direction. The lift-up type pier 1 includes a bridge body 10, a moving means 30, and a lifting means 50. The bridge body 10 extends from an access road 4 toward the top surface 3 of the dam embankment 2. In this embodiment, the end of the bridge body 10 on the access road 4 side is the "base end" and the end on the dam embankment 2 side is the "tip end". The bridge body 10 is formed, for example, with a truss structure, and includes a truss 11 and a running track 12. The running track 12 is provided inside the truss 11 and is formed by laying steel plates or the like. The base end of the bridge body 10 is supported by the moving means 30 so as to be rotatable. That is, the bridge body 10 can be rotated in the up-down direction around the base end. The middle part of the bridge body 10 (near the tip in this embodiment) is supported by the lifting means 50 so as to be able to rise and fall. The connection between the bridge structure 10 and the moving means 30, and the connection between the bridge structure 10 and the lifting means 50 will be described later.
[0014] A base end slope platform 13 is provided at the base end of the bridge body 10. As shown in FIG. 2, the base end slope platform 13 is equipped with a road surface portion 14 and a lifting jack 15. The road surface portion 14 is a plate-shaped member extending from the base end of the bridge body 10 toward the access road 4, and is made of, for example, a steel plate. The road surface portion 14 is connected to the base end of the running road 12 via a pin 16, and can be rotated in the vertical direction with the pin 16 as the central axis. The lifting jack 15 is a member that rotates the road surface portion 14. The lifting jack 15 is hung between the tip of a cantilever beam 17 that protrudes rearward from the upper end base end of the truss 11 and the middle part of the side of the road surface portion 14. When the lifting jack 15 is retracted, the road surface portion 14 is pulled up, and when it is extended, the road surface portion 14 is lowered and rubbed against the access road 4. The extension amount of the lifting jack 15 is set so that the gradient of the road surface portion 14 is constant.
[0015] As shown in FIG. 3, a tip-side slope platform 18 is provided at the tip of the bridge body 10. As shown in FIG. 2, the tip-side slope platform 18 is equipped with a road surface portion 19 and a lifting winch 20. The road surface portion 19 is a member extending from the tip of the bridge body 10 toward the top surface 3 of the dam embankment 2, and is made of, for example, a steel plate. The road surface portion 19 is connected to the tip of the running road 12 via a pin 21, and can rotate up and down around the pin 21 as a central axis. The lifting winch 20 is used when rotating the road surface portion 19 upward to lift it up. The lifting winch 20 is installed on the upper part of the truss 11 of the bridge body 10. A wire 22 extending from the lifting winch 20 is connected to the upper end of a lifting post 23 erected on the road surface portion 19. When the wire 22 is wound up by the lifting winch 20, the road surface portion 19 rotates upward around the pin 21. The amount of winding of the wire 22 is set so that the center of gravity of the road surface portion 19 does not move toward the base end side of the pin 21. When the wire 22 is paid out by the lifting winch 20, the road surface portion 19 rotates downward around the pin 21. The wire 22 is paid out until the tip of the road surface portion 19 abuts against the top surface 3. Note that the mechanism for lifting the road surface portion 19 is not limited to the lifting winch 20, and may be another mechanism such as an extension jack.
[0016] The movement means 30 moves the bridge body 10 in the bridge axis direction, and is installed at the base end of the bridge body 10. As shown in Fig. 2, the movement means 30 is provided on both sides of the bridge body 10 in the width direction. As also shown in Fig. 4, the movement means 30 is equipped with a guide rail 31 and a movement device 32. The guide rail 31 guides the movement of the movement device 32 and the bridge body 10, and is laid on the approach road 4. The guide rail 31 is made of, for example, H-shaped steel, and extends from the approach road 4 in the bridge axis direction of the bridge body 10.
[0017] The moving device 32 moves the bridge body 10 along the guide rail 31, and is installed on the upper flange of the guide rail 31. The moving device 32 is equipped with a moving support part 33, a fixed part 34, and a telescopic jack 35. The moving support part 33 rotatably supports the base end of the bridge body 10, and is movable along the guide rail 31. The moving support part 33 is equipped with a roller (not shown) on the underside, and the moving support part 33 moves as the roller rolls on the guide rail 31. A pin 36 that rotatably supports the leg part of the bridge body 10 is provided on the upper part of the moving support part 33. When the middle part of the bridge body 10 on the dam embankment 2 side rises, the bridge body 10 rotates upward around the pin 36.
[0018] The fixed part 34 is a part that is fixed to the guide rail 31, and is attached to the tip of the rod of the telescopic jack 35. In this embodiment, the fixed part 34 grips the guide rail 31 by clamping the upper flange of the guide rail 31. The fixed part 34 is detachable from the guide rail 31. When the moving support part 33 is moved (i.e., when the telescopic jack 35 is extended or retracted), one of the pair of fixed parts 34, 34 is fixed to the guide rail 31 and receives the reaction force of the telescopic jack 35. The other fixed part 34 is released from its fixation to the guide rail 31, making it movable along the guide rail 31. The telescopic jack 35 generates a force that moves the moving support part 33 and the fixed part 34 closer to or farther from each other, and is stretched between the moving support part 33 and the fixed part 34 so as to be able to expand and contract. The telescopic jack 35 is disposed so as to extend along the longitudinal direction of the guide rail 31. When the telescopic jack 35 is extended, the moving support part 33 and the fixed part 34 move farther away from each other, and when the telescopic jack 35 is retracted, the moving support part 33 and the fixed part 34 move closer to each other. In this embodiment, the fixing parts 34 and the expansion jacks 35 are respectively arranged on the front and rear sides (the access road 4 side and the dam body 2 side) of the moving support part 33. When fixing the bridge body 10, the fixing parts 34, 34 are fixed to the guide rail 31 by gripping the guide rail 31 with both fixing parts 34, 34 (see FIG. 4(a)).
[0019] A method for moving a lift-up type pier, in which the bridge body 10 is moved toward the dam embankment 2 by the moving means 30 having the above-mentioned configuration, will be described below. The method for moving a lift-up type pier in this embodiment includes a front release step, an extension step, a front fixing step, a rear release step, a retraction step, and a rear fixing step. The front release step is a step of releasing the fixed state (gripping state: state in which the guide rail 31 is gripped and fixed to the guide rail 31) of the fixing part 34 on the front side (the side closer to the dam embankment 2 than the moving support part 33). In the front release step, only the fixed state of the fixing part 34 on the front side (the side closer to the dam embankment 2) is released from the state of Fig. 4(a), and the fixed state of the fixing part 34 on the rear side (the side closer to the access road 4) is maintained.
[0020] The extension process is a process of extending the rear telescopic jack 35 and the front telescopic jack 35. In the extension process, as shown in Fig. 4(b), both telescopic jacks 35 are extended to the same length, with the rear fixed part 34 receiving the reaction force of the telescopic jack 35. As a result, the moving support part 33 is pushed forward by the stroke length of the rear telescopic jack 35, and the front fixed part 34 is pushed forward by the combined stroke length of the rear telescopic jack 35 and the front telescopic jack 35. The front fixing step is a step of fixing the front fixing portion 34 to the guide rail 31. In the front fixing step, the front and rear fixing portions 34 grip the guide rail 31, and the movement support portion 33 is temporarily fixed.
[0021] The rear releasing step is a step of releasing the fixed state of the rear fixing portion 34. In the rear releasing step, only the fixed state of the rear fixing portion 34 is released, and the fixed state of the front fixing portion 34 is maintained. The retraction process is a process of retracting the rear telescopic jack 35 and the front telescopic jack 35. In the retraction process, as shown in FIG. 4(c), both telescopic jacks 35 are retracted by the same length, with the front fixed part 34 receiving the reaction force of the telescopic jack 35. As a result, the moving support part 33 is pulled forward by the stroke length of the front telescopic jack 35, and the rear fixed part 34 is pulled forward by the combined stroke length of the rear telescopic jack 35 and the front telescopic jack 35. As a result, the moving support part 33 and the pair of front and rear fixed parts 34 move forward by the combined stroke length of the pair of front and rear telescopic jacks 35 from their pre-movement states. The rear fixing process is a process of fixing the rear fixing part 34 to the guide rail 31. In the rear fixing process, the front and rear fixing parts 34 grip the guide rail 31, the movement support part 33 is fixed to the guide rail 31, and the movement of the bridge body 10 is completed.
[0022] FIG. 5 is a perspective view showing the lifting and lowering means of a lift-up type pier according to an embodiment of the present invention, and FIG. 6 is a front view showing the lifting and lowering means and bridge body of a lift-up type pier according to an embodiment of the present invention. The lifting means 50 is a section that supports the middle part of the bridge structure 10 so that it can be raised and lowered. By raising and lowering the middle part of the bridge structure 10 (in this embodiment, near the tip end) with the lifting means 50, the bridge structure 10 rotates up and down around the pin 36 as a central axis, and the tip end moves up and down. As shown in Figures 5 and 6, the lifting means 50 includes a gate-shaped support pillar 51, a bridge structure support frame 52, and a lifting device 53. The gate-shaped pillars 51 are arranged to sandwich the bridge structure 10 from both sides in the width direction, with two pillars 54 erected on each side of the bridge structure 10 in the width direction. The two pillars 54 are arranged with a gap in the bridge axis direction of the bridge structure 10. An extension jack 62, which will be described later, is arranged between the two pillars 54. A pin hole 55 is formed in the pillar 54. The pin hole 55 is a hole into which a fixing pin 64 of a lifting device 53, which will be described later, is inserted, and extends from the inside to the outside along the width direction of the bridge structure 10. A plurality of pin holes 55 are formed with gaps in the vertical direction.
[0023] The bridge body support frame 52 is a part that supports the bridge body 10. The bridge body support frame 52 supports the middle part of the bridge body 10 from below, and moves up and down while supporting the bridge body 10. The bridge body support frame 52 also supports the bridge body 10 so that it can move in the bridge axis direction (longitudinal direction). The bridge body support frame 52 is equipped with a support beam 57 and support rollers 58. The support beam 57 extends along the width direction of the bridge body 10 and is hung between the columns 54 on both sides. Both ends of the support beam 57 are fixed to the lower plate 60 of the lifting device 53 described later. A walkway (not shown) is provided below the support beam 57, allowing workers to move between the columns 54, 54 facing each other in the width direction. The support rollers 58 are provided on both sides of the width direction above the support beam 57 to support the bridge body 10 so that it can move in the bridge axis direction. The bottom of the bridge body 10 is placed on the support rollers 58 (see FIG. 6).
[0024] The lifting device 53 is a device that lifts and lowers the bridge body support frame 52. The lifting device 53 is of the inchworm type, equipped with a lower plate 60, an upper plate 61, and an extension jack 62. The lower plate 60 is a plate material fixed to the inner surfaces of the pillars 54, 54 arranged in front and behind, and is made of, for example, a steel plate. A work scaffold 63 is fixed integrally to the outside of the lower plate 60. The bridge support frame 52 is suspended between the lower plates 60, 60 facing each other in the width direction of the bridge body 10. The lower plate 60 has a pin insertion hole 66 (see FIG. 6) formed at a position corresponding to the pin hole 55 of the pillar 54. Then, the lower plate 60 and the work scaffold 63 are fixed to the pillar 54 by inserting a fixing pin (hairpin) 64 into the pin hole 55 and the pin insertion hole 66 of the pillar 54 from the work scaffold 63 side.
[0025] The upper plate 61 is a plate material fixed to the inner surface of the column bodies 54, 54 arranged in front and behind, at a position above the lower plate 60, and is made of, for example, a steel plate. The upper end and the lower end of the telescopic jack 62 are fixed to the upper plate 61 and the lower plate 60, respectively. A work scaffold 63 is fixed integrally to the outside of the upper plate 61. The upper plate 61 has a pin insertion hole 66 (see FIG. 6) formed at a position corresponding to the pin hole 55 of the column body 54. Then, the upper plate 61 and the work scaffold 63 are fixed to the column body 54 by inserting a fixing pin 64 into the pin hole 55 and the pin insertion hole 67 of the column body 54 from the work scaffold 63 side. In normal times when the height position of the bridge body support frame 52 is fixed, the upper plate 61 is fixed at the height position of the pin hole 55 two pin holes above the pin hole 55 to which the lower plate 60 is fixed.
[0026] The telescopic jack 62 is used to raise and lower the bridge body support frame 52, and is composed of a hydraulic jack. The hydraulic device 65 of the telescopic jack 62 is fixed to the lower part of the support beam 57 of the bridge body support frame 52. The telescopic jack 62 extends in the vertical direction and is suspended between a lower plate 60 and an upper plate 61. When the telescopic jack 62 is extended or contracted, the distance between the lower plate 60 and the upper plate 61 varies. The telescopic jack 62 is placed between the pillar bodies 54, 54 that are spaced apart in the bridge axis direction of the bridge body 10.
[0027] The following describes a method for raising and lowering the bridge structure 10 using the lifting means 50. The method for raising and lowering the bridge structure 10 includes an upper fixing release step, an extension step, an upper fixing step, a lower fixing release step, a retraction step, and a lower fixing step. The upward fixing release step is a step of releasing the fixed state of the upper plate 61 from the pillar bodies 54, 54. In the upward fixing release step, the fixing pin 64 is removed from the work scaffold 63 side. This releases the fixation of the upper plate 61, and the upper plate 61 and the work scaffold 63 become capable of ascending and descending relative to the pillar body 54. The extension process is a process of extending the telescopic jack 62. In the extension process, the telescopic jack 62 is extended to raise the upper plate 61 and the work scaffold 63. The extension length of the telescopic jack 62 is the length between the vertically adjacent pin holes 55, 55. As a result, the upper plate 61 and the work scaffold 63 are raised to the height position of the pin hole 55 above.
[0028] The upward fixing process is a process of fixing the raised upper plate 61 to the pillar body 54. In the upward fixing process, the fixing pin 64 is inserted into the pin hole 55 and the pin insertion hole 67 of the pillar body 54 from the working scaffold 63 side. This fixes the upper plate 61 to the pillar body 54. The downward fixing release step is a step of releasing the fixed state of the lower plate 60 from the pillar bodies 54, 54. In the downward fixing release step, the fixing pin 64 is removed from the working scaffold 63 side. This releases the fixation of the lower plate 60, and the lower plate 60 and the working scaffold 63 become capable of ascending and descending relative to the pillar body 54. The retraction process is a process of retracting the telescopic jack 62. In the retraction process, the lower plate 60 and the work scaffolding 63 are raised by retracting the telescopic jack 62. The retracted length of the telescopic jack 62 is the length between the vertically adjacent pin holes 55, 55, and the telescopic jack 62 is returned to the state before extension. As a result, the lower plate 60, the work scaffolding 63, and the bridge body support frame 52 are raised to the height position of the pin hole 55 above.
[0029] The downward fixing process is a process of fixing the raised lower plate 60 to the column body 54. In the lower fixing process, the fixing pin 64 is inserted into the pin hole 55 and the pin insertion hole 67 of the column body 54 from the working scaffold 63 side. This fixes the lower plate 60 to the column body 54. The above processes complete the raising of the bridge body 10.
[0030] Next, the effects of the lift-up type pier 1 and the moving method thereof according to this embodiment will be described. According to the lift-up type pier 1 of this embodiment, the tip of the bridge body 10 is raised by the lifting means 50, and the bridge body 10 is moved toward the dam embankment 2 by the moving means 30, so that the tip of the bridge body 10 rises along the downstream slope of the dam embankment 2. That is, according to the lift-up type pier 1, even if the distance from the lifting means 50 to the top surface 3 of the dam embankment 2 increases with the rise of the dam embankment 2, the bridge body 10 can be extended to the top surface 3. This allows the lift-up type pier 1 to be installed in a position facing the slope (downstream surface) of the dam embankment 2. Therefore, even if a ready-mixed concrete manufacturing plant is installed downstream of the construction position of the gravity concrete dam, there is no need to secure a ready-mixed concrete transport route (a moving path for ready-mixed concrete transport vehicles) that bypasses the dam construction position, and ready-mixed concrete can be supplied from the ready-mixed concrete manufacturing plant via the shortest route, which makes it possible to suppress an increase in the construction cost of the access road 4 and a decrease in transportation efficiency.
[0031] Moreover, the moving means 30 includes a guide rail 31 and a moving device 32, and the moving device 32 includes a moving support part 33, a fixed part 34, and a telescopic jack 35, so that the bridge structure 10 can be moved with a simple and inexpensive mechanism. In particular, in the moving means 30 of this embodiment, the fixed part 34 and the telescopic jack 35 are arranged on both sides of the moving support part 33 in the moving direction, so that the moving support part 33 can be moved with the two telescopic jacks 35. Therefore, the bridge structure 10, which is heavy, can be moved easily. Furthermore, in one moving process, the bridge structure 10 can be moved a distance twice the stroke of the telescopic jack 32.
[0032] A base-end slope platform 13 is provided at the base end of the bridge body 10, so that the road surface 14 can be brought into contact with the access road 4. This allows the travel path 12 and the access road 4 to be connected without any steps, regardless of the inclination angle of the bridge body 10, allowing vehicles to travel smoothly. A tip-side slope platform 18 is provided at the tip of the bridge body 10, so the road surface 19 can be rubbed against the top surface 3 of the dam body 2. This allows the running road 12 and the top surface 3 to be connected without any steps regardless of the inclination angle of the bridge body 10, allowing vehicles to run smoothly.
[0033] The above describes the embodiment of the present invention, but the present invention is not limited to the above embodiment, and appropriate design changes are possible without departing from the spirit of the present invention. For example, in the above embodiment, the fixed part 34 and the telescopic jack 35 of the moving means 30 are arranged on both sides of the moving support part 33 in the moving direction, but this is not limited to this. For example, the fixed part and the telescopic jack may be arranged on one side closer to the dam body than the moving support part. In this case, the moving method of the lift-up type pier includes a release process, an extension process, a fixing process, and a retraction process. The release step is a step of releasing the fixed state of the fixed part arranged on the dam body side from the movable support part. In the release step, the fixed state of the guide rail of the fixed part is released, so that the fixed part becomes movable along the guide rail. The extension process is a process of fixing the extension jack by extending it. In the extension process, the extension jack is extended, and the fixing part moves toward the dam body.
[0034] The fixing step is a step of fixing the fixed portion, which has moved forward, to the guide rail. In the fixing step, the fixed portion grips the guide rail. The retraction process is a process in which the telescopic jack is retracted. In this process, the fixed part receives the reaction force of the telescopic jack, and by retracting the telescopic jack, the moving support part is pulled toward the fixed part at the front, and the moving support part moves forward. This completes the lateral movement of the bridge body. According to the lift-up type pier and its moving method configured as described above, when the weight of the bridge body is relatively small, the moving means can be made to have a simple shape, thereby achieving a reduction in construction costs compared to the above embodiment.
[0035] The fixed part and the telescopic jack may be disposed on the side closer to the approach road than the movable support part. In this case, the method for moving the lift-up type pier includes an extension process, a release process, a retraction process, and a fixing process. The extension process is a process of extending the telescopic jack. In the extension process, the fixed part receives the reaction force of the telescopic jack, and the telescopic jack is extended, so that the movable support part is pushed toward the dam body, and the movable support part moves forward. The release step is a step of releasing the fixed state of the fixed part arranged behind the movable support part (on the access road side). In the release step, the fixed state of the fixed part to the guide rail is released, so that the fixed part can move along the guide rail. The retraction process is a process of fixing the telescopic jack by retracting it. In the retraction process, the telescopic jack is retracted, so that it is pulled toward the movable support part and moves forward. The fixing process is a process of fixing the fixed part that has moved forward to the guide rail. In the fixing process, the fixed part grips the guide rail. Through these processes, the lateral movement of the bridge body is completed. With the lift-up type pier and its moving method configured as described above, when the weight of the bridge body is relatively small, the moving means can be made to have a simple shape, thereby achieving a reduction in construction costs compared to the previous embodiment. [Explanation of symbols]
[0036] 1. Lift-up pier 2. Dam body 3 Top surface 4. Access roads 10 Bridge body 13 Base end slope stand 18 Tip side slope stand 30 Transportation 31 Guide rail 32 Mobile Devices 33 Moving support part 34 Fixed part 35 Telescopic Jack 50 Lifting means
Claims
1. A lift-up pier that connects the top of the dam embankment, which rises during construction, to an access road, The bridge structure includes a bridge body extending from the access road toward the top surface of the dam body, a moving means installed on the access road side for moving the bridge body toward the top surface, and a lifting means for supporting a middle portion of the bridge body so that it can be raised and lowered; The base end of the bridge body is rotatably supported by the moving means. This lift-up type pier is characterized by its
2. The moving means includes a guide rail laid on the access road side, and a moving device that moves the bridge body along the guide rail; The moving device includes a moving support part that is movable along the guide rail while rotatably supporting the base end of the bridge body, a fixed part that is detachably fixed to the guide rail, and a telescopic jack that is stretched between the moving support part and the fixed part. The lift-up type pier according to claim 1.
3. The fixed portion and the expansion jack are disposed on both sides of the movable support portion, one on the approach road side and the other on the dam body side.
3. The lift-up type pier according to claim 2.
4. A base end slope platform extending toward the access road is rotatably provided at the base end of the bridge body. The lift-up type pier according to claim 1.
5. A tip-side slope platform extending toward the top surface is rotatably provided at the tip of the bridge body. The lift-up type pier according to claim 1.
6. A method for moving a lift-up type pier by using the moving means of the lift-up type pier according to claim 2 to move the bridge body toward the dam body, comprising the steps of: a telescopic jack is operated by using the fixed part as a reaction force receiver to move the movable support part,
7. A method for moving a lift-up type pier by using the moving means of the lift-up type pier according to claim 3 to move the bridge body toward the dam body, comprising the steps of: a forward release process for releasing a fixed state of the fixed portion on the dam body side relative to the moving support portion; an extension process in which the telescopic jack on the access road side and the telescopic jack on the dam body side are extended to push out the moving support part and the fixed part on the dam body side forward of the dam body side; a front fixing step of fixing the fixing portion on the dam body side to the guide rail; a rear release step of releasing a fixed state of the fixing part on the access road side; a retraction process of retracting the telescopic jack on the access road side and the telescopic jack on the dam body side to draw the mobile support part and the fixed part on the access road side forward of the dam body side; A rear fixing step of fixing the fixing portion on the access road side to the guide rail. A method for moving a lift-up type pier, comprising:
Citation Information
Patent Citations
JP1988121608U
Embarking deck installation device on dam body
JP1999264131A