Accounting management device, accounting management method, and accounting management program

The accounting management device uses the Hotelling and rule-based methods to quickly identify abnormal costs in construction projects, addressing the inefficiency of manual detection and enhancing financial management through graphical visualization.

JP2024153432AActive Publication Date: 2024-10-29OBIC CO LTD

Patent Information

Application Number
JP2023067328
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-17
Publication Date
2024-10-29
Estimated Expiration
2043-04-17

AI Technical Summary

Technical Problem

In the construction industry, detecting abnormal values in data related to contract work is difficult due to the large volume of data, making manual detection inefficient and time-consuming.

Method used

An accounting management device and method that utilizes the Hotelling method and rule-based approach to compare remaining order amounts and estimated costs, displaying abnormal values in a distinct format on a graphical interface, allowing for quick identification of anomalies.

Benefits of technology

Enables rapid and accurate detection of abnormal values in construction project costs, enhancing fraud detection and improving financial management efficiency by visualizing discrepancies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024153432000001_ABST
    Figure 2024153432000001_ABST
Patent Text Reader

Abstract

To provide an accounting management device that easily and quickly detects and displays an abnormal value in data related to contract work, for example, in a construction project.SOLUTION: An acquisition unit acquires a remaining order amount and a deemed cost when work for a predetermined contract is completed. A comparison unit compares the obtained ordering remainder amount with the deemed cost. Furthermore, a determination unit determines, when the deemed cost is greater than the ordering remainder amount, or when the deemed cost is less than the ordering remainder amount, an amount of the deemed cost to be abnormal. A display control unit then displays at least the ordering remainder amount and a deemed cost accounting status graph on a display unit, and displays the deemed cost accounting status graph determined to be an abnormal amount in a display format different from that of the ordering remainder amount.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an accounting management device, an accounting management method, and an accounting management program. [Background technology]

[0002] Patent Document 1 (JP Patent Publication No. 2016-045819A) discloses a performance management system capable of efficiently creating budget information. This performance management system includes a performance information DB that stores performance information on preceding cases, a budget information DB that stores budget information on the case to be created, a budget creation management department budget system that creates budget information, and a budget input screen that exchanges information with the user.

[0003] The budget system extracts performance information of related preceding projects related to the target project from the performance information of preceding projects stored in the performance information database based on the identification information associated with the target project, and outputs the extracted performance information of the related preceding projects in association with the budget information of the target project. This allows for efficient creation of budget information.

[0004] Paragraph 0029 of Patent Document 1 discloses a technology in which an indication diagnosis unit reads performance information of other preceding projects that have a similar implementation timing (production period) to the project to be created from a performance information DB, compares it with the cost items of the project to be created, diagnoses the possibility of an error occurring, and outputs the diagnosis result. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2016-045819 A Summary of the Invention [Problem to be solved by the invention]

[0006] For example, in the construction industry, data related to contract work such as construction may show abnormal values. Since detecting abnormal values ​​requires searching through a huge amount of data, it is very difficult to do it manually. For this reason, there is a demand for the development of technology that can detect abnormal values ​​easily and quickly.

[0007] The present invention has been made in consideration of the above-mentioned problems, and aims to provide an accounting management device, an accounting management method, and an accounting management program that can easily and quickly detect and display abnormal values ​​in data related to contract work. [Means for solving the problem]

[0008] In order to solve the above-mentioned problems and achieve the objective, the accounting management device of the present invention has an acquisition unit that acquires the remaining order amount and deemed cost when work for a specified contract is completed, a comparison unit that compares the acquired remaining order amount with the deemed cost, a determination unit that determines whether the correlation between the remaining order amount and the deemed cost is outside the acceptable range for a specified trend or within the acceptable range based on the comparison result of the comparison unit, and determines the amount of the deemed cost to be an abnormal amount if the correlation between the remaining order amount and the deemed cost is outside the acceptable range for the specified trend, and a display control unit that displays at least a recording status graph of the remaining order amount and the deemed cost on a display unit, and displays the recording status graph of the deemed cost determined by the determination unit to be an abnormal amount in a display form different from that of the remaining order amount.

[0009] In addition, in order to solve the above-mentioned problems and achieve the object, the accounting management method of the present invention includes an acquisition step in which an acquisition unit acquires the remaining order amount and the deemed cost when work for a specified contract is completed; a comparison step in which a comparison unit compares the acquired remaining order amount with the deemed cost; a determination step in which a determination unit determines whether the correlation between the remaining order amount and the deemed cost is outside the acceptable range for a specified trend or within the acceptable range based on the comparison result of the comparison step, and determines the amount of the deemed cost to be an abnormal amount if the correlation between the remaining order amount and the deemed cost is outside the acceptable range for the specified trend; and a display control step in which a display control unit displays at least a recording status graph of the remaining order amount and the deemed cost on the display unit, and displays the recording status graph of the deemed cost determined to be an abnormal amount in the determination step in a display form different from that of the remaining order amount.

[0010] In addition, in order to solve the above-mentioned problems and achieve the object, the accounting management program of the present invention causes a computer to function as an acquisition unit that acquires the remaining order amount and deemed cost when work for a specified contract is completed, a comparison unit that compares the acquired remaining order amount and deemed cost, a determination unit that determines whether the correlation between the remaining order amount and the deemed cost is outside the acceptable range for a specified trend or within the acceptable range based on the comparison result of the comparison unit, and determines the amount of the deemed cost to be an abnormal amount if the correlation between the remaining order amount and the deemed cost is outside the acceptable range for the specified trend, and a display control unit that displays at least an accounting status graph of the remaining order amount and the deemed cost on a display unit, and displays the accounting status graph of the deemed cost determined by the determination unit to be an abnormal amount in a display form different from the remaining order amount. Effect of the Invention

[0011] The present invention can easily and quickly detect and display outliers in data relating to contract work. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a block diagram illustrating the hardware configuration of an account management device according to an embodiment. [Diagram 2] FIG. 2 is a diagram for explaining a method for detecting abnormal values ​​of assumed costs using a rule-based method. [Diagram 3] FIG. 3 is a diagram for explaining a method for detecting abnormal values ​​of assumed costs using the Hotelling method. [Figure 4] FIG. 4 is a diagram showing how an abnormal value of the assumed cost is detected by the rule-based method. [Diagram 5] FIG. 5 is a diagram showing a normal distribution of a population that is preferable when using the Hotelling method as an outlier detection method. [Figure 6] FIG. 6 is a diagram showing a non-normal distribution of a population, which becomes difficult when using the Hotelling method as an outlier detection method. [Figure 7] FIG. 7 is a diagram for explaining grouping such as clustering in the Hotelling method and the operation of determining the degree of abnormality using the Mahalanobis distance. [Figure 8] FIG. 8 is a diagram showing an example of an abnormal value of the assumed cost. [Figure 9] FIG. 9 is a diagram showing an example of analyzing abnormal values ​​by dividing the construction cost into material costs, subcontract costs, labor costs, and expenses. [Figure 10] FIG. 10 is a diagram showing an example of the analysis screen. [Figure 11] FIG. 11 is a diagram showing an example of the analysis details screen. [Figure 12] FIG. 12 is a diagram showing an example of the construction data, the construction cost data, and the construction order data. [Figure 13] FIG. 13 is a diagram showing an example of automatic detection execution schedule data, anomaly determination result registration target period data, automatic anomaly detection method data, and parameters. [Figure 14] FIG. 14 is a diagram for explaining the automatic execution timing determination process. [Figure 15] FIG. 15 is a diagram showing various data used when performing the Hotelling method. [Figure 16]FIG. 16 is an image diagram of the normal data range calculation in the internal anomaly detection process when the "Hotelling method" is set as the anomaly detection method. [Figure 17] FIG. 17 is an image diagram of the abnormal value determination in the internal anomaly detection process when the "Hotelling method" is set as the anomaly detection method. [Figure 18] FIG. 18 is a diagram showing an example of normal range boundary line data for drawing normal range boundary lines in the construction-by-cost-approval status graph. [Figure 19] FIG. 19 is a diagram for explaining the operation of detecting construction work for which an abnormal deemed cost has been recorded when the "Hotelling method" is set as the anomaly detection method. [Figure 20] FIG. 20 is a diagram showing an example of abnormality determination result data, abnormality determination result message data, abnormality determination result message detailed data, and abnormality determination result auxiliary information data. [Figure 21] FIG. 21 is a diagram showing an example of the work data, the work cost data, the work order data, the work status data, and the parameters. [Figure 22] FIG. 22 is a diagram illustrating an example of the automatic anomaly detection method data and the construction status data. [Figure 23] FIG. 23 is a diagram for explaining an anomaly determination technique in the rule-based method. [Figure 24] FIG. 24 is a diagram showing an example of abnormality determination result data, abnormality determination result message data, and abnormality determination result message detail data. [Diagram 25] FIG. 25 is a diagram for explaining the operation of generating a message to be displayed on the analysis screen. [Figure 26] FIG. 26 is a diagram showing an example of the analysis screen on which a message is displayed. [Figure 27] FIG. 27 is a diagram for explaining the area for inputting extraction conditions on the analysis screen. [Figure 28] FIG. 28 is a diagram for explaining the operation of generating a detailed message to be displayed on the analysis details screen. [Figure 29]FIG. 29 is a diagram showing an example of the analysis details screen on which a detailed message is displayed. [Diagram 30] FIG. 30 is a diagram for explaining an example of input of extraction conditions for the acquisition range for collecting analysis data. [Diagram 31] FIG. 31 shows the analysis details screen on which extraction conditions have been input. [Diagram 32] FIG. 32 is a diagram for explaining the operation of generating the construction-specific cost accounting status data. [Diagram 33] FIG. 33 is a diagram for explaining the display operation of the normal range boundary line. [Diagram 34] FIG. 34 is a diagram for explaining how to display the accounting status graph by subject. [Diagram 35] FIG. 35 is a diagram showing an example of the construction status data by construction item and the construction status data by construction. [Diagram 36] FIG. 36 is a diagram showing an example of the parameters, the abnormality determination result data, the construction data, the construction order data, and the construction detail data. [Figure 37] FIG. 37 is a diagram for explaining the operation of generating the drawing data for the construction cost recording status graph. [Figure 38] FIG. 38 is a diagram showing an example of a graph showing the cost recording status by construction project. [Figure 39] FIG. 39 is a diagram for explaining the display operation of the accounting status graph. [Diagram 40] FIG. 40 is a diagram for explaining the display operation of the accounting status graph by subject. [Diagram 41] FIG. 41 is a diagram for explaining the display operation of a table for confirming the cost accumulation status at the time of completion by construction / cost classification. [Diagram 42] FIG. 42 is a diagram for explaining the display operation of a table that outputs detailed information about construction work for which an abnormality has been detected. [Diagram 43] FIG. 43 is a diagram showing an example of the analysis details screen in a state in which various graphs and tables for detecting construction projects whose assumed costs indicate abnormal values ​​are displayed. [Diagram 44]FIG. 44 is a diagram for explaining the change control of the display form for various graphs and tables on the analysis details screen. [Diagram 45] FIG. 45 is a diagram showing an example of an accounting status graph showing an abnormality in the deemed cost. [Diagram 46] FIG. 46 is a diagram showing an example of a graph of the accounting status by item showing an abnormality in the deemed cost. [Figure 47] FIG. 47 is a diagram for explaining the operation of displaying a message on the analysis screen. [Figure 48] FIG. 48 is a diagram for explaining the operation of generating a detailed message to be displayed on the analysis details screen. [Figure 49] FIG. 49 shows the analysis details screen on which detailed messages, various graphs, and tables are displayed. [Figure 50] FIG. 50 is a diagram for explaining the change control of the display form for various graphs and tables on the analysis details screen. [Figure 51] FIG. 51 is a diagram for explaining the operation of detecting a construction project whose deemed cost is an abnormal value, based on the accounting status graph. [Figure 52] FIG. 52 is a diagram for explaining the operation of detecting construction work whose deemed cost shows an abnormal value, based on a table for checking the cost accumulation status at the time of completion by construction / cost classification. [Diagram 53] FIG. 53 is a diagram for explaining the switching operation of the extraction condition. [Figure 54] FIG. 54 is a diagram for explaining the operation of acquiring various data based on the switched extraction condition. [Figure 55] FIG. 55 is another diagram for explaining the operation of acquiring various data based on the switched extraction condition. [Figure 56] FIG. 56 is a diagram showing an example of an analysis details screen in which the display forms of various graphs and tables have been changed and controlled. [Figure 57] FIG. 57 is a diagram for explaining an example of reducing the number of points plotted on the construction cost accounting status graph. [Figure 58]FIG. 58 is a diagram for explaining an example of settings for automatic anomaly detection method data when the local outlier factor method is used. [Figure 59] FIG. 59 is a diagram for explaining the number of neighbors. [Figure 60] FIG. 60 is a diagram showing the flow of an operation for detecting a construction project whose assumed cost shows an abnormal value, based on the local outlier factor method. [Figure 61] FIG. 61 is a diagram showing how construction works whose assumed costs show abnormal values ​​can be easily detected even when multiple populations exist. [Figure 62] FIG. 62 is a diagram showing an example of the automatic anomaly detection method data. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] An accounting management device according to an embodiment of the present invention will be described in detail below with reference to the drawings. As an example, an example will be described below in which an abnormal value of the recorded assumed cost in a construction project, which is an example of contract work, is detected as an abnormal value of data related to the contract work. In addition, the detection method will be described as using the "Hotelling method" or (and) the "rule-based method", but this is also an example, and other detection methods such as the "local outlier factor method" may also be used. As such, the present invention is not limited to the following embodiment.

[0014] (Hardware configuration) As shown in FIG. 1, the accounting management device 1 of the embodiment includes a memory unit 2, a control unit 3, a communication interface unit 4, and an input / output interface unit 5. An input device 6 and an output device 7 are connected to the input / output interface unit 5. The output device 7 may be a display unit such as a monitor device (including a home television), a printing device, or a speaker device. The input device 6 may be a keyboard device, a mouse device, a microphone device, or a monitor device that cooperates with a mouse device to realize a pointing device function. The communication interface unit 4 is connected to a network, for example, a wide area network such as the Internet or a private network such as a LAN (Local Area Network).

[0015] A storage device such as a ROM (Read Only Memory), a RAM (Random Access Memory), a HDD (Hard Disk Drive), or an SSD (Solid State Drive) can be used as the storage unit 2. The storage unit 2 stores an accounting management program that detects anomalies in the assumed cost of each construction project recorded in the accounting and displays a predetermined alert, as well as various related data.

[0016] (Functional configuration of the accounting management device) Next, the control unit 3 executes the accounting management program stored in the memory unit 2, and thereby functions as a display control unit 21, an acquisition unit 22, a comparison unit 23, a judgment unit 24, and a memory control unit 25, as shown in FIG. 1.

[0017] The acquisition unit 22 acquires the remaining order amount and the deemed cost upon completion of work (construction) for a specified contract. The comparison unit 23 compares the acquired remaining order amount with the deemed cost. The determination unit 24 determines whether the correlation between the remaining order amount and the deemed cost is outside the allowable range for a specified trend or is within the allowable range based on the comparison result of the comparison unit 23, and determines that the amount of the deemed cost is abnormal if the correlation between the remaining order amount and the deemed cost is outside the allowable range for a specified trend.

[0018] Although the details will be described later, whether or not the correlation between the order backlog and the deemed cost is outside the allowable range of a predetermined trend can be determined using the "rule-based method", the "Hotelling method", the "local outlier factor method", or the like. When the "rule-based method" is used, the correlation between the order backlog and the deemed cost can be determined based on the direct magnitude relationship (not equal) between the order backlog and the deemed cost, and whether or not the difference between the order backlog and the deemed cost is outside the predetermined range. When the "Hotelling method" is used, the correlation between the order backlog and the deemed cost can be determined based on whether or not it is outside the normal boundary line range of a predetermined significance level based on the normal distribution of the Mahalanobis distance. When the "local outlier factor method" or the like is used, the correlation between the order backlog and the deemed cost can be determined based on whether or not the LOF (Local Outlier Factor) index calculated from the local reachability density is equal to or greater than a predetermined threshold.

[0019] The display control unit 21 displays at least the remaining order amount and the estimated cost recording status graph on the display unit (output device 7), and also displays the estimated cost recording status graph determined to be an abnormal amount by the determination unit 24 in a display form different from that of the remaining order amount. One example of a "different display form" is a change in display color or brightness.

[0020] The acquisition unit 22 also acquires the remaining order amount and the deemed cost for each predetermined item. The display control unit 21 displays the item-by-item status graph on the display unit, and also displays the item-by-item status graph of the deemed cost of the construction work determined by the determination unit 24 to have an abnormal amount in a display format different from the item-by-item status graph of the remaining order amount. The predetermined items are, for example, material costs, subcontract costs, labor costs, and expenses.

[0021] The acquisition unit 22 also acquires the budget amount and the deemed cost for each task (for each construction work) of the contract. The display control unit 21 plots points corresponding to the acquired budget amount and the deemed cost on a task-specific cost accounting status graph in which one coordinate axis is the budget amount and the other coordinate axis is the deemed cost. The determination unit 24 determines, when plotting points corresponding to the acquired budget amount and the deemed cost on a task-specific cost accounting status graph (construction-specific cost accounting status graph) in which one coordinate axis (for example, the X-axis) is the budget amount and the other coordinate axis (for example, the Y-axis) is the deemed cost, that the amount of the deemed cost corresponding to a point plotted at a predetermined distance or more from the center point of the population of each point is an abnormal amount.

[0022] The display control unit 21 plots and displays points corresponding to the acquired budget amount and assumed cost on a task-specific cost accounting status graph, which has one coordinate axis representing the budget amount and the other coordinate axis representing the assumed cost, and displays points that are determined to be abnormal amounts and are plotted more than a specified distance away from the center point of the population in a display format different from that of other points on the task-specific cost accounting status graph.

[0023] Furthermore, the display control unit 21 displays a normal range boundary line that connects the points plotted at positions corresponding to the outline of the population on the construction-by-construction cost accounting status graph.

[0024] The acquisition unit 22 also acquires the amount of each predetermined expense item by work (by construction) of the contract. The display control unit 21 displays on the display unit the work-by-work-item-specific construction status data (work-by-item-specific construction status data) indicating the amount of each predetermined expense item by work (by construction) of the contract.

[0025] In addition, the display control unit 21 displays on the display unit detailed work data (detailed construction data) including the business establishment and the person in charge who performed the work (construction) of the contract whose deemed cost amount was determined to be an abnormal amount.

[0026] (overview) There are cases where construction work that has reached completion date must be recorded as completed construction before the invoice for the ordered portion that constitutes the cost arrives from the supplier. This is the case when the invoice arrives in the month following the month in which the construction work is completed. In such cases, one practice is to record the "deemed cost" as the amount that would have been incurred as a cost. The general practice is to record the remaining order amount as it is as the "deemed cost" as shown in Figure 2 (a).

[0027] However, in companies that have not automated this process or that have a lot of unplanned purchases, operators manually record the "deemed cost," which leads to intentional increases and decreases in costs and human errors in recording. For example, in the case of a group of companies, the deemed amount is controlled by the head or other person in charge of each base, which can result in inflated costs or retroactive costs (recorded after reporting) as shown in Figure 2(b), or missed costs as shown in Figure 2(c).

[0028] As an example, the accounting management device 1 of the embodiment uses the Hotelling method shown in FIG. 3, which utilizes the tendency of estimated costs to occur between construction projects of the same scale, and / or the rule-based method shown in FIG. 4, which compares the backlog of orders with the estimated costs, as a method for detecting abnormal values ​​in the estimated costs.

[0029] Construction projects of the same scale tend to have similar cost trends (time, material amount, manpower, etc.), and the amount of backorders at the time of completion is often similar. The Hotelling method shown in Figure 3 makes use of this to detect abnormal values ​​in costs.

[0030] Also, depending on the company, there are cases where the companies are similar in terms of type of work, public / private, organization, etc. For this reason, the accounting management device 1 of the embodiment uses a common axis that applies to many companies, performs estimated cost comparisons for similar-scale construction projects, and detects abnormal values. The perspectives of type of work, public / private, organization, etc. can be set as extraction items on the analysis screen so that they can be used and analyzed according to the company.

[0031] On the other hand, in the case of the construction industry, where the backlog of orders is regarded as cost and recorded as such, the rule-based method shown in Figure 4 utilizes this. This rule-based method detects "backlog of orders > regarded cost" as an oversight or fraudulent non-recording of costs (profit manipulation). The rule-based method also detects "backlog of orders < regarded cost" as an incorrect entry or double recording.

[0032] When using the Hotelling method as an anomaly detection technique, the population that can be used with the Hotelling method needs to follow a normal distribution as shown in Figure 5. The Hotelling method utilizes the characteristics of data that follow a normal distribution to perform grouping such as clustering as shown in Figure 7. Then, within this group, the Mahalanobis distance is calculated to determine the degree of anomaly.

[0033] Whether the correlation between the total cost budget and the assumed cost used to detect abnormal values ​​in the accounting management device 1 of the embodiment follows the normal distribution illustrated in FIG. 5 depends on the transaction circumstances or rules of the user company, but if it is known that it can be assumed that it follows a normal distribution, the Hotelling method can be used to automatically determine the threshold value for determining abnormal values, making it possible to flexibly and accurately detect abnormal values ​​that are tailored to the characteristics of each company or project.

[0034] Furthermore, as shown in Figure 6, even in cases where the data does not follow a normal distribution, if the population can be divided into units that follow a normal distribution by performing cluster analysis on the type of construction work, public or private, etc., the construction data can be labeled for each population of the divided clusters, and anomalies can be detected by the Hotelling method using different thresholds for each.

[0035] Furthermore, if the distribution does not follow a normal distribution, it may be replaced with any other known statistical method that can be used.

[0036] In either case, data that is equal to or greater than a specific threshold or less than a specific threshold is detected as an abnormal value, and the results of this abnormality detection can be processed in a unified manner.

[0037] In addition, if it can be confirmed that the total cost budget and assumed cost tend to roughly follow a normal distribution, applying the Hotelling method is expected to improve the accuracy of anomaly detection.

[0038] Next, in the accounting management device 1 of the embodiment, as an example, the detection and analysis of abnormal values ​​of the deemed cost are performed for completed construction. That is, the presence or absence of abnormalities is detected for the remaining deemed cost at the time of completion of the construction, by comparing it with the planned cost or the order backlog. It is difficult to imagine a case where the cost fluctuates greatly at the time of completion, and the basic pattern is that the order backlog = deemed cost in many cases.

[0039] In contrast, construction work that does not incur an assumed cost is not subject to detection of abnormal values ​​of the assumed cost. That is, the accounting management device 1 of the embodiment focuses on the assumed cost by construction work at the time of completion, and construction work that does not have an assumed cost is, so to speak, noise for the accounting management device 1 of the embodiment, so it is treated as not being subject to confirmation.

[0040] Next, construction projects of the same scale tend to be similar in type, quality, and quantity of things (materials or personnel) required for the project. For this reason, construction projects of the same scale also tend to have similar cost trends. Transportation costs to the construction site, arranging with subcontractors with availability, and differences in material prices for public and private construction projects are cost elements whose amounts vary for each project, but when compared to the totals of the major categories of construction costs such as material costs, subcontract costs, labor costs, and expenses, the differences are within the margin of error. For this reason, bias in the population is absorbed to a certain extent, and it is thought that the data roughly follows a certain normal distribution.

[0041] Next, since the rules for recording deemed costs differ from company to company, it is difficult to uniformly determine the method for detecting abnormal values ​​in deemed costs. For this reason, the accounting management device 1 of the embodiment makes it possible to select an abnormality detection method, enabling flexible and general-purpose abnormality detection according to the operation form and data trends or characteristics of each company.

[0042] For example, when a simple accounting rule of order backlog = deemed cost is applied as shown in Figure 8(a), there are cases where the system is used for automated accounting, etc. In this case, there is a concern that checks will be overlooked, which may lead to fraudulent operations such as profit manipulation.

[0043] Automating the rule for recording backorders = deemed cost creates the perception that fraud is unlikely to occur because it is a simple process, but on the contrary, it often becomes an element that induces fraud. Also, the rule for recording backorders = deemed cost is often used by companies with many bases, but since checking is left to the bases, there is a risk that fraud at the base level will be concealed. Specifically, in the construction industry, the power of the base manager is often strong, and fraudulent operations are sometimes carried out at the command of the base manager in order to inflate the profits of the base.

[0044] For this reason, the accounting management device 1 of the embodiment detects anomalies using a rule-based method, and visualizes the backlog and deemed cost, not just the data volume and base volume, making it easier for operators to notice abnormal values ​​that have occurred. This allows the head office to check the operations and checks being performed at the base, making it easier to notice abnormal values ​​in the deemed cost. For this reason, as shown in Figure 8(a), fraud can be prevented because the accounting rule for backlog = deemed cost is a simple rule.

[0045] Next, when checking for abnormalities in deemed costs by comparing the deemed costs of similar-scale projects, it is difficult to compare projects of the same scale, and there is a risk of incurring large work costs. In other words, when comparing projects of the same scale, it is necessary to divide the total cost budget into equal parts and classify them, tally up the results for each project by classification, and then compare projects of the same scale. This can lead to errors in calculations and huge costs. Also, it is difficult to define "projects of the same scale," and depending on the definition, it can be difficult to notice abnormalities in deemed costs.

[0046] For this reason, in the accounting management device 1 of the embodiment, the system focuses on the correlation of the cost assumed to be the total cost budget, calculates the range that can be regarded as similar to similar groups (similar works), detects anything outside this range (outcasts) as abnormal, and notifies the operator (displays on the display). As a result, as shown in Figure 8(b), the system can statistically determine the definition of similarity (can use a definition with a higher reliability than the method used in market analysis, etc.), and can quickly detect abnormal values ​​of the assumed cost.

[0047] Next, there are cases where the appropriateness of deemed costs is judged based on the perception of the person in charge at each site. If the person in charge has a low level of awareness, the manager is forced to check and correct the cost, which places a heavy burden on the manager.

[0048] In other words, the appropriateness of the deemed cost is confirmed by checking future purchases that may occur based on the backlog of orders and past similar constructions, or by comparing the deemed costs of similar constructions. In either case, the scope of the confirmation is wide, and in the case of a group company, the confirmation is often left to the person in charge at each base. For this reason, if the person in charge is not aware of the issue, it may be difficult to notice abnormalities in the deemed cost, which may have a negative impact on the company's business condition, such as sluggish profits.

[0049] For this reason, the accounting management device 1 of the embodiment compares the assumed costs between similar works as described above, and visualizes outliers as shown in Fig. 8(c). This allows the appropriateness of the approximate level of the assumed costs to be confirmed, and clearly abnormal values ​​can be quickly detected.

[0050] In addition, the accounting management device 1 of the embodiment is capable of switching between rule-based methods and statistical methods in which similar definitions are statistically determined on the system side, making it possible to respond to a variety of patterns.

[0051] Secondly, in the case of costs that are not recorded in the order for labor costs and expenses, etc., this can lead to abnormalities in the cost of construction, such as omissions or adjustments in the cost of construction work. For this reason, analysis by cost classification is necessary, but the work costs are huge, and it is not realistic to check each time.

[0052] Also, construction costs can be confirmed by analyzing them by dividing them into material costs, subcontract costs, labor costs, and expenses as shown in Figure 9, but in this case, it is necessary to aggregate by construction and by cost classification, which may result in oversights and huge costs. Also, it is possible to analyze abnormalities by comparing with the planned costs, but if this is done by construction, there is a risk that the work costs will increase even further.

[0053] Note that the material costs shown in the example of Figure 9 are the same as the backlog and also match the estimated cost, including the deemed cost, so there is no sign of anything abnormal. The deemed cost for subcontracting is low compared to the backlog. This means that it is possible that the deemed cost has not been recorded. Conversely, if the deemed cost is high compared to the backlog, it is possible that unnecessary costs have been recorded as deemed costs. For labor costs, the actual cost is too high compared to the planned cost. This means that it is possible that unnecessary labor costs and improper expenses have been incurred. For expenses, the actual cost is low compared to the planned cost. This means that it is possible that construction work is being carried out while keeping costs down, but it is also possible that costs have been overlooked. For this reason, it is preferable to recognize this as something to check.

[0054] The accounting management device 1 of the embodiment visualizes information on the estimated amount to be incurred by each construction cost classification, order backlog, order results, and estimated cost. This makes it possible to compare the estimated and actual costs of each cost, and the order backlog and estimated costs, on a single display screen. This makes it possible to quickly check whether there are any abnormalities in the cost of each construction project, and narrow down the range of costs that may be abnormal.

[0055] (Analysis screen) The display control unit 20 of the accounting management device 1 of the embodiment displays on the analysis screen "estimated cost amount against total cost budget for each construction project," and "order plan, order record, order backlog, and estimated cost for each cost classification within the construction project." In addition, the display control unit 20 highlights information for which an abnormality has been detected by changing the display form, such as the display color or character size, so that the information can be visually recognized.

[0056] The anomaly detection data that can be confirmed targets the assumed cost amount of completed construction as mentioned above, and the construction that is judged to be abnormal changes depending on the anomaly detection method. For example, when the Hotelling method is used, construction that does not have the same assumed cost in the same scale of total cost budget is detected. Also, when the rule-based method is used, construction where the backlog > assumed cost is detected.

[0057] (Screen composition) FIG. 10 is a diagram showing an example of such an analysis screen. The display control unit 20 switches this analysis screen in the order of "displaying a list of messages resulting from the detection of anomalies" and "outputting a summary of messages resulting from the detection of anomalies". As shown in FIG. 10, the display control unit 20 displays the timing of the detection of anomalies, the construction, and the month in which the anomaly was detected in an area R2 that displays messages related to the anomaly detection process on the analysis screen. At this point, the display control unit 20 displays a summary of the anomaly detection, and when a message is selected by the operator, the display control unit 20 switches to an analysis detail screen shown in FIG. 11 and displays the detection information of the degree of anomaly corresponding to the selected message. In addition, when there are a large number of pieces of information detected as anomalies, the display control unit 20 displays each piece of information in a vertical line (by column). The area R1 shown in FIG. 10 is a display area for inputting extraction conditions.

[0058] FIG. 11 is a diagram showing an example of an analysis details screen. When a message is selected on the analysis screen shown in FIG. 10, the display control unit 20 displays detailed information corresponding to the selected message on the analysis details screen shown in FIG. 11. This analysis details screen has an area RS2 for displaying messages related to anomaly detection processing. In this area RS2, the display control unit 20 displays "the detection method used when detecting the anomaly" and "key information of the data in which the anomaly was detected." Furthermore, when there are multiple pieces of information detected as anomalies, the display control unit 20 displays the number of messages in area RS2.

[0059] In addition, when the operator selects a message displayed in area RS2, the display control unit 20 highlights (=changes the display form: thick line, high brightness display, change of display color, etc.) the portion of the selected message related to the abnormality detection information in each of the graphs in areas RS3 to RS5 described below.

[0060] For area RS3, the display control unit 20 displays a graph of "total cost budget amount and assumed cost amount for past construction projects" and "total cost budget amount and assumed cost amount for construction projects for which an abnormality was detected." In other words, for this area RS3, the display control unit 20 displays a graph that makes it possible to confirm "the correlation between the total cost budget amount and assumed cost amount for each construction project." For construction projects with similar total cost budgets, the display is based on the premise that actual results are output within a certain assumed cost amount range. This makes it possible to analyze the degree of abnormality for construction projects for which an abnormality was detected, compared to past construction projects of the same scale.

[0061] The graph displayed in area RS3 defines the range of similar total cost budgets as "same-scale projects" on the X-axis (the definition of the same-scale range differs from company to company, so this is left to the analyst).

[0062] Furthermore, the display control unit 20 displays this graph regardless of the anomaly detection method. When the Hotelling method is used as the anomaly detection method, the display control unit 20 further displays a boundary line that can be determined as a normal range on this graph. Even if the anomaly detection method is other than the Hotelling method, the tendency of construction work occurrence can be visualized from the tendency of the plot. For example, although anomaly detection was performed using the rule-based method, it is possible to determine a data tendency that may allow the Hotelling method to be used based on the plot situation.

[0063] Furthermore, the display control unit 20 displays a graph of "Scheduled costs, remaining costs, current actual costs, and assumed costs for construction work for which an abnormality has been detected" in area RS4. That is, the display control unit 20 displays in area RS4 the actual costs that were scheduled to be incurred in the current month as of the previous month (future scheduled costs), the remaining costs ordered and waiting to be received or purchased within the current month (backordered costs), the actual costs ordered and purchased in the current month (actual costs), and the backordered costs that have been entered as the actual costs for this month (assumed costs).

[0064] Based on the graph of this area RS4, compare "backlog" with "estimated cost" to check the size of "estimated cost." Also, compare "future planned cost" with "actual + estimated cost" to check the size of "actual + estimated cost." If it is small, it can be determined that it was overlooked, and if it is large, it can be determined that there is a possibility of fraudulent accounting.

[0065] In addition, the display control unit 20 displays a graph of "Planned, Actual, and Remaining by Cost Classification for Construction Work for which an Anomaly was Detected" in area RS5. This allows confirmation of abnormal values ​​by cost classification. Since labor costs and expenses are not included in the order, only the perspectives of planned costs and actual results will be confirmed in the future. If the estimated amount for material costs is high, it is possible to guide the analysis to an investigation of the basis for the abnormality, such as whether it includes items for other construction works, or if the estimated amount for outsourcing costs is high, it is possible to guide the analysis to an investigation of the basis for the abnormality, such as whether arrangements have been made with unnecessary outsourcing companies or whether funds have flowed out to outsourcing companies.

[0066] In addition, the display control unit 20 displays in area RS6 a table that confirms the planned, remaining, and actual figures for each construction and cost category in numerical form, and indicates the ratio of the current cost to the estimated cost of the construction. That is, the display control unit 20 displays in area RS6 a table that allows the user to check the "cost accumulation status at the time of completion for each construction and cost category." If the estimated cost exceeds 100%, the construction is detected as a construction to be checked, since it is a construction with low profits or that may result in a loss. By displaying this table, the cost category that leads to an anomaly can be analyzed, and related cost data can be investigated.

[0067] Furthermore, the display control unit 20 displays a table of "detailed information on the construction work in which an abnormality was detected" in area RS7. That is, the display control unit 20 displays a table in area RS7 that allows the user to check "detailed information on the construction work in which an abnormality was detected." This table displays the organization, person in charge, supplier, and completion date that manages the construction work. This makes it possible to provide notification of the abnormality and information on where to confirm the actual situation.

[0068] Moreover, area RS1 is an extraction condition area for data extraction, and the display control unit 20 displays the extraction conditions for the data displayed in the graph or table described above. Specifically, when extracting and analyzing a fiscal period to be checked, the display control unit 20 displays in the graph or table described above only construction works that have been performed within the fiscal year and month range of the specified fiscal period. Also, when extracting and analyzing output data at the organizational level, the display control unit 20 displays the graph or table described above by specifying a business establishment or department.

[0069] (Processing flow) Next, the process flow for displaying the above-mentioned analysis screen and analysis details screen in the accounting management device 1 of the embodiment will be described. Note that, as an example, the above-mentioned Hotelling method and rule-based method will be used as an anomaly detection method. These anomaly detection methods can be changed according to the trends of the data of the using company. Therefore, the following description should be understood as an example.

[0070] In the case of the accounting management device 1 of the embodiment, the following two processes can be performed.

[0071] 1. Check the [Construction data], [Construction cost data], and [Construction order data] in the business data to detect any abnormal construction work.

[0072] 2. Display the "abnormal data detected in 1" and "data related to the abnormal data referenced to detect it" on the analysis screen.

[0073] (Detection of abnormal construction work) The following data is used to detect construction projects with abnormal costs according to the anomaly detection method from the [Construction data], [Construction cost data], and [Construction order data] in the business data of “1”.

[0074] <Business data>: Data accumulated during business operations - Construction data (see Figure 12(a)) Construction cost data (see Figure 12(b)) - Construction order data (see Figure 12(c))

[0075] <Data for anomaly detection execution>: Pre-configured data - Automatic detection execution schedule data (see Figure 13(a)) Automatic anomaly detection method data (see Figure 13(c)) - Data for the period for which abnormality judgment results are registered (see Figure 13(b)) ·Construction data acquisition range condition data

[0076] <Anomaly detection result data>: Data that stores the result of anomaly detection execution - Abnormality judgment result data (see Figure 20(a)) - Abnormality judgment result message data (see Figure 20(b)) -Detailed data of abnormality judgment result message (see Figure 20(c)) -Anomaly judgment result ancillary information data (see Figure 20(d))

[0077] (Pre-set) First, the acquisition unit 22 acquires the automatic detection execution schedule data shown in Fig. 13(a), the abnormality determination result registration target period data shown in Fig. 13(b), and the automatic abnormality detection method data shown in Fig. 13(c), which are necessary for detecting an abnormality in the deemed cost. The memory control unit 25 stores this information in the memory unit 2.

[0078] (Automatic execution) Next, the acquisition unit 22 acquires timing information for detecting an abnormality based on the detection identification information (detection ID) and schedule ID shown in FIG. 13(d) by referring to the automatic detection execution schedule data shown in FIG. 13(a) and the abnormality determination result registration target period data shown in FIG. 13(b).

[0079] Next, the determination unit 24 performs the automatic execution timing determination process shown in Fig. 14, which is a process for determining whether the timing of automatic execution is the timing to detect an abnormality. If the automatic execution timing determination process returns a result of "execute," the abnormality detection process is performed based on the "Hotelling method" or "rule-based method" described below. In contrast, if the automatic execution timing determination process returns a result of "not execute," the accounting management device 1 does not execute the subsequent process and enters a standby state until the next automatic execution timing determination process.

[0080] The determination unit 24 determines holidays and business days by referring to a calendar master (not shown) stored in the storage unit 2. This calendar master is based on the sales business calendar and is always updated.

[0081] Next, the acquisition unit 22 acquires necessary data based on the anomaly detection method (Hotelling method or rule-based method) stored in the automatic anomaly detection data shown in Fig. 13(c). The comparison unit 23 and the determination unit 24 perform anomaly detection processing of the deemed cost based on the acquired data.

[0082] (If the Hotelling Law is set) When the "Hotelling method" illustrated in Figures 16 and 17 is set as the anomaly detection method in the automatic anomaly detection data shown in Figure 13(c), the acquisition unit 22 acquires the construction data shown in Figure 15(b) and the construction cost data shown in Figure 15(c) based on the acquisition criteria (fiscal year and month and construction progress status is "Completed") set as parameters as shown in Figure 15(a).

[0083] In other words, construction data from before the fiscal year and month is the target for acquisition. The target for anomaly detection is limited by referring to the "Acquisition Criteria" of the "Abnormality Judgment Result Registration Target Period Data" and anomaly judgment is performed. In this example, the target is the month before the month to which the start date belongs, and construction completed before October 2022 is the target (only completed construction is the target for acquisition).

[0084] The acquisition unit 22 acquires the budget amount for each construction project from the construction data shown in Fig. 15(b) and the assumed cost amount for each construction project from the construction cost data shown in Fig. 15(c) to calculate the total assumed cost amount for each construction project. The memory control unit 25 stores the budget amount for each construction project and the total assumed cost amount for each construction project in the memory unit 2 as shown in Fig. 15(d).

[0085] Next, the judgment unit 24 checks the correlation between the estimated costs of all construction works and the total cost budget (budget amount) based on the budget amount for each construction work shown in Figure 15 (d) and the total amount of the estimated costs for each construction work, and calculates the range that is considered normal.

[0086] Specifically, the determination unit 24 calculates the distance (Mahalanobis distance) from the center point to each point in the population as shown in FIG. 19(a). Then, the determination unit 24 calculates the distance (Mahalanobis distance) from the center point to each point in FIG. 19(b). 2 ÷δ 2 =((x-μ)÷δ) 2 As shown in the formula for "normal distribution," the distance for each point is used as an element to fit a normal distribution, and construction work that does not meet the range of "the significance level of 0.05 for the anomaly determination method in the automatic anomaly detection method data" is deemed to be abnormal and is determined to be construction work for which costs have been recorded.

[0087] In order to output the normal range, the memory control unit 25 stores and holds the plot information data for the normal range boundary line shown in Fig. 18 in the memory unit 2. More specifically, the determination unit 24 determines the point for the normal range boundary line based on the condition of "significance level 0.05 of the anomaly determination method in the automatic anomaly detection method data."

[0088] In other words, for "x" and "μ", the assumed cost and total cost budget are used as two variables to calculate the Mahalanobis distance. The calculated Mahalanobis distance is fitted to a normal distribution as shown in the formula in Figure 19(b), and construction work that does not fall within the significance level of 0.05 is determined to be construction work for which abnormal assumed costs are recorded.

[0089] More specifically, the storage unit 2 stores automatic anomaly detection method data including a detection ID, a method, an example of use, a reference value, a comparison value, and an anomaly determination method, as shown in Fig. 62. In this example, the determination unit 24 refers to the record of the "Hotelling method" in this automatic anomaly detection method data based on the detection ID, detects that the significance level is set to "0.05", and, as described above, determines that construction work that does not fall within the significance level of 0.05 is construction work for which costs are deemed abnormal and are recorded.

[0090] Next, as shown in Fig. 20(a), the memory control unit 25 updates the abnormality determination result (whether or not the result is abnormal) contained in the abnormality determination result data of the construction work determined to be abnormal, stored in the memory unit 2, to "True (abnormal)". In addition, as shown in Fig. 20(b), the memory control unit 25 stores abnormality determination result message data including an assumed cost alert message such as "Construction A has been detected" in the memory unit 2. This message is displayed on an analysis screen, which will be described later.

[0091] In addition, the memory control unit 25 inputs the detection ID of the above-mentioned automatic detection execution schedule data (see Figure 13(a)) into the abnormality judgment result message detail data shown in Figure 20(c) and the abnormality judgment result ancillary information data shown in Figure 20(d).

[0092] (If rule-based method is set) Next, when the "rule-based method" is set as the anomaly detection method in the automatic anomaly detection data shown in FIG. 13(c), the acquisition unit 22 acquires the construction data shown in FIG. 21(a), the construction cost data shown in FIG. 21(b), and the construction order data shown in FIG. 21(c) based on the acquisition criteria (fiscal year and month and construction progress status is "completed") set as parameters as shown in FIG. 21(e).

[0093] Based on the construction cost data shown in Figure 21(b), the memory control unit 25 inputs the estimated cost amount obtained by adding the estimated cost of materials and the estimated cost of subcontracting for Construction A in October 2022, which is the month in which the construction is completed, into the construction-specific status data shown in Figure 21(d).

[0094] 21(c), the memory control unit 25 calculates the total order amount of the material costs and subcontract costs for the work A in October 2022, which is the completion month of the work, and calculates the total amount of the debt recorded for the material costs and subcontract costs for the work A in October 2022. The memory control unit 25 then calculates the remaining order amount by subtracting the total amount of the debt recorded amount from the total order amount (remaining order amount = order amount - debt recorded amount), and inputs this to the work-specific status data shown in FIG. 21(d).

[0095] In addition, since labor costs and expenses are salary-related items, no amounts are ordered.

[0096] Next, the comparison unit 23 uses the order remaining amount for the construction A in October 2022 entered in the construction status data shown in FIG. 21(d) as a reference value, and the deemed cost amount as a comparison target, and compares the two amounts as shown in FIG. 22(a) and FIG. 22(b). FIG. 23 shows an example of this comparison result. The example of FIG. 23(a) is an example in which the order remaining amount, which is the reference value, and the deemed cost amount, which is the comparison target, are the same amount. The example of FIG. 23(b) is an example in which the deemed cost amount, which is the comparison target, is greater than the order remaining amount, which is the reference value. The example of FIG. 23(c) is an example in which the deemed cost amount, which is the comparison target, is smaller than the order remaining amount, which is the reference value.

[0097] Although the example in FIG. 23 is an example of the condition "reference value>comparison target", the order remaining amount and the deemed cost amount may be compared under the condition "|reference value-comparison target|≧fixed value".

[0098] Next, in the example shown in FIG. 22(b), the order remaining amount (reference value) is 190,000 yen, the assumed cost amount (comparison target) is 170,000 yen, and the comparison target is an amount smaller than the reference value. Since this means that the assumed cost indicates an abnormal value, the memory control unit 25 updates the abnormality determination result (whether or not there is an abnormality) included in the abnormality determination result data of the construction determined to be abnormal, which is stored in the memory unit 2, to "True (abnormality exists)" as shown in FIG. 24(a). In addition, the memory control unit 25 inputs the detection ID of the above-mentioned automatic detection execution schedule data (see FIG. 13(a)) into the abnormality determination result message data shown in FIG. 24(b) and the abnormality determination result message detail data shown in FIG. 24(c), respectively.

[0099] (Analysis screen display process) (When using the Hotelling method) Next, a process for displaying the detected abnormal data and data related to the abnormal data on the analysis screen will be described. Note that the following example is an example of the display process on the analysis screen when an abnormality is detected by the Hotelling method.

[0100] First, the acquisition unit 22 acquires the abnormality judgment result of "True" and the JOBID of the "estimated cost alert" by referring to the abnormality judgment result data as shown in Fig. 25(b). The memory control unit 25 sets the acquired abnormality judgment result of "True" and the JOBID of the "estimated cost alert" to the parameters shown in Fig. 25(a). Note that, in order to display a list of alerts for each construction in which an abnormality in the assumed cost has been detected, the detection ID is not acquired at this point, and the detection ID is not set for the parameters.

[0101] Next, the acquisition unit 22 refers to the abnormality determination result message data shown in Fig. 25(c) and acquires the degree of abnormality, definition name, summary, and detection target. The display control unit 21 generates message data to be displayed on the analysis screen, including the acquired degree of abnormality, definition name, summary, and detection target, as shown in Fig. 25(e). Then, the display control unit 21 displays a list of messages for each construction work indicating that an abnormality has occurred, including the degree of abnormality, definition name, summary, and detection target, in area R2 of the analysis screen shown in Fig. 26. The abnormality determination result message detail data shown in Fig. 25(d) is referenced when displaying the analysis detail screen described later.

[0102] Next, the operator obtains the date when the analysis screen was launched as the "reference date," as shown in FIG. 27(a), and sets this as the "reference date" of the extraction conditions for area R1 of the analysis screen, as shown in FIG. 27(b).

[0103] (Display process of analysis details screen) Next, the operator selects the message of the construction for which the details are to be checked from among the messages of each construction displayed in a list on the analysis screen, and operates the display button. When this display button is operated, the acquisition unit 22 acquires each data of the business establishment, department, person in charge, construction name, construction type, and completion time from the abnormality judgment result data shown in Fig. 28(a). In addition, the acquisition unit 22 acquires the detection method (Hotelling method in this case) from the abnormality judgment result message detail data shown in Fig. 28(b).

[0104] The display control unit 21 generates a detailed message shown in Fig. 28(c) including the acquired business establishment, department, person in charge, project name, project type, completion time, and detection method together with the displayed message list, and displays this in area RS2 of the analysis details screen shown in Fig. 29. This makes it possible to provide the operator with a detailed message corresponding to the project corresponding to the message selected from the list on the analysis screen via the analysis details screen.

[0105] Next, the operator inputs the extraction conditions of the acquisition range for collecting the analysis data in the input field of the extraction conditions of area RS1 in FIG. 29. For example, if there is a completed construction between November 2021 and October 2022 as shown in FIG. 30(a) and FIG. 30(b), the operator sets the "fiscal year and month" in the extraction condition column as the analysis data acquisition range condition as shown in FIG. 30(c), sets the FROM condition to "November 2021", and sets the TO condition to "October 2022". As a result, the storage control unit 25 stores in the storage unit 2 the extraction condition initial values ​​in which the base date shown in FIG. 31(a) is "November 8, 2022", the start of the period is "November 2021", the end of the period is "October 2022", and the target construction is "Construction A". The display control unit 21 displays the base date, accounting year and month, etc., set by the operator, as shown in FIG. 31(b), in area RS1 of the analysis details screen shown in FIG. 31(c).

[0106] Next, the acquisition unit 22 refers to the construction data shown in Fig. 32(b) and acquires the budget amount for each construction based on the period start parameters and period end parameters shown in Fig. 32(a) set by the operator. The acquisition unit 22 also refers to the construction cost data shown in Fig. 32(c) via the construction name and completion time of the construction data shown in Fig. 32(b) and acquires the estimated cost amount for each construction. The memory control unit 25 inputs the acquired budget amount for each construction into the construction-specific cost accounting status data stored in the memory unit 2, as shown in Fig. 32(d), and also inputs the total amount of the estimated costs for each construction (total amount for each construction).

[0107] Furthermore, in order to display the above-mentioned normal range boundary line, the acquisition unit 22 refers to the abnormality judgment result ancillary information data shown in FIG. 33(b) based on the abnormality judgment result data shown in FIG. 33(a) and also acquires normal range boundary line information.

[0108] Next, the acquisition unit 22 refers to the construction data shown in FIG. 34(b) based on the parameters shown in FIG. 34(a) and acquires the completion time of each construction. The memory control unit 25 inputs the completion time of each construction item to the construction status data by construction item shown in FIG. 34(e) stored in the memory unit 2. The acquisition unit 22 also refers to the construction cost data shown in FIG. 34(c) and acquires the future planned cost for each item in, for example, September 2022 (in the case of construction A), which is the end of the previous month of each construction, and the future planned cost for each item in, for example, October 2022 (in the case of construction A), which is the completion month of each construction. The memory control unit 25 inputs the future planned cost for each item in September 2022 into the planned cost at the end of the previous month of the construction status data by construction item, and inputs the future planned cost for each item in October 2022 into the future planned cost of the construction status data by construction item.

[0109] The acquisition unit 22 also acquires the incurred cost amount for each expense item shown in Figure 34(c). The memory control unit 25 inputs the acquired incurred cost amount as the incurred cost amount for each expense item in the construction status data by project and expense item shown in Figure 34(e). The acquisition unit 22 also acquires the assumed cost amount for each expense item shown in Figure 34(c). The memory control unit 25 inputs the acquired assumed cost amount for each expense item as the assumed cost amount for each expense item in the construction status data by project and expense item shown in Figure 34(e).

[0110] The acquisition unit 22 also acquires the order amount and the debt amount for each item of material cost and subcontract cost for the month prior to the completion month of each construction project from the construction order data shown in Fig. 34(d). The memory control unit 25 generates the remaining order amount for material cost and subcontract cost by subtracting the debt amount from the order amount for each item of material cost and subcontract cost, and inputs this as the previous month's remaining order amount for material cost and subcontract cost in the construction status data by construction project item shown in Fig. 34(e).

[0111] The acquisition unit 22 also acquires the order amount and the debt amount for each item of material cost and subcontract cost for the completion month of each construction project from the construction order data shown in Fig. 34(d). The memory control unit 25 generates the remaining order amount for material cost and subcontract cost by subtracting the debt amount from the order amount for each item of material cost and subcontract cost, and inputs this as the remaining order amount for material cost and subcontract cost for the current month in the construction status data by construction item shown in Fig. 34(e).

[0112] Next, the acquisition unit 22 acquires the material costs and subcontract costs that will be the remaining order amount for each construction project for the current month from the construction status data by construction project and expense item shown in Figure 35(a) formed in this way. The memory control unit 25 inputs the total amount of the acquired material costs and subcontract costs as the remaining order amount for the current month in the construction status data by construction project and expense item shown in Figure 35(b). The acquisition unit 22 also acquires the future planned cost of each expense item for each construction project from the construction status data by construction project and expense item shown in Figure 35(a). The memory control unit 25 inputs the total amount of the acquired future planned cost of each expense item as the future planned cost in the construction status data by construction project and expense item shown in Figure 35(b).

[0113] The acquisition unit 22 also acquires the incurred cost amount of each expense item for each work from the construction status data by work item shown in Figure 35(a). The memory control unit 25 inputs the total of the acquired incurred cost amounts of each expense item as the incurred cost amount of the construction status data by work shown in Figure 35(b). The acquisition unit 22 also acquires the deemed cost amounts of material costs and subcontract costs from the construction status data by work item shown in Figure 35(a). The memory control unit 25 inputs the acquired total of the deemed cost amounts of material costs and subcontract costs as the deemed cost amount of the construction status data by work shown in Figure 35(b).

[0114] Next, the acquisition unit 22 refers to the abnormality determination result data shown in FIG. 36(b) based on the parameters shown in FIG. 36(a) to acquire the name of the work (work A) and the completion time (October 2022) of the work in which an abnormal value of the assumed cost was detected (the abnormality result is True). The acquisition unit 22 also refers to the work data shown in FIG. 36(c) based on the work name and completion time acquired from the abnormality determination result data to acquire the business name, department, person in charge, and type of work. Furthermore, the acquisition unit 22 refers to the work order data shown in FIG. 36(d) based on the work name and completion time acquired from the abnormality determination result data to acquire the supplier.

[0115] The memory control unit 25 inputs the business name, department, person in charge, project name, project type, completion date, and supplier acquired by the acquisition unit 22 into the construction detail data shown in Figure 36 (e) stored in the memory unit 2.

[0116] Next, the display control unit 21 generates drawing data for a construction-specific cost accounting status graph in which the X-axis is the total cost budget and the Y-axis is the assumed cost amount as shown in FIG. 38 based on the data binding information shown in FIG. 37(a) stored in the storage unit 2. The display control unit 21 also generates drawing data for plotting points corresponding to the total cost budget and assumed cost amount of each construction shown in FIG. 37(b) on this construction-specific cost accounting status graph. Furthermore, the display control unit 21 generates drawing data for displaying a normal range boundary line connecting points corresponding to the outline of the population of plotted points based on the abnormality determination result attached information data shown in FIG. 37(c). Then, it generates drawing data for the construction-specific cost accounting status graph illustrated in FIG. 38.

[0117] The acquisition unit 22 also refers to the construction status data for each construction, for example, construction A (FIG. 39(c)) shown by the parameters in FIG. 39(a), and acquires the current month's order remaining amount, future planned cost, incurred cost amount, and deemed cost amount shown in the data binding information in FIG. 39(b). The display control unit 21 generates drawing data for drawing an accounting status graph for construction A, as shown in FIG. 39(d). The display control unit 21 also generates a bar graph of the current month's order remaining amount to be displayed on this accounting status graph, based on the acquired current month's order remaining amount.

[0118] The display control unit 21 also generates a bar graph of the future planned cost to be displayed on the accounting status graph based on the acquired future planned cost. The display control unit 21 also generates data for drawing a bar graph in which the incurred cost amount is treated as the actual amount and the assumed cost amount is placed at the tip of the incurred cost amount based on the acquired incurred cost amount and assumed cost amount.

[0119] Next, the acquisition unit 22 refers to the construction status data by construction item shown in Fig. 40(c) based on the parameters shown in Fig. 40(a) stored in the storage unit 2, and acquires the previous month's order remaining amount, the current month's order remaining amount, and the assumed cost amount corresponding to the material cost and subcontract cost of each construction. The acquisition unit 22 also acquires the planned cost as of the end of the previous month, the planned cost in the future, and the incurred cost amount for each item of material cost, subcontract cost, labor cost, and expense by referring to the construction status data by construction item shown in Fig. 40(c).

[0120] The display control unit 21 generates data for drawing an itemized accounting status graph as shown in Fig. 40(d). Based on the acquired previous month's order balance amount, current month's order balance amount, and assumed cost amount of the material cost, the display control unit 21 also generates data for drawing a bar graph of the previous month's order balance amount of the material cost and the subcontract cost, a bar graph of the future planned cost, and a bar graph with the assumed cost amount placed at the top of the incurred cost amount.

[0121] In addition, the display control unit 21 generates data for drawing bar graphs of incurred cost amounts of labor costs and expenses and bar graphs of assumed cost amounts based on the previous month's remaining order amount, the current month's remaining order amount, and the assumed cost amount of the acquired material costs.

[0122] Next, based on the data binding information shown in Figure 41(b), the acquisition unit 22 refers to the construction status data by construction item shown in Figure 41(c) and acquires the previous month's remaining order amount, the current month's remaining order amount, the planned cost as of the end of the previous month, the planned cost in the future, the incurred cost amount, and the deemed cost amount corresponding to each item of material costs, subcontract costs, labor costs, and expenses for each construction project.

[0123] The display control unit 21 generates data for drawing to display the "table for checking the cost accumulation status at the time of completion by construction / cost classification" shown in Fig. 41(d). Based on the acquired previous month's order remaining amount, current month's order remaining amount, planned cost at the end of the previous month, future planned cost, incurred cost amount, and assumed cost amount, the display control unit 21 generates data for drawing the order remaining amount of material cost, the estimated material cost amount, the actual material cost amount, the assumed material cost amount, the estimated material cost amount obtained by adding the actual material cost amount and the assumed cost, and the ratio (%) of the estimated material cost amount to the amount obtained by adding the actual material cost amount and the assumed cost. The acquired future planned cost is used as the estimated material cost amount.

[0124] Furthermore, the display control unit 21 generates data for plotting the remaining order amount of the outsourcing cost, the forecasted amount of the outsourcing cost, the actual amount of the outsourcing cost, the deemed cost amount of the outsourcing cost, the forecasted amount obtained by adding the actual amount of the outsourcing cost and the deemed cost, and the ratio (%) of the forecasted amount to the amount obtained by adding the actual amount of the outsourcing cost and the deemed cost, based on the previous month's remaining order amount, the current month's remaining order amount, the planned cost as of the end of the previous month, the future planned cost, the incurred cost amount, and the deemed cost amount. Note that the acquired future planned cost is used as the forecasted amount.

[0125] In addition, the display control unit 21 generates data for displaying the estimated final amount of labor costs, the actual amount, and the ratio (%) of the estimated final amount to the actual amount, based on the estimated cost of labor costs as of the end of the previous month, the estimated cost in the future, and the cost amount incurred.

[0126] In addition, the display control unit 21 generates data for displaying the estimated end amount, actual amount, and the ratio (%) of the estimated end amount to the actual amount of the expense, based on the acquired planned cost as of the end of the previous month, the planned cost in the future, and the cost amount incurred of the expense.

[0127] The acquisition unit 22 also references the construction detail data shown in Fig. 42(c) based on the parameters shown in Fig. 42(a) and acquires the business establishment name, department, construction name, construction type, completion time, and supplier. The display control unit 21 references the data binding information shown in Fig. 42(d) and generates drawing data for displaying the "table that outputs detailed information about construction for which an abnormality has been detected" shown in Fig. 42(d). The display control unit 21 also generates drawing data for displaying the acquired business establishment name, department, construction name, construction type, completion time, and supplier on the table that outputs detailed information about construction for which an abnormality has been detected.

[0128] Next, the display control unit 21 displays the construction-by-construction cost recording status graph illustrated in Fig. 38 in area RS3 of the analysis details screen shown in Fig. 43. The display control unit 21 also displays the recording status graph shown in Fig. 39(d) in area RS4 of the analysis details screen shown in Fig. 43. The display control unit 21 also displays the subject-by-subject recording status graph shown in Fig. 40(d) in area RS5 of the analysis details screen shown in Fig. 43.

[0129] Furthermore, the display control unit 21 displays the "table for checking the cost accumulation status at the time of completion by construction / cost classification" shown in Fig. 41(d) in area RS6 of the analysis details screen shown in Fig. 43. Furthermore, the display control unit 21 displays the "table for outputting detailed information of construction in which an abnormality has been detected" shown in Fig. 42(d) in area RS7 of the analysis details screen shown in Fig. 43. This makes it possible to immediately recognize detailed information of construction in which an abnormal value for the deemed cost has occurred, and the degree of the abnormality (such as amount), etc.

[0130] (Change in display format) Furthermore, the display control unit 21 displays the plot points and bar graphs, etc., corresponding to construction projects with deemed costs that are abnormal values ​​in a display format that is different from that of other plot points or bar graphs, etc.

[0131] Specifically, the acquisition unit 22 refers to the graph coloring parameters shown in Fig. 44(a) stored in the storage unit 2, and acquires the display colors of the abnormality flag, the display colors of the reference information flag, and the display colors of the plot points and broken lines when the abnormality result of the abnormality determination result data shown in Fig. 44(c) is "True" and "False". Based on the acquired display colors, the display control unit 21 displays the plot points of the construction works in which abnormal values ​​were detected (True) as red points, for example, as shown in the construction work-specific cost accounting status graph of area RS3 in Fig. 44(d).

[0132] The acquisition unit 22 also refers to the graph coloring parameters (for assumed cost) shown in Fig. 44(b) and acquires various information indicating the color scheme, shading, and brightness of each bar graph of the current month's order remaining amount, future planned cost amount, actual amount, assumed cost amount, etc. The display control unit 21 displays each bar graph of the accounting status graph in area R4 of Fig. 44(d) and each bar graph of the accounting status graph by subject in area RS5 of Fig. 44(d) in a display form corresponding to the various information indicating the acquired color scheme, shading, and brightness.

[0133] On this type of analysis details screen, detailed information including the object of the detected abnormality (such as the name of the construction work), the detection method, and the standard value used to determine the abnormality can be displayed by the message displayed in area RS2. This makes it possible to start analysis even when construction work that may have an abnormality is already known.

[0134] In addition, the graph of the cost accounting status by construction project displayed in Area RS3 allows you to check the correlation of costs by considering them as total cost budgets based on information on past completed construction projects. The Hotelling method uses the following characteristic as a premise for correlation: "Constructions of the same scale tend to have similar trends in cost occurrence (timing, amount of materials, number of people ordered, etc.), and often have similar amounts of backorders at the time of completion." Then, check for construction projects that clearly differ from past trends.

[0135] In the example of Figure 44, it can be seen that the construction projects shown with plotted points in red clearly have outlier performance compared to the other construction projects (the assumed cost shows an abnormal value).

[0136] Even for population data for which the Hotelling method cannot be used, there are cases where characteristics can be seen by plotting the data. In other words, if there is a correlation, the characteristics will be seen.

[0137] As shown in Figure 45, the accounting status graph displayed in area RS4 makes it possible to check the cost status of the construction work for which an abnormality has been detected. This accounting status graph can visualize the following information.

[0138] 1. The status of the current month's backlog and deemed cost: These two generally match, but if there is a shortage, it is possible that an amount has been overlooked from the backlog to deemed cost. 2. Future planned costs and actual results + assumed costs: Whether or not the actual results are expected to be as planned. If the actual results are greater than expected, it is possible that costs have piled up or the plan was too optimistic and adjustments will be necessary.

[0139] As shown in Figure 46, the graph of accounting status by item displayed in area RS5 allows you to check the planned and actual status for each cost breakdown. Specifically, for material costs, operations such as emergency procurement or reassignment to other work are possible. For subcontracting costs, operations such as outflow of funds to subcontractors or reassignment to other work are possible.

[0140] The labor cost graph should be checked in parallel with the accounting status graph in Figure 45. This information will be relevant in the actual results when comparing with the planned costs in the future. Also, if labor costs are being cut and costs are being manipulated, the labor cost graph will show some characteristics.

[0141] The expense graph should be checked in parallel with the accounting status graph in Figure 45. This information is relevant to the actual results when comparing with the planned costs in the future. If there are illegal travel expenses or entertainment expenses, etc., piling up, the expense graph will show some characteristics.

[0142] (When using the rule-based method) Next, the display process of the analysis screen when anomaly detection is performed using the rule-based method will be described. In this case as well, first, the acquisition unit 22 acquires the abnormality determination result of "True" and the JOBID of the "assumed cost alert" by referring to the abnormality determination result data as shown in FIG. 47(b). The storage control unit 25 sets the acquired abnormality determination result of "True" and the JOBID of the "assumed cost alert" to the parameters shown in FIG. 47(a). Note that, in order to display a list of alerts for each construction in which an abnormality in the assumed cost has been detected, the detection ID is not acquired at this point, and the detection ID is not set for the parameters.

[0143] Next, the acquisition unit 22 refers to the abnormality determination result message data shown in Fig. 47(c) and acquires the degree of abnormality, definition name, summary, and detection target. The display control unit 21 generates message data to be displayed on the analysis screen, including the acquired degree of abnormality, definition name, summary, and detection target, as shown in Fig. 47(e). Then, the display control unit 21 displays a list of messages for each construction work indicating that an abnormality has occurred, including the degree of abnormality, definition name, summary, and detection target, in area R2 of the analysis screen shown in Fig. 47(f). The abnormality determination result message detail data shown in Fig. 47(d) is referenced when displaying the analysis detail screen described later.

[0144] Next, the operator obtains the date when the analysis screen was launched as the "base date" and sets this as the "base date" of the extraction conditions of area R1 on the analysis screen.

[0145] (Display process of analysis details screen) Next, the operator selects the message of the construction for which the details are to be checked from among the messages of each construction displayed in a list on the analysis screen, and operates the display button. When this display button is operated, the acquisition unit 22 acquires each data of the business establishment, department, person in charge, construction name, construction type, and completion time from the anomaly judgment result data shown in Fig. 48(a). In addition, the acquisition unit 22 acquires the detection method (in this case, the rule-based method) from the anomaly judgment result message detail data shown in Fig. 48(b).

[0146] The display control unit 21 generates a detailed message shown in Fig. 48(c) including the acquired business establishment, department, person in charge, project name, project type, completion time, and detection method together with the displayed message list, and displays this in area RS2 of the analysis details screen shown in Fig. 49. This makes it possible to provide the operator with a detailed message corresponding to the project corresponding to the message selected from the list on the analysis screen via the analysis details screen.

[0147] The display process of the graphs and tables displayed in areas RS4 to RS7 shown in Fig. 50, and the process of changing the display form of plotted points and bar graphs when displaying the graphs and tables, are the same as when an abnormality is detected by the Hotelling method described above. Note that the difference with area RS3 is whether or not the normal range boundary line is plotted. For details, please refer to the explanation of Fig. 44.

[0148] In the graph of the cost accounting status by project displayed in area RS3 of the analysis details screen in Figure 50(d), projects whose costs do not match the remaining order amount can be detected as abnormal projects based on the rule-based method.

[0149] In addition, the graph of the cost accounting status by work displayed in area RS3 of the analysis details screen in Figure 50 (d) allows you to confirm the correlation between the total cost budget and the deemed cost based on information on past completed works. If there is a correlation between the deemed cost and the total cost budget and abnormal data is out of the ordinary (if there is a point plotted at a position away from the population), the characteristic will appear here. Therefore, if a plot at a position away from the population is confirmed on the graph of the cost accounting status by work, anomaly detection can be performed using the Hotelling method described above.

[0150] The accounting status graph displayed in area RS4 of the analysis details screen in Figure 50(d) allows you to check the information on the key of the abnormality detection. Check how the estimated costs are accumulating in relation to the backlog of orders.

[0151] In area RS4, as shown in Figure 51(a), for example, construction projects whose estimated cost amount to be added to the actual amount is significantly less than the remaining order amount for the current month are displayed in the form of a bar graph as construction projects to be detected.

[0152] In this way, when there is a clear difference between the order balance and the deemed cost, it is easy to confirm, but when the difference between the order balance and the deemed cost is small, as shown in Figure 51(b), it becomes difficult to confirm whether the deemed cost is an abnormal value or not. In such cases, use the "Table for confirming the cost accumulation status at the time of completion by construction / cost classification" displayed in area RS6 of the analysis details screen in Figure 50(d).

[0153] FIG. 52 is a diagram showing an example of this "table for checking the cost accumulation status at the time of completion by construction and cost classification." Even if the difference between the current month's order balance amount and the deemed cost amount is small in the accounting status graph, the "table for checking the cost accumulation status at the time of completion by construction and cost classification" allows the difference between the two to be clearly confirmed in numbers, for example, when the current month's order balance amount is "80" and the deemed cost amount is "70." Therefore, even small abnormal values ​​in the deemed cost can be easily detected.

[0154] (Switching graphs for analysis) Next, the accounting management device of the embodiment can switch the display of the analysis graph to perform the analysis. In other words, the operator can extract data using desired extraction conditions and check for abnormal values ​​in the cost price by viewing the data as easier to check.

[0155] As an example, when the construction type of construction work is specified, the operator inputs "construction work" as the construction type in the input field for extraction conditions displayed in area RS1 of the analysis details screen, as shown in Fig. 53. The memory control unit 25 sets "construction work" as the construction type of the parameters stored in the memory unit 2, as shown in Fig. 54(a).

[0156] As a result, the acquisition unit 22 acquires the budget amount for each construction work corresponding to the "construction work" from the construction work data shown in FIG. 54(b), and also acquires the estimated cost amount for each construction work from the construction cost data shown in FIG. 54(c). The memory control unit 25 inputs the acquired budget amount for each construction work (total cost budget) and the total amount of the estimated cost for each construction work to the construction cost accounting status data stored in the memory unit 2, as shown in FIG. 54(d). The construction work data, various data acquired from the construction cost data, and various data stored in the construction cost accounting status data are used to display the "table for confirming the cost accumulation status at the time of completion by construction / cost classification" displayed in area RS6 of the analysis details screen in FIG. 50(d).

[0157] In addition, the acquisition unit 22 refers to the construction data shown in FIG. 55(b) based on the parameter in which "construction work" is set as the construction type as shown in FIG. 55(a), and acquires the completion time of each construction work. The memory control unit 25 inputs the completion time of each construction work for each expense item to the construction work-specific expense item-specific construction status data shown in FIG. 55(e) stored in the memory unit 2. In addition, the acquisition unit 22 refers to the construction cost data shown in FIG. 55(c), and acquires the future planned cost for each expense item for, for example, September 2022 (in the case of construction A), which is the end of the previous month of each construction work, and the future planned cost for each expense item for, for example, October 2022 (in the case of construction A), which is the completion month of each construction work. The memory control unit 25 inputs the future planned cost for each expense item for September 2022 into the planned cost as of the end of the previous month in the construction status data by project and expense item shown in Figure 55 (e), and inputs the future planned cost for each expense item for October 2022 into the future planned cost in the construction status data by project and expense item.

[0158] The acquisition unit 22 also acquires the incurred cost amount for each expense item from the construction cost data shown in Figure 55(c). The memory control unit 25 inputs the acquired incurred cost amount as the incurred cost amount for each expense item in the construction and expense item-specific construction status data shown in Figure 55(e). The acquisition unit 22 also acquires the assumed cost amount for each expense item from the construction cost data shown in Figure 55(c). The memory control unit 25 inputs the acquired assumed cost amount for each expense item as the assumed cost amount for each expense item in the construction and expense item-specific construction status data shown in Figure 55(e).

[0159] The acquisition unit 22 also acquires the order amount and the debt amount for each item of material cost and subcontract cost for the month prior to the completion month of each construction project from the construction order data shown in Figure 55(d). The memory control unit 25 generates the remaining order amount for material cost and subcontract cost by subtracting the debt amount from the order amount for each item of material cost and subcontract cost, and inputs this as the previous month's remaining order amount for material cost and subcontract cost in the construction status data by construction project item shown in Figure 55(e).

[0160] The acquisition unit 22 also acquires the order amount and the debt amount for each item of material cost and subcontract cost in the completion month of each construction from the construction order data shown in FIG. 55(d). The memory control unit 25 generates the order remaining amount of material cost and subcontract cost by subtracting the debt amount from the order amount of each item of material cost and subcontract cost, and inputs this as the order remaining amount of material cost and subcontract cost for the current month in the construction status data by construction item shown in FIG. 55(e). The construction status data by construction item shown in FIG. 55(e) and the like are used to display the "table for checking the cost accumulation status at the time of completion by construction / cost classification" displayed in area RS6 of the analysis details screen, the "table for outputting detailed information on construction where abnormality was detected" displayed in area RS7, and the itemized accounting status graph displayed in area RS5.

[0161] Even if the extraction conditions are changed, the display processing of the graphs and tables displayed in areas RS3 to RS7, as well as the processing for changing the display form of plotted points and bar graphs when displaying the graphs and tables, are the same as described above, as shown in Figures 56(a) to 56(d). For details, see the explanation of Figure 44.

[0162] As shown in Figure 57(a), if there are many points plotted on the graph of the cost accounting status by work displayed in area RS3, it becomes difficult to detect works that show abnormal values ​​for the deemed cost. In such a case, by extracting data by specifying a work type such as "construction work" as described above, the number of points plotted on the graph of the cost accounting status by work can be reduced as shown in Figure 57(b), making it easier to detect works that show abnormal values ​​for the deemed cost.

[0163] Furthermore, if there is information that could form clusters (groups) when divided by construction type, these can be visualized. The example in Figure 57(b) is an example where two clusters (groups) are visualized. This shows that the data used to display the graph of the cost accounting status by construction type was not only a cluster (group) that followed a single normal distribution. It also makes it clear that the Hotelling method cannot detect this. In this case, the anomaly detection method is changed to the rule-based method to detect abnormal values ​​in costs.

[0164] In addition, a cluster analysis may be performed in advance using parameters such as the construction type confirmed in this way, and an analysis may be performed using the Hotelling's method for each population of construction data.

[0165] (For cases where there is a high possibility that there are one or more dense distributions of points whose key conditions for cluster division are unknown, or whether they follow a normal distribution) Next, if the key conditions are known, the Hotelling method can be used for each cluster (group), but if the key conditions are unknown, it becomes difficult to separate the clusters (groups). In such cases, anomalies can be detected using the "local outlier factor method."

[0166] When using this "local outlier factor method," the operator sets the detection ID, method, column to be used, reference value, comparison value, and anomaly determination method as automatic anomaly detection method data, as shown in FIG. 58. "Local outlier factor method" is set as the "method." "Deemed cost, budget amount" is set as the "column to be used." "Number of neighbors = 2, threshold = 1.5" is set as the "anomaly determination method." The memory control unit 25 stores this automatic anomaly detection method data in the memory unit 2.

[0167] "Number of neighbors" is a value that specifies how many points close to each point are to be referenced. For example, if "number of neighbors = 2" is set, in the example of Figure 59, two points, points B and C, are referenced as neighbors of point A.

[0168] 60(a) to 60(d) show a process flow using the "local outlier factor method." First, the display control unit 21 calculates the local reachability density of each point. The "local reachability density" is the reciprocal of the average value of the reachability distance between a certain point and each of its neighbors, and is calculated by the display control unit 21 based on the following formula.

[0169] lrd k (A)=1÷(((rd k (A,B))+(rd k (A,C))÷2)

[0170] "A" is the point itself, "B" is the first neighboring point (the point closest to A), and "C" is the second neighboring point (the point second closest to A). "rd" is the distance, and "rd(A,B)" is the distance from A to B. Also, "distance" means "reachability distance."

[0171] Next, the display control unit 21 calculates the LOF (Local Outlier Factor). The "LOF" is the average value of the local reachability density of two neighboring points divided by the local reachability density of each point. The storage control unit 25 stores the calculated LOF of each point in the storage unit 2 as the score value of each point as shown in FIG. 60(b).

[0172] Next, as shown in FIG. 60(c), the judgment unit 24 detects (judges) as abnormal a point where the LOF is greater than the "threshold value=1.5" set in the "abnormality judgment method" of the automatic anomaly detection method data shown in FIG. 58.

[0173] Next, the memory control unit 25 inputs and stores the total cost budget and assumed cost amount at the point where LOF = 1.5 into the "anomaly judgment result ancillary information data" stored in the memory unit 2, as shown in Figure 60 (d).

[0174] Figure 61 is an example diagram in which each point and the point where LOF=1.5 are plotted. By plotting the points in the "Abnormality Judgment Result Attached Information Data", it is possible to plot a threshold line (normal range boundary line) as shown by the dotted line in Figure 61. This makes it possible to easily detect construction work whose assumed cost shows an abnormal value, corresponding to a point far from each population, even when multiple populations exist.

[0175] (Effects of the embodiment) As is clear from the above explanation, the accounting management device 1 of the embodiment displays, as an example, the deemed cost showing an abnormal value detected based on the rule-based method in a specific display format on the accounting status graph, and also displays the deemed cost showing an abnormal value detected based on the Hotelling method in a specific display format on the construction-specific cost accounting status graph. This makes it possible to flexibly and accurately detect and display abnormal values ​​of the deemed cost of the recorded construction in accordance with the characteristics of each company or construction, and allows the operator to easily and quickly recognize construction in which an abnormal value of the deemed cost has occurred.

[0176] In addition, the accounting management device 1 of the embodiment focuses on the correlation of costs assumed to be total cost budgets, calculates the range that can be regarded as similar to similar groups (similar constructions) on the system side, detects anything outside this range that can be regarded as similar (outcasts) as abnormal, and notifies the operator (displays on the display unit). This allows the system to statistically determine the definition of similarity (a definition with a higher reliability than the method used in market analysis, etc.), and allows abnormal values ​​of the assumed costs to be detected quickly.

[0177] In addition, the accounting management device 1 of the embodiment compares the assumed costs between similar construction projects and visually displays outliers. This allows the appropriateness of the approximate level of the assumed costs to be confirmed, and clearly abnormal values ​​to be quickly detected.

[0178] Furthermore, the accounting management device 1 of the embodiment visually displays information on the estimated amount to be incurred for each construction cost classification, order backlog, order performance, and assumed cost. This makes it possible to compare the estimated and actual costs of each cost, and the order backlog and assumed costs, on a single display screen. This makes it possible to quickly check whether there are any abnormalities in the cost of each construction project, and narrow down the range of costs that may be abnormal.

[0179] [Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, and can therefore contribute to Goals 8 and 9 of the SDGs.

[0180] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of Goals 12, 13, and 15 of the SDGs.

[0181] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0182] [Other embodiments] The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0183] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0184] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0185] Furthermore, with regard to the accounting management device 1, the components shown in the figure are merely conceptual functional components, and do not necessarily have to be physically configured as shown in the figure.

[0186] For example, all or any part of the processing functions of the accounting management device 1, particularly the control unit 3 and each processing function performed by the control unit 3, may be realized by a CPU (Central Processing Unit) and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded on a non-transitory computer-readable recording medium that contains programmed instructions for causing the information processing device to execute the processes described in this embodiment, and is mechanically read by the accounting management device 1 as needed. That is, a storage unit such as a ROM or HDD records a computer program for working with the OS to give instructions to the CPU and perform various processes. This computer program is executed by being loaded into RAM, and works with the CPU to constitute the control unit 3.

[0187] In addition, the accounting management program of this accounting management device 1 may be stored in another server device connected to the accounting management device 1 via any network, and it is also possible to download all or part of it as needed.

[0188] The accounting management program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the term "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical Disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0189] Furthermore, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration consisting of multiple modules or libraries, and a program that works in conjunction with a separate program, such as an OS, to achieve its function. Note that well-known configurations and procedures can be used for the specific configuration and reading procedure for reading a recording medium in the accounting management device 1 shown in the embodiment, as well as the installation procedure after reading.

[0190] The memory unit 2 is a storage means such as a memory device such as RAM or ROM, a fixed disk device such as a hard disk, a flexible disk, or an optical disk, and stores various programs, tables, databases, and web page files used for various processes and providing websites.

[0191] The accounting management device 1 may be configured as an information processing device such as a known personal computer device or a workstation, or may be configured as an information processing device connected to any peripheral device. The information processing device may be realized by implementing software (including programs or data, etc.) that realizes the processing described in this embodiment.

[0192] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Industrial Applicability]

[0193] The present invention is suitable for application to accounting work in the construction industry, for example. [Explanation of symbols]

[0194] 1. Accounting management device 2 Storage section 3. Control Unit 4. Communication Interface Section 5 Input / Output Interface Section 6 Input Devices 7 Output Devices 21 Display control unit 22 Acquisition Department 23 Comparison section 24 Judgment section 25 Memory control unit

Claims

1. an acquisition unit that acquires the remaining order amount and the deemed cost when the work of a specified contract is completed; a comparison unit for comparing the acquired order remaining amount with the assumed cost; a determination unit which determines whether the correlation between the order remaining amount and the deemed cost is outside a tolerable range of a predetermined trend or is within a tolerable range based on the comparison result of the comparison unit, and determines the amount of the deemed cost as an abnormal amount when the correlation between the order remaining amount and the deemed cost is outside the tolerable range of a predetermined trend; a display control unit that displays at least the order remaining amount and a calculation status graph of the deemed cost on a display unit, and displays the calculation status graph of the deemed cost determined by the determination unit as an abnormal amount in a display form different from that of the order remaining amount; An accounting management device having the above configuration.

2. the determination unit determines that the amount of the deemed cost is abnormal when the difference between the deemed cost and the remaining order amount is greater than a predetermined amount, or when the difference between the deemed cost and the remaining order amount is less than a predetermined amount; 2. The accounting management device according to claim 1 .

3. The acquisition unit acquires the order remaining amount and the deemed cost for each predetermined item, The display control unit displays a status graph by item on the display unit, and displays the status graph by item of the deemed cost of the item determined by the determination unit to have an abnormal amount in a display form different from the status graph by item of the order remaining amount; 3. The accounting management device according to claim 2.

4. The acquisition unit acquires a budget amount and an estimated cost for each task of the contract, the determination unit, when plotting points corresponding to the acquired budget amount and the deemed cost on a task-specific cost accounting status graph having one coordinate axis representing the budget amount and the other coordinate axis representing the deemed cost, determines, as an abnormal amount, the amount of the deemed cost corresponding to a point plotted at a distance greater than a predetermined distance from the center point of the population of each point; the display control unit plots and displays points corresponding to the acquired budget amount and the deemed cost on a task-specific cost apportionment status graph having one coordinate axis representing the budget amount and the other coordinate axis representing the deemed cost, and displays points determined to be abnormal amounts that are plotted at a distance greater than a predetermined distance from the center point of the population in a display form different from that of other points on the task-specific cost apportionment status graph; 4. The accounting management device according to claim 3.

5. the display control unit displays a normal range boundary line connecting points plotted at positions corresponding to the contour of the population on the task-specific cost recording status graph; 5. The accounting management device according to claim 4.

6. The acquisition unit acquires an amount for each predetermined expense item for each task of the contract, The display control unit displays on the display unit work status data by work item indicating an amount for each predetermined expense item by work of the contract; 6. The accounting management device according to claim 5,

7. the display control unit displays on the display unit detailed work data including the business establishment and the person in charge who performed the work of the contract, the deemed cost amount of which has been determined to be an abnormal amount; 7. The accounting management device according to claim 6.

8. An acquisition step in which an acquisition unit acquires an order remaining amount and a deemed cost when a work of a specified contract is completed; A comparison step in which a comparison unit compares the acquired order remaining amount with the assumed cost; a determination step in which a determination unit determines whether the correlation between the order remaining amount and the deemed cost is outside a tolerable range of a predetermined trend or is within a tolerable range based on a comparison result of the comparison step, and determines the amount of the deemed cost as an abnormal amount when the correlation between the order remaining amount and the deemed cost is outside a tolerable range of a predetermined trend; a display control step in which a display control unit displays at least the order remaining amount and a calculation status graph of the deemed cost on a display unit, and displays the calculation status graph of the deemed cost determined to be an abnormal amount in the determination step in a display form different from that of the order remaining amount; An accounting management method having the above.

9. Computer, an acquisition unit that acquires the remaining order amount and the deemed cost when the work of a specified contract is completed; a comparison unit for comparing the acquired order remaining amount with the assumed cost; a determination unit which determines whether the correlation between the order remaining amount and the deemed cost is outside a tolerable range of a predetermined trend or is within a tolerable range based on the comparison result of the comparison unit, and determines the amount of the deemed cost as an abnormal amount when the correlation between the order remaining amount and the deemed cost is outside the tolerable range of a predetermined trend; displaying, on a display unit, a recording status graph of at least the order remaining amount and the deemed cost, and functioning as a display control unit that displays, in a display form different from that of the order remaining amount, the recording status graph of the deemed cost that has been determined by the determination unit to be an abnormal amount; An accounting management program that features:

Citation Information

Patent Citations

  • Checking device for received money amount

    JP2000035989A

  • Cost control device, cost control method, recording medium and program

    JP2003044645A

  • Contract-type receivable settlement processor, contract type receivable settlement method, and contract type receivable settlement program

    JP2020030720A

  • Stock fraud detection work support device, stock fraud detection work support method, and stock fraud detection work support program

    JP2023039152A

  • Business result management system and computer program

    JP2016045819A

Cited By

  • Business support device, business support method, and business support program

    JP2026141253A