Rail elevation correction method, rail elevation correction auxiliary device and rail elevation correction auxiliary program

The rail elevation correction method improves slab track construction accuracy and reduces costs by using three-dimensional data to optimize mortar usage and rail elevation adjustments.

JP2024154560AActive Publication Date: 2024-10-31KANEKO
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023068441
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-19
Publication Date
2024-10-31
Estimated Expiration
2043-04-19

AI Technical Summary

Technical Problem

Existing slab track construction methods lack sufficient accuracy and cost-effectiveness due to the limited number of measurement points and high construction costs, particularly in the adjustment of rail elevation and mortar usage.

Method used

A rail elevation correction method utilizing three-dimensional point cloud data acquisition, plan information acquisition, and interval calculation to modify planned rail elevation, reducing the need for repairs and mortar usage by calculating optimal mortar thickness and correcting rail elevation before construction.

Benefits of technology

The method reduces the amount of repairs and mortar required, thereby decreasing the overall cost of slab track construction by accurately adjusting rail elevation and mortar thickness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024154560000001_ABST
    Figure 2024154560000001_ABST
Patent Text Reader

Abstract

To further reduce a cost of slab track construction.SOLUTION: A rail elevation correction method according to the present invention includes a point group data acquisition step, a plan information acquisition step, an information correction step, and an interval calculation step. The point group data acquisition step acquires three-dimensional point group data that indicate coordinates of a roadbed. The plan information acquisition step acquires information related to the planned rail elevation. The information correction step acquires correction information for the planned rail elevation, and calculates the corrected rail elevation which is information obtained by correcting the planned rail elevation based on the correction information. The interval calculation step calculates an interval between a track slab of the planned rail elevation or a track slab of the corrected rail elevation, and the roadbed indicated by the three-dimensional point group data.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a rail elevation correction method, a rail elevation correction assist device, and a rail elevation correction assist program for correcting rail elevation on a slab track. [Background technology]

[0002] The technology of Patent Document 1 is known as a conventional technology that takes into account the difference between the plan and the actual roadbed. Also, the technology of Patent Document 2 is a conventional technology that uses a 3D scanner to measure the actual roadbed and extract the repair position. Non-Patent Document 1 is a document that shows what kind of work is carried out in the construction of slab track. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2004-333140 A [Patent Document 2] JP 2019-210677 A [Non-patent literature]

[0004] [Non-Patent Document 1] Nagasaki Prefecture, "Introduction to the 'Track Construction' of the Kyushu Shinkansen West Kyushu Route", [Retrieved January 20, 2023], Internet<https: / / www.pref.nagasaki.jp / shared / uploads / 2021 / 03 / 1615951931.pdf> . Summary of the Invention [Problem to be solved by the invention]

[0005] However, the technology of Patent Document 1 was developed before 3D scanners became widespread, and there are few measurement points, so there is a need to improve accuracy. The technology of Patent Document 2 is a technology that extracts repair positions to execute a plan, and is a technology that reduces costs in construction from a state where the reference pins are fixed (a state where the set value is determined), but it does not sufficiently reduce the cost of slab track construction. The object of the present invention is to provide a technology that can further reduce the cost of slab track construction. [Means for solving the problem]

[0006] The rail elevation correction method of the present invention is a rail elevation correction method for correcting planned rail elevation, which is information on the elevation of the rail at the time of planning, for a slab track having a protruding concrete on which a reference instrument is arranged, a roadbed, and a track slab placed on the roadbed via mortar. The planned rail elevation also includes information on the slope and cant of the rail. The rail elevation correction method of the present invention includes a point cloud data acquisition step, a plan information acquisition step, an information correction step, and a clearance calculation step. The point cloud data acquisition step acquires three-dimensional point cloud data indicating the coordinates of the roadbed. The plan information acquisition step acquires information on the planned rail elevation. The information correction step acquires correction information for the planned rail elevation, and calculates a corrected rail elevation, which is information obtained by correcting the planned rail elevation based on the correction information. The clearance calculation step calculates the clearance between the track slab in the case of the planned rail elevation or the track slab in the case of the corrected rail elevation, and the roadbed indicated by the three-dimensional point cloud data. Effect of the Invention

[0007] According to the rail elevation correction method of the present invention, the planned rail elevation created before slab track construction is corrected, and the distance between the track slab and the roadbed indicated by the 3D point cloud data is calculated. This correction reduces the amount of repair work and the amount of mortar injected between the roadbed and the track slab, which makes it possible to reduce the cost of slab track construction compared to conventional methods. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a diagram for explaining the outline of a slab track. [Diagram 2] FIG. 2 is a diagram showing an example of the functional configuration of a rail elevation correction assisting device according to the present invention. [Diagram 3] FIG. 4 is a diagram showing a process flow of the rail altitude correction method of the present invention. [Figure 4] A diagram showing the roadbed and protruding concrete on the up and down lines. [Diagram 5] FIG. 13 is a diagram showing an example of an output of a distance calculation result by a plan difference calculation unit. [Figure 6] FIG. 2 is a diagram showing an example of the functional configuration of a computer. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an embodiment of the present invention will be described in detail. Note that components having the same functions are given the same reference numbers and duplicated explanations will be omitted. EXAMPLES

[0010] FIG. 1 shows a diagram for explaining the outline of slab track. Slab track is a track used as a track for bullet trains and the like, and has protruding concrete 921-1, 921-2 on which datums 951-1, 951-2 are arranged, a roadbed 911, and a track slab 931 arranged on the roadbed 911 via mortar 941. Rails (not shown) are arranged on the track slab 931. As the mortar 941, CA (cement asphalt) mortar is used at the time of filing this application.

[0011] The construction process is described in detail in Non-Patent Document 1. As described in Non-Patent Document 1, first, the protruding concrete 921-1, 921-2 and the roadbed 911 are created by civil engineering work. Then, these structures are surveyed, and the reference devices 951-1, 951-2 are placed on the upper surfaces of the protruding concrete 921-1, 921-2 (see page 4 of Non-Patent Document 1).

[0012] After that, the position, height, and inclination of the track slab 931 are adjusted, and CA mortar is filled between the roadbed 911 and the track slab 931. In this adjustment, an error of 1 mm or less is required (see page 9 of Non-Patent Document 1). In other words, this is a process that plays a role in reducing the error between the protruding concrete 921-1, 921-2 created by civil engineering work and the plan (design) of the roadbed 911. In addition, although not described in Non-Patent Document 1, the position, height, and inclination of the track slab 931 are adjusted so that the rail placed on the track slab 931 satisfies the planned rail elevation. The planned rail elevation is information about the rail, including the slope and cant of the rail. Furthermore, there is a standard for the thickness of the CA mortar, which must be satisfied. Therefore, when the position, height, and inclination of the track slab 931 are adjusted to satisfy the planned rail elevation, if the distance between the roadbed 911 and the track slab 931 does not satisfy the standard for the thickness of the CA mortar, repairs such as scraping the roadbed 911 or re-construction of the roadbed 911 will be required.

[0013] On the other hand, the planned rail elevation may be allowed to be corrected taking into account the already completed roadbed 911. If the planned rail elevation can be corrected, repair work involving scraping the roadbed 911 or re-construction of the roadbed 911 can be reduced, and the amount of CA mortar 941 to be injected can be reduced within a range that satisfies the standards. The present invention relates to a rail elevation correction method for correcting the planned rail elevation, a rail elevation correction assist device for assisting in the execution of the rail elevation correction method, and a rail elevation correction assist program.

[0014] Fig. 2 shows an example of the functional configuration of a rail elevation correction assisting device of the present invention. Fig. 3 shows a processing flow of a rail elevation correction method of the present invention. The rail elevation correction method of the present invention is a rail elevation correction method for correcting planned rail elevation, which is information related to the elevation of the rail at the time of planning, on a slab track having a protruding concrete on which a reference instrument is placed, a roadbed, and a track slab placed on the roadbed with mortar interposed therebetween. The rail elevation correction assisting device is a device for assisting in rail elevation correction. The planned rail elevation includes information related to the rail, such as gradient and cant.

[0015] The rail elevation correction auxiliary device 100 includes a point cloud data acquisition unit 120, a plan information acquisition unit 130, a planned roadbed coordinate plane calculation unit 140, a planned difference calculation unit 150, an information correction unit 160, an interval calculation unit 170, and a recording unit 290. The rail elevation correction auxiliary device 100 may further include a point cloud data generation unit 110, an injection mortar amount calculation unit 180, an out-of-tolerance output unit 190, a corrected injection mortar amount calculation unit 200, and a reference device setting value calculation unit 210. The rail elevation correction method includes a point cloud data acquisition step (S120), a plan information acquisition step (S130), a planned roadbed coordinate plane calculation step (S140), a planned difference calculation step (S150), an information correction step (S160), and an interval calculation step (S170, S171). The rail elevation correction method may also include a measurement step (S105), a point cloud data generation step (S110), an injection mortar amount calculation step (S180), an out-of-tolerance output step (S190), a corrected injection mortar amount calculation step (S200), and a reference device setting step (S210).

[0016] The measurement step (S105) and the point cloud data generation step (S110) will be described with reference to Fig. 4. Fig. 4 is a diagram showing the roadbeds and protruding concrete of the up and down lines. Protruding concrete pieces 921-1, ..., 921-8 are formed on roadbed 911 of the down line. Protruding concrete pieces 922-1, ..., 922-8 are formed on roadbed 912 of the up line. The distance between adjacent protruding concrete pieces is generally 5m.

[0017] The measurement step (S105) repeatedly executes the 3D measurement sub-step (S101). In the 3D measurement sub-step (S101), a 3D scanner is placed between two protruding concrete pieces, and measurements are performed to include both the up line and the down line, and to include two protruding concrete pieces in the up direction and two protruding concrete pieces in the down direction from the scanner. In other words, measurements are performed over a range that includes at least eight protruding concrete pieces. For example, a 3D scanner 101-1 is placed between protruding concrete pieces 921-1 and protruding concrete pieces 921-2 on the down line, and measurements are performed over a range 102-1 (S101).

[0018] Then, the position where the 3D scanner is installed is moved to a position on the different side of the up line and the down line, separated by the width of two concrete protrusions, and the measurement is repeated (S104). For example, the 3D scanner 101-2 is placed between the concrete protrusions 922-3 and 922-4 on the up line, and the measurement is performed in the range 102-2. Next, the 3D scanner 101-3 is placed between the concrete protrusions 921-5 and 921-6 on the down line, and the measurement is performed in the range 102-3. Next, the 3D scanner 101-4 is placed between the concrete protrusions 922-7 and 922-8 on the up line, and the measurement is performed in the range 102-4. The measurement of the measurement range can be performed repeatedly in this manner. The measurement result obtained in the 3D measurement sub-step (S101) is a set of points having 3D coordinates, and the relative positional relationship between the points is clear, but the absolute position is not known.

[0019] In the three-dimensional measurement results obtained in the measurement step (S105), adjacent measured ranges measure four common concrete projections. For example, the ranges 102-2 and 102-3 include four common concrete projections 921-4, 921-5, 922-4, and 922-5. Furthermore, a reference instrument is placed on the four concrete projections. Therefore, the three-dimensional measurement results can be combined using clearly identifiable points such as the position of the pin of the reference instrument. Therefore, in the point cloud data generation step (S110), a plurality of measurement results obtained by repeating the three-dimensional measurement sub-step (S101) can be combined based on the position of the pin of the reference instrument included in the measurement results to generate three-dimensional point cloud data. Furthermore, in the areas where the measurement ranges overlap, the areas that could not be measured due to being shaded by the concrete projections or the like can be combined while complementing each other.

[0020] Furthermore, absolute coordinates (e.g., latitude, longitude, altitude, etc.) may be given to each point of the three-dimensional point cloud data by using position information of the pin of the reference instrument, or the position of the pin of the reference instrument may be made identifiable. The pin of the reference instrument when its position can be made identifiable is called a "target". The point cloud data generating unit 110 of the rail elevation correction assisting device 100 receives a plurality of measurement results obtained by repeating the three-dimensional measurement sub-step (S101) and records the measurement results in the recording unit 290. Then, the point cloud data generating unit 110 may generate three-dimensional point cloud data by combining the measurement results based on the positions of the pins of the reference instrument included in the measurement results. Alternatively, the point cloud data generating unit 110 may display the measurement results three-dimensionally on a display to assist a person in combining the measurement results, thereby assisting in the adjustment work.

[0021] In the point cloud data acquisition step (S120), the point cloud data acquisition unit 120 acquires three-dimensional point cloud data indicating the coordinates of the roadbed, and records the data in the recording unit 290. The three-dimensional point cloud data acquired in the point cloud data acquisition step (S120) may be the data generated in the point cloud data generation step (S110).

[0022] In the planning information acquisition step (S130), the planning information acquisition unit 130 acquires information on the planned rail elevation and the datum, and records it in the recording unit 290. The planned rail elevation includes information on the slope and cant of the rail so that absolute coordinates can be derived. If the information on the datum includes absolute coordinates of the positions of the pins of the datum, the absolute coordinates of the positions of the pins of the datum may be used in the point cloud data generation step (S110). Also, if the pins of the datum are simply used as "targets" in the point cloud data generation step (S110), absolute coordinates may be assigned to the targets in the point cloud data acquisition step (S120) or in the planning difference calculation step (S150) described later, and the absolute coordinates of each point of the 3D point cloud data may be calculated based on the absolute coordinates of the targets.

[0023] In the planned roadbed coordinate plane calculation step (S140), the planned roadbed coordinate plane calculation unit 140 obtains the planned roadbed coordinate plane, which is information indicating the coordinates of the plane forming the planned roadbed surface, from the planned rail elevation. Since the planned rail elevation also includes information on gradient and cant, the planned position, height, and inclination of the rail can be known. Therefore, the planned roadbed 911 surface can be obtained by considering the thickness of the track slab 931 and the standard or ideal thickness of the mortar 941 that satisfies the standards. In addition, the thickness of the mortar 941 to be considered may be changed depending on, for example, whether the section is a straight section or a curved section.

[0024] In the planned difference calculation step (S150), the planned difference calculation unit 150 calculates the distance between each point of the three-dimensional point cloud data and the planned roadbed coordinate plane at the corresponding position. In other words, the difference between the actual roadbed 911 and the plan is obtained. FIG. 5 is an example of the output of the distance calculation result of the planned difference calculation unit. The planned roadbed coordinate plane 141 may be divided into a grid and the average value or median value of the distance in each grid may be output. The unit of the numerical values ​​shown in FIG. 5 is, for example, mm. A minus sign indicates that the actual roadbed is lower than the plan. Note that if the distance information shown in FIG. 5 can be obtained by some other method or if the distance information can be predicted, the planned roadbed coordinate plane calculation step (S140) and the planned difference calculation step (S150) may be omitted.

[0025] Here, in the gap calculation step (S171), the gap calculation unit 170 may calculate the gap between the track slab in the case of the planned rail elevation and the roadbed indicated by the 3D point cloud data. The "gap" is a value equivalent to the thickness of the mortar 941. By performing this process, it is possible to confirm the thickness of the mortar 941 in the case where the planned rail elevation is not corrected. The gap calculation result may also be output in a grid-like partition as shown in FIG. 5.

[0026] In the information correction step (S160), the information correction unit 160 acquires correction information for the planned rail elevation, and calculates a corrected rail elevation, which is information obtained by correcting the planned rail elevation based on the correction information. The "correction information" may be, for example, a correction position and correction value desired by a person. Then, the information correction unit 160 may obtain correction values ​​around the correction position so that the input correction can be executed, and calculate the corrected rail elevation.

[0027] In the interval calculation step (S170), the interval calculation unit 170 calculates the interval between the track slab in the case of the corrected rail elevation and the roadbed indicated by the three-dimensional point cloud data. The calculation result of the interval may be output in a grid pattern as shown in FIG. 5. It is possible to check whether the interval satisfies the standard for the thickness of the mortar. In addition, in the corrected plan difference calculation step (S151), the plan difference calculation unit 150 may calculate the distance between each point of the three-dimensional point cloud data and the planned roadbed coordinate plane in the case of the corrected rail elevation at the corresponding position. In steps S170 and S151, the planned roadbed coordinate plane calculation unit 140 may obtain the planned roadbed coordinate plane in the case of the corrected rail elevation as necessary, and then the interval calculation unit 170 and the plan difference calculation unit 150 may perform processing.

[0028] If the rail elevation correction auxiliary device 100 also includes the injection mortar amount calculation unit 180, in the injection mortar amount calculation step (S180), the injection mortar amount calculation unit 180 calculates the amount of mortar to be injected based on the interval information obtained in the interval calculation step (S170 or S171). The cost of slab track construction increases as the amount of CA mortar to be injected increases. When considering the cost of slab track construction, not only the necessity of repair work but also the amount of CA mortar required is important information.

[0029] If the rail elevation correction auxiliary device 100 also includes an unacceptable output unit 190, in the unacceptable output step (S190), if there is a gap among the gaps that falls outside a predetermined allowable range, the unacceptable output unit 190 outputs information about the gap and its position. The position where the mortar thickness is out of standard is a position that requires some kind of repair. Therefore, as the "information about the gap and its position", information such as the position where the repair is required, the content of the repair (such as the thickness to be cut), and the area can be output. From this information, it is possible to easily calculate the cost required for the repair work. Note that if the gap calculation results are output in a grid pattern, the output may be such that the position where the mortar thickness is out of standard is easily recognizable.

[0030] If the rail elevation correction auxiliary device 100 also includes the corrected injection mortar amount calculation unit 200, in the corrected injection mortar amount calculation step (S200), the corrected injection mortar amount calculation unit 200 acquires roadbed repair data, corrects the interval based on the roadbed repair data to calculate a corrected interval, and calculates the amount of mortar to be injected based on the corrected interval information. The "roadbed repair data" may be information output by the unacceptable output unit 190 or information input by a person.

[0031] The information correction step (S160), the interval calculation step (S170), the injection mortar amount calculation step (S180), the out-of-allowance output step (S190), and the corrected injection mortar amount calculation step (S200) may be repeated (S161) until a corrected rail elevation is determined that can sufficiently reduce the cost of slab track construction.

[0032] If the rail elevation correction auxiliary device 100 also includes the reference instrument setting value calculation unit 210, in the reference instrument setting step (S210), the reference instrument setting value calculation unit 210 calculates the setting value for each reference instrument based on the corrected rail elevation, and the reference instrument is set manually. In the work of adjusting the position, height, and inclination of the track slab 931, the pin of the reference instrument is used as a reference point. Since the reference instrument 951 placed on the protruding concrete 921 is adjusted based on the planned rail elevation, this is a process of setting the reference instrument 951 for the corrected rail elevation as necessary.

[0033] According to the rail elevation correction method of the present invention, a desired planned roadbed coordinate plane is determined to realize the planned rail elevation created before slab track construction, and the difference between this and 3D point cloud data measured from the actual roadbed is calculated. The planned rail elevation is then corrected, and the distance between the track slab and the roadbed indicated by the 3D point cloud data is calculated. This correction reduces the amount of repair work and the amount of mortar injected between the roadbed and track slab, making it possible to reduce the cost of slab track construction compared to conventional methods.

[0034] [Programs, recording media] The processing of the above-mentioned rail elevation correction assist device can be carried out by loading a program for executing each step of the above-mentioned method into the recording unit 2020 of the computer 2000 shown in FIG. 6, and operating the control unit 2010, input unit 2030, output unit 2040, display unit 2050, etc.

[0035] The program describing the processing contents can be recorded on a computer-readable recording medium, which may be, for example, a magnetic recording device, an optical disk, a magneto-optical recording medium, a semiconductor memory, or any other type of recording medium.

[0036] The program may be distributed, for example, by selling, transferring, lending, etc. portable recording media such as DVDs and CD-ROMs on which the program is recorded. Furthermore, the program may be distributed by storing the program in a storage device of a server computer and transferring the program from the server computer to other computers via a network.

[0037] A computer that executes such a program, for example, first stores the program recorded on a portable recording medium or the program transferred from a server computer in its own storage device. Then, when executing a process, the computer reads the program stored in its own recording medium and executes a process according to the read program. As another execution form of the program, the computer may directly read the program from the portable recording medium and execute a process according to the program, or may execute a process according to the received program each time a program is transferred from the server computer to the computer. The above-mentioned process may be executed by a so-called ASP (Application Service Provider) type service that realizes a processing function only by issuing an execution instruction and obtaining a result, without transferring a program from the server computer to the computer. Note that the program in this embodiment includes information used for processing by an electronic computer and equivalent to a program (data that is not a direct command to the computer but has a nature that specifies the processing of the computer, etc.).

[0038] In addition, in this embodiment, the present device is configured by executing a specific program on a computer, but at least a part of the processing contents may be realized by hardware. [Explanation of symbols]

[0039] 100 Rail elevation correction auxiliary device 101 3D scanner 102 Range 110 Point cloud data generator 120 Point cloud data acquisition unit 130 Plan information acquisition unit 140 Planned roadbed coordinate plane calculation unit 141 Planned roadbed coordinate plane 150 Plan difference calculation unit 160 Information correction unit 170 Spacing calculation section 180 Injection mortar amount calculation section 190 Out-of-tolerance output unit 200 Corrected injection mortar amount calculation unit 210 Reference instrument setting value calculation section 290 Recording section 911,912 Roadbed 921,922 Protruding concrete 931 Track slab 941 Mortar 951 Reference device

Claims

1. 1. A rail elevation correction method for correcting a planned rail elevation, which is information related to a rail elevation at the time of planning, on a slab track having a protruding concrete on which a datum is arranged, a roadbed, and a track slab placed on the roadbed with mortar therebetween, comprising: The planned rail elevation also includes information on the slope and cant of the rail, A point cloud data acquisition step of acquiring three-dimensional point cloud data indicating coordinates of a roadbed; a plan information acquisition step of acquiring information about the planned rail altitude; an information correcting step of acquiring correction information of the planned rail elevation, and calculating a corrected rail elevation, which is information obtained by correcting the planned rail elevation based on the correction information; a distance calculation step of calculating a distance between a track slab in the case of the planned rail elevation or a track slab in the case of the corrected rail elevation and a roadbed indicated by the three-dimensional point cloud data; A rail elevation correction method comprising:

2. 2. A rail altitude correction method according to claim 1, comprising the steps of: A planned roadbed coordinate plane calculation step of calculating a planned roadbed coordinate plane, which is information indicating the coordinates of a plane forming a planned roadbed surface, from the planned rail elevation; A planned difference calculation step of calculating a distance between each point of the three-dimensional point cloud data and the planned roadbed coordinate plane at a corresponding position. A rail elevation correction method also includes:

3. 3. The rail altitude correction method according to claim 1, further comprising the steps of: A step of calculating the amount of mortar to be injected based on the information on the interval. A rail elevation correction method also includes:

4. 3. The rail altitude correction method according to claim 1, further comprising the steps of: an unacceptable output step of outputting information about an interval and its position when the interval is outside a predetermined acceptable range; A rail elevation correction method also includes:

5. 5. A rail altitude correction method according to claim 4, comprising the steps of: a step of calculating a corrected injection mortar amount, which includes acquiring roadbed repair data, correcting the interval based on the roadbed repair data to calculate a corrected interval, and calculating an amount of mortar to be injected based on information on the corrected interval; A rail elevation correction method also includes:

6. 3. The rail altitude correction method according to claim 1, further comprising the steps of: In the plan information acquisition step, information regarding the reference device is also acquired; A reference instrument setting step of determining a setting value for each reference instrument based on the corrected rail elevation and setting the reference instrument. A rail elevation correction method also includes:

7. 3. The rail altitude correction method according to claim 1, further comprising the steps of: a measurement step in which a three-dimensional scanner is installed between the two protruding concrete pieces, and a three-dimensional measurement sub-step is performed to measure both the up line and the down line, and to measure two protruding concrete pieces in the up line and two protruding concrete pieces in the down line from the scanner, by moving the position where the three-dimensional scanner is installed to a position on the different side of the up line and the down line, and separated by the distance of two protruding concrete pieces; a point cloud data generation step of combining a plurality of measurement results obtained by repeating the three-dimensional measurement sub-step based on the positions of the pins of the reference device included in the measurement results, and generating the three-dimensional point cloud data; Also has The three-dimensional point cloud data acquired in the point cloud data acquisition step is generated in the point cloud data generation step. A method for correcting rail elevation.

8. A rail elevation correction assistance device for assisting in correction of planned rail elevation, which is information relating to the elevation of a rail at the time of planning, on a slab track having a protruding concrete on which a datum is arranged, a roadbed, and a track slab placed on the roadbed with mortar therebetween, comprising: The planned rail elevation also includes information on the slope and cant of the rail, A point cloud data acquisition unit that acquires three-dimensional point cloud data indicating coordinates of a roadbed; a plan information acquisition unit that acquires information related to the planned rail altitude; an information correcting unit that obtains correction information of the planned rail elevation and calculates a corrected rail elevation, which is information obtained by correcting the planned rail elevation based on the correction information; a distance calculation unit that calculates a distance between a track slab in the case of the planned rail elevation or a track slab in the case of the corrected rail elevation and a roadbed indicated by the three-dimensional point cloud data; A rail elevation correction auxiliary device.

9. 9. The rail altitude correction assisting device according to claim 8, A planned roadbed coordinate plane calculation unit that calculates a planned roadbed coordinate plane, which is information indicating the coordinates of a plane that forms a planned roadbed surface, from the planned rail elevation; A plan difference calculation unit that calculates the distance between each point of the three-dimensional point cloud data and the planned roadbed coordinate plane at a corresponding position Also equipped with a rail elevation correction auxiliary device.

10. 9. The rail altitude correction assisting device according to claim 8, An injection mortar amount calculation unit that calculates the amount of mortar to be injected based on the information on the interval. Also equipped with a rail elevation correction auxiliary device.

11. 9. The rail altitude correction assisting device according to claim 8, an unacceptable output unit that outputs information about an interval and its position when the interval is outside a predetermined acceptable range; Also equipped with a rail elevation correction auxiliary device.

12. The rail altitude correction assisting device according to claim 11, a corrected injection mortar amount calculation unit that acquires roadbed repair data, corrects the interval based on the roadbed repair data to calculate a corrected interval, and calculates an amount of mortar to be injected based on information on the corrected interval; Also equipped with a rail elevation correction auxiliary device.

13. 9. The rail altitude correction assisting device according to claim 8, The plan information acquisition unit acquires information regarding the reference device, A reference instrument setting value calculation unit that calculates a setting value for each reference instrument based on the corrected rail elevation Also equipped with a rail elevation correction auxiliary device.

14. A rail altitude correction assistance program for causing a computer to function as the rail altitude correction assistance device according to any one of claims 8 to 13.

Citation Information

Patent Citations

  • Method for planning and computing vertical section alignment of slab track

    JP2004333140A

  • Track roadbed measuring system

    JP2019210677A