Liquefaction countermeasure structure and construction method
The liquefaction countermeasure structure efficiently addresses the inefficiencies of similar liquefaction prevention structures for attached buildings by sharing construction elements with the main building, achieving cost-effective and enhanced liquefaction suppression.
Patent Information
- Application Number
- JP2023076811
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2024-11-20
AI Technical Summary
Existing liquefaction prevention structures for smaller attached buildings next to larger main buildings require excessive construction effort and cost due to similar specifications, leading to inefficiencies.
A liquefaction countermeasure structure that shares a ground restraint part with the main building's ground improvement part, using a ground restraint section with an underground wall and a buffer body to support the attached building, reducing construction effort and cost.
The structure effectively suppresses liquefaction by sharing construction elements, reducing labor and costs while enhancing the supporting capacity and liquefaction prevention for the attached building.
Smart Images

Figure 2024161788000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a liquefaction-resistant structure and a construction method thereof. [Background technology]
[0002] As liquefaction countermeasures for suppressing ground liquefaction during an earthquake, those described in Patent Documents 1 and 2, for example, are known. The liquefaction prevention method in Patent Document 1 involves forming an underground perimeter wall that surrounds the building in the ground that supports the building, and placing a counterweight on the ground inside the underground perimeter wall. The ground is constrained by the counterweight and the weight of the building, which tightens the ground and prevents liquefaction. The liquefaction prevention structure of Patent Document 2 includes a diaphragm wall formed in a lattice shape when viewed from above, a structure constructed above the diaphragm wall, and a buffer body interposed between the diaphragm wall and the structure. The rigidity of the buffer body is set to be smaller than the rigidity of the ground directly below the structure, reducing the vertical load of the structure acting on the diaphragm wall and increasing the vertical load acting on the ground directly below. As a result, even though the diaphragm wall that suppresses shear deformation is located below the structure, it is expected that the vertical load of the structure will have a restraining effect on the ground. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2009-7894 A [Patent Document 2] JP 2011-190645 A Summary of the Invention [Problem to be solved by the invention]
[0004] Incidentally, there are cases where an annex building such as a multi-storey car park is constructed next to a large building (main building), but the annex building is often smaller in scale than the main building. In such cases, if the liquefaction countermeasures of the annex building are made to the same specifications as those of the main building, the performance will be excessive, resulting in additional construction work and costs. From this perspective, an objective of the present invention is to provide a liquefaction prevention structure and construction method that can provide efficient liquefaction prevention measures that can reduce construction work and costs. [Means for solving the problem]
[0005] The first invention to solve such problems is a liquefaction prevention structure for suppressing liquefaction of an accessory ground supporting an accessory building adjacent to a main building, comprising a ground improvement section provided below the main building and a ground restraint section for restraining the outer edge of the accessory ground. A part of the ground restraint section is a portion of the ground improvement section that contacts the accessory ground. According to the liquefaction prevention structure of the present invention, part of the ground restraint section of the annex building is shared with part of the ground improvement section of the main building, thereby reducing the construction effort and cost of the ground restraint section. In the liquefaction countermeasure structure of the present invention, the ground restraint section includes a diaphragm wall formed in the ancillary ground, and the diaphragm wall is preferably arranged so that the load of the ancillary building is transmitted to the ancillary ground without the ancillary building being directly supported by the diaphragm wall. With this configuration, it is possible to expect a liquefaction suppression effect due to the suppression of shear deformation of the ancillary ground by the diaphragm wall and an increase in the effective stress of the ancillary ground due to the load of the ancillary building, and to strengthen the bearing capacity of the ancillary ground.
[0006] In the liquefaction countermeasure structure of the present invention, the ground restraint section further includes a buffer body interposed between the diaphragm wall and the annex building, and the rigidity or strength of the buffer body is preferably smaller than the rigidity or strength of the annex ground. According to this configuration, by arranging a buffer body that is more easily deformed than the ground, the vertical load acting on the diaphragm wall (load caused by the weight of the building) is reduced and the vertical load acting on the ground directly below the building (ground located in the area surrounded by the diaphragm wall) is increased compared to when the structure is directly supported by the diaphragm wall, so that the ground restraint effect due to the weight of the building can be expected even if the diaphragm wall that suppresses shear deformation is arranged below the structure. In the liquefaction countermeasure structure of the present invention, it is preferable that the diaphragm walls are arranged in a lattice pattern in a plan view. With such a configuration, it is possible to further enhance the liquefaction suppression effect by the diaphragm walls suppressing shear deformation of the attached ground and by increasing the effective stress of the attached ground due to the load of the attached building, and also to further strengthen the bearing capacity of the attached ground. In the liquefaction prevention structure of the present invention, it is preferable that a reinforcing section is formed at the connection between the underground wall formed in the annex ground and the ground improvement section provided below the main building. With this configuration, even if a difference in the amount of ground subsidence occurs due to the difference in weight between the main building and the annex building, it is possible to counter the shear force generated at the connection. In the liquefaction countermeasure structure of the present invention, the ground improvement section provided below the main building is a fully improved body obtained by improving the entire surface of the ground below the main building, and it is preferable that a part of the ground restraint section is a surface of the outer periphery of the fully improved body that contacts the auxiliary ground. With this configuration, the side surface of the fully improved body can be used as a part of the ground restraint section.
[0007] The second invention for solving the above-mentioned problem is a construction method for constructing a building on a liquefaction-resistant structure, characterized in that it comprises a main building construction process for constructing the main building, a ground leveling process for leveling the annexed ground that has sloped due to subsidence of the main ground below the main building after the main building has been constructed at least up to the ridgepole, and an annexed building construction process for constructing an annexed building on the leveled annexed ground. According to the construction method of the present invention, the annex building can be constructed after flattening the annex ground that has become tilted due to subsidence caused by the weight of the main building, thereby reducing the construction labor and costs involved in constructing the annex building. Effect of the Invention
[0008] According to the liquefaction countermeasure structure and construction method of the present invention, construction work and costs can be reduced, and efficient liquefaction countermeasures can be implemented. [Brief description of the drawings]
[0009] [Figure 1] 1A and 1B are diagrams showing a liquefaction countermeasure structure according to a first embodiment of the present invention, in which (a) is an overall plan view and (b) is an enlarged plan view of a main portion. [Diagram 2] FIG. 1 is a diagram for explaining a construction method according to a first embodiment of the present invention, where (a) is a cross-sectional view showing the main building construction process, (b) is a cross-sectional view showing the ground leveling process, and (c) is a cross-sectional view showing the annex building construction process. [Diagram 3] 1 is a mesh model for analysis by a three-dimensional finite element method of a liquefaction prevention structure according to a first embodiment of the present invention. [Figure 4] This is a diagram showing the vertical load due to the building's own weight. [Diagram 5] (a) is a contour map of the amount of subsidence when the main building is constructed first, and (b) is a contour map of the amount of subsidence when the annex building is constructed after the annex ground is leveled. [Figure 6] (a) is a contour diagram of the overburden pressure on the ground when the main building is constructed first, and (b) is a contour diagram of the overburden pressure on the ground when the annex building is constructed after the annex ground is leveled. [Figure 7](a) is a contour diagram of the maximum shear stress in the diaphragm wall when the main building is erected first, and (b) is a contour diagram of the maximum shear stress in the diaphragm wall when the annex building is constructed after the annex ground is leveled. [Figure 8] (a) is a plan view showing the reinforcement part of the connection between the underground wall formed in the annex ground and the ground improvement part installed below the main building, and (b) is a plan view showing the reinforcement part for a modified example. [Figure 9] 1A and 1B are diagrams showing a liquefaction-resistant structure according to a second embodiment of the present invention, in which (a) is an overall plan view and (b) is a cross-sectional view. [Figure 10] 13A and 13B are diagrams showing a liquefaction-prevention structure according to a third embodiment of the present invention, in which (a) is an overall plan view and (b) is a cross-sectional view. [Figure 11] 13A and 13B are diagrams showing a liquefaction countermeasure structure according to a fourth embodiment of the present invention, in which (a) is an overall plan view and (b) is a cross-sectional view. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] The liquefaction prevention structure and construction method according to the first embodiment of the present invention will be described with reference to the attached drawings. In this embodiment, a liquefaction prevention structure and construction method will be described with reference to the attached drawings. In this embodiment, a main building and an annex building are constructed adjacent to each other, and the main building is supported by a ground improvement section formed in a lattice pattern. Figure 1 shows a liquefaction countermeasure structure relating to the first embodiment, where (a) is an overall plan view and (b) is an enlarged plan view of the main parts. Figure 2 is a view for explaining the construction method, where (a) is a cross-sectional view showing the liquefaction countermeasure structure construction process, (b) is a cross-sectional view showing the main building construction process and the ground leveling process, and (c) is a cross-sectional view showing the annex building construction process.
[0011] As shown in Figures 1 and 2, the liquefaction countermeasure structure 1 according to the first embodiment is intended to suppress liquefaction of an accessory ground 5 supporting an accessory building 3 (see Figure 2) adjacent to a main building 2 (see Figure 2). The liquefaction countermeasure structure 1 comprises a ground improvement section 10 provided below the main building 2, and a ground restraint section 20 that restrains the outer peripheral edge of the accessory ground 5.
[0012] The main building 2 is a building with a large floor area, a heavy weight, and a strict tolerance for tilt, such as an office building, a tenant building, an apartment building, etc. The main building 2 in this embodiment has an L-shape in plan view. The annex building 3 is a building constructed adjacent to the main building 2. The annex building 3 is a building, such as a multi-storey car park or a warehouse, that is lighter in weight and has a lower tolerance for tilt compared to the main building 2. The annex building 3 in this embodiment is located in a recessed portion of the main building 2, which is L-shaped in plan view.
[0013] The ground improvement section 10 is constructed by improving the main ground 4 that supports the main building 2. The ground improvement section 10 of this embodiment is a ground improvement body formed in a lattice shape in a plan view inside the main ground 4. The ground improvement body is formed by mixing and stirring a cement-based solidification material and solidifying it inside the main ground 4. Specifically, the ground improvement section 10 includes a peripheral wall 11 that surrounds the peripheral portion of the main ground 4, and an inner wall 12 that divides the inside of the peripheral wall 11 into a lattice shape. The ground improvement section 10 suppresses horizontal displacement of the ground and prevents liquefaction by surrounding liquefiable ground with a lattice-shaped ground improvement body.
[0014] The ground restraint section 20 is a section that restrains the outer peripheral edge of the annex ground 5, and is formed so as to surround from the outside the construction position of the annex building 3. The ground restraint section 20 comprises an outer underground wall 21 and an inner shared wall 22. The outer diaphragm wall 21 is an underground wall located outside the peripheral part of the main building 2 (the peripheral part of the main ground 4) within the outer periphery of the annex building 3, and is formed separately from the ground improvement section 10. In other words, the outer diaphragm wall 21 is an underground wall that does not contact the main ground 4. The outer diaphragm wall 21 of this embodiment has an L-shape in plan view that is convex outward. The inner shared wall 22 is an underground wall located on the boundary between the main building 2 and the annex building 3 (the boundary between the main ground 4 and the annex ground 5), and is a wall shared with the ground improvement section 10. In other words, a part of the ground restraint section 20 (the inner shared wall 22) is shared at the portion of the ground improvement section 10 that contacts the annex ground 5 (a part of the peripheral wall 11). The inner shared wall 22 has an L-shape in plan view that is concave toward the inside (the main building 2 side).
[0015] The outer diaphragm wall 21 and the inner common wall 22 are continuous walls with low water permeability, and the lower end of the continuous wall is embedded in the non-liquefied layer 7 below the liquefied ground 6 that is likely to liquefy (see FIG. 2(a)). The continuous wall may be constructed by various continuous wall construction methods (e.g., column-type continuous wall construction method, constant thickness continuous wall construction method, steel continuous wall construction method, etc.) using concrete, mortar, soil cement, sheet piles, steel pipes, H-beams, etc. as components. In this embodiment, the outer diaphragm wall 21 and the inner common wall 22 are formed by connecting vertically extending cylindrical parts 23 in parallel in the horizontal direction (see FIG. 1(b)). The peripheral wall 11 and the inner wall 12 of the ground improvement section 10 are also configured in the same manner as the outer diaphragm wall 21 and the inner common wall 22. The ground restraint section 20 supports the weight of the annex building 3 on the surrounding annex ground 5, and thereby provides a liquefaction suppression effect by increasing the confining pressure of the annex ground 5 due to the weight of the building.
[0016] Next, a construction method according to this embodiment will be described with reference to Fig. 2. The construction method according to this embodiment is a method for constructing a building on the liquefaction countermeasure structure 1 having the above-mentioned configuration. The construction method includes a liquefaction countermeasure structure construction process, a main building construction process, a subsidence process, a ground leveling process, and an annex building construction process.
[0017] The liquefaction countermeasure structure construction process is a process of constructing a liquefaction countermeasure structure 1. In the liquefaction countermeasure structure construction process, as shown in (a) of Fig. 2, a ground improvement section 10 is formed in the main ground 4, and a ground restraint section 20 is formed in the auxiliary ground 5. The main building construction process is a process for constructing the main building 2. In the main building construction process, as shown in Fig. 2(b), the main building 2 is constructed on top of the ground improvement section 10 formed in the main ground 4 of the liquefaction countermeasure structure 1. As the main building 2 is constructed, its weight increases, causing the main ground 4 to sink. The ground leveling process is a process of leveling the accessory ground 5 that has been inclined due to the subsidence of the main ground 4. In the ground leveling process, after the main building 2 is constructed at least up to the ridgepole, the surface of the accessory ground 5 is leveled to form a leveled surface 27. The annex building construction process is a process of constructing the annex building 3. In the annex building construction process, as shown in (c) of FIG. 2, the annex building 3 is constructed on the leveled and flat ground 27 (the surface of the annex ground 5).
[0018] Figure 3 is a mesh model of a liquefaction prevention structure analyzed using the three-dimensional finite element method, Figure 4 is a diagram showing the vertical load due to the building's own weight, Figure 5 (a) is a contour map of the amount of subsidence when the main building is put up first, and (b) is a contour map of the amount of subsidence when the annex building is constructed after the annex ground is leveled, Figure 6 (a) is a contour map of the overburden pressure on the ground when the main building is put up first, and (b) is a contour map of the overburden pressure on the ground when the annex building is constructed after the annex ground is leveled, Figure 7 (a) is a contour map of the maximum shear stress in the underground wall when the main building is put up first, and (b) is a contour map of the maximum shear stress in the underground wall when the annex building is constructed after the annex ground is leveled.
[0019] The results of an analysis of ground subsidence when the building's own weight acts on it will be explained with reference to Figs. 3 to 8. As shown in Fig. 3, in this analysis, the main ground 4, ground improvement section 10, auxiliary ground 5 and ground restraint section 20 are modeled using three-dimensional solid elements. Shell elements simulating foundations are arranged on the top of the ground improvement section 10 on the main building 2 side and on the auxiliary ground 5 surrounded by the ground restraint section 20 on the auxiliary building 3 side. As shown in Fig. 4, the vertical load due to the building's own weight is applied as a distributed load from the top surface of the foundation. Specifically, on the main building 2 side, a load of approximately 600 kN / m is applied to the ground improvement section 10. 2 On the side of the annex building 3, the attached ground 5 surrounded by the ground restraint section 20 is subjected to a load of approximately 60 kN / m 2 A load of 100 mm is applied.
[0020] First, the amount of settlement due to the building's own weight will be explained. As shown in Figure 5(a), in the case where the main building 2 is raised first, before the construction of the annex building 3, settlement occurs due to the weight of the main building 2. Specifically, near the center of the ground improvement section 10, settlement of approximately 1.8 cm has occurred. Within the area of the annex building 3, settlement and tilt have been observed in the areas close to the main building 2, particularly in the lower left part of the annex ground 5 in the figure, due to the influence of the weight of the main building 2. The amount of settlement of the annex ground 5 is smaller than the amount of settlement of the annex ground 5 when the main building 2 and annex building 3 are constructed simultaneously (not shown). Figure 5(b) shows the amount of subsidence when the accessory building 3 was constructed after the accessory ground 5 was leveled. The amount of subsidence in Figure 5(b) is based on the ground level of the accessory ground 5 after the main building 2 was raised. The amount of subsidence of the accessory ground 5 is about 0.6 cm in the center and about 0.2 cm on the periphery. This amount of subsidence is smaller than the amount of subsidence of the accessory ground 5 when the main building 2 and accessory building 3 are constructed simultaneously (not shown), and the slope is also significantly reduced.
[0021] Next, the overburden pressure acting on the ground will be explained. As shown in Fig. 6(a), when the main building 2 is constructed first and before the construction of the annex building 3, no overburden pressure is applied to the annex ground 5. On the other hand, as shown in Fig. 6(b), after the annex building 3 is constructed, the annex ground 5 is subjected to a overburden pressure of 30 to 60 kN / m 2 Although not shown in the figure, when the main building 2 and the annex building 3 are constructed simultaneously, the overburden pressure in the annex ground 5 is high in some areas and extremely low in others due to the influence of the slope. In areas where the overburden pressure is low, the liquefaction prevention effect is weakened.
[0022] Next, the maximum shear stress of the ground improvement section 10 and the ground restraint section 20 will be described. As shown in Fig. 7, it can be seen that the shear stress is locally large at the boundary between the main building 2 and the annex building 3 (the connection section 25 of the ground restraint section 20 to the ground improvement section 10). When the main building 2 is put up first, and before the construction of the annex building 3, as shown in Fig. 7(a), the shear stress of the connection section 25 is the largest, at 311.5 kN / m2 After construction of the annex 3, as shown in FIG. 7(b), the shear stress of the joint 25 was the largest, at 308.9 kN / m 2 The maximum shear stress is smaller after the construction of the annex 3 than before. In addition, although not shown in the figure, when the main building 2 and the annex 3 are constructed simultaneously, the shear stress of the connection is the largest, at 332.5 kN / m 2 The maximum shear stress is greater than when the annex building 3 is constructed after the main building 2.
[0023] In places where the maximum shear stress is large, it is possible to deal with this by reinforcing the diaphragm wall. The structure for reinforcing the diaphragm wall is explained below. Figure 8 (a) is a plan view showing the reinforcement part of the connection part between the diaphragm wall formed in the auxiliary ground and the ground improvement part installed under the main building, and (b) is a plan view showing the reinforcement part according to a modified example.
[0024] As shown in FIG. 8(a), the structure reinforcing the underground wall is formed at a connection portion 25 (end portion of the outer underground wall 21) between the outer underground wall 21 of the ground restraint portion 20 and the ground improvement portion 10. The reinforcing portion 26 reinforcing the connection portion 25 has multiple rows (two rows in this embodiment) of cylindrical portions 23 arranged, and has a thick wall thickness. The cylindrical portions 23 are additionally arranged inside the cylindrical portions 23 at the end portion of the outer underground wall 21. With this configuration, the reinforcing portion 26 with a thicker wall thickness can resist shear stress and reduce the shear stress. 8(b), the reinforcing portion 26 according to the modified example has two rows of cylindrical portions 23, 23 arranged to sandwich the central axis of the outer underground wall 21. With this configuration, the reinforcing portion 26 with its increased wall thickness can resist the shear stress in a balanced manner, and the shear stress can be further reduced. The location where the cylindrical portion 23 is added is not limited to the above configuration. When the shear stress is large, the cylindrical portion 23 may be further added and arranged to extend toward the ground improvement portion 10.
[0025] The effects of the liquefaction countermeasure structure 1 and construction method of this embodiment will be described below. According to this liquefaction countermeasure structure 1, the inner common wall 22, which is part of the ground restraint section 20, is shared with part of the peripheral wall 11 of the ground improvement section 10 (the peripheral wall 11 facing the attached ground 5), so construction of the inner common wall 22 can be omitted. In other words, the construction work and cost of the ground restraint section 20 can be reduced. In addition, a reinforcing section 26 is formed at the connection section 25 between the outer underground wall 21 of the ground restraint section 20 and the ground improvement section 10, so that even if a difference in the amount of ground subsidence occurs due to the difference in weight between the main building 2 and the annex building 3, it is possible to resist the shear stress generated at the connection section 25.
[0026] According to the construction method of this embodiment, after construction of at least the upper ridge of the main building 2, the annex ground 5 is leveled and the annex building 3 is constructed, so that the annex building 3 can be constructed in a flat state on the annex ground 5 that has tilted due to ground subsidence caused by the weight of the main building 2. This allows the annex building 3 to be constructed in a stable state, reducing the construction effort and costs. Moreover, according to the construction method, the amount of settlement of the attached ground 5 can be reduced. Furthermore, since the overburden pressure of the attached ground 5 can be distributed in a well-balanced manner so that it is large in the center and small in the peripheral areas, the overburden pressure does not become extremely small locally. This makes it possible to efficiently obtain the liquefaction suppression effect over the entire attached ground 5. Furthermore, since the shear stress acting on the connection part 25 between the outer underground wall 21 of the ground restraint part 20 and the ground improvement part 10 can be reduced, the structure of the reinforcement part 26 does not need to be made large-scale.
[0027] Next, a liquefaction countermeasure structure according to a second embodiment of the present invention will be described with reference to FIG. FIG. 9 shows a liquefaction-resistant structure according to the second embodiment, where (a) is an overall plan view and (b) is a cross-sectional view. The liquefaction countermeasure structure 1a of the second embodiment differs from the first embodiment in the configuration of the ground improvement section 10a. The ground improvement section 10a is a full-surface improved body 15 in which the entire surface of the main ground 4 below the main building 2 has been improved. The full-surface improved body 15 is an improved body formed in a block shape at a predetermined depth over the entire surface of the main ground 4. The ground restraint section 20 comprises an outer diaphragm wall 21 and an inner common wall 22. The outer diaphragm wall 21 has the same configuration as in the first embodiment, so it is given the same reference numeral and its explanation is omitted. The inner common wall 22 is formed by the side surface 16 of the outer peripheral surface of the full-surface improved body 15 that contacts the attached ground 5. According to the liquefaction countermeasure structure 1a of the second embodiment, as in the first embodiment, construction of the inner common wall 22 can be omitted. Therefore, the construction work and cost of the ground restraint portion 20 can be reduced.
[0028] A liquefaction countermeasure structure according to a third embodiment of the present invention will be described with reference to FIG. FIG. 10 shows a liquefaction-resistant structure according to a third embodiment of the present invention, where (a) is an overall plan view and (b) is a cross-sectional view. The liquefaction countermeasure structure 1b of the third embodiment differs from the first embodiment in the configuration of the ground restraint section 20b. The ground restraint section 20b includes an outer diaphragm wall 21, an inner common wall 22, a diaphragm wall 30, and a buffer body 31. The outer diaphragm wall 21 and the inner common wall 22 have the same configuration as in the first embodiment, so they are denoted by the same reference numerals and their explanations are omitted. The diaphragm wall 30 is disposed inside the outer diaphragm wall 21 and the inner shared wall 22. The diaphragm wall 30 has a lattice shape (a cross shape in this embodiment) in a plan view, and divides the attached ground 5 surrounded by the outer diaphragm wall 21 and the inner shared wall 22. The diaphragm wall 30 is disposed so that the load of the attached building 3 is transmitted to the attached ground 5 without the attached building 3 being directly supported by the diaphragm wall 30. Specifically, the upper end of the diaphragm wall 30 is formed at a position lower than the lower end of the foundation of the attached ground 5, and a clearance is formed between the diaphragm wall 30 and the attached ground 5.
[0029] The buffer body 31 is disposed for the purpose of mitigating the vertical load acting on the underground wall 30 (the load caused by the weight of the annex building 3), and is interposed between the underground wall 30 and the annex building 3. The buffer body 31 is buried in the surface layer of the annex ground 5, and the upper surface of the buffer body 31 is flush with the surface of the annex ground 5. The buffer body 31 may be disposed over the entire upper end surface of the underground wall 30 so as to form a lattice pattern in a plan view, or may be molded into blocks and dotted at appropriate locations on the upper end surface of the underground wall 30. The rigidity or strength of the buffer 31 is smaller than that of the attached ground 5. There are no restrictions on the material of the buffer 31, but for example, polystyrene foam or urethane foam, which have a smaller elastic modulus than the attached ground 5, can be used as the buffer 31. When using a material (wood, steel, etc.) with a larger elastic modulus than the attached ground 5, it is sufficient to adopt a structure or shape that is easier to deform than the attached ground 5, such as forming it into a box shape with a cavity inside.
[0030] The liquefaction countermeasure structure 1b of the third embodiment provides the same effects as those of the first embodiment, and further provides the following effects. In the liquefaction countermeasure structure 1b, the buffer body 31, which is more easily deformed than the attached ground 5, is arranged, so that the vertical load acting on the diaphragm wall 30 is reduced and the vertical load acting on the attached ground 5 directly below the attached building 3 is increased, compared to when the annex building 3 is directly supported by the diaphragm wall 30. As a result, even though the diaphragm wall 30 that suppresses shear deformation is arranged below the annex building 3, the weight of the annex building 3 can be expected to have a restraining effect on the attached ground 5. That is, according to the liquefaction countermeasure structure 1b of the third embodiment, the initial effective stress of the attached ground 5 is increased by the weight of the annex building 3, and further, the diaphragm wall 30 suppresses the shear deformation of the attached ground 5, so that the liquefaction suppression effect is further increased. Furthermore, the bearing capacity of the attached ground 5 can be strengthened.
[0031] A liquefaction countermeasure structure according to a fourth embodiment of the present invention will be described with reference to FIG. FIG. 11 shows a liquefaction-resistant structure according to a fourth embodiment of the present invention, where (a) is an overall plan view and (b) is a sectional view. The liquefaction countermeasure structure 1c of the fourth embodiment differs from the first embodiment in the configuration of the ground restraint section 20c. The ground restraint section 20c includes an outer diaphragm wall 21 and an inner common wall 22. The inner common wall 22 has the same configuration as in the first embodiment, so it is given the same reference numeral and its explanation is omitted. The outer diaphragm wall 21 is composed of a steel sheet pile 33. The steel sheet pile 33 is driven to a predetermined depth in a position covering the outside of the attached ground 5. According to the liquefaction countermeasure structure 1c of the fourth embodiment, the same effects as those of the first embodiment can be obtained, and in addition, the effect of being able to further reduce the construction work and costs of the outer underground wall 21 can be obtained.
[0032] The above describes the embodiment for carrying out the present invention, but the present invention is not limited to the above embodiment, and appropriate design changes are possible within the scope of the present invention. For example, the shape and combination of the ground improvement section 10 and the ground restraint section 20 are not limited to the above embodiment. For example, the ground improvement section 10a formed of the full-surface improvement body 15 may be combined with the ground restraint section 20b having the underground wall 30 and the buffer body 31, or the ground improvement section 10a may be combined with the ground restraint section 20c having the outer underground wall 21 formed of the steel sheet pile 33. In the above embodiment, both the outer diaphragm wall 21 and the inner shared wall 22 are L-shaped, but this is not limited thereto. For example, if the inner shared wall is concavely U-shaped in plan view, the outer diaphragm wall may be straight. If the inner shared wall is straight, the outer diaphragm wall may be U-shaped in plan view so as to surround the annex ground that supports the annex. The shapes of the outer diaphragm wall and the inner shared wall may be changed as appropriate depending on the outer peripheral shape of the annex. [Explanation of symbols]
[0033] 1 Liquefaction prevention structure 2. Main Building 3. Annex buildings 5 Attached ground 10 Ground Improvement Department 20 Ground restraint part 21 Exterior underground wall 22 Inner common wall 25 Connection 26 Reinforcement 1a Liquefaction prevention structure 10a Ground improvement department 15 Completely improved body 1b Liquefaction prevention structure 20b Ground restraint part 30 underground wall 31 Buffer 1c Liquefaction prevention structure 20c Ground restraint part 33 Steel sheet pile
Claims
1. A liquefaction prevention structure for suppressing liquefaction of the auxiliary ground supporting the auxiliary building adjacent to the main building, The structure includes a ground improvement section provided below the main building and a ground restraint section that restrains the outer periphery of the auxiliary ground, A part of the ground restraint portion is a portion of the ground improvement portion that contacts the auxiliary ground. A liquefaction prevention structure characterized by the above.
2. The ground restraint section includes a diaphragm wall formed in the auxiliary ground, The diaphragm wall is disposed so that the load of the annex building is transferred to the annex ground without the annex building being directly supported by the diaphragm wall.
2. A liquefaction prevention structure according to claim 1.
3. The ground restraint section further includes a buffer body interposed between the underground wall and the annex, The stiffness or strength of the buffer body is less than the stiffness or strength of the auxiliary ground.
3. A liquefaction prevention structure according to claim 2.
4. The underground walls are arranged in a lattice pattern in a plan view.
3. A liquefaction prevention structure according to claim 2.
5. A reinforcement portion is formed at the connection portion between the underground wall formed in the auxiliary ground and the ground improvement portion provided below the main building.
3. A liquefaction prevention structure according to claim 2.
6. The ground improvement section provided below the main building is a full-surface improvement body obtained by improving the entire surface of the ground below the main building, A part of the ground restraint portion is a surface of the outer periphery of the full improvement body that contacts the attached ground. A liquefaction prevention structure according to any one of claims 1 to 5.
7. A method for constructing a building on the liquefaction-resistant structure according to claim 1, comprising the steps of: A main building construction process for constructing a main building; a leveling process for leveling the annex ground that has become inclined due to the subsidence of the main ground below the main building after constructing the main building at least up to the ridgepole; and an annex building construction step of constructing an annex building on the leveled annex ground. A method of construction comprising:
Citation Information
Patent Citations
Ground liquefaction preventing method, liquefaction registant ground, and building base part structure
JP2009007894A
Structure for liquefaction countermeasure
JP2011190645A