Lifting takeover device, moving device, lifting takeover method, and moving method
The hoisting transfer device facilitates the movement of slabs using a temporary support girder and transfer equipment, eliminating the need for crane inspections and reducing the operational burden on businesses.
Patent Information
- Application Number
- JP2023077874
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-21
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The use of cranes for moving floor slabs in construction projects imposes a significant regulatory burden on businesses due to mandatory inspections, and there is a need for an alternative method that reduces this burden.
A hoisting transfer device comprising a temporary support girder, lifting and lowering equipment, and transfer equipment that allows for the movement of slabs without cranes, utilizing a combination of mechanical and manual lifting methods.
Enables the movement of slabs without the need for crane inspections, thereby reducing the operational burden on businesses.
Smart Images

Figure 2024162403000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a lifting and taking over device, a moving device, a lifting and taking over method, and a moving method used in construction work. [Background technology]
[0002] In recent years, construction infrastructure such as bridges and tunnels, which were developed intensively during the period of high economic growth, has been aging, and there is a need for maintenance and management of infrastructure that ensures safety and security.
[0003] For example, the decks of road bridges over which vehicles travel can suffer a lot of damage due to factors such as the spraying of de-icing agents and the effects of increased traffic loads, and if left untreated there is a risk of them falling out, so deck renewal work is required at such sites.
[0004] In deck renewal work, the existing deck is removed and a new deck is installed in its place. Conventionally, the existing deck and the new deck have been moved using a crane or the like (Patent Document 1). [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Japanese Patent Application Publication No. 6-306819 Summary of the Invention [Problem to be solved by the invention]
[0006] Incidentally, when using a crane to move decks, it is mandatory to undergo an inspection to see if it complies with the prescribed regulations. In this case, a "crane" refers to a mechanical device that uses power to lift a load and transport it horizontally, either stationary or movable within a limited area (see "Safety Regulations for Cranes, etc.").
[0007] "Power" refers to the energy required to operate a machine, such as electricity or air. Note that power does not include manual operation.
[0008] The above-mentioned inspections include large-scale inspection items such as test hanging, which place a heavy burden on businesses, and there is a need for proposals for alternative methods that can reduce the burden on businesses.
[0009] The present invention has been made in consideration of the above circumstances, and its problem to be solved is to provide a lifting and handover device, a moving device, a lifting and handover method, and a moving method that can be used in cases other than crane applications and help reduce the burden on businesses. [Means for solving the problem]
[0010] [Hook-up transfer device] The lifting and taking over device of the present invention is a device equipped with a temporary support girder that supports a member or a suspension beam that supports a member, a lifting and lowering equipment that lifts and lowers the suspension beam, and a taking over equipment that takes over the load of the suspension beam lifted by the lifting and lowering equipment from the lifting and lowering equipment. The "member" referred to here refers to a part or all of a structure, such as a part or all of a bridge including a deck or a girder, or both. The temporary support girder supports the member directly or indirectly.
[0011] In the lifting and handover device, a first lifting steel material may be connected to the suspension beam, and the suspension beam may be lifted by lifting the first lifting steel material with the lifting and lowering equipment.
[0012] In the lifting and handover device, the lifting and lowering equipment may be powered.
[0013] In the lifting and taking over device, a second lifting steel material may be connected to the lifting beam, and the taking over equipment may take over the lifted beam lifted by the lifting and lowering equipment by holding the second lifting steel material.
[0014] In the lifting handover device, the handover equipment may be non-powered.
[0015] In the lifting and handover device, a support beam on which the lifting and lowering equipment is installed may be provided, and the lifting and lowering equipment may be installed on the support beam.
[0016] In the lifting and handover device, a carriage can also be provided on the support beam.
[0017] [Mobile device] The moving device of the present invention comprises a lifting handover device with a support beam, a girder, and a lateral travelling equipment, which is equipment for moving the girder in the bridge axial direction. The lateral travelling equipment is connected to the girder, and the lifting handover device is configured so that it can move together with the girder in the axial direction of the girder by the lateral travelling equipment.
[0018] The moving device of the present invention can also be configured to include a lifting handover device having a support beam with a bogie and a girder, the lifting handover device being placed on the girder so that the bogie of the lifting handover device moves on the girder, and the lifting handover device being movable in the axial direction of the girder by the bogie.
[0019] [How to take over] The lifting and handover method of the present invention is a method comprising the steps of: lifting a suspension beam supporting a temporary support girder or member using the lifting and lowering equipment of the lifting and handover device; and taking over the load of the suspension beam that was lifted by the lifting and lowering equipment from the lifting and lowering equipment using the handover equipment of the lifting and handover device.
[0020] [How to move] The moving method of the present invention is a method comprising the steps of transferring the load of the suspended beam from the lifting and lowering equipment of the lifting and handover device to the handover equipment of the lifting and handover device by the lifting and handover method, and moving the lifting and handover device together with the girder in the axial direction of the girder by the traversing equipment of the lifting and handover device.
[0021] The moving method of the present invention can also be a method including a step of transferring the load of the suspended beam from the lifting and lowering equipment of the lifting and handover device to the handover equipment of the lifting and handover device by the lifting and handover method, and a step of moving the lifting and handover device in the axial direction of the girder by a cart provided on the support beam of the lifting and handover device. Effect of the Invention
[0022] According to the present invention, components can be moved without using a crane, eliminating the need for inspection when applying a crane, thereby reducing the burden on businesses. [Brief description of the drawings]
[0023] [Figure 1] (a) is a schematic diagram of the new deck before lateral movement, and (b) is a schematic diagram of the new deck after lateral movement. [Diagram 2] FIG. [Diagram 3] FIG. 3 is an end view taken along the line III-III in FIG. 2 . [Figure 4] FIG. 1A is a front view showing an example of four sets of member-holding equipment, and FIG. [Diagram 5] FIG. 13 is an explanatory diagram showing a case where multiple support stands and component lifting jacks are provided. [Figure 6] 6 is an end view taken along the line VI-VI in FIG. 2 . [Figure 7] FIG. 13 is a front view showing another example of a lifting transfer device. [Figure 8] 4(a) to (d) are diagrams illustrating the operation of the lifting takeover device. [Figure 9] 8(a) to 8(d) are explanatory diagrams of the operation when a member is moved using the moving device equipped with the lifting takeover device of FIG. 7. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0024] (Embodiment) An example of an embodiment of the present invention will be described with reference to the drawings. The moving device of the present invention is a device for moving a member X (a new deck in the illustrated example) in various construction works including deck renewal work.
[0025] As an example, the moving device shown in Figs. 1(a) and (b) comprises a setting beam 10, a lifting handover device 20, a girder 30, and a traversing facility 40 as main components.
[0026] The temporary support girder 10 is a member for holding (supporting) the member X. The temporary support girder 10 can be made of H-shaped steel or the like. The temporary support girder 10 can also be made by welding steel plates into an H shape.
[0027] In this embodiment, two temporary support girders 10 are installed at a distance in the bridge axis direction, so that one temporary support girder 10 (first temporary support girder) holds one end of component X, and the other temporary support girder 10 (second temporary support girder) holds the other end of component X.
[0028] A support base 11 and a reaction base 12 are provided on the underside of each temporary support girder 10 with a gap in the longitudinal direction (see FIG. 3). The support base 11 is provided at a position closer to the lifting side of the lifting and lowering equipment 22 described below than the longitudinal half of the temporary support girder 10, and the reaction base 12 is provided at a position closer to the end of the lifting and lowering equipment 22 opposite the lifting side (hereinafter referred to as the "opposite end").
[0029] The support base 11 is a member that supports the temporary support girder 10. The support base 11 has an opening through which a part of a steel rod X1 (hereinafter referred to as an "embedded steel rod"), part of which is embedded in the member X and the other part of which protrudes to the upper surface side of the member X, passes.
[0030] As shown in Figures 2 and 3, a member-lifting jack 13 for lifting up the buried steel bar X1 is provided on the upper surface side of the temporary support girder 10 at a position above the support base 11. PC steel or the like can be used for the buried steel bar X1, and a center hole jack or a chain block can be used for the member-lifting jack 13. Other materials may also be used for the buried steel bar X1 and the member-lifting jack 13. Power may or may not be used to lift up the member X.
[0031] In this embodiment, two sets of equipment including the support base 11, reaction base 12, and component lifting jack 13 (hereinafter referred to as "component holding equipment") are used for the temporary support girder 10 as an example, but as shown in Figures 4(a) and (b), three or more sets of component holding equipment (four sets in the example of Figures 4(a) and (b)) can also be provided for one temporary support girder 10. In this case, the number of sets can be appropriately set depending on the weight, size, etc. of the component X.
[0032] The reaction table 12 is a member that receives a force acting on the temporary support girder 10 when the temporary support girder 10 is lifted by the lifting and handover device 20. In this embodiment, the reaction table 12 is provided on the underside of the temporary support girder 10 at the end opposite to the lifting and lowering equipment 22.
[0033] As shown in FIG. 5, by providing multiple buried steel rods X1 at intervals along the longitudinal direction of the member X and providing a support base 11 and a member lifting jack 13 above the extension line of each buried steel rod X1, the reaction base 12 can be omitted.
[0034] Specifically, in the example shown in Fig. 5, the support base 11 and the member lifting jack 13 are arranged on both outer sides in the longitudinal direction of the temporary support girder 10 of the lifting and lowering equipment 22, so when the temporary support girder 10 is lifted by the lifting and handover device 20, a large moment does not act on only one end side, and there is no need to provide a reaction base 12. When used in this way, the temporary support girder 10 is sometimes called a hanging balance.
[0035] The lifting and handover device 20 is a device that lifts and takes over the temporary support girder 10 and the member X. As shown in Fig. 2, the lifting and handover device 20 of this embodiment includes a hanging beam 21, a lifting and lowering facility 22, a handover facility 23, and a support beam 24 as main components.
[0036] The suspension beam 21 is a member that supports the temporary support girder 10 and member X. The suspension beam 21 can be made of H-shaped steel or the like. In this embodiment, the suspension beam 21 is made of H-shaped steel that is long in the direction perpendicular to the bridge axis. The suspension beam 21 can also be made of steel plates welded into an H shape. A wire rope 27 (Figure 3) for preventing swaying can be connected to the suspension beam 21.
[0037] Support fittings 21a to 21d are provided on the upper surface of the suspension beam 21. In this embodiment, four support fittings 21a to 21d are provided at intervals in the longitudinal direction of the suspension beam 21. Existing clevises or the like can be used for the support fittings 21a to 21d.
[0038] Suspension steel members 25a-25d for suspending the suspension beam 21 are connected to the respective support brackets 21a-21d. Existing PC steel bars (for example, Kevin Destabel) can be used for the suspension steel members 25a-25d. A space large enough to accommodate the temporary support girder 10 is provided between the two central suspension steel members (first suspension steel members) 25b and 25c.
[0039] The first suspension steel members 25b, 25c are used when lifting the suspension beam 21 at the lifting and lowering equipment 22, and the two outer suspension steel members (second suspension steel members) 25a, 25d are used when taking over at the handover equipment 23.
[0040] The lifting and lowering equipment 22 is equipment for lifting and lowering the suspension beam 21. As shown in Fig. 2 and Fig. 3, the lifting and lowering equipment 22 is installed on a support beam 24. The lifting and lowering equipment 22 in this embodiment includes a girder support bracket 22a, a reaction base 22b, and a jack 22c.
[0041] The girder support bracket 22a is a member installed on the support beam 24, and has an opening in the center through which the hanging steel materials 25a to 25d pass. A reaction force table 22b is installed on the girder support bracket 22a. An existing ram chair or the like can be used for the reaction force table 22b. The reaction force table 22b also has an opening through which the hanging steel materials 25a to 25d pass.
[0042] The jack 22c is a member for raising and lowering the suspension beam 21. The suspension beam 21 can be raised by pulling up the first suspension steel materials 25b, 25c with the jack 22c, and the suspension beam 21 can be lowered by pulling down the first suspension steel materials 25b, 25c. This jack 22c is equipped with power, and the suspension beam 21 can be raised and lowered by its force.
[0043] Various types of jacks can be used for the jack 22c. In this embodiment, an existing center hole jack is used as the jack 22c, but the jack 22c may be anything other than a center hole jack as long as it can pull up and down the first suspension steel materials 25b and 25c, and a chain block or the like may also be used.
[0044] The lifting and lowering device 20 of this embodiment is an independent device for lifting and lowering (lifting and lowering device 22) and device for supporting the load (handover device 23), and the lifting and lowering device 22 is provided with a power for lifting the suspension beam 21. The lifting and lowering device 22 lifts (lifts) and lowers (lowers) the first suspension steel materials 25b, 25c by the power of the jack 22c.
[0045] The handover equipment 23 is equipment for taking over the suspended beam 21 lifted by the lifting and lowering equipment 22 from the lifting and lowering equipment 22. As shown in Fig. 2 and Fig. 6, the handover equipment 23 in this embodiment is equipped with a support plate 23a and a nut 23b. The second suspension steel materials 25a, 25d that have passed through the support plate 23a are fastened with the nut 23b to hold the second suspension steel materials 25a, 25d, and the suspended beam 21 can be taken over.
[0046] As described above, the lifting and handover device 20 of this embodiment is an independent device for lifting and lowering (lifting and lowering device 22) and device for supporting the load (handover device 23), and the handover device 23 is not equipped with power. In the handover device 23, the second lifting steel members 25a and 25d are fixed by the support plate 23a, the nut 23b, and other members.
[0047] In addition, when supporting a load, the handover equipment 23 may be equipped with a manual center hole jack, and the second hoisting steel materials 25a, 25d pulled up by the lifting and lowering equipment 22 may be replaced with the manual center hole jack, etc. As mentioned above, the manual center hole jack does not fall under the category of powered equipment.
[0048] The support beam 24 is a member for installing the lifting and lowering equipment 22. As shown in Figures 2 and 3, the support beam 24 in this embodiment has two long beams (H-shaped steel) in the direction perpendicular to the bridge axis. The two beams are installed parallel to each other with a gap in the bridge axis direction. A lateral displacement prevention device 26 is provided on the bottom side of the support beam 24 to prevent lateral displacement.
[0049] The girder 30 is an erection girder. As shown in Fig. 1(a) and (b), the girder 30 in this embodiment is a vertical girder that is long in the bridge axis direction and includes an erection section 30a where the handover equipment 23 is installed and a hand-extending section 30b that is sent out from the erection section 30a toward the bridge axis direction.
[0050] A vertical bogie 31 is provided at the rear end of the bottom side of the girder 30. In this embodiment, the vertical bogie 31 is equipped with a self-propelled bogie and a trailing bogie, but the vertical bogie 31 may be other than this. A bridge axis direction earthquake resistance equipment 32 that can withstand vibrations in the bridge axis direction is provided at the rear end side of the girder 30.
[0051] In this embodiment, a self-propelled cart driven by electricity is used as the traverse equipment, but the self-propelled cart may be replaced with a trailing cart that does not have driving force, and the cart may be moved using a manual or electric tiller, winch, strand jack, etc.
[0052] The traverse facility 40 is a facility for moving the girder 30, the lifting and handover device 20 installed on the girder 30, and the member X held by the lifting and lowering facility 22 of the lifting and handover device 20 in the bridge axial direction. As shown in Fig. 1(a) and (b), in this embodiment, a driven roller facility 41 and a tip roller facility 42 installed on the bottom side of the girder 30 are used as the traverse facility 40.
[0053] A self-propelled carriage can be used as the driven roller device 41, and a bogie roller can be used as the tip roller device 42. The driven roller device 41 and the tip roller device 42 may be other than the above.
[0054] The member X held by the girder 30, the lifting and handover device 20 installed on the girder 30, and the lifting and lowering facility 22 of the lifting and handover device 20 can be moved laterally in the bridge axis direction by the vertical trolley 31 and the lateral movement facility 40.
[0055] The moving device can be moved in the bridge axis crossing direction by the crossing equipment 50. The crossing equipment 50 in this embodiment is equipped with a rail and a jack arranged in the bridge axis crossing direction. An H-shaped steel can be used for the rail, and a horizontal jack or the like can be used for the jack. The horizontal jack takes a reaction force from the rail to move the crossing device 50. In this case, power may or may not be used.
[0056] The configuration of the above embodiment is an example, and the configuration of the lifting takeover device and the moving device of the present invention is not limited to the configuration of the above embodiment. The configuration of the lifting takeover device and the moving device of the present invention can be modified by adding, omitting, replacing, etc. as appropriate within the scope of achieving the intended purpose.
[0057] -Variation 1- In the above embodiment of the lifting and handover device 20, an example is shown in which the first hanging steel members 25b, 25c and the second hanging steel members 25a, 25d are arranged at positions toward the longitudinal center of the hanging beam 21 and the supporting beam 24, but the first hanging steel members 25b, 25c and the second hanging steel members 25a, 25d can also be arranged away from each other at positions toward both longitudinal ends of the hanging beam 21 and the supporting beam 24.
[0058] For example, as shown in Figure 7, the first hanging steel material 25b and the second hanging steel material 25a can be provided at a position near one longitudinal end of the hanging beam 21 and the supporting beam 24, and the first hanging steel material 25c and the second hanging steel material 25d can be provided at a position near the other longitudinal end of the hanging beam 21 and the supporting beam 24.
[0059] In this case, it is preferable to ensure a sufficient space between the second hanging steel member 25a near one longitudinal end and the second hanging steel member 25c near the other longitudinal end so as not to interfere with the girder 30.
[0060] When the first suspension steel members 25b, 25c and the second suspension steel members 25a, 25d are provided at positions away from each other near both ends of the longitudinal direction of the suspension beam 21 and the support beam 24 as in this modified example, a dolly 28 can be installed under the support beam 24 (above the girder 30) so that the lifting handover device 20 including the support beam 24 can be moved in the axial direction of the girder 30 by the dolly 28. This point will be described in detail in Example 3 of Use, which will be described later.
[0061] In addition, the trolley 28 installed under the support beam 24 can be separate from the lifting and handover device 20, or it can be fixed to the support beam 24 in advance and configured as a part of the lifting and handover device 20.
[0062] In this modified example, if sufficient space is secured between the second hanging steel members 25a, 25d so as not to interfere with the girder 30, and the lifting handover device 20 can be moved in the axial direction of the girder 30 by the trolley 28, the lifting handover device 20 can be moved in the axial direction of the bridge separately from the girder 30.
[0063] -Variation 2- In the above embodiment, the moving device is provided with the temporary support beam 10 as an example, but the moving device of the present invention may not be provided with the temporary support beam 10.
[0064] In this case, the member X may be directly held by the suspension beam 21. There are no particular limitations on the method of holding the member X, and for example, the member X may be fixed to the suspension beam 21 by fixing a steel bar (hereinafter referred to as the "suspension beam side steel bar") to the suspension beam 21 side and connecting the suspension beam side steel bar and the buried steel bar X1 with a coupler, or the like.
[0065] The configurations of the modified examples 1 and 2, the description of which is omitted, are the same as those of the embodiment.
[0066] (operation) Next, with reference to Figures 8(a) to (d), the operation of taking over the suspension beam 21 lifted by the lifting and lowering equipment 22 with the handover equipment 23 and moving it laterally in the bridge axis direction will be described. Note that in Figures 8(a) to (d), the first suspension steel materials 25b, 25c and the second suspension steel materials 25a, 25d are shown by solid lines when they are held and by dashed lines when they are not held.
[0067] (1) The first suspension steel members 25b, 25c are raised to a predetermined height by the jacks 22c of the lifting and lowering equipment 22, and the suspension beam 21 is lifted to a predetermined position (FIGS. 8(a) and 8(b)). (2) After the suspension beam 21 has been raised to a predetermined position, the second suspension steel members 25a, 25d connected to the support brackets 21a, 21d of the suspension beam 21 are tightened with nuts 23b to hold the suspension beam 21 in place (FIG. 8(c)). (3) After the suspension beam 21 has been held, the first suspension steel members 25b, 25c are released from the jack 22c, and the handover of the suspension beam 21 to the handover equipment 23 is completed (FIG. 8(d)). (4) After the handover of the suspension beam 21 to the handover equipment 23 is completed, the girder 30 can be moved laterally in the bridge axis direction by the vertical trolley 31 and the lateral movement equipment 40 (see Figures 1(a) and (b)).
[0068] Next, examples of use (lifting and handing over method and moving method) of the lifting and handing over device and the moving device of this embodiment will be described as follows: a case where the existing deck X is removed is described as Use Example 1; a case where a new deck X is installed is described as Use Example 2; and a case where the component X is moved using the moving device of the modified example 2 is described as Use Example 3.
[0069] -Usage example 1: Removal of existing deck slab- As a first example of use, we will explain an example of removing the existing deck X from an existing road bridge.
[0070] When removing an existing deck X from an existing road bridge, the existing deck X to be removed is supported by a temporary support girder 10. The existing deck X is supported by pulling up the buried steel rods X1 with a member lifting jack 13 installed on the temporary support girder 10.
[0071] After the existing deck X is held by the temporary support girder 10, the jack 22c of the lifting and lowering equipment 22 is operated while the temporary support girder 10 is suspended by the suspension beam 21, and the suspension beam 21 is lifted to a predetermined position. At this time, the force acting on the opposite end of the temporary support girder 10 is received by the reaction stand 22b installed below the opposite end of the temporary support girder 10.
[0072] After the suspension beam 21 has been raised to a predetermined position, the second suspension steel materials 25a, 25d connected to the support fittings 21a, 21d of the suspension beam 21 are fastened with nuts 23b to hold the suspension beam 21. Thereafter, the holding of the first suspension steel materials 25b, 25c by the jack 22c is released, thereby completing the handover of the suspension beam 21 holding the existing deck X to the handover equipment 23.
[0073] After the handover of the suspension beam 21 to the handover equipment 23 is completed, the existing deck X held by the girder 30, the lifting and handover device 20 installed on the girder 30, and the lifting and lowering equipment 22 of the lifting and handover device 20 is moved laterally in the bridge axis direction.
[0074] At the lateral destination, the existing deck X is deposited on a transport vehicle that has been kept waiting in advance. Specifically, after the first hoisting steel materials 25b, 25c are held by the jacks 22c of the lifting and lowering equipment 22, the holding by the handover equipment 23 is released and the suspension beam 21 holding the existing deck X is handed over to the lifting and lowering equipment 22, and the existing deck X is lowered to the loading position of the transport vehicle by the operation of the lifting and lowering equipment 22.
[0075] When the existing deck X reaches a predetermined loading position of the transportation vehicle, the first hanging steel members 25b and 25c are released from the lifting and lowering equipment 22, and the loading of the existing deck X onto the transportation vehicle is completed. After that, the existing deck X is carried out by the transportation vehicle.
[0076] -Usage example 2: Installation of new deck slabs- As a second use example, an example of installing a new deck X at a location where an existing deck X has been removed will be described.
[0077] When a new deck X is to be installed at the location where the existing deck X has been removed, the new deck X brought in by a transport vehicle is supported by a temporary support girder 10. The new deck X is supported by pulling up the buried steel rods X1 with a member lifting jack 13 installed on the temporary support girder 10.
[0078] After the new deck X is held by the temporary support girder 10, the jack 22c of the lifting and lowering equipment 22 is operated while the temporary support girder 10 is suspended by the suspension beam 21, and the suspension beam 21 is lifted to a predetermined position. At this time, the force acting on the opposite end of the temporary support girder 10 is received by the reaction stand 22b installed below the opposite end of the temporary support girder 10.
[0079] After the suspension beam 21 has been raised to a predetermined position, the second suspension steel materials 25a, 25d connected to the support fittings 21a, 21d of the suspension beam 21 are fastened with nuts 23b to hold the suspension beam 21. Thereafter, the holding of the first suspension steel materials 25b, 25c by the jack 22c is released, thereby completing the handover of the suspension beam 21 holding the new deck X to the handover equipment 23.
[0080] After the handover of the suspension beam 21 to the handover equipment 23 is completed, the girder 30, the lifting and handover device 20 installed on the girder 30, and the newly constructed deck X held by the lifting and lowering equipment 22 of the lifting and handover device 20 are moved laterally in the bridge axis direction.
[0081] At the lateral destination, the new deck X is installed at a preset planned position. Specifically, after the first suspension steel materials 25b, 25c are held by the jacks 22c of the lifting and lowering equipment 22, the holding by the handover equipment 23 is released and the suspension beam 21 holding the new deck X is handed over to the lifting and lowering equipment 22, and the lifting and lowering equipment 22 operates to lower the new deck X to the planned position.
[0082] After the new deck X reaches the planned position, the new deck X is installed at the planned position. After that, these steps are repeated a required number of times to complete the installation of the planned number of new decks X.
[0083] - Example 3: When moving the lifting handover device separately from the girder - As a third use example, an example of moving a member X (a newly constructed girder or an existing girder) using a moving device not equipped with the temporary support girder 10 described in the second modified example will be described.
[0084] When moving a component X (a newly constructed girder in this example) using a moving device that does not have the temporary support girder 10 described in the above-mentioned variant example 2, the girder 30 is moved by the first vent equipment 43 and the send-out vent equipment 44, and the installation section 30a of the girder 30 is bridged between the first vent equipment 43 and the second vent equipment 45 installed on the forward side in the direction of movement of the girder (Figures 9(a)(b)).
[0085] After the erection section 30a is laid across the first vent facility 43 and the second vent facility 45, the lifting and handover device 20 is installed at a position near the rear end of the erection section 30a (FIG. 9(c)). If the support beam 24 and the dolly 28 are separate, the dolly 28 is placed on the erection section 30a first, and the lifting and handover device 20 is installed on the dolly 28.
[0086] In the illustrated example, two lifting handover devices 20 are installed, one for forward support of the newly installed girder X and one for rearward support. For ease of explanation, the former will be referred to as the forward lifting handover device 20A and the latter as the rearward lifting handover device 20B.
[0087] Separately from the installation of the lifting handover device 20, the new girder X is assembled. The new girder X is placed on a feed cart 47 and a ground assembly cart 48 on a rail facility 46 installed along the bridge axis direction, and is made movable in the bridge axis direction by the feed cart 47 and the ground assembly cart 48 moving along the rail facility 46.
[0088] The assembled new girder X is moved forward in the bridge axial direction by the feed bogie 47 and the ground assembly bogie 48, and is stopped when the forward side of the new girder X reaches below the front side lifting handover device 20A (Figure 9 (c)).
[0089] At that stopped position, the tip side of the newly constructed girder X is lifted by the lifting and lowering equipment 22 of the front side lifting and handover device 20A, and the load of the suspension beam 21 lifted by the lifting and lowering equipment 22 is taken over from the lifting and lowering equipment 22 by the handover equipment 23 (Figure 9 (c)).
[0090] With the front side held by the handover equipment 23 of the front side lifting handover device 20A and the rear side supported by the feed trolley 47, the new deck slab X is further advanced until the rear side of the new girder X reaches below the rear side lifting handover device 20B, at which point it is stopped.
[0091] At that stopped position, the rear side of the newly constructed girder X is lifted by the lifting and lowering equipment 22 of the rear side lifting and handover device 20B, and the load of the suspension beam 21 lifted by the lifting and lowering equipment 22 is taken over from the lifting and lowering equipment 22 by the handover equipment 23.
[0092] The lifting of the newly installed girder X at the lifting and lowering equipment 22 of the front side lifting and handover device 20A and the lifting and lowering equipment 22 of the rear side lifting and handover device 20B, and the handover of the load at the handover equipment 23 of the front side lifting and handover device 20A and the handover equipment 23 of the rear side lifting and handover device 20B can be performed in the same manner as in the above-mentioned usage examples 1 and 2.
[0093] Once the new girder X is held by the front side lifting handover device 20A and the rear side lifting handover device 20B, both lifting handover devices 20A and 20B are moved to predetermined positions in the axial direction of the girder 30, and the new girder X held by both lifting handover devices 20 is moved to the predetermined position (Figure 9 (d)).
[0094] After the new girder X reaches the predetermined position, the new girder X is installed at the planned position (FIG. 9(d)). The installation of the new girder X at the planned position can be performed in the same manner as in the above-mentioned examples 1 and 2.
[0095] Thereafter, these steps are repeated the required number of times to complete the installation of the planned number of new girders X.
[0096] In addition, when the component X is an existing girder X that has been cut off from an existing road bridge or the like, the existing girder X, which is the object to be moved, is lifted by the lifting and lowering equipment 22 of both lifting and handover devices 20A, 20B, and the suspension beam 21 holding the existing girder X is handed over to the handover equipment 23.
[0097] After the handover of the suspension beam 21 to the handover equipment 23 is completed, the two lifting and handover devices 20A, 20B are moved by the trolley 28 to predetermined positions in the axial direction of the girder 30, and the existing girder X held by the lifting and lowering equipment 22 of the two lifting and handover devices 20A, 20B is moved in the axial direction of the bridge.
[0098] At the destination, the existing girder X is deposited in a transportation vehicle that has been kept waiting in advance. Depositing the existing girder X in the transportation vehicle can be performed in the same manner as in the above-mentioned Usage Example 1. After that, the existing girder X is carried out by the transportation vehicle.
[0099] Thereafter, these steps are repeated the required number of times to complete the removal of the planned number of existing girders X.
[0100] The above-mentioned examples of use are merely examples, and the procedures and uses of the lifting and taking over device and the moving device of the present invention are not limited to the above-mentioned examples of use (lifting and taking over method and moving method). [Industrial Applicability]
[0101] The lifting and handing over device and moving device, as well as the lifting and handing over method and moving method of the present invention can be used for the lifting and handing over and moving of various components during construction work (construction site), and can be particularly suitably used for the lifting and handing over and moving of existing deck slabs or existing girders, or new deck slabs or new girders, associated with deck renewal. [Explanation of symbols]
[0102] 10 Setting beam 11 Support stand 12 Reaction table 13 Component lifting jack 20 Lifting handover device 20A Front side lifting handover device 20B Rear side lifting handover device 21 Hanging beam 21a~21d Support bracket 22 Lifting and lowering equipment 22a Beam support bracket 22b Reaction stand 22c Jack 23 Transfer Facilities 23a Bearing plate 23b Nut 24 Beam support 25a Suspension steel (second suspension steel) 25b Suspension steel (first suspension steel) 25c Suspension steel (first suspension steel) 25d Suspension steel (second suspension steel) 26 Sideways slip prevention device 27 Wire Rope 28 Trolley 30. Girder 30a Erection section 30b Hand-stretched part 31 Vertical Cart 32 Bridge axial seismic equipment 40 Traverse Equipment 41 Driven roller equipment 42 Tip roller equipment 43 First Vent Equipment 44 Delivery vent equipment 45 Second vent facility 46 Rail Equipment 47 Feeding cart 48 Ground assembly cart 50 Stealing Equipment X member (existing deck, new deck, existing girder, new girder) X1 Buried steel rod
Claims
1. In equipment used in construction work, A temporary support girder or a suspension beam supporting a member; A lifting and lowering facility for lifting and lowering the suspension beam; Equipped with a handover facility that takes over the load of the lifted beam lifted by the lifting and lowering facility from the lifting and lowering facility, A lift-up takeover device characterized by the above.
2. 2. The lifting and taking over device according to claim 1, The first suspension steel member is connected to the suspension beam, The lifting and lowering equipment lifts the suspension beam by lifting the first suspension steel material. A lift-up takeover device characterized by the above.
3. 2. The lifting and taking over device according to claim 1, The lifting and lowering equipment is powered, A lift-up takeover device characterized by the above.
4. 2. The lifting and taking over device according to claim 1, A second steel suspension member is connected to the suspension beam, The handover equipment takes over the lifted beam by the lifting and lowering equipment by holding the second lifting steel material. A lift-up takeover device characterized by the above.
5. 2. The lifting and taking over device according to claim 1, The transfer equipment is not powered. A lift-up takeover device characterized by the above.
6. 2. The lifting and taking over device according to claim 1, Equipped with a support beam for installing lifting and lowering equipment, The support beam is equipped with lifting and lowering equipment. A lift-up takeover device characterized by the above.
7. 7. The lifting and taking over device according to claim 6, A cart was installed on the support beam. A lift-up takeover device characterized by the above.
8. In an apparatus for moving a member, The lifting and handover device according to claim 6, a girder and a traversing facility are provided, The traverse equipment is equipment for moving the girder in the bridge axis direction, The traverse facility is connected to the girder, The lifting handover device can be moved in the axial direction of the girder together with the girder by the traverse equipment. A mobile device comprising:
9. In an apparatus for moving a member, A lifting and handover device according to claim 7 and a girder are provided, The lifting and handing over device is placed on the girder so that the carriage of the lifting and handing over device moves on the girder, The lifting handover device is movable in the axial direction of the girder by the carriage. A mobile device comprising:
10. A method for lifting a member using the lifting and taking over device according to claim 1, comprising: A process of lifting a suspension beam supporting a temporary support girder or member by the lifting and lowering equipment of the lifting and handover device; The method further includes a step of transferring the load of the lifted beam lifted by the lifting and lowering equipment from the lifting and lowering equipment by the lifting and lowering equipment. The method for taking over a data transfer system according to the present invention is characterized in that:
11. 9. A method for moving a member using the moving device according to claim 8, further comprising the steps of: A step of transferring the load of the lifting beam from the lifting and lowering equipment of the lifting and handover device to the handover equipment of the lifting and handover device by the lifting and handover method according to claim 10; The lifting and handing over device is moved together with the girder in the axial direction of the girder by a traverse facility of the lifting and handing over device. A method of movement comprising:
12. 10. A method for moving a member using the moving device according to claim 9, further comprising the steps of: A step of transferring the load of the lifting beam from the lifting and lowering equipment of the lifting and handover device to the handover equipment of the lifting and handover device by the lifting and handover method according to claim 10; The method includes a step of moving the lifting takeover device in the axial direction of the girder by a cart provided on the support beam of the lifting takeover device. A method of movement comprising:
Citation Information
Patent Citations
Replacing method of rc floor slab having nonsynthetic structure and self-traveling floor slab lifting device
JP1994306819A