Melting facility and melting facility operation method
The described melting equipment efficiently powers large DC arc furnaces by allowing flexible power distribution and incorporating backup supplies, addressing inefficiencies in existing systems and enhancing operational efficiency and cost-effectiveness.
Patent Information
- Application Number
- JP2023078187
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-21
AI Technical Summary
Existing melting equipment with a single DC power supply unit for a DC arc furnace is inefficient for large furnaces requiring over 200 MW of power, and existing twin-type configurations limit power supply to 50% capacity per furnace, reducing efficiency and making power distribution difficult.
A melting equipment with two DC arc furnaces, each with two or more graphite electrodes, and four or more power supply devices, allowing selective connection and control of power distribution, enabling simultaneous power supply exceeding 50% capacity to one furnace and incorporating backup power supplies to ensure redundancy.
The equipment efficiently supplies power to large DC arc furnaces, minimizing non-operational times, increasing power supply operating rates, and extending the lifespan of power supply devices while reducing equipment costs.
Smart Images

Figure 2024162563000001_ABST
Abstract
Description
[Technical Field]
[0001] The present invention relates to a melting facility and a method for operating the melting facility, and more particularly to a melting facility for producing steel using two DC arc furnaces and a method for operating the melting facility. [Background technology]
[0002] In an arc furnace, an arc is generated between electrodes, and metal materials such as scrap are melted by the heat of the arc. The basic configuration of melting equipment, which includes a DC power source to generate the arc and a DC arc furnace, is a combination of one power supply unit for one DC arc furnace. However, in the steel melting process, in addition to the melting and refining periods when electricity is used, there are also periods when electricity is not generally used, such as the slag removal period, charging period, and steel tapping period. This made it difficult to increase the operating rate of the power supply unit above a certain level.
[0003] As a melting facility equipped with a means for increasing the operating rate of the power supply unit, a twin-type DC arc furnace melting facility is known, in which two 50% capacity power supply units can be selectively connected to two DC arc furnaces via a switching device (for example, Patent Document 1 below). However, the melting equipment described in Patent Document 1 has a configuration in which each furnace has one electrode, making it difficult to accommodate large furnaces that require, for example, 200 MW or more of power for melting. Also, because it has two power supply units, when power is supplied to both furnaces simultaneously, the power that can be supplied to each furnace is limited to a maximum of 50% capacity (half the total capacity of each power supply unit), making it difficult to distribute power efficiently. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Japanese Patent Application Publication No. 6-331282 Summary of the Invention [Problem to be solved by the invention]
[0005] SUMMARY OF THE INVENTION In view of the above circumstances, an object of the present invention is to provide a melting facility capable of efficiently supplying power to two large DC arc furnaces, and a method for operating the melting facility. [Means for solving the problem]
[0006] The melting equipment according to the first aspect of the present invention is defined as follows: two DC arc furnaces each having two or more graphite electrodes; a power supply means having four or more power supply devices; a connection switching means for selectively connecting each of the power supply devices to each of the DC arc furnaces; a power supply control unit that controls power supply from each of the power supply devices to each of the DC arc furnaces; Equipped with It is possible to select whether to supply power to only one of the two DC arc furnaces or to supply power to both simultaneously. When supplying power simultaneously, it is possible to supply power to either DC arc furnace at a rate exceeding 50% of the capacity of the total power supply unit.
[0007] According to the melting equipment of the first aspect defined in this manner, each furnace has two or more graphite electrodes, and can accommodate furnaces with large furnace capacities (large furnaces) that require large amounts of power. In addition, four or more power supplies are shared by the two furnaces, and the power of each power supply can be exchanged as needed, thereby increasing the operating rate of the power supplies. Furthermore, in this melting facility of the first phase, when power is supplied simultaneously, it is possible to supply more than 50% of the power of all power supplies to one furnace, so even if, for example, the melting period, which requires a large amount of power, and the refining period, which requires only a small amount of power, overlap in two furnaces, it is possible to supply each furnace with the appropriate amount of power according to the respective furnace periods. Therefore, according to the melting facility of the first aspect, it is possible to efficiently supply power to two large DC arc furnaces.
[0008] Here, the number of the power supply devices included in the power supply means can be greater than the total number of the graphite electrodes included in the two DC arc furnaces (second aspect). For example, if the two DC arc furnaces each have two of the graphite electrodes and the power supply means has six of the power supply devices, then during simultaneous power supply, the power from the power supply devices can be distributed to each furnace in a ratio of 67% (capacity of four units) to 33% (capacity of two units) (third aspect).
[0009] In addition, in this melting facility, in addition to the power supply device essential for supplying the maximum input power per DC arc furnace, a backup power supply device can be connected to the DC arc furnace so as to be able to supply power to the DC arc furnace (fourth aspect). In this way, even if one of the power supply devices fails, the power supply device used for power supply can be switched from the failed power supply device to the backup power supply device in a short time, and operations can be resumed.
[0010] Furthermore, if power is supplied to the DC arc furnace not only from the essential power supply device but also from the backup power supply device during power supply, the number of power supply devices in operation during power supply can be increased, allowing each power supply device to be operated with a margin of error (with reduced output), thereby reducing the failure rate of the power supply devices and extending their lifespan (fifth aspect).
[0011] The plurality of power supply units may also be installed in two or more separate machine rooms. In this way, a plurality of power supply devices can be arranged in different areas (machine rooms) for each group, thereby increasing the degree of freedom in facility layout (sixth aspect).
[0012] A method for operating a melting facility according to a seventh aspect of the present invention is defined as follows: When using the melting equipment according to the first aspect to melt steel in each of the two DC arc furnaces, The furnace period of the DC arc furnace is divided into a melting period including a maximum power period during which a maximum input power is supplied, a refining period during which a power lower than the maximum input power is supplied, a slag removal period, a tapping period for the molten metal, and a charging period for the metal raw material, When the maximum input power per furnace during the melting period is Sd and the total capacity value of each power supply device is Seqip, the maximum input power is set so that Seqip ≧ Sd; Electric power is supplied to each DC arc furnace so that the maximum power period in one DC arc furnace overlaps with at least one of the slag removal period, the steel tapping period and the charging period in the other DC arc furnace, and so that the melting period and the refining period excluding the maximum power period in one DC arc furnace overlap with the melting period and the refining period excluding the maximum power period in the other DC arc furnace.
[0013] According to the operating method of the seventh aspect thus defined, the maximum power periods during which the maximum input power is supplied to the two DC arc furnaces do not overlap, so the capacity of the power supply equipment can be saved (reduced) and equipment costs can be reduced. Also, by overlapping the melting period and refining period excluding the maximum power periods of the DC arc furnaces, the operating rate of the power supply equipment can be increased and power can be supplied efficiently. [Brief explanation of the drawings]
[0014] [Figure 1] 1 is a diagram showing a schematic configuration of a melting facility according to an embodiment of the present invention. [Figure 2] FIG. 2 is a diagram showing an example of the transition of input power during operation of the DC arc furnace of FIG. [Figure 3] This is a diagram showing the connection destinations of each power supply device in an operation pattern in which the melting periods of two furnaces do not overlap each other. [Figure 4] 4 is a diagram showing a connection state between the DC arc furnace and each power supply device in State A of FIG. 3. FIG. [Figure 5] 4 is a diagram showing a connection state between the DC arc furnace and each power supply device in state B of FIG. 3. FIG. [Figure 6]This is a diagram showing the connections of each power supply unit in an operation pattern in which the melting periods of two furnaces partially overlap. [Figure 7] FIG. 10 is a diagram showing a main part of a melting facility according to another embodiment of the present invention. DETAILED DESCRIPTION OF THE INVENTION
[0015] Next, an embodiment of the present invention will be described in detail with reference to the drawings. Fig. 1 is a diagram showing the schematic configuration of a melting facility according to one embodiment of the present invention. As shown in the figure, the melting facility 1 of this embodiment is a melting facility in which two DC arc furnaces 2A, 2B are installed as a pair, and further includes a power supply means 15, a connection switching means 29, and a power supply control unit 50.
[0016] The DC arc furnaces 2A and 2B are equipped with a furnace body 3, a furnace lid 4 covering the top of the furnace body 3, two graphite electrodes 6 and 7 that protrude freely up and down from near the center of the furnace lid 4, and a bottom electrode 9 installed approximately in the center of the bottom of the furnace body 3. An arc is generated between the tips of the graphite electrodes 6 and 7 and metal materials such as scrap charged into the furnace body 3, to melt and heat the metal materials. In the following explanation, the graphite electrodes of the DC arc furnace 2A will be referred to as 6A and 7A and the bottom electrode as 9A, and the graphite electrodes of the DC arc furnace 2B will be referred to as 6B and 7B and the bottom electrode as 9B.
[0017] In these DC arc furnaces 2A and 2B, the molten steel (molten metal) in the furnace body 3 is tapped after going through a melting period in which the metal materials charged in the furnace body 3 are melted to produce molten steel, a refining period in which the produced molten steel is heated and its composition is adjusted, and a slag discharge period in which at least a portion of the slag is discharged outside the furnace.
[0018] FIG. 2 is a diagram showing an example of the transition of input power along the operational procedure from charging metallic materials to tapping molten steel in a DC arc furnace. According to the example in the figure, the melting period has the highest input power, and the latter period in particular is the maximum power period when the maximum input power Sd (390 MW) is supplied. The input power for the refining period that follows the melting period is lower than that for the melting period, in this example 130 MW. For the slag removal, tapping, and charging that follow refining, it is basically not necessary to supply power to the electrodes.
[0019] As shown in FIG. 1, the power supply means 15 includes a power receiving transformer 18 connected to a three-phase AC power source 16 via a main switch 17, and six power supply devices 20 (20-1 to 20-6) connected in parallel to the secondary side of the power receiving transformer 18, and supplies DC power to the graphite electrodes 6, 7 and the bottom electrode 9 of the DC arc furnaces 2A, 2B. Each power supply unit 20 includes a sub-switch 21, a furnace transformer 22 that steps down AC power to a predetermined voltage, and a thyristor 23 that converts the AC power supplied from the furnace transformer 22 into DC power. A cathode cable and an anode cable are connected to the thyristor 23, and the DC power converted by the thyristor 23 is supplied to the graphite electrodes 6, 7 of the arc furnace 2A or 2B via the cathode cable, and is also supplied to the bottom electrode 9 of the arc furnace 2A or 2B via the anode cable.
[0020] The above-mentioned maximum input power Sd must be covered by the power supply from each of the power supply devices 20-1 to 20-6, and the total capacity value Seqip of the six power supply devices must be equal to or greater than the maximum input power Sd (Seqip≧Sd). In this example, if the capacity of each power supply device is 70 MW, Seqip will be 420 MW, which is equal to or greater than the above-mentioned maximum input power Sd (390 MW).
[0021] The capacity Seqip of all power supplies may be the same as the maximum input power Sd, but by making Seqip slightly larger than Sd and operating the power supply 20 with a margin relative to its 100% capacity, it is possible to reduce the failure rate of the power supply 20. Therefore, it is preferable that Seqip≧Sd, and more preferably that Seqip>Sd.
[0022] On the other hand, if Seqip is too large, it will increase the equipment cost. From the viewpoint of saving power capacity, it is preferable that 2×Sd>Seqip.
[0023] The connection switching means 29 is configured to include 12 types of switching devices 30 (30-1 to 30-6), 32 (32-1 to 32-6) arranged between each power supply device 20 and the DC arc furnaces 2A, 2B. Each switching device 30, 32 has one common contact x and two switching contacts a, b, and the common contact x is connected to the DC output terminal of the thyristor 23 via a cable, while the switching contacts a, b of the switching device 30 are connected to the graphite electrodes 6 or 7 of the DC arc furnaces 2A, 2B via cables, respectively, and the switching contacts a, b of the switching device 32 are connected to the bottom electrodes 9 of the DC arc furnaces 2A, 2B via cables, respectively. That is, each power supply device 20 can be selectively connected to one of the DC arc furnaces by the switching devices 30 and 32 that constitute the connection switching means 29.
[0024] The power supply control unit 50 controls the power supply to the DC arc furnaces 2A, 2B based on a preset power supply pattern. The power supply control unit 50 is connected to the above-mentioned power supply devices 20-1 to 20-6 and the switching devices 30 (30-1 to 30-6), 32 (32-1 to 32-6), and controls the start and stop of power supply to each of the power supply devices 20-1 to 20-6, and also controls the output from each power supply device during power supply. Furthermore, for each of the switching devices 30 and 32, the conduction between the internal contacts x, a, and b is switched and controlled so that each power supply device 20 is connected to the intended arc furnace. At this time, a pair of switching devices connected to a common power supply device 20 (for example, switching devices 30-1 and 32-1 both connected to power supply device 20-1) are switched and controlled so that the same arc furnace is selected as the connection destination.
[0025] Next, the power supply operation during operation of the melting apparatus 1 of this embodiment will be described. First, a case will be described in which the melting periods in the DC arc furnaces 2A and 2B do not overlap, as shown in FIG.
[0026] When scrap is charged into the DC arc furnace 2A, in state A shown in FIG. 3, the connection switching means 29 switches the connection of the four power supply units 20-2, 20-3, 20-5, and 20-6, which correspond to the input power (260 MW) at the beginning of the melting period, to the DC arc furnace 2A side, forming a power supply circuit, and heating of the scrap inside the furnace begins with arcs from the graphite electrodes 6A and 7A of the DC arc furnace 2A. On the other hand, DC arc furnace 2B is in the refining period during state A, and receives power supply from the remaining two power supply devices 20-1 and 20-4 to heat molten steel with an input power of 130 MW. FIG. 4 is a diagram showing the connection state between the DC arc furnaces 2A, 2B and the power supply devices 20-1 to 20-6 in this state A. As shown in FIG.
[0027] Next, in state B shown in FIG. 3, when the DC arc furnace 2A reaches the latter half of the melting period, the power supply units 20-1 and 20-4 are switched to the DC arc furnace 2A side, and the DC arc furnace 2A receives power supply from all six power supply units and promotes scrap melting at the maximum input power Sd (390 MW). On the other hand, the DC arc furnace 2B is in a non-energized state during this state B, and slag removal, steel tapping, and new scrap charging are carried out. FIG. 5 is a diagram showing the connection state between the DC arc furnaces 2A, 2B and the power supply devices 20-1 to 20-6 in this state B. As shown in FIG.
[0028] In the next state C shown in FIG. 3, the DC arc furnace 2A, which has completed the melting period, continues to perform refining by receiving power supply from the power supply devices 20-1 and 20-4. Meanwhile, the connections of the remaining four power supply units 20-2, 20-3, 20-5, and 20-6 are switched to the DC arc furnace 2B side to form a power supply circuit, and the DC arc furnace 2B starts heating the scrap charged into the furnace with arcs from the graphite electrodes 6B and 7B.
[0029] When the refining period of the DC arc furnace 2A is completed, the DC arc furnace 2A performs slag removal and then tapping of molten steel in the furnace in state D of Fig. 3. After that, new scrap is charged into the furnace. Meanwhile, the DC arc furnace 2B is in the latter half of the melting period, and the power supplies 20-1 and 20-4 are further switched to the DC arc furnace 2B side, so that the DC arc furnace 2B receives power supply from all six power supplies and promotes scrap melting at the maximum input power Sd (390 MW).
[0030] 3, the maximum power periods during which the maximum input power Sd is supplied to the two DC arc furnaces do not overlap, which makes it possible to reduce the capacity of the power supply device 20 and thereby reduce equipment costs. Furthermore, by overlapping the melting period excluding the maximum power period in one DC arc furnace with the refining period in the other DC arc furnace, it is possible to increase the operating rate of the power supply device 20 and perform efficient power supply.
[0031] Next, a case where the melting period of the DC arc furnace 2A and the melting period of the DC arc furnace 22B partially overlap as shown in FIG. 6 will be described.
[0032] State A' and the subsequent state B' shown in FIG. 6 are the same as states A and B shown in FIG. 6, the melting period of the DC arc furnace 2A continues, while the melting period of the DC arc furnace 2B also begins, and the melting periods of the DC arc furnace 2A and the DC arc furnace 2B partially overlap. Therefore, in state C', the connection of the power supplies 20-2, 20-5, and 20-6 is switched to the DC arc furnace 2B side, and the DC arc furnace 2A receives power supply from the three power supplies to continue heating during the melting period, and the DC arc furnace 2B also receives power supply from the three power supplies to start heating during the melting period.
[0033] When the melting period of the DC arc furnace 2A is completed, in the subsequent state D' shown in FIG. 6, the DC arc furnace 2A continues refining with power supplied from the power supply units 20-1 and 20-4. On the other hand, the connection destination of the power supply device 20-3 is switched to the DC arc furnace 2B side, and the DC arc furnace 2B receives power supply from a total of four power supply devices 20 to promote melting of the scrap.
[0034] After the refining period of the DC arc furnace 2A is completed, in the next state F′ in Fig. 6, the DC arc furnace 2A starts to discharge slag and then taps molten steel. After that, new scrap is charged into the furnace. Meanwhile, the power supply devices 20-1 and 20-4 are further switched to the DC arc furnace 2B side, and the DC arc furnace 2B receives power supply from all six power supply devices and further promotes scrap melting with the maximum input power Sd (390 MW).
[0035] 6, the maximum power periods during which the maximum input power Sd is supplied to the two DC arc furnaces do not overlap, so it is possible to reduce the capacity of the power supply 20 and hold down equipment costs. Furthermore, by overlapping the melting period and refining period excluding each other's maximum power periods or the melting periods excluding each other's maximum power periods, it is possible to increase the operating rate of the power supply 20 and supply power efficiently.
[0036] As described above, according to the melting equipment 1 of this embodiment, each furnace has two graphite electrodes 6, 7, and can accommodate furnaces with large furnace capacities (large furnaces) that require large amounts of power. In addition, six power supply devices 20-1 to 20-6 are shared by the two furnaces 2A and 2B, and by sharing the power of each power supply device as needed, the power off time can be minimized and the availability of the power supply devices can be increased. Furthermore, in the melting equipment 1 of this embodiment, when the total capacity of the six power supply units is 100%, the power supply to each furnace during simultaneous power supply can be allocated at a ratio of 33:67 in addition to 50:50. Therefore, even if, for example, two furnaces have a melting period requiring large amounts of power and a refining period requiring small amounts of power, each furnace can be supplied with the appropriate amount of power according to the respective furnace periods.
[0037] Next, Fig. 7 is a diagram showing the main parts of another embodiment of the present invention, in which the cables connecting each power supply device and the bottom electrode of the arc furnace and the switching device 42 are omitted. The melting equipment 1B of this example is equipped with two DC arc furnaces 2A, 2B, a power supply means 15B, and a connection switching means 29B, and has the same basic configuration as the above-mentioned melting equipment 1. Among the components of the melting equipment 1B, components common to the above-mentioned melting equipment 1 are designated by the same reference numerals, and their explanation will be omitted.
[0038] The power supply means 15B of this example is configured to include two backup power supply devices 40 (40-1, 40-2) in addition to the power supply devices 20-1 to 20-6 that are essential for supplying the maximum input power Sd per DC arc furnace. Here, the backup power supply devices 40 are power supply devices that are not used to input power when one or the other arc furnace is in the maximum power period. The capacity of each power supply device 40 can be, for example, 70 MW, the same as that of the power supply device 20. Between the power supply devices 40 (40-1, 40-2) and the DC arc furnaces 2A, 2B, there are provided switching devices 41 (41-1, 41-2) and 42 (42-1, 42-2, both not shown), which constitute the connection switching means 29B. The switching devices 41, 42 have one common contact x and two switching contacts a, b. The common contact x is connected to the DC output terminal of the thyristor 23 via a cable, and the switching contacts a, b of the switching device 41 are connected to the graphite electrodes 6 or 7 of the DC arc furnaces 2A, 2B via cables, respectively. The switching contacts a, b of the switching device 42 are connected to the bottom electrodes 9 of the DC arc furnaces 2A, 2B via cables, respectively. That is, each power supply device 40 can be selectively connected to one of the DC arc furnaces by means of switching devices 41 and 42 that constitute the connection switching means 29B.
[0039] In the melting equipment 1B configured in this manner, during operation (when at least one or the other arc furnace is in the maximum power period), the backup power supply device 40 (40-1, 40-2) is not used, and a predetermined power supply can be performed to each DC arc furnace using only the power supply devices 20-1 to 20-6, as in the case of the melting equipment 1. On the other hand, if any of the power supply devices 20-1 to 20-6 fails, the power supply device used for power supply can be switched from the failed power supply device to the backup power supply device 40 (40-1, 40-2) in a short time, and operation can be resumed.
[0040] In addition, in the melting facility 1B, only when one or the other arc furnace is not in its maximum power period, power can be supplied to the DC arc furnace from backup power supplies 40-1 and 40-2 in addition to power supplies 20-1 to 20-6. For example, when one DC arc furnace is in its melting period other than its maximum power period and the other DC arc furnace is in its refining period, 270 MW of power can be supplied to one DC arc furnace using six power supplies, and 130 MW of power can be supplied to the other DC arc furnace using two power supplies. In this way, the number of power supply units in operation during power supply will increase from six to eight, allowing each power supply unit to operate with a margin of error (with reduced output per unit), thereby extending the lifespan of the power supply units.
[0041] Although the embodiments of the present invention have been described in detail above, these are merely examples, and the present invention can be configured in various modified forms without departing from the spirit of the invention.
[0042] (1) For example, the number of graphite electrodes and power supply units constituting the melting equipment of the present invention is not limited to that of the above embodiment and can be changed as appropriate. In the above embodiment, six power supply units are used to supply power to two DC arc furnaces, but it is also possible to increase the number of power supply units to five, seven, or more. By increasing the number of power supply units, the power supplied to each furnace during simultaneous power supply can be distributed in a more precise ratio.
[0043] (2) The structure of the bottom electrode of a DC arc furnace is not particularly limited, and various types can be used as appropriate, such as a type using many relatively small diameter steel bars (contact pins) (multi-pin type), a type using one to three relatively large diameter steel bars (billets) (billet type), or a type using no steel bars but utilizing the conductivity of the bricks themselves (contact body type).
[0044] (3) Furthermore, the multiple (six) power supply units of the melting equipment of the embodiment shown in Figure 1 can be divided into two groups and installed in separate machine rooms. By placing the multiple power supply units in different areas (machine rooms) for each group, the flexibility of the equipment layout can be increased.
[0045] (4) In the present invention, the total capacity Seqip of the power supply devices only needs to be equal to or greater than the maximum input power Sd, so the full capacity of the power supply devices can be used. For example, in the example operation pattern shown in Fig. 3, the input power to the DC arc furnace 2A in state A can be changed to 280 MW, the input power to the DC arc furnace 2A in state B can be changed to 420 MW, and the input power to the DC arc furnace 2A in state C can be changed to 140 MW. [Explanation of symbols]
[0046] 1,1B Melting equipment 2A, 2B DC arc furnace 6,6A,6B,7,7A,7B Graphite electrodes 15, 15B Power supply means 20,20-1~20-6 Power supply 29, 29B Connection switching means 30, 30-1 to 30-6 Switching device 32, 32-1 to 32-6 Switching device 40,40-1,40-2 Power supply 41, 41-1, 41-2 Switching device 42, 42-1, 42-2 Switching device 50 Power supply control unit
Claims
1. Two DC arc furnaces having two or more graphite electrodes; A power supply means having four or more power supply devices; a connection switching means for selectively connecting each of the power supply devices to each of the DC arc furnaces; a power supply control unit for controlling power supply from each of the power supply devices to each of the DC arc furnaces; Equipped with A melting facility in which it is possible to select between supplying power to only one of the two DC arc furnaces or to supply power to both of them simultaneously, and when supplying power simultaneously, it is possible to supply power to either one of the DC arc furnaces at more than 50% of the capacity of the entire power supply unit.
2. 2. The melting facility according to claim 1, wherein the number of the power supply devices included in the power supply means is greater than the total number of the graphite electrodes included in the two DC arc furnaces.
3. 3. The melting facility according to claim 2, wherein each of said two DC arc furnaces has two of said graphite electrodes, and said power supply means has six or more of said power supply devices.
4. 2. The melting facility according to claim 1, further comprising a backup power supply connected to said DC arc furnace so as to be capable of supplying power to said DC arc furnace in addition to said power supply device required for supplying a maximum input power per DC arc furnace.
5. 5. The melting facility according to claim 4, wherein, during power supply, power is supplied to said DC arc furnace from said backup power supply device in addition to said essential power supply device.
6. The melting equipment according to claim 1 , wherein the plurality of power supply devices are installed separately in two or more machine rooms.
7. When using the melting equipment according to claim 1 to melt steel in each of the two DC arc furnaces, The furnace period of the DC arc furnace is divided into a melting period including a maximum power period during which a maximum input power is supplied, a refining period during which a power smaller than the maximum input power is supplied, a slag removal period, a steel tapping period for the molten metal, and a metal raw material charging period, When the maximum input power per furnace during the melting period is Sd and the total capacity value of each power supply device is Seqip, the maximum input power is set so that Seqip ≧ Sd; A method for operating melting equipment, comprising the steps of: supplying power to each DC arc furnace such that the maximum power period in one DC arc furnace overlaps with at least any of the slag removal period, the steel tapping period, and the charging period in the other DC arc furnace; and such that the melting period and the refining period excluding the maximum power period in one DC arc furnace overlap with the melting period and the refining period excluding the maximum power period in the other DC arc furnace.
Citation Information
Patent Citations
Dissolving equipment of dc arc furnace
JP1994331282A
