Construction method of underground structure and underground structure

The method of constructing an underground structure with sequential and reverse pouring methods, supplemented by boundary braces, addresses ground level differences and deformation issues, ensuring stable construction.

JP2024162913APending Publication Date: 2024-11-21OHBAYASHI GUMI LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023078896
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-11
Publication Date
2024-11-21

AI Technical Summary

Technical Problem

Conventional underground structure construction methods using sequential and reverse pouring methods risk ground level differences leading to deformation between structural parts.

Method used

A method involving a first structural part constructed by sequential pouring, a second part by reverse pouring, and installing braces at their boundary to suppress ground height differences.

Benefits of technology

Prevents ground level discrepancies and deformation between structural parts by supporting the second part with braces, ensuring stable construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024162913000001_ABST
    Figure 2024162913000001_ABST
Patent Text Reader

Abstract

To provide a construction method of an underground structure and an underground structure which can suppress generation of a difference of elevation of a ground between a part constructed by a normal construction method and a part constructed by an inverted construction method.SOLUTION: There are provided: a construction method of an underground structure of a building 1 which includes a first construction step of constructing a first structure part 21 of an underground structure 20 by a normal construction method, a second construction step of constructing a second structure part 22 adjacent to the first structure part 21 of the underground structure 20 by an inverted construction method, and a brace installation step of installing a brace 30 in a boundary part B between the first structure part 21 and the second structure part 22; and the underground structure 20 which has the first structure part 21 constructed by the normal construction method, the second structure part 22 constructed by the inverted construction method, and the brace 30 installed in the boundary part B between the first structure part 21 and the second structure part 22.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing an underground structure of a building and to an underground structure. [Background technology]

[0002] For example, in buildings such as high-rise buildings, it is common to have underground structures having multiple floors.

[0003] Conventionally, a method for constructing underground structures for such buildings has been known in which a first structural part, which is one part of the underground structure, is constructed using a forward pouring method, and a second structural part, which is the remaining part of the underground structure, is constructed using a reverse pouring method (see, for example, Patent Document 1).

[0004] According to this method of constructing underground structures, for example, if there are two existing buildings on a site where a new building is to be constructed, the first structural part can be constructed using a forward pouring method at the site of the existing building that was demolished first, and after the remaining existing buildings have been demolished, the second structural part can be constructed using a reverse pouring method at the same site, making it possible to construct an above-ground structure without delay on top of the first and second structural parts. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent Publication No. 2021-95693 Summary of the Invention [Problem to be solved by the invention]

[0006] However, in the above-mentioned conventional method of constructing underground structures, pressure is applied from the first structural part constructed by the pour-in-place method to the part constructed by the top-down method, and there is a risk of a difference in ground level occurring between the part constructed by the pour-in-place method and the part constructed by the top-down method. If a difference in ground level occurs between the part constructed by the pour-in-place method and the part constructed by the top-down method, various problems will arise, such as the risk of deformation occurring between the first structural part and the second structural part.

[0007] The present invention has been made in consideration of such problems, and its purpose is to provide a method for constructing an underground structure and an underground structure that are capable of suppressing the occurrence of differences in ground elevation between the parts constructed by the forward pouring method and the parts constructed by the reverse pouring method. [Means for solving the problem]

[0008] The underground structure construction method of the present invention is a method for constructing an underground structure of a building, and is characterized by having a first construction step of constructing a first structural part of the underground structure by a forward pouring method, a second construction step of constructing a second structural part adjacent to the first structural part of the underground structure by a reverse pouring method, and a brace installation step of installing a brace at the boundary between the first structural part and the second structural part.

[0009] The underground structure of the present invention is an underground structure of a building, and is characterized in having a first structural part of the underground structure constructed by a forward pouring method, a second structural part of the underground structure constructed adjacent to the first structural part by a reverse pouring method, and a brace installed at the boundary between the first structural part and the second structural part. Effect of the Invention

[0010] According to the present invention, it is possible to provide a method for constructing an underground structure and an underground structure that can suppress the occurrence of a difference in ground elevation between the part constructed by the forward pouring method and the part constructed by the reverse pouring method. [Brief description of the drawings]

[0011] [Figure 1] 1 is an explanatory diagram showing, in outline, a building having an underground structure constructed by a method for constructing an underground structure according to one embodiment of the present invention; [Diagram 2] FIG. 13 is an explanatory diagram illustrating a state in which a first construction step has been completed. [Diagram 3] FIG. 11 is an explanatory diagram illustrating a state in which a second construction step is being performed. [Figure 4] FIG. 13 is an explanatory diagram illustrating a state in which a second construction step has been completed. [Diagram 5] FIG. 13 is an explanatory diagram illustrating the state after the brace installation process is completed. [Figure 6] An explanatory diagram showing an outline of an underground structure relating to a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, a method for constructing an underground structure and an underground structure according to one embodiment of the present invention will be described in detail with reference to the drawings.

[0013] A building 1 shown in FIG. 1 has an above-ground structure 10 constructed above ground, and an underground structure 20 according to one embodiment of the present invention constructed underground.

[0014] The ground structure 10 is, for example, a building having multiple floors. In this embodiment, the ground structure 10 is a high-rise building made of reinforced concrete and having a height of about 200 m. However, the ground structure 10 is not limited to a high-rise building.

[0015] The underground structure 20 has a first structural portion 21 and a second structural portion 22 adjacent to the first structural portion 21. The first structural portion 21 and the second structural portion 22 are each a framework or structure that constitutes the underground structure 20.

[0016] The first structural section 21 is constructed by a pouring-in-place construction method. More specifically, the first structural section 21 has a concrete foundation 21a poured into the ground 3 dug from the ground 2, a plurality of columns 21b supported by the foundation 21a, and a plurality of beams 21c joined to adjacent columns 21b. Although not shown in detail, the first structural section 21 is provided with a plurality of slabs corresponding to each floor of the basement, forming a multi-story underground space.

[0017] The second structural section 22 is constructed by the inverted construction method. More specifically, the second structural section 22 has a plurality of inverted support columns 22b supported by concrete supports 22a driven into the ground 3 dug from the ground 2, and a plurality of beams 22c joined to adjacent inverted support columns 22b. Although not shown in detail, the second structural section 22 is provided with a plurality of slabs corresponding to each floor of the basement, forming a multi-story underground space.

[0018] The pillar 21b of the first structural part 21 adjacent to the second structural part 22 and the inverted support pillar 22b of the second structural part 22 adjacent to the first structural part 21 are joined to each other by a plurality of connecting beams 23. As a result, the first structural part 21 and the second structural part 22 are integrated.

[0019] In addition, in FIG. 1, for the sake of convenience, only one pillar 21b, beam 21c, inverted support pillar 22b, beam 22c, and connecting beam 23 are labeled with reference numerals.

[0020] A brace 30 is installed at a boundary portion B between the first structural portion 21 and the second structural portion 22. The brace 30 is a vertical brace. More specifically, the brace 30 is installed between a column 21b adjacent to the second structural portion 22 of the first structural portion 21, an inverted support column 22b adjacent to the first structural portion 21 of the second structural portion 22, and a pair of connecting beams 23 joined to the column 21b and the inverted support column 22b, respectively, and arranged side by side above and below.

[0021] In this embodiment, one end of the brace 30 is joined to the joint between the inverted support column 22b of the second structural part 22 and the lower connecting beam 23, and the other end is joined to the joint between the column 21b of the first structural part 21 and the upper connecting beam 23.

[0022] When a load is applied to the second structural part 22 in a direction that displaces it upward relative to the first structural part 21, the brace 30 transmits the load to the first structural part 21 so that the second structural part 22 is supported by the first structural part 21, thereby suppressing the upward displacement of the second structural part 22 relative to the first structural part 21.

[0023] In this embodiment, one end of the brace 30 is joined to the joint between the inverted support 22b of the second structural part 22 and the lower connecting beam 23, and the other end is joined to the joint between the column 21b of the first structural part 21 and the upper connecting beam 23. However, this is not limited to this, and the brace 30 can also be configured such that one end is joined to the joint between the inverted support 22b of the second structural part 22 and the upper connecting beam 23, and the other end is joined to the joint between the column 21b of the first structural part 21 and the lower connecting beam 23.

[0024] In addition, in this embodiment, the brace 30 is provided only between a pair of connecting beams 23 that constitute a specified basement at the boundary portion B between the first structural portion 21 and the second structural portion 22, but the brace 30 may be provided between each of multiple pairs of connecting beams 23 that constitute other basements.

[0025] The underground structure 20 of the building 1 having the above-mentioned configuration can be constructed by a method for constructing an underground structure according to one embodiment of the present invention.

[0026] A method for constructing an underground structure according to one embodiment of the present invention includes a first construction step, a second construction step, and a brace installation step.

[0027] The first construction step is a step of constructing the first structural part 21 of the underground structure 20 by a pour-in-place construction method. More specifically, as shown in Fig. 2, a part of the ground 2 of the planned construction site of the building 1 is dug down, and a retaining wall 4 is provided around the periphery by shoring (not shown) or the like to form an underground space, concrete is poured into the ground 3 at the bottom of the underground space to form a foundation 21a, and a beam 21c is joined to the foundation 21a while supporting a plurality of columns 21b, thereby constructing the first structural part 21 from the bottom floor upward. Then, when the construction is repeated up to the top floor, the construction of the first structural part 21 in which the plurality of columns 21b and beams 21c are joined is completed.

[0028] After the first construction step is completed, the second construction step is carried out. The second construction step is a step of constructing the second structural part 22 adjacent to the first structural part 21 of the underground structure 20 by the inverted construction method. More specifically, as shown in FIG. 3, a plurality of inverted support columns 22b are driven into the ground 2 adjacent to the first structural part 21, and a floor part 22d of the ground floor supported by the plurality of inverted support columns 22b is constructed. Then, a retaining wall 5 is provided on the periphery by shoring (not shown) or the like, and the ground 2 is excavated to construct the second structural part 22 in sequence from the upper floor to the lower floor. In addition, the constructed part of the second structural part 22 is appropriately joined to the first structural part 21 by the connecting beam 23. Then, as shown in FIG. 4, when the construction is repeated up to the lowest floor, the construction of the second structural part 22 in which the plurality of inverted support columns 22b and the beam 22c are joined is completed.

[0029] After constructing the ground floor floor portion 22d in the second construction process, as shown in Figure 4, the second construction process can be carried out while simultaneously constructing the ground structure 10 on the first structural portion 21 and the second structural portion 22.

[0030] After the second construction step is completed, the brace installation step is performed. In the brace installation step, the brace 30 is installed at the boundary B between the first structural part 21 and the second structural part 22. The brace 30 is a vertical brace. More specifically, as shown in FIG. 5, the brace 30 is installed between the column 21b adjacent to the second structural part 22 of the first structural part 21 constructed in the first construction step, the inverted support column 22b adjacent to the first structural part 21 of the second structural part 22 constructed in the second construction step, and a pair of connecting beams 23 joined to the column 21b and the inverted support column 22b and arranged vertically.

[0031] In the brace installation process, it is preferable to install the brace 30 so that one end is joined to the joint between the inverted support 22b of the second structural part 22 and the lower connecting beam 23, and the other end is joined to the joint between the column 21b of the first structural part 21 and the upper connecting beam 23, but this is not limited to this, and the brace 30 may be installed so that one end is joined to the joint between the inverted support 22b of the second structural part 22 and the upper connecting beam 23, and the other end is joined to the joint between the column 21b of the first structural part 21 and the lower connecting beam 23.

[0032] In this embodiment, in the brace installation process, the brace 30 is installed only between a pair of connecting beams 23 that constitute a specified basement, at the boundary portion B between the first structural portion 21 and the second structural portion 22, but the brace 30 may be installed between each of multiple pairs of connecting beams 23 that constitute other basements.

[0033] According to the method for constructing an underground structure of this embodiment having the above-mentioned configuration, for example, if there are two existing buildings on the planned construction site of building 1, the construction of the first structural part 21 can be carried out by the first construction process, i.e., the forward pouring method, at the site of the existing building that was demolished first, and after the remaining existing buildings are demolished, the construction of the second structural part 22 can be carried out at the same site by the second construction process, i.e., the reverse pouring method, so that the above-ground structure 10 can be constructed on top of the first structural part 21 and the second structural part 22 without delay.

[0034] On the other hand, if the first structural part 21 is constructed by the forward pouring method in the first construction step and the second structural part 22 is constructed by the reverse pouring method in the second construction step, pressure is applied from the first structural part 21 constructed by the forward pouring method to the part of the ground 3 constructed by the reverse pouring method, and there is a risk of a difference in elevation of the ground 3 occurring between the part where the first structural part 21 is constructed by the forward pouring method and the part where the second structural part 22 is constructed by the reverse pouring method. If a difference in elevation of the ground 3 occurs between the part where the first structural part 21 is constructed by the forward pouring method and the part where the second structural part 22 is constructed by the reverse pouring method, various problems such as a risk of deformation occurring between the first structural part 21 and the second structural part 22 will occur.

[0035] In contrast, in the method for constructing an underground structure according to this embodiment, the first structural part 21 is constructed by a pour-in-place method in the first construction step, the second structural part 22 is constructed by a pour-in-place method in the second construction step, and then a brace 30 is installed at the boundary part B between the first structural part 21 and the second structural part 22 in the brace installation step. Therefore, even if a force that causes a difference in elevation of the ground 3 is generated between the part where the first structural part 21 is constructed by the pour-in-place method and the part where it is constructed by the pour-in-place method, and a load is applied to the second structural part 22 in a direction that displaces it upward relative to the first structural part 21, the load is transmitted to the first structural part 21 by the brace 30 installed at the boundary part B between the first structural part 21 and the second structural part 22, so that the second structural part 22 is supported by the first structural part 21, thereby suppressing the upward displacement of the second structural part 22 relative to the first structural part 21. Therefore, the ground 3 in the portion where the second structural section 22 is constructed is prevented from displacing upward relative to the portion where the first structural section 21 is constructed, and the occurrence of a difference in elevation of the ground 3 between the portion where the first structural section 21 is constructed by the forward pouring method and the portion where the second structural section 22 is constructed by the reverse pouring method is prevented.

[0036] Thus, according to the underground structure construction method or underground structure 20 of this embodiment, the brace 30 installed at the boundary portion B between the first structural portion 21 and the second structural portion 22 suppresses upward displacement of the second structural portion 22 relative to the first structural portion 21, thereby suppressing the occurrence of a difference in elevation of the ground 3 between the first structural portion 21, which is the portion constructed by the forward pouring method, and the second structural portion 22, which is the portion constructed by the reverse pouring method.

[0037] As shown as a modified example in Fig. 6, the underground structure 20 constructed by the underground structure construction method according to this embodiment may be configured such that the inverted support column 22b adjacent to the first structural section 21 of the second structural section 22 constructed in the second construction step has a portion inclined with respect to the vertical direction, i.e., the inclined column 22e. In this case, the brace 30 may be configured such that one end is joined to the joint between the lower end of the inclined column 22e and the lower connecting beam 23, and the other end is joined to the joint between the column 21b and the upper connecting beam 23. That is, in the brace installation step, the brace 30 is installed so as to be arranged as shown in Fig. 6.

[0038] In addition, in the configuration of the modified example, an auxiliary brace 31 can be provided having one end joined to the joint between another inverted support 22b adjacent to the inclined column 22e and the lower beam 22c, and the other end joined to the joint between the inclined column 22e and the upper beam 22c, so that the horizontal load applied to the inclined column 22e can be supported by the auxiliary brace 31.

[0039] In the configuration of this modified example, as in the case shown in Figure 1, the brace 30 installed at the boundary part B between the first structural part 21 and the second structural part 22 suppresses upward displacement of the second structural part 22 relative to the first structural part 21, thereby suppressing the occurrence of a difference in elevation of the ground 3 between the first structural part 21, which is the part constructed by the forward pouring method, and the second structural part 22, which is the part constructed by the reverse pouring method.

[0040] The present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit and scope of the present invention. [Explanation of symbols]

[0041] 1 Building 2 ground 3 Ground 4 Retaining wall 5 Retaining wall 10 Ground structures 20 Underground structures 21 1st structure part 21a Basics 21b pillar 21c beam 22 Second structure part 22a Support 22b Reverse-drive post 22c beam 22d floor part 22e tilted column 23 Connecting beam 30 Brace 31 Auxiliary brace B Boundary part

Claims

1. A method for constructing an underground structure of a building, comprising the steps of: A first construction step of constructing a first structural portion of the underground structure by a forward pouring method; A second construction step of constructing a second structural portion adjacent to the first structural portion of the underground structure by a reverse construction method; A method for constructing an underground structure, comprising: a brace installation process for installing a brace at the boundary portion between the first structural portion and the second structural portion.

2. An underground structure of a building, A first structural portion of the underground structure constructed by a pour-in method; A second structural portion of the underground structure constructed adjacent to the first structural portion by an inverted construction method; and a brace installed at the boundary between the first structural portion and the second structural portion.