Masonry structure wall reinforcement structure and masonry structure wall reinforcement method
The masonry wall reinforcement structure forms horizontal and vertical holes to apply compressive force via tendons, addressing inefficiencies and foundation requirements in existing methods, ensuring efficient reinforcement and preservation of historic structures.
Patent Information
- Application Number
- JP2023082492
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-18
- Publication Date
- 2024-11-28
AI Technical Summary
Existing masonry wall reinforcement methods are inefficient and cannot be applied to buildings without foundations, and require extensive cutting and excavation, which can damage historic sites and reduce construction efficiency.
A masonry wall reinforcement structure that forms horizontal holes in the lower side surface of the wall, with a vertical hole passing through a bearing surface, and uses a tendon material inserted into the holes, secured with a fixing plate and tensioned by a tightening member, generating compressive force without the need for a foundation.
Enables efficient reinforcement of masonry walls without foundations, preserving the original design and avoiding excavation damage, by creating compressive force through tensioned tendons.
Smart Images

Figure 2024165906000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a masonry wall reinforcement structure and a masonry wall reinforcement method. [Background technology]
[0002] 2. Description of the Related Art Reinforcement structures for buildings having masonry walls have been proposed in the past.
[0003] The following Patent Document 1 discloses a reinforcement structure for a masonry structure that includes a vertical hole provided from the top to the bottom of the masonry building, and an enlarged portion at the lower end of the vertical hole that is larger in diameter than the vertical hole. In this reinforcement structure for a masonry structure, an anchor plate is attached to the lower end of a rod-shaped material, and then the rod-shaped material is inserted into the vertical hole, and the enlarged portion is filled with a solidification material to bury the anchor plate.
[0004] Furthermore, the following Patent Document 2 discloses a masonry wall reinforcement structure in which a horizontal hole is formed in the side wall of the brick wall foundation. In this masonry wall reinforcement structure, a tendon is inserted into a through hole that passes between the upper and lower ends of the brick wall, and a lower fixing member that fixes the lower end of the tendon is fixed by a filler filled in the horizontal hole. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2020-094431 A [Patent Document 2] JP 2010-281034 A Summary of the Invention [Problem to be solved by the invention]
[0006] In the reinforcement structure for masonry structures described in Patent Document 1, when forming an enlarged portion at the lower end of a vertical hole, the lower end of the vertical hole is cut outward in the horizontal direction to be enlarged to a diameter larger than the inner diameter of the vertical hole. This makes the cutting of the enlarged portion time-consuming and reduces construction efficiency.
[0007] In addition, in the reinforcement structure for masonry walls described in Patent Document 2, a horizontal hole is formed in the side wall of the brick wall foundation. For this reason, this technology cannot be applied to masonry buildings that do not have a foundation, and there is room for improvement.
[0008] In consideration of the above, an object of the present invention is to provide a masonry wall reinforcing structure and a masonry wall reinforcing method that can reinforce masonry walls regardless of whether or not there is an existing foundation, and that can improve construction efficiency. [Means for solving the problem]
[0009] The masonry wall reinforcement structure described in the first embodiment has a horizontal hole formed on the lower side of the masonry wall, the bearing surface of which follows the joints of the masonry wall, a vertical hole passing from the upper surface of the masonry wall through the bearing surface of the horizontal hole, a tensioning member inserted into the vertical hole and with an anchor plate attached to its tip positioned within the horizontal hole, a concrete section filled into the horizontal hole and burying the anchor plate, and a tightening member that tensions the tensioning member.
[0010] According to the masonry wall reinforcement structure of the first aspect, a horizontal hole is formed on the lower side surface of the masonry wall, with the bearing surface following the joints of the masonry wall. A tensioning material is inserted from the upper surface of the masonry wall into a vertical hole passing through the bearing surface of the horizontal hole, and an anchor plate attached to the tip of the tensioning material is positioned inside the horizontal hole. A concrete portion is filled in the horizontal hole, and the anchor plate is embedded in the concrete portion. Furthermore, by tensioning the tensioning material using a tightening member provided on the upper surface of the masonry wall, a compressive force is generated in the masonry wall from the bearing surface of the upper surface of the concrete portion inside the horizontal hole. Therefore, even in masonry walls that do not have existing foundations, the tendons can generate compressive forces throughout the masonry wall, allowing reinforcement. Furthermore, because horizontal holes are formed in the lower side of the masonry wall, even if excavation is not possible due to historical sites or other issues in the ground surrounding the building, reinforcement is possible from the inside of the building, and damage to the original design of the building is prevented.
[0011] The masonry wall reinforcement structure according to the second aspect is the masonry wall reinforcement structure according to the first aspect, in which the bearing surface above the horizontal hole is parallel to the joints of the masonry wall.
[0012] According to the masonry wall reinforcement structure described in the second aspect, the upper bearing surface of the horizontal hole is parallel to the joints of the masonry wall, so it is easy to form a horizontal hole with a horizontal surface on the upper side that serves as the bearing surface, in line with the joints of the masonry wall.
[0013] The masonry wall reinforcing method described in the third aspect includes a horizontal hole forming process of drilling a plurality of circular holes in the lower side of the masonry wall by shifting them laterally and overlapping them, and chipping the upper surface to form horizontal holes to create a bearing surface along the joints of the masonry wall, a tensioning member inserting process of inserting tensioning members into vertical holes drilled from the upper surface of the masonry wall so as to pass through the bearing surface of the horizontal holes, an anchor plate attaching process of attaching an anchor plate to the tip of the tensioning member and positioning the anchor plate within the horizontal hole, a filling process of filling the horizontal holes with concrete and burying the anchor plate, and a tensioning process of tensioning the tensioning member from above the vertical hole.
[0014] According to the third aspect of the masonry wall reinforcing method, in the horizontal hole forming step, a plurality of circular holes are drilled in the lower side of the masonry wall by shifting them horizontally and overlapping them, and the upper surface is chipped to form horizontal holes for forming a bearing surface along the joints of the masonry wall. In the tension rod inserting step, tension rods are inserted into the vertical holes drilled so as to pass through the bearing surface of the horizontal holes from the upper surface of the masonry wall. In the anchor plate attaching step, an anchor plate is attached to the tip of the tension rod and positioned inside the horizontal hole. In the filling step, concrete is filled into the horizontal hole and the anchor plate is buried. Furthermore, in the tensioning step, tension is applied to the tension rod from above the vertical hole. As a result, a compressive force is generated in the masonry wall from the bearing surface of the upper surface of the concrete filled in the horizontal hole. Therefore, even in masonry walls that do not have existing foundations, the tendons can generate compressive forces throughout the masonry wall, allowing reinforcement. Furthermore, because horizontal holes are formed in the lower side of the masonry wall, even if excavation is not possible due to historical sites or other issues in the ground surrounding the building, reinforcement is possible from the inside of the building, and damage to the original design of the building is prevented. Effect of the Invention
[0015] According to the masonry wall reinforcement structure and masonry wall reinforcement method disclosed herein, it is possible to reinforce a masonry wall regardless of whether or not there is an existing foundation, and to improve construction efficiency. [Brief description of the drawings]
[0016] [Figure 1] FIG. 1 is a side cross-sectional view showing a part of a building to which a masonry wall reinforcement structure according to a first embodiment is applied. [Diagram 2] FIG. 1 is a front cross-sectional view showing a part of a building to which a masonry wall reinforcement structure according to a first embodiment is applied. [Diagram 3] 1 is a front cross-sectional view showing an enlarged state of the masonry wall reinforcement structure according to the first embodiment. FIG. [Figure 4] FIG. 2 is a side cross-sectional view showing an enlarged state of the masonry wall reinforcement structure according to the first embodiment. [Diagram 5] FIG. 2 is a process diagram showing a masonry wall reinforcing method for constructing a masonry wall reinforcing structure according to the first embodiment. [Figure 6] FIG. 1A is a side view showing how a horizontal hole is formed in a masonry wall, and FIG. 1B is a plan view showing how a horizontal hole is formed in a masonry wall. [Figure 7] FIG. 11 is a side cross-sectional view showing a part of a building to which a masonry wall reinforcement structure relating to the second embodiment is applied. [Figure 8] FIG. 11 is a front cross-sectional view showing a part of a building to which a masonry wall reinforcement structure of a comparative example is applied. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will now be described in detail with reference to the accompanying drawings, in which elements that are less relevant to the present invention are omitted.
[0018] [First embodiment] A masonry wall reinforcing structure and a masonry wall reinforcing method according to a first embodiment will be described with reference to Figs. 1 to 6.
[0019] (Building structure with masonry wall reinforcement applied) FIG. 1 shows a side cross-sectional view of a part of a building 100 to which a masonry wall reinforcement structure 10 according to the first embodiment is applied. FIG. 2 shows a front cross-sectional view of a part of a building 100 to which a masonry wall reinforcement structure 10 according to the first embodiment is applied. As shown in FIG. 1, the building 100 includes broken granite stones 104 arranged at the bottom of an excavated ground 102, mortar concrete 106 poured above the broken granite stones 104, and a brick wall 108 provided above the mortar concrete 106. The masonry wall means a wall of a structure formed by stacking block-shaped members such as stones, bricks, and concrete blocks. In the first embodiment, the building 100 is a brick building and includes a brick wall 108 formed by stacking bricks. The brick wall 108 is an example of a masonry wall.
[0020] Furthermore, inside the building 100, a brick floor 110 is disposed above the basin concrete 106, and a dry floor 112 is formed above the brick floor 110. As an example, the dry floor 112 is provided on the first basement floor of the building 100. The dry floor 112 is formed, for example, by laying floor panels 115 on the upper surfaces of a plurality of pillars 114 disposed on the brick floor 110. The floor panels 115 are in contact with the side surfaces of the brick wall 108. In addition, outside the building 100, the lower end of the brick wall 108 is in contact with a portion where the ground 102 has been excavated.
[0021] As shown in Fig. 2, the brick wall 108 is constructed by piling up bricks 116, and joints 117 filled with joint material are provided between the bricks 116 (see Fig. 3). The joint material is, for example, mortar or grout. Note that broken granite stones 104 and waste concrete 106 are not shown in Fig. 2.
[0022] Also, as an example, the building 100 to which the masonry wall reinforcement structure 10 was applied was provided with broken granite stones 104 and basal concrete 106 (see FIG. 1), but the masonry wall reinforcement structure of the present disclosure can be applied regardless of the presence or absence of broken granite stones and basal concrete.
[0023] (Structure of masonry wall reinforcement structure) Next, a description will be given of the masonry wall reinforcement structure 10. In the first embodiment, the masonry wall reinforcement structure 10 reinforces a brick wall 108 of a building 100.
[0024] As shown in Figures 1 and 2, the masonry wall reinforcement structure 10 comprises a horizontal hole 12 formed in a lower side surface 108A of a brick wall 108, a vertical hole 14 passing through the upper surface of the brick wall 108 to the horizontal hole 12, and a PC steel bar 16 inserted into the vertical hole 14. The PC steel bar 16 is an example of a tendon. An anchor plate 18 is attached to the tip end (the lower end in the first embodiment) of the PC steel bar 16, and the anchor plate 18 is located within the horizontal hole 12 (see Figures 3 and 4).
[0025] Furthermore, the masonry wall reinforcement structure 10 includes a concrete portion 20 in which the horizontal hole 12 is filled with concrete, and a tightening member 22 that tensions the PC steel bar 16.
[0026] The horizontal hole 12 is formed in the lower side surface 108A of the brick wall 108 inside the building 100. The horizontal hole 12 is, for example, a recess formed in the horizontal direction in the lower side surface 108A of the brick wall 108. As an example, the horizontal hole 12 is shaped so as not to penetrate the brick wall 108. The horizontal hole 12 is formed by drilling a plurality of (two in the first embodiment) circular holes 30A, 30B by shifting them laterally and overlapping them, and the upper surface is chipped to form an upper flat surface portion 32 (see FIG. 3). The upper flat surface portion 32 is formed along the joint 117 of the brick wall 108 (see the center line 118 of the horizontal joint 117 shown in FIG. 3). When the concrete portion 20 is filled in the horizontal hole 12, the upper flat surface portion 32 becomes the bearing surface 34. In the first embodiment, the upper bearing surface 34 of the horizontal hole 12 is parallel to the joint 117 of the brick wall 108.
[0027] In addition, the horizontal hole 12 is formed by chipping the lower surface of the portion where the circular holes 30A and 30B are drilled by overlapping them to form a lower flat portion 36 (see FIG. 3). As an example, the lower flat portion 36 is formed at a position different from the joints 117 of the brick wall 108.
[0028] The vertical hole 14 is formed so as to pass through the upper surface of the brick wall 108 and the bearing surface 34 of the horizontal hole 12. The vertical hole 14 is, for example, circular in plan view (see FIG. 6(B)). As shown in FIG. 2, an existing concrete circumferential beam 130 is provided on the upper side of the brick wall 108. The vertical hole 14 is formed continuously with the concrete circumferential beam 130 and the brick wall 108.
[0029] The PC steel rod 16 is, for example, a circular member. The outer diameter of the PC steel rod 16 is smaller than the inner diameter of the vertical hole 14, so that the PC steel rod 16 can be inserted into the vertical hole 14 from the upper part thereof.
[0030] The anchor plate 18 is, for example, a plate material having a rectangular shape in a plan view. The outer shape of the anchor plate 18 is larger than the inner diameter of the vertical hole 14. The PC steel rod 16 is inserted into the vertical hole 14 from the top of the vertical hole 14, and with the tip of the PC steel rod 16 coming out of the horizontal hole 12, the anchor plate 18 can be attached to the tip of the PC steel rod 16 through the opening of the horizontal hole 12 in the lower side surface 108A of the brick wall 108. In the first embodiment, with the anchor plate 18 attached to the tip of the PC steel rod 16, the PC steel rod 16 and the anchor plate 18 cannot be inserted into the vertical hole 14.
[0031] As an example, the anchor plate 18 has a through hole through which the PC steel rod 16 passes. As an example, the PC steel rod 16 is inserted into the through hole of the anchor plate 18, and a mounting tool 40 such as a nut is fastened to a threaded portion formed at the tip of the PC steel rod 16, thereby attaching the anchor plate 18 to the tip of the PC steel rod 16.
[0032] As shown in Fig. 1 to Fig. 4, in the first embodiment, spiral reinforcements 42 wound in a spiral shape are arranged in the horizontal hole 12 in the portions where the circular holes 30A and 30B are overlapped. The spiral reinforcements 42 are an example of reinforcing bars. The two spiral reinforcements 42 are arranged so that they are offset from each other in the horizontal direction and partially overlap each other (see Fig. 3, etc.).
[0033] An anchor plate 18 at the tip of the PC steel rod 16 is embedded in the concrete portion 20 formed by filling the horizontal hole 12 with concrete or mortar. The concrete portion 20 hardens and obtains the desired strength, whereby the anchor plate 18 is fixed to the concrete portion 20. In the first embodiment, two spiral reinforcements 42 are arranged in staggered positions in the horizontal hole 12, and the two spiral reinforcements 42 are embedded in the concrete portion 20.
[0034] As shown in Fig. 2, the fastening member 22 is fastened to the tip of the PC steel rod 16 exposed from the vertical hole 14 of the concrete circumferential girder 130 with the PC steel rod 16 in a tensioned state. The fastening member 22 holds the PC steel rod 16 in a tensioned state. As an example, the fastening member 22 includes an upper fixing member 52 inserted into the upper end of the PC steel rod 16, and an anchoring nut 54 fastened to a threaded portion provided on the upper end of the PC steel rod 16. The fastening nut 54 is fastened to the threaded portion at the upper end of the PC steel rod 16 via the upper fixing member 52, thereby holding the PC steel rod 16 in a tensioned state.
[0035] (Masonry wall reinforcement method) Next, a method for reinforcing a brick wall 108 will be described as an example of the method for reinforcing a masonry wall according to the first embodiment. FIG.
[0036] As shown in FIG. 5, the method of reinforcing the brick wall 108 includes a hole drilling operation 201 , a PC steel bar insertion operation and concrete filling operation 202 , and tensioning work 203 .
[0037] In the drilling work 201, a drilling machine (not shown) is placed on the top of the brick wall 108, and vertical drilling is performed (see step S211). As a result, the vertical hole 14 is drilled from the top surface of the brick wall 108 (see FIG. 2). In the vertical drilling, the vertical construction accuracy of the vertical hole 14 is managed, and the drilling length of the vertical hole 14 is checked.
[0038] 6(A) and (B), a drilling machine 300 is placed on the lower side surface 108A of the brick wall 108, and a core hole is drilled from the side of the brick wall 108 (see step S212). The drilling machine 300 includes a drill 304 extending from a main body portion 302, and a fixing member 306 that fixes the main body portion 302 to the brick wall 108. As an example, the fixing member 306 is configured to be fastened to a member screwed into the brick wall 108.
[0039] In the core drilling step S212, the circular hole 30A is drilled from the lower side surface 108A of the brick wall 108 by the drill 304. Furthermore, the drilling machine 300 is set to be shifted to the side of the brick wall 108, and the circular hole 30B is drilled by the drill 304 to be shifted to the side of the circular hole 30A. As a result, the two circular holes 30A and 30B can be drilled in the lower side surface 108A of the brick wall 108 by shifting them to the side and overlapping them. In the core drilling step S212, the dimensions and shapes of the two circular holes 30A and 30B, such as the inner diameter, pitch, and position, are confirmed. Furthermore, the two circular holes 30A and 30B are chipped to form the horizontal hole 12 to form the bearing surface 34 along the joint 117 of the brick wall 108 (horizontal hole forming step). The horizontal hole 12 is formed at a position communicating with the lower end of the vertical hole 14. As a result, the vertical hole 14 is drilled so as to pass through the bearing surface 34 of the horizontal hole 12 from the upper surface of the brick wall 108. In the first embodiment, the horizontal hole 12 is formed in the lower side surface 108A of the brick wall 108 by peeling off the dry floor 112 shown in FIG.
[0040] Furthermore, the shape of the lateral hole 12 is measured and confirmed (see step S213), and the inside of the lateral hole 12 is cleaned (see step S214).
[0041] As an example, circular holes 30A and 30B having a diameter of 350 mm are provided at intervals of 250 mm to form a horizontal hole 12 having a bearing surface 34 having a width of 250 mm.
[0042] In the PC steel bar insertion work and concrete filling work 202, the PC steel bar 16 is inserted into the vertical hole 14 of the brick wall 108 (tension member insertion step), and the top of the PC steel bar 16 is fixed (see step S221). A plurality of PC steel bars 16 may be joined together by intermediate joints. As an example, the PC steel bar 16 is subjected to an anti-rust treatment.
[0043] Furthermore, the spiral reinforcement 42 is set in the horizontal hole 12, and the anchor plate 18 is attached to the tip of the PC steel bar 16 (see step S222). This positions the anchor plate 18 inside the horizontal hole 12 (anchor plate attachment step).
[0044] As an example, if circular holes 30A, 30B with a diameter of 350 mm are provided at intervals of 250 mm, the upper surface of the anchor plate 18 attached to the tip of the PC steel rod 16 should be more than 200 mm away from the support surface 34 with a width of 250 mm.
[0045] After that, concrete is filled into the horizontal hole 12 (see step S223), and the anchor plate 18 is embedded (filling step). Then, the concrete is hardened and cured, and its strength is checked (see step S224).
[0046] In the tensioning work 203, the surface of the upper fixing portion of the PC steel bar 16 is cleaned (see step S231), and then the upper fixing member 52 is installed on the upper end of the PC steel bar 16 (see FIG. 2), and a hydraulic jack (not shown) is set (see step S232). Then, tension is applied to the PC steel bar 16 using the hydraulic jack (see step S233). In this state, the fixing nut 54 is screwed into the threaded portion at the upper end of the PC steel bar 16, and the fixing nut 54 is tightened using a tool to apply a predetermined tension (tensioning step, see step S234). This completes the step of reinforcing the brick wall 108. After that, a dry floor 112 is formed inside the building 100 so as to cover the horizontal hole 12 of the brick wall 108.
[0047] (Action and Effects) Next, the operation and effects of the first embodiment will be described.
[0048] In the masonry wall reinforcement structure 10, a horizontal hole 12 is formed on the lower side surface 108A of a brick wall 108, with the bearing surface 34 aligned with the joint 117 of the brick wall 108. A PC steel rod 16 is inserted into a vertical hole 14 that passes through the bearing surface 34 of the horizontal hole 12 from the upper surface of the brick wall 108, and an anchor plate 18 attached to the tip of the PC steel rod 16 is located in the horizontal hole 12. A concrete portion 20 is filled in the horizontal hole 12, and the anchor plate 18 is embedded in the concrete portion 20. Furthermore, the PC steel rod 16 is tensioned by a fastening member 22 provided on the upper surface of the brick wall 108. As a result, a compressive force is generated in the brick wall 108 from the bearing surface 34 of the upper surface of the concrete portion 20 in the horizontal hole 12, as shown by the arrow in FIG. 2. That is, a compressive force is generated in the brick wall 108 when the brick wall 108 is sandwiched between the concrete circumferential girder 130 and the upper bearing surface 34 of the concrete portion 20 (see FIG. 2).
[0049] For this reason, in the masonry wall reinforcement structure 10, even in a brick wall 108 that does not have an existing foundation, the tensioned PC steel bars 16 can be used to generate compressive force throughout the brick wall 108 for reinforcement. Furthermore, because the horizontal holes 12 are formed in the lower side surface 108A of the brick wall 108, even if excavation is not possible due to historical sites or the like in the ground 102 surrounding the building 100 equipped with the brick wall 108, reinforcement is possible from the inside of the building 100, and damage to the design of the building 100 at the time of its original construction is suppressed.
[0050] In addition, in the masonry wall reinforcement structure 10, the upper bearing surface 34 of the horizontal hole 12 is parallel to the joints 117 of the brick wall 108. In the first embodiment, the upper bearing surface 34 of the horizontal hole 12 is formed to match the position of the joints 117 of the brick wall 108.
[0051] For this reason, in the masonry wall reinforcement structure 10, it is easy to form the horizontal holes 12 with a horizontal surface on the upper side that serves as the bearing surface 34 in line with the joints of the brick walls 108.
[0052] The masonry wall reinforcing method includes a horizontal hole forming step, a tendon inserting step, an anchor plate attaching step, a tensioning step, and a filling step. In the horizontal hole forming step, a plurality of circular holes 30A, 30B are drilled in the lower side surface 108A of the brick wall 108 by shifting them horizontally and lapping them, and the upper surface is chipped to form horizontal holes 12 for forming the bearing surface 34 along the joints 117 of the brick wall 108. In the tendon inserting step, a PC steel rod 16 is inserted into a vertical hole 14 drilled from the upper surface of the brick wall 108 so as to pass through the bearing surface 34 of the horizontal hole 12. In the anchor plate attaching step, an anchor plate 18 is attached to the tip of the PC steel rod 16, and the anchor plate 18 is positioned in the horizontal hole 12. In the filling step, the horizontal hole 12 is filled with concrete, and the anchor plate 18 is buried. Furthermore, in the tensioning step, the PC steel rod 16 is tensioned from above the vertical hole 14. As a result, a compressive force is generated in the brick wall 108 from the bearing surface 34 on the upper surface of the concrete portion 20 formed by filling the horizontal hole 12 with concrete. That is, a compressive force is generated in the brick wall 108 while the brick wall 108 is sandwiched between the concrete girders 130 and the upper bearing surface 34 of the concrete portion 20 (see FIG. 2).
[0053] Therefore, in the masonry wall reinforcement method, even in a brick wall 108 that does not have an existing foundation, the tensioned PC steel bars 16 can be used to generate compressive force throughout the brick wall 108, thereby reinforcing it. Furthermore, because the horizontal holes 12 are formed in the lower side surface 108A of the brick wall 108, even if excavation is not possible due to historical sites or the like in the ground 102 surrounding the building 100 equipped with the brick wall 108, reinforcement is possible from the inside of the building 100, and damage to the design of the building 100 at the time of its original construction is suppressed.
[0054] (Masonry wall reinforcement structure of comparative example) Here, a comparative example of a masonry wall reinforcement structure 500 will be described.
[0055] In the masonry wall reinforcement structure 500 of the comparative example, the brick walls 108 are stacked on the upper side of the concrete foundation 502 buried in the ground. A vertical hole 504 is drilled from the upper surface of the brick wall 108 toward the concrete foundation 502. The vertical hole 504 is drilled to a position that reaches the concrete foundation 502 but does not penetrate the concrete foundation 502. An enlarged diameter portion 506 having a hole diameter enlarged from the inner diameter of the vertical hole 504 is formed at the tip of the vertical hole 504. For example, a hole enlargement device (not shown) is attached to the tip of a drilling rod inserted into the vertical hole 504, and the enlarged diameter portion 506 can be formed at the tip of the vertical hole 504 by the hole enlargement device by rotating the drilling rod.
[0056] An anchoring portion 508 is attached to the tip of the PC steel bar 16, and the PC steel bar 16 is inserted into the vertical hole 504 from the anchoring portion 508 side. The anchoring portion 508 abuts against the bottom of the vertical hole 504 on the inner side of the enlarged diameter portion 506. The anchoring portion 508 is fixed to the concrete foundation 502 by the solidification of the grout material 510 in the enlarged diameter portion 506.
[0057] An upper fixing member 52 is placed on the upper end of the PC steel bar 16, and a fixing nut 54 is tightened to the threaded portion of the upper end of the PC steel bar 16 while tension is applied to the PC steel bar 16.
[0058] In the masonry wall reinforcement structure 500 of the comparative example, the brick wall 108 is sandwiched between the concrete foundation 502 and the concrete girders 130 in the vertical direction, and a compressive force is applied to the brick wall 108 .
[0059] However, in the masonry wall reinforcement structure 500 of the comparative example, an enlarged diameter portion 506 whose hole diameter is larger than the inner diameter of the vertical hole 504 is formed at the tip of the vertical hole 504 in the concrete foundation 502, and this configuration cannot be applied to a building 100 (see FIG. 2) that does not have a concrete foundation 502. That is, in a building 100 (see FIG. 2) that does not have a concrete foundation 502, an enlarged diameter portion cannot be provided at the lower end of the vertical hole 14 formed in the brick wall 108.
[0060] In contrast, in the masonry-wall reinforcement structure 10 of the first embodiment, a horizontal hole 12 is formed in a lower side surface 108A of a brick wall 108, with a bearing surface 34 aligned with a joint 117 of the brick wall 108. Then, a PC steel bar 16 is inserted into a vertical hole 14 of the brick wall 108, and an anchor plate 18 attached to the tip of the PC steel bar 16 is embedded in a concrete portion 20 filled in the horizontal hole 12. Therefore, in the masonry-wall reinforcement structure 10 and the masonry-wall reinforcement method of the first embodiment, even in a brick wall 108 that does not have an existing concrete foundation, the PC steel bar 16 can generate a compressive force in the entire brick wall 108, thereby reinforcing the brick wall 108.
[0061] Second Embodiment Next, a masonry wall reinforcement structure and a masonry wall reinforcement method according to a second embodiment will be described. Note that the same components as those in the first embodiment will be given the same reference numerals and the description thereof will be omitted.
[0062] Fig. 7 shows a vertical cross-sectional view of a building 150 to which a masonry wall reinforcement structure 160 of the second embodiment is applied. As shown in Fig. 7, the building 150 includes broken granite stones 152 arranged in an excavated portion of the ground 102, basing concrete 154 poured on the upper side of the broken granite stones 152, and a brick wall 108 provided on the upper side of the basing concrete 154. The brick wall 108 is buried in the ground 102. Inside the building 150, a dirt floor slab 156 is provided on the ground 102. As an example, the dirt floor slab 156 is provided on the first basement floor of the building 150.
[0063] During construction to reinforce the brick wall 108, the floor slab 156 and the ground 102 are excavated in an excavation range 162 in which the lower side surface 108A of the brick wall 108 is exposed. Then, a horizontal hole 12 is formed in the lower side surface 108A of the brick wall 108 exposed from the ground 102. The masonry wall reinforcement structure 160 of the second embodiment is similar to the masonry wall reinforcement structure 10 of the first embodiment.
[0064] After reinforcing the brick wall 108, the excavated area 162 of the ground 102 is backfilled, and a floor slab 156 is provided on top of the backfilled ground 102. Other aspects of the masonry wall reinforcing method of this embodiment are similar to the masonry wall reinforcing method of the first embodiment.
[0065] The masonry wall reinforcement structure 160 and the masonry wall reinforcement method of the second embodiment have the same configuration as the masonry wall reinforcement structure 10 and the masonry wall reinforcement method of the first embodiment, and can provide the same functions and effects.
[0066] 〔others〕 In the first and second embodiments, the horizontal hole 12 is a recess that does not penetrate the brick wall 108, but the present disclosure is not limited to this configuration. For example, the horizontal hole may penetrate the brick wall 108. That is, the "horizontal hole" in the present disclosure includes both a hole that penetrates a brick wall, which is an example of a masonry wall, and a hole that does not penetrate the brick wall.
[0067] In the first and second embodiments, the bearing surface 34 of the transverse hole 12 is flat, but the present disclosure is not limited to this configuration. For example, the bearing surface of the transverse hole may have a non-flat (i.e., uneven) shape.
[0068] In the first and second embodiments, the bearing surface 34 of the horizontal hole 12 is formed to match the position of the joint 117 of the brick wall 108, but the present disclosure is not limited to this configuration. For example, the bearing surface of the horizontal hole may be provided at a position slightly offset from the joint 117 of the brick wall 108 as long as it is parallel to the joint 117 of the brick wall 108.
[0069] In the first and second embodiments, after the vertical holes 14 are formed in the brick wall 108, the horizontal holes 12 are formed in the lower side surface 108A of the brick wall 108, but the present disclosure is not limited to this configuration. For example, in the masonry wall reinforcing method of the present disclosure, the order of forming the horizontal holes and the vertical holes may be reversed.
[0070] In the first and second embodiments, two circular holes 30A, 30B are drilled in the lower side surface 108A of the brick wall 108 with a lateral offset and overlap, but the present disclosure is not limited to this configuration. For example, a horizontal hole may be formed by drilling three or more circular holes with a lateral offset and overlap.
[0071] In the first and second embodiments, the horizontal hole 12 is formed in the brick wall 108 with one row of bricks 116 remaining, but the present disclosure is not limited to this configuration. For example, the horizontal hole may be formed in a portion of the brick wall 108 that includes the lowest brick 116.
[0072] In the first and second embodiments, the horizontal hole 12 is formed in the lower side surface 108A of the indoor brick wall 108 of the building 100 or the building 150, but the present disclosure is not limited to this configuration. For example, if the horizontal hole 12 is lower than the ground level of the ground 102, the horizontal hole 12 cannot be seen, so the horizontal hole may be formed in the lower side surface of the outdoor brick wall of the building 100 or the building 150.
[0073] In the first and second embodiments, the spiral reinforcement 42 is disposed in the horizontal hole 12, but the present disclosure is not limited to this configuration. For example, a configuration may be adopted in which reinforcing bars such as spiral reinforcement are not provided in the horizontal hole.
[0074] Although the present invention has been described in detail with respect to a specific embodiment, it will be apparent to those skilled in the art that the present invention is not limited to such an embodiment, and that various other embodiments are possible within the scope of the present invention. [Explanation of symbols]
[0075] 10 Masonry wall reinforcement structure 12 horizontal hole 14 Vertical hole 16 steel rod 18 Fixing plate 20 Concrete Section 22 Fastening member 30A circular hole 30B Circular hole 34 Bearing surface 100 Buildings 108 Brick Wall 108A Lower side 150 Buildings 160 Masonry wall reinforcement structure
Claims
1. A horizontal hole formed on a lower side surface of the masonry wall, the bearing surface of which is along a joint of the masonry wall; A vertical hole extending from the upper surface of the masonry wall through the bearing surface of the horizontal hole; a tension member inserted into the vertical hole and having an anchor plate attached to a tip end thereof positioned within the horizontal hole; A concrete portion that is filled into the horizontal hole and embeds the anchor plate; A tightening member that tensions the tension member; A masonry wall reinforcement structure having:
2. The masonry wall reinforcement structure according to claim 1 , wherein the bearing surface above the horizontal hole is parallel to the joints of the masonry wall.
3. A horizontal hole forming process in which a plurality of circular holes are drilled in the lower side of the masonry wall by shifting them laterally and overlapping them, and the upper surface is chipped to form horizontal holes to serve as a bearing surface along the joints of the masonry wall; a tendon insertion step of inserting a tendon into a vertical hole drilled so as to pass through the bearing surface of the horizontal hole from the upper surface of the masonry wall; an anchor plate attachment step of attaching an anchor plate to a tip end of the tendon and positioning the anchor plate within the horizontal hole; A filling step of filling the horizontal hole with concrete and burying the anchor plate; a tensioning step of tensioning the tendon from an upper side of the vertical hole; A method for reinforcing a masonry wall comprising:
Citation Information
Patent Citations
Structure for reinforcing masonry wall, and masonry structure
JP2010281034A
Reinforcement structure and reinforcing method for masonry structure
JP2020094431A