Automatic shoring construction control device, automatic shoring construction control program, and automatic shoring construction method

The automatic shoring erection control device and method automate the positioning and erection of steel shoring using a total station, addressing safety and labor issues by ensuring accurate and efficient construction.

JP2024167861APending Publication Date: 2024-12-04FTS +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023143446
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-22
Filing Date
2023-09-05
Publication Date
2024-12-04

AI Technical Summary

Technical Problem

Existing shoring erection methods require manual labor near the tunnel face, posing safety risks and excessive burden on workers, and lack clear control processing procedures for full automation.

Method used

An automatic shoring erection control device and method using an automatic tracking type total station, which includes an erector, erector adjustment device, and a construction control system to automate the positioning and erection of steel shoring, utilizing temporary and actual measurement data to ensure accurate placement.

Benefits of technology

Ensures worker safety and achieves labor savings by automating the shoring erection process, with clear control procedures, ensuring accurate and efficient construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024167861000001_ABST
    Figure 2024167861000001_ABST
Patent Text Reader

Abstract

To provide an automatic shoring construction control device, an automatic shoring construction control program, and an automatic shoring construction method that enable automatic construction of shoring.SOLUTION: A construction control device 30 has a CPU 31. The CPU 31 realizes vehicle measurement instruction means for instructing TS 10 to perform vehicle measurements targeting a vehicle target 95 installed on an erector vehicle 20, temporary erection data generation means for generating temporary erection data for a shoring 99 by using the vehicle measurement data, erection control means for operating an erector 50 and an erector adjustment device 60 so that the shoring 99 is erected in accordance with the temporary erection data, shoring measurement instruction means for instructing the TS 10 to perform shoring measurements targeting the shoring target 95, and movement control means for operating the erector adjustment device 60 to move the shoring 99 until the shoring actual measurement data matches the design position data.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an automatic shoring erection control device, an automatic shoring erection control program, and an automatic shoring erection method that enable the automatic erection of steel shoring using a total station. [Background technology]

[0002] The New Austrian Tunneling Method (NATM) is a well-known tunnel construction method. NATM is an excavation technique that uses the support function of the surrounding ground to support the tunnel itself, and is mainly used for road and railway tunnels in mountainous areas.

[0003] In tunnel construction, large excavation machines are used to dig holes while removing soil from mountains and underground. The inside of the tunnel will eventually be paved over with concrete, but there is a risk that the exposed rock and soil may collapse during the excavation process. For this reason, structures called supports are constructed at regular intervals to support the rock and soil so that they do not collapse.

[0004] The end of a tunnel tunnel under construction is called the tunnel face. After the tunnel is excavated using excavating machinery, shoring is installed at the tunnel face. The shoring is made of steel and is an arch-shaped structure. The arch-shaped shoring is formed by connecting a pair of arc-shaped components at the top end. A large heavy machine called an erector is used for this. The arc-shaped components are held by the erector and connected at the center to form an arch-shaped shoring, and the work of installing the shoring at the tunnel face is called erecting the shoring.

[0005] When erecting the shoring, workers enter the area just below the face and check the position of the shoring visually and with a ruler.

[0006] However, working directly below the face poses safety problems due to the risk of rock and soil collapsing. Therefore, a technique for erecting such shoring has been known in the past, for example, as disclosed in Patent Document 1. Patent Document 1 discloses a shoring installation method and installation device in which a target is fixed to the hand of an erector that holds the shoring, the installation coordinate value of the target is obtained by a laser range finder, and the amount of movement of the erector is set based on the installation coordinate value and the coordinate value of the shoring to be installed.

[0007] The technology disclosed in Patent Document 1 allows the erection of shoring without manual work just before the face, but the target for the laser range finder is set on the hand of the erector, which causes the problem that the coordinates obtained by the laser range finder do not correspond to the actual position of the shoring, resulting in the position of the shoring being shifted.

[0008] In view of this, conventionally, techniques have been known in which targets or the like are attached to supports and then erected (see, for example, Patent Documents 2, 3, 4, and 5).

[0009] In Patent Document 2, multiple targets are attached to the shoring, and the coordinates of each target are tracked and obtained by a total station to obtain the distance of each target from the center of the tunnel, and the operator adjusts the position of the shoring based on the error between the distance and the design radius of the shoring. In Patent Document 3, the shoring is held by an erector, multiple targets are attached, a laser beam is irradiated from a total station, and the operator operates the erector so that the laser beam is irradiated to the center of the target, erects the shoring at the face, and operates the erector while checking the position of the laser beam irradiated to the target after erection to move the shoring. Furthermore, Patent Document 4 discloses that the shoring can be erected without increasing the number of surveying instruments, even if the number of parts of the shoring to be surveyed increases, by attaching a motion capture marker to the shoring and photographing the marker with a motion capture camera. [Prior art documents] [Patent documents]

[0010] [Patent Document 1] Patent No. 3381606 [Patent Document 2] Patent No. 4559346 [Patent Document 3] Patent Publication No. 2021-17790 [Patent Document 4] JP 2019-173393 A [Patent Document 5] JP 2023-37188 A Summary of the Invention [Problem to be solved by the invention]

[0011] According to the above-mentioned conventional technology, the safety of workers is ensured since workers do not need to enter directly below the face when erecting shoring.

[0012] However, in all of the above conventional technologies, although the work directly below the face is eliminated and the safety of the workers is ensured, the workers are required to perform operations such as moving the shoring with an erector while watching a monitor, and therefore the burden on the workers is not sufficiently reduced. In particular, when multiple shoring is erected, the erection work is repeated, which can cause excessive burden on the workers. Therefore, there has been a demand for further labor saving in the erection work of steel shoring.

[0013] In this regard, according to the shoring erection system disclosed in Patent Document 5, the erection of shoring is performed fully automatically. When the erection of shoring is performed fully automatically, the erection work is labor-saving.

[0014] However, in order to realize full automation, it is necessary to clarify the procedure of the control process, that is, how a processing device such as a computer executes the control process required for full automation, but such a procedure of the control process is not disclosed in Patent Document 5. Therefore, there was a demand for the procedure of the control process to be disclosed so that labor savings can be reliably realized through the automation of construction work.

[0015] The present invention has been made to solve the above-mentioned problems, and aims to provide an automatic shoring construction control device, an automatic shoring construction control program, and an automatic shoring construction method that ensures the safety of workers, clarifies the control processing procedures, and reliably realizes labor savings through the automation of construction work. [Means for solving the problem]

[0016] In order to solve the above problems, the present invention provides an automatic support erection control device used for automatic erection of steel shoring using an automatic tracking type total station, comprising: a vehicle measurement instruction means for instructing the total station to perform vehicle measurements on a vehicle target installed on an erector vehicle having an erector for gripping the steel shoring and an erector adjustment device for adjusting the position and attitude of the erector; a temporary erection data generation means for generating temporary erection data corresponding to a temporary position where the steel shoring will be erected, using vehicle measurement data obtained by the total station performing the vehicle measurements; The present invention provides an automatic shoring construction control device having an erection control means for operating an erector and an erector adjustment device so that the steel shoring is erected in accordance with the provisional erection data, a shoring measurement instruction means for instructing a total station to perform shoring measurement targeting a shoring target installed on the steel shoring after the steel shoring is erected using temporary erection data, and a movement control means for operating the erector adjustment device to move the steel shoring until shoring actual measurement data obtained by the total station executing the shoring measurement matches design position data corresponding to the shoring target when the steel shoring is erected in the design position.

[0017] In the case of the above-mentioned automatic shoring installation control device, it further has a movement data generation means for generating shoring movement data using shoring actual measurement data and design position data, which moves the steel shoring so that it is erected at the design position, and the movement control means can operate the erector adjustment device in accordance with the shoring movement data to move the steel shoring so that it is erected at the design position.

[0018] Furthermore, when shoring actual measurement data obtained by performing shoring measurement when the steel shoring is gripped by the erector is defined as first shoring actual measurement data, and shoring actual measurement data obtained by performing shoring measurement when the steel shoring is not gripped by the erector is defined as second shoring actual measurement data, it is preferable to further have a correction data generating means for generating correction data that corrects the first shoring actual measurement data using the first shoring actual measurement data and the second shoring actual measurement data, and a corrected measurement data generating means for generating corrected measurement data by correcting the first shoring actual measurement data using the correction data.

[0019] In the above-mentioned automatic support construction control device, it is preferable to further have a correction control means for operating the correction data generating means and the corrected actual measurement data generating means to generate corrected actual measurement data until the corrected actual measurement data coincides with the design position data.

[0020] Furthermore, the movement control means can use the corrected actual measurement data as the support actual measurement data, and move the steel support until the corrected actual measurement data matches the design position data.

[0021] In addition, the system may further include a display control means for displaying side by side the actual measured position of the steel support according to the actual support measurement data and the designed position of the steel support according to the designed position data.

[0022] Furthermore, it is preferable that the automatic shoring installation control device is used for the automatic installation of steel shoring using a three-dimensional scanner together with an automatic tracking total station, and further has a pre-confirmation means for activating a work vehicle measurement instruction means when the point cloud data generated by the three-dimensional scanner scanning the unexcavated surface, which shows the difference between the unexcavated surface design data, which is the design value of the unexcavated surface, meets the automatic installation tolerance criteria for allowing the automatic installation of steel shoring.

[0023] The present invention also provides an automatic shoring erection control program that causes a computer to function as an automatic shoring erection control device used for automatic erection of steel shoring using an automatic tracking total station, the computer comprising vehicle measurement instruction means for instructing the total station to perform vehicle measurement of a vehicle target installed on an erector vehicle having an erector that grips the steel shoring and an erector adjustment device that adjusts the position and attitude of the erector, and temporary erection data generating means for generating temporary erection data corresponding to the temporary position where the steel shoring will be erected, using vehicle measurement data obtained by the total station performing the vehicle measurement. The present invention provides an automatic shoring construction control program which functions as a generating means, a construction control means for operating an erector and an erector adjustment device so that steel shoring is constructed using temporary construction data, a shoring measurement instruction means for instructing a total station to perform shoring measurement targeting a shoring target installed on the steel shoring after the steel shoring has been constructed in accordance with the temporary construction data, and a movement control means for activating the erector adjustment device to move the steel shoring until shoring actual measurement data obtained by the total station performing the shoring measurement matches design position data corresponding to the shoring target when the steel shoring is constructed in the design position.

[0024] In the case of the above-mentioned automatic shoring construction control program, the computer further functions as a movement data generating means for generating shoring movement data using shoring actual measurement data and design position data for moving the steel shoring so that it is erected at the design position, and when the computer functions as a movement control means, it is preferable to operate the erector adjustment device in accordance with the shoring movement data so that the steel shoring is erected at the design position.

[0025] Furthermore, when the computer is configured to use shoring actual measurement data obtained by performing shoring measurement when the steel shoring is held by the erector as first shoring actual measurement data, and shoring actual measurement data obtained by performing shoring measurement when the steel shoring is not held by the erector as second shoring actual measurement data, it is preferable for the computer to further function as a correction data generating means for generating correction data to correct the first shoring actual measurement data using the first shoring actual measurement data and the second shoring actual measurement data, and as a corrected measurement data generating means for generating corrected measurement data by correcting the first shoring actual measurement data using the correction data.

[0026] In the above-mentioned automatic support construction control program, it is preferable that the program further functions as a correction control means for generating corrected actual measurement data by operating the correction data generating means and the corrected actual measurement data generating means until the corrected actual measurement data matches the design position data.

[0027] In addition, in the above-mentioned automatic shoring construction control program, the automatic shoring construction control device is used for the automatic construction of steel shoring using a three-dimensional scanner together with an automatic tracking type total station, and it is preferable that the computer further functions as a pre-confirmation means for activating a work vehicle measurement instruction means when the automatic tracking type total station has a three-dimensional scanner and the point cloud data generated by the three-dimensional scanner scanning the unexcavated surface, which shows the difference between the unexcavated surface design data, which is the design value of the unexcavated surface, meets the automatic construction tolerance criteria for allowing the automatic construction of the steel shoring.

[0028] Furthermore, the present invention provides a method for controlling automatic erection of steel shoring using an automatic tracking total station, the method comprising: a vehicle measurement instruction step of instructing the total station to perform vehicle measurement of a vehicle target installed on an erector vehicle having an erector for gripping the steel shoring and an erector adjustment device for adjusting the position and attitude of the erector; a temporary erection data generation step of using vehicle measurement data obtained by the total station performing the vehicle measurement to generate temporary erection data corresponding to a temporary position where the steel shoring will be erected; The present invention provides an automatic shoring construction control method, which includes an erection control step of operating an erector and an erector adjustment device so that the steel shoring is erected, a shoring measurement instruction means for instructing a total station to perform shoring measurement targeting a shoring target installed on the steel shoring after the steel shoring is erected using temporary erection data, and a movement control step of operating the erector adjustment device to move the steel shoring until shoring actual measurement data obtained by the total station executing the shoring measurement matches design position data corresponding to the shoring target when the steel shoring is erected in the design position.

[0029] The above-mentioned automatic shoring erection control method preferably further includes a movement data generation process for generating shoring movement data using shoring actual measurement data and design position data to move the steel shoring so that it is erected at the design position, and the movement control process preferably operates an erector adjustment device in accordance with the shoring movement data to move the steel shoring so that it is erected at the design position.

[0030] Furthermore, in the above-mentioned shoring automatic erection control method, when shoring actual measurement data obtained by performing shoring measurement when the steel shoring is grasped by the erector is defined as first shoring actual measurement data, and shoring actual measurement data obtained by performing shoring measurement when the steel shoring is not grasped by the erector is defined as second shoring actual measurement data, it is preferable to further have a correction data generation process for generating correction data that corrects the first shoring actual measurement data using the first shoring actual measurement data and the second shoring actual measurement data, and a corrected measurement data generation process for generating corrected measurement data by correcting the first shoring actual measurement data using the correction data.

[0031] In the above-mentioned automatic support erection control method, it is preferable to operate the correction data generating means and the corrected measurement data generating means to generate corrected measurement data until the corrected measurement data coincides with the design position data. Effect of the Invention

[0032] As described above in detail, according to the present invention, it is possible to obtain an automatic shoring construction control device, an automatic shoring construction control program, and an automatic shoring construction method which not only ensure the safety of workers, but also clarify the control processing procedures, thereby reliably realizing labor savings through the automation of construction work. [Brief description of the drawings]

[0033] [Figure 1] This is an oblique view showing the main parts of a tunnel in which steel shoring is being automatically erected by an erector work vehicle having an automatic shoring erection control device related to an embodiment of the present invention. [Diagram 2] FIG. 1 is a block diagram of an automatic support erection system having an automatic support erection control device. [Diagram 3] A block diagram showing an erector work vehicle, a total station, and shoring. [Figure 4] FIG. 2 is a plan view of the erector work vehicle. [Diagram 5]FIG. 2 is a side view of an erector work vehicle. [Figure 6] FIG. 2 is a front view of an erector work vehicle. [Figure 7] This is a plan view of the sensor-equipped erector of the erector work vehicle. [Figure 8] This is a side view of the sensor-equipped erector of the erector work vehicle. [Figure 9] This is a front view of the sensor-equipped erector of the erector work vehicle. [Figure 10] 13 is a flowchart showing the operation procedure of the automatic installation control process. [Figure 11] 13 is a flowchart showing the operation procedure of the support construction movement processing. [Figure 12] 12 is a flowchart showing the operational procedure of the support construction movement processing following FIG. 11 . [Figure 13] 13 is a flowchart showing the operational procedure of the support construction movement processing following FIG. 12. [Figure 14] FIG. 13 is a diagram showing an example of a placement comparison display displayed on a liquid crystal display device. [Figure 15] FIG. 13 is a diagram showing a schematic diagram of the shifting of the support when the boom is deflected. [Figure 16] FIG. 11 is a block diagram of an automatic shoring construction system having an automatic shoring construction control device according to a modified example. [Figure 17] A block diagram showing an erector work vehicle, a total station related to a modified example, and shoring. [Figure 18] 13 is a flowchart showing an operation procedure of an automatic installation control process with advance confirmation according to a modified example. [Figure 19] 13 is a flowchart showing an operation procedure of an unexcavated surface pre-check process. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0034] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Note that the same elements are designated by the same reference numerals, and duplicated explanations will be omitted.

[0035] With reference to Figs. 1 to 9, the automatic erection of steel shoring by the automatic shoring erection control device (hereinafter also referred to as the "erection control device") 30 according to the embodiment of the present invention will be described. Fig. 1 is a perspective view showing the main part of a tunnel TN in which a steel shoring 99 is automatically erected by an erector vehicle 20 having an automatic shoring erection control device (hereinafter also referred to as the "erection control device") 30 according to the embodiment of the present invention. Fig. 2 is a block diagram of the automatic shoring erection system 1. Fig. 3 is a block diagram showing an erector vehicle 20 having the erection control device 30, an automatic tracking type total station (TS) 10, and steel shoring 99 (99A, 99B). Figs. 4 to 6 are diagrams showing an erector vehicle 20 having the erection control device 30. Figs. 7 to 9 are diagrams showing a sensor-equipped erector 50 (50A, 50B) that the erector vehicle 20 has.

[0036] As shown in FIG. 1, automatic erection of shoring by the erection control device 30 is performed near the face of the tunnel TN. In the tunnel TN, an erector vehicle 20, which will be described later, is placed near the face. A total station (TS) 10 is fixed to the wall W of the tunnel TN (for example, a base fixed to an existing steel shoring 99) behind the tunnel TN (on the tunnel entrance side of the erector vehicle 20). Then, shoring 99 (99A, 99B) is installed near the face. The shoring 99 (99A, 99B) is erected by automatic erection of the shoring. Each of the shoring 99 (99A, 99B) is a member on a circular arc, and when erected in the designed position, the top end is fastened to form an integrated arch-shaped shoring 99. Targets 96 (96A, 96B) and 97 (97A, 97B) are installed at the top and bottom of supports 99 (99A, 99B), respectively.

[0037] The total station (TS) 10 is an automatic tracking type that automatically tracks a target. The total station (TS) 10 irradiates a tracking laser light, receives the light returned from the target (prism) 95 (or targets 96, 97) installed on the erector work vehicle 20 with an image sensor, calculates the deviation between the target 95 (targets 96, 97) and the center of the telescope crosshairs by image processing, and realizes the automatic tracking function by feedback controlling the motor in the housing based on the deviation so that the target 95 (targets 96, 97) is always at the center of the telescope crosshairs. With such an automatic tracking function, the total station (TS) 10 automatically tracks and aims at the target 95 installed on the erector work vehicle 20 and the targets 96, 97 installed on the support 99 (99A, 99B). The total station (TS) 10 is also connected to the construction control device 30 with a connection cable 9c (see FIG. 2). According to the measurement instruction data (described later) transmitted from the construction control device 30 via the connection cable 9c, the TS 10 aims at the targets 95, 96, and 97, and generates position and posture data (three-dimensional coordinate data) for the erector work vehicle 20 and position and posture data (three-dimensional coordinate data) for the supports 99 (99A, 99B).

[0038] (Erector work vehicle) As shown in FIG. 1, the erector vehicle 20 has a construction control device 30, sensor-equipped erectors 50 (50A, 50B), and an erector adjustment device 60. As also shown in FIGS. 4 to 6, the erector vehicle 20 has a pair of sensor-equipped erectors 50 (50A, 50B) on the left and right sides arranged at the front, and a concrete spraying device 71 is arranged between them. The erector adjustment device 60 and a control deck 72 are arranged behind it, and the entire erector vehicle 20 is arranged on a traveling part 73 having an endless belt. The construction control device 30 is arranged on the control deck 72. In addition, a target 95 is installed on the erector vehicle 20 behind the face (see FIG. 1). The target 95 is collimated by the TS 10. Thereby, position and attitude data of the erector vehicle 20 (vehicle position and attitude data described later) is generated. The vehicle position and attitude data is used by the construction control device 30 to generate temporary construction data described later.

[0039] (Installation control device) The construction control device 30 is a device used for automatic construction of shoring, and executes the automatic construction control process described below. As shown in Fig. 2, the construction control device 30 can communicate with a total station (TS) 10 via a connection cable 9c. In the following explanation, a notebook personal computer is assumed as the construction control device 30, but a stationary personal computer may also be used.

[0040] 2, the construction control device 30 has a CPU 31, a ROM 32, a RAM 33, a data storage unit 34, and a liquid crystal display unit 35. The construction control device 30 also has a voice conversion processing unit 36, a communication control unit 37, a communication processing unit 38a, a wireless communication unit 38b, a speaker 39, and a microphone 40.

[0041] The CPU 31 operates according to a program stored in the ROM 32 and controls the operation of the entire installation control device 30. The ROM 32 stores a control program executed by the CPU 31. The RAM 33 stores a communication control program for performing data communication, data necessary for the CPU 31 to execute the program, and the like.

[0042] The data storage unit 34 stores various data, the automatic support erection control program described below, other application programs, various data, etc. The data storage unit 34 is, for example, configured with an SSD (Solid State Drive). The liquid crystal display unit 35 has an LCD (Liquid Crystal Display) and its drive unit, and is an image display means for displaying images such as characters, figures, and symbols.

[0043] The LCD display unit 35 has a touch panel function and inputs data entered by manual operation into the CPU 31, while also having a display function of displaying the placement comparison display 135, which will be described later, etc., in accordance with the instructions of the CPU 31.

[0044] The voice conversion processing unit 36 ​​expands the voice data and outputs it to the speaker 39, while converting and compressing the analog voice signal input from the microphone 40 into digital voice data and inputting it to the communication processing unit 38a. The communication control unit 37 operates upon instruction from the CPU 31 and controls connection and disconnection of the line for data communication. The communication processing unit 38a operates according to instructions from the communication control unit 37 and executes data transmission and reception via a wired LAN cable (not shown). The wireless communication unit 38b is a wireless communication means that executes wireless data transmission and reception according to the control of the communication control unit 37. The speaker 39 is a voice output means that outputs voice, and the microphone 40 inputs voice such as the contents of the user's conversation and converts it into an electric signal. Furthermore, the connection cords 9a, 9b, and 9c are connected to the connection connector 41. The sensor-equipped erector 50 (50A, 50B), the erector adjustment device 60, and the TS 10 are connected to the connection cords 9a, 9b, and 9c, respectively.

[0045] (Sensor-equipped erector, erector adjustment device) As shown in Figs. 7 to 9, each of the sensor-equipped erectors 50 (50A, 50B) has a boom 51, and a gripping device 52 is provided at the tip of the boom 51. As shown in Fig. 3, the sensor-equipped erector 50 (50A, 50B) is connected to an actuator 61 (described later) of an erector adjustment device 60. The position and posture of the boom 51 and the gripping device 52 are adjusted according to the operation of the actuator 61. That is, the telescopic mechanism 51a, the inclination adjustment mechanism 51b, and the left and right turning mechanisms 51c (described later) of the boom 51, and the moving mechanism 52b (described later) of the gripping device 52 are operated according to the operation of the actuator 61, and the position and posture of the boom 51 and the gripping device 52 are adjusted.

[0046] The boom 51 is a device that supports the gripping device 52. As shown in Figs. 7 to 9, the boom 51 has an extension mechanism 51a, an inclination adjustment mechanism 51b, and a swivel mechanism 51c, and is provided with a stroke sensor 51aa and angle sensors 51ba and 51ca that detect the respective amounts of movement (amount of extension and contraction, inclination angle, and swivel angle). Data detected by the stroke sensor 51aa and the angle sensors 51ba and 51ca are output to the erection control device 30 as detection data e51. The gripping device 52 has a hand 52a that grips the support 99, and a moving mechanism 52b that rotates (up and down or horizontally), rotates, or extends and contracts the hand 52a, and is further provided with angle sensors 52ba, 52bb, and 52bc that detect the amount of movement of the moving mechanism 52b (up and down rotation angle, horizontal rotation angle, or rotation angle). Data detected by the angle sensors 52ba, 52bb, and 52bc are output to the erection control device 30 as detection data e52.

[0047] The erector adjustment device 60 is a device that adjusts the position and posture of the sensor-equipped erector 50 (50A, 50B). As shown in FIG. 3, the erector adjustment device 60 has an actuator 61, an electromagnetic proportional valve (hydraulic valve) 62, a hydraulic oil tank 63, a hydraulic pump 64, and a motor 65.

[0048] The actuator 61 is connected to the boom 51 and the gripping device 52 of the sensor-equipped erector 50 (50A, 50B) by a connecting member not shown. The actuator 61 operates the telescopic mechanism 51a, the tilt adjustment mechanism 51b, and the swivel mechanism 51c of the boom 51, and the moving mechanism 52b of the gripping device 52 in response to the operation of the electromagnetic proportional valve 62. A hydraulic pump 64 is connected to the electromagnetic proportional valve 62. The hydraulic pump 64 is operated by the power of a motor 65, and oil pressurized by the hydraulic pump 64 is supplied to the electromagnetic proportional valve 62. The hydraulic pump 64 pressurizes oil stored in a hydraulic oil tank 63 and supplies it to the electromagnetic proportional valve 62. In addition, instruction data d10, d11, and d12, which will be described later, are output to the electromagnetic proportional valve 62 from the construction control device 30. The electromagnetic proportional valve 62 changes the valve opening / closing amount in response to the instruction data d10, d11, and d12. This adjusts the hydraulic pressure sent to the actuator 61, and the movement of the boom 51 and the gripping device 52 changes accordingly.

[0049] (Automatic installation control processing) Next, an automatic construction control process executed by the construction control device 30 will be described with reference to Fig. 10 to Fig. 13. The construction control device 30 executes the automatic construction control process in accordance with an automatic support construction control program according to the present invention.

[0050] When the automatic erection control process is executed, the CPU 31 accesses the data storage unit 34 etc. and operates in accordance with the flowcharts shown in Figures 10 to 13 to execute operations as a work vehicle measurement instruction means, a temporary erection data generation means, an erection control means, a shoring measurement instruction means, a movement control means, etc. In Figures 10 to 13, "S" is an abbreviation for step.

[0051] The CPU 31 executes the automatic erection control process according to the flowchart shown in Fig. 10. When the CPU 31 starts the automatic erection control process, the process proceeds to step 1 in Fig. 10, where it executes an operation as a vehicle measurement instruction means, and outputs measurement instruction data i1 for the erector vehicle 20 to the TS 10 (see Fig. 3). The measurement instruction data i1 is data that instructs the TS 10 to execute a measurement (also called "vehicle measurement") of the erector vehicle 20 (target 95). When the TS 10 executes the vehicle measurement according to the measurement instruction data i1, position and attitude data (three-dimensional coordinate data) e1 corresponding to the result of the vehicle measurement is generated. Next, the operation proceeds to step 2, where the erection control device 30 waits until it inputs the position and attitude data e1 from the TS 10 (see Fig. 3), and when the position and attitude data e1 are input from the TS 10, the process proceeds to step 3 and executes the support erection movement process described later (see Fig. 10). The position and attitude data e1 is data obtained when the TS 10 receives the measurement instruction data i1 and executes the work vehicle measurement, and corresponds to the work vehicle measurement data according to the present invention. Then, after executing the support erection movement processing described later, the CPU 31 advances the processing to step 4, and determines whether or not an end condition (e.g., the work time has elapsed) is satisfied. If the end condition is satisfied, the automatic erection control processing is terminated, but if the end condition is not satisfied, the processing returns to step 1 and the above processing is repeated.

[0052] Here, as an end condition, for example, when one set of shoring 99 (99A, 99B) is considered as one piece, multiple shoring 99 are considered as one set, and the end condition can be that one set of shoring 99 has been erected. In this way, for example, when three shoring 99 are considered as one set, steps 1 to 4 can be repeated until the three shoring 99 are erected, and one set of three shoring 99 can be automatically erected. In this way, the erection work can be made even more labor-saving.

[0053] (Shoring construction and moving process) Next, the CPU 31 executes a shoring erection movement process according to the flowcharts shown in Figures 11 to 13. In the shoring erection movement process, the CPU 31 executes an operation as a movement control means, and the shoring 99 movement process is repeated until the shoring 99 is erected at the designed position and actual shoring measurement data, which will be described later, matches the designed position data.

[0054] When the CPU 31 starts the shoring erection movement process, the process proceeds to step 11 in Fig. 11, where the position and attitude data e1 input from the TS 10 is saved as vehicle position and attitude data, and the process proceeds to step 12. The vehicle position and attitude data is data showing the position and attitude of the erector vehicle 20, and is generated by the TS 10 aiming at the target 95 of the erector vehicle 20. In step 12, the CPU 31 operates as temporary erection data generating means, and generates temporary erection data using the vehicle position and attitude data saved in step 11. In the following step 13, the CPU 31 operates as erection control means, and generates instruction data d10 including temporary erection data using the detection data e51, e52, and outputs the instruction data d10 to the erector adjustment device 60, and operates the erector adjustment device 60 so that the shoring 99 is erected according to the temporary erection data. The temporary erection data is data used to provisionally erect the shoring 99 near the face, and includes data on the coordinate values ​​of the shoring 99, the operation amount of the boom 51, the operation amount of the gripping device 52, and the like. The position and attitude data e1 is actual measurement data of the position and attitude generated by the TS 10 by sighting the target 95 of the erector work vehicle 20. When the position and attitude (three-dimensional coordinate data) of the target 95 is grasped, the distance and direction from the target 95 to the design position are calculated by comparing with the design position data. Then, according to the calculation result, the operation amount (extension length, up / down and left / right angles) of the boom 51 and the operation amount (up / down and left / right angles) of the gripping device 52 are calculated. By using the operation amount data indicating the calculation result, the shoring 99 can be provisionally erected near the face. The operation amount data corresponds to the temporary erection data.

[0055] Next, the process proceeds to step 14, where the CPU 31 waits until the temporary construction is completed, and when the temporary construction is completed, the process proceeds to step 15. In step 15, the CPU 31 operates as a shoring measurement instruction means, and outputs shoring measurement instruction data i2 to the TS 10. The measurement instruction data i2 is data that instructs the TS 10 to perform measurement (also called "shoring measurement") of the targets 96, 97 (of the shoring 99). When the TS 10 performs the shoring measurement according to the measurement instruction data i2, position and orientation data (three-dimensional coordinate data) e2 corresponding to the result of the shoring measurement is generated. Next, the process proceeds to step 16, where the CPU 31 waits until the position and orientation data e2 is input from the TS 10, and when the position and orientation data e2 is input from the TS 10, the process proceeds to step 17, where the input position and orientation data e2 is stored as temporary construction actual measurement data. The position / attitude data e2 is data indicating the position / attitude of the support 99 temporarily erected near the face. Thereafter, the CPU 31 advances the process to step 21.

[0056] As described above, in the shoring erection movement process, step 15 is executed after step 14, so that the shoring measurement according to the measurement instruction data i2 in step 15 is executed after the temporary erection is completed. In that shoring measurement, the shoring 99 is not held by the sensor-equipped erector 50. Therefore, the temporary erection actual measurement data does not include the deviation (mainly the deviation due to the deflection of the boom 51) that occurs when the shoring 99 is held by the sensor-equipped erector 50. The temporary erection actual measurement data is generated by the shoring measurement when the shoring 99 is not held by the sensor-equipped erector 50 after the temporary erection is completed, and therefore corresponds to the second shoring actual measurement data in this invention.

[0057] The CPU 31 executes the processing from step 21 onward in accordance with the flowchart shown in Fig. 12. When the CPU 31 advances the processing to step 21, it generates shoring gripping instruction data d11 using the detection data e51 and e52, and outputs the shoring gripping instruction data d11 to the erector adjustment device 60 of the erector work vehicle 20. The shoring gripping instruction data d11 is data that instructs the erector adjustment device 60 to grip the shoring 99. In the following step 22, the CPU 31 operates as a shoring measurement instruction means, and outputs measurement instruction data i2 of the shoring 99 to the TS10. When the TS10 executes the shoring measurement in accordance with the measurement instruction data i2, position and posture data (three-dimensional coordinate data) e2 corresponding to the result of the shoring measurement is generated. Next, in step 23, the CPU 31 waits until the position and attitude data e2 is input from the TS 10, and when the position and attitude data e2 is input from the TS 10, the processing proceeds to step 24, and the input position and attitude data e2 is stored as actual support measurement data.

[0058] As described above, step 22 is executed after step 21, and therefore the shoring measurement according to the measurement instruction data i2 in step 22 is executed after the shoring 99 is grasped by the sensor-equipped erector 50. Therefore, the shoring actual measurement data stored in step 24 includes the deviation (mainly the deviation due to the deflection of the boom 51) when the shoring 99 is grasped by the sensor-equipped erector 50. The shoring actual measurement data stored here is generated when the shoring 99 is grasped by the sensor-equipped erector 50, and therefore corresponds to the first shoring actual measurement data in the present invention.

[0059] Next, the process proceeds to step 25, where the CPU 31 operates as a correction data generating means, and determines the difference between the temporary erection measurement data (second shoring measurement data) stored in step 17 and the shoring measurement data (first shoring measurement data) stored in step 24, and generates data according to the difference as deflection correction data. As described above, the temporary erection measurement data is data generated by shoring measurement when the shoring 99 is not being held, and the shoring measurement data is data generated by shoring measurement when the shoring 99 is being held. When the shoring 99 is held by the sensor-equipped erector 50, the sensor-equipped erector 50 (especially the boom 51) is deflected by the weight of the shoring 99, and the position (three-dimensional coordinates) of the shoring 99 changes (in the direction along gravity and in the horizontal direction) due to the deflection. Furthermore, the deflection increases as the length of the boom 51 increases, and also as the vertical angle of the boom 51 increases. If construction continues without taking into account the effects of such deflection, the construction position of the shoring 99 will shift in accordance with the shift in three-dimensional coordinates caused by the deflection, making it difficult to erect the shoring 99 in an accurate position. Therefore, in order to realize automatic construction of the shoring 99 in a more accurate manner, it is preferable to eliminate the shift in three-dimensional coordinates caused by the deflection.

[0060] Therefore, in the automatic erection control process, steps 25 and 26 are executed to eliminate the influence of the deflection. In step 26 following step 25, the CPU 31 operates as a corrected measured data generating means to generate corrected measured data by correcting the measured data of the support structure using the deflection correction data. In the corrected measured data, the deviation of the three-dimensional coordinates caused by the influence of the deflection of the sensor-equipped erector 50 is eliminated.

[0061] In this regard, Patent Document 5 discloses that boom deflection correction is performed in fully automatic shoring construction control. In the boom deflection correction disclosed in Patent Document 5, the magnitude of deflection according to the boom length (main body extension / retraction amount) is measured in advance for each weight of the shoring 99, and the boom length (main body extension / retraction amount) and the magnitude of deflection are associated and stored in a storage means (deflection correction table) for each weight of the shoring 99. Since the boom length is stored in discrete amounts in the deflection correction table, when the deflection correction table is used for deflection correction, the actually measured length of the boom 51 may not match the boom length stored in the deflection correction table, and in that case, the magnitude of deflection acquired from the deflection correction table differs from the actual magnitude of deflection (if the boom length stored in the deflection correction table is changed in small increments, it becomes easier to match the actually measured length, but the difference between the two does not disappear). Therefore, in the deflection correction disclosed in Patent Document 5, there is a risk that the deviation of the three-dimensional coordinates caused by the influence of the deflection may not be corrected accurately.

[0062] In contrast, the deflection correction data according to this embodiment is generated using temporary erection actual measurement data and shoring actual measurement data, which is data showing the results of actual shoring measurements. Therefore, the deflection correction data reflects the actual length of boom 51 and the actual weight of shoring 99, and thus the deflection correction data accurately corrects the deviation of the three-dimensional coordinates caused by the influence of deflection.

[0063] Furthermore, when the erection of the shoring 99 is repeated (when the above-mentioned end condition is set to be that one set of shoring 99 is erected), steps 1 to 4 are repeated, and steps 11 to 38 are executed for each shoring 99 to be erected. Therefore, each time a shoring 99 is erected, shoring measurement is executed, and deflection correction data is generated according to the situation at that time (weight of the shoring 99, length and angle of the boom 51). Therefore, even when the erection of the shoring 99 is repeated, accurate erection work is executed for each shoring 99.

[0064] Furthermore, in the boom deflection correction disclosed in Patent Document 5, the deflection correction amount obtained from a deflection correction table is added to the Z-axis coordinate, and the Z-axis coordinate is corrected to a larger value according to the deflection correction amount.

[0065] However, the deviation due to the length of the boom 51 and the weight of the shoring 99 appears not only in the Z-axis (height) direction but also in the horizontal direction. For example, as shown in FIG. 15, if the boom 51 (51e) and the shoring 99 (99e) are shifted to the position of the boom 51 (51f) and the shoring 99 (99f) due to deflection, the position of the shoring 99 is shifted as shown by the arrow L1. In this case, the deviation of the position of the shoring 99 (99e) includes a height deviation h1 and a horizontal deviation d1. Therefore, if the deflection correction amount is simply added to the Z-axis coordinate, the horizontal deviation is not reflected, and the deflection correction becomes inaccurate. In this regard, the deflection correction data according to this embodiment is generated using the temporary construction actual measurement data and the shoring actual measurement data, which is data indicating the result of the shoring measurement actually performed. Therefore, the deflection correction data according to this embodiment reflects not only the deviation in the Z-axis (height) direction but also the deviation in the horizontal direction. Therefore, in the automatic erection control process according to this embodiment, deviations due to the length of the boom 51 and the weight of the support 99 are accurately corrected, thereby achieving accurate automation of erection work.

[0066] On the other hand, after step 26, the CPU 31 advances the process to step 31 and compares the corrected actual measurement data with the design position data. In the following step 32, the CPU 31 judges whether the corrected actual measurement data and the design position data match, and if they match, the shoring construction movement process ends, but if they do not match, the process proceeds to step 33. In step 33, the CPU 31 operates as a movement data generating means and generates shoring movement data d12 using the detection data e51 and e52. The shoring movement data d12 is data for moving the shoring 99 so that the corrected actual measurement data matches the design position data. The shoring movement data d12 is data corresponding to the difference between the corrected actual measurement data and the design position data, and includes data such as the coordinate value of the shoring 99, the operation amount of the boom 51, and the operation amount of the gripping device 52. In the next step 34, the shoring movement data d12 is output to the erector adjustment device 60 of the erector work vehicle 20 in order to move the shoring 99 so that it can be erected in the designed position according to the shoring movement data d12. In the next step 35, the process waits until the movement of the shoring 99 according to the shoring movement data d12 is completed, and when the movement of the shoring 99 is completed, the process proceeds to step 36. In step 36, the CPU 31 operates as a shoring measurement instruction means and outputs measurement instruction data i2 of the shoring 99 to the TS10. When the TS10 executes the shoring measurement according to the measurement instruction data i2, position and attitude data (three-dimensional coordinate data) e2 according to the result of the shoring measurement is generated. In the next step 37, the process waits until the position and attitude data e2 is input from the TS10, and when the position and attitude data e2 is input from the TS10, the process proceeds to step 38, and the input position and attitude data e2 is stored as shoring actual measurement data. The shoring measurement data saved in step 38 corresponds to the first shoring measurement data in the present invention because it is generated after the movement of the shoring 99 is completed and the shoring 99 is being grasped by the sensor-equipped erector 50. When step 38 is completed, the process returns to step 25 as shown in Fig. 12, and the above process is repeatedly executed.

[0067] As described above, in the shoring construction movement process, the shoring actual measurement data obtained by the shoring measurement of the TS10 is compared with the design position data (step 31), and until the two match (step 32), the generation of shoring movement data d12 and the movement of the shoring 99 according to the shoring movement data d12 (steps 33 to 35) are repeated. Therefore, the automatic construction control process by the construction control device 30 allows the shoring 99 to be constructed automatically, that is, to the design position without the worker performing an operation such as moving the shoring 99 with an erector. Even if the shoring 99 is not constructed to the design position in one construction operation, the movement of the shoring 99 according to the shoring movement data d12 is repeated, so that the automatic construction of the shoring 99 without manual intervention is realized. Therefore, the construction control device 30 according to the embodiment of the present invention not only ensures the safety of the workers, but also realizes labor saving by automating the construction work. In the above embodiment, the procedure of the control process for realizing the automation of installation work is clarified as an automatic installation control process, and how the control process is executed is made clear, thereby ensuring the realization of labor savings.

[0068] In particular, in the automatic erection control process by the erection control device 30, the corrected actual measurement data is used as the shoring actual measurement data to be compared with the design position data, and the corrected actual measurement data is compared with the design position data until the two match (step 32), and the generation of shoring movement data d12, the movement of the shoring 99 according to the shoring movement data d12, and the generation of corrected actual measurement data (step 26) are repeated. The corrected actual measurement data is data corrected to eliminate the effects of deflection of the sensor-equipped erector 50 (particularly the boom 51). Therefore, by using the corrected actual measurement data as the shoring actual measurement data to be compared with the design position data, the effects of deflection of the sensor-equipped erector 50 (particularly the boom 51) are eliminated, and the above-mentioned automatic erection work is realized in a more accurate manner.

[0069] Furthermore, by the CPU 31 operating as a correction control means, the movement of the shoring 99 according to the shoring movement data d12, the saving of the shoring actual measurement data after the movement (steps 33 to 38), the generation of deflection correction data, and the generation of corrected actual measurement data (steps 25, 26) are repeated until the corrected actual measurement data coincides with the design position data. Therefore, every time the movement of the shoring 99 is executed, the shoring measurement, the generation of deflection correction data, and the generation of corrected actual measurement data are performed. When the movement of the shoring 99 is executed, the position of the shoring 99 and the state (length, angle) of the boom 51 change, and the shoring actual measurement data changes accordingly, so that for accurate erection, it is necessary for the deflection correction data to be data corresponding to the shoring 99 after the movement. Therefore, by having the correction control means, the corrected actual measurement data becomes data corresponding to the shoring 99 after the movement, and accurate automatic erection is realized by the erection control device 30.

[0070] In the erection control device 30, it is preferable that the CPU 31 operates as a display control means and displays an erection comparison display 135 on the liquid crystal display unit 35. For example, as shown in Fig. 14, the erection comparison display 135 displays the actual position P1 of the shoring 99 according to the shoring actual measurement data and the designed position P2 side by side. In addition to the actual position P1 and the designed position P2, the erection comparison display 135 also displays the amount of movement X based on the difference between the two. This allows the operator to visually grasp the extent to which the actual position P1 of the shoring 99 differs from the designed position P2, without the need for any operation by the operator himself, thereby reducing the psychological burden on the operator.

[0071] Furthermore, it is preferable that the erection control device 30 further comprises erection angle calculation means for calculating the erection angle of the shoring 99 using the shoring actual measurement data, and angle control means for operating the erector adjustment device so that the shoring 99 is erected at the design angle according to the erection angle data indicating the calculated erection angle. The shoring 99 is integrated by connecting the left and right shoring 99 (99A, 99B), but by rotating the shoring 99 so that it is erected at the design angle, the fastening accuracy can be improved.

[0072] Although not shown, the shoring 99 is automatically erected in the designed position by the erection control device 30. For this reason, it is preferable to provide a number setting means so that the number of shoring 99 to be erected can be set prior to execution of the shoring erection control process, and to continue the shoring automatic erection control process until the erection of the number of shoring structures set by the number setting means has been completed. In this case, for example, the satisfaction of the termination condition of step 4 may be determined by whether the erection of the set number of shoring structures has been completed. This achieves even greater labor savings.

[0073] (Modification) Next, an automatic shoring construction system 1A according to a modified example will be described with reference to Figs. 16 to 19. Fig. 16 is a block diagram of the automatic shoring construction system 1A having an automatic shoring construction control device 30A according to a modified example, and Fig. 17 is a block diagram showing an erector work vehicle 20A, a three-dimensional scanner (3D scanner) 110, a total station 10, and a shoring 99 according to the modified example. Fig. 18 is a flowchart showing the operation procedure of automatic construction control processing with advance confirmation according to the modified example, and Fig. 19 is a flowchart showing the operation procedure of unlined excavation surface advance confirmation processing.

[0074] The automatic shoring construction system 1A of this modified example differs from the aforementioned automatic shoring construction system 1 in that, instead of the erector work vehicle 20 and the construction control device 30, it has an erector work vehicle 20A and a construction control device 30A, respectively, and in that it has a three-dimensional scanner 110.

[0075] The three-dimensional scanner 110 irradiates a surrounding object with a laser beam and calculates the distance and angle to the object from the reflected light to generate three-dimensional point cloud data. The point cloud data is a collection of countless point data, and is data in which the uneven shape of the object is recorded in three-dimensional coordinates. The three-dimensional scanner 110 is installed inside the tunnel TN and connected to the construction control device 30A using a connection cable 9d. Although not shown, the three-dimensional scanner 110 may be a laser scanner that uses laser beams, or a radar scanner such as a millimeter wave scanner. The radar scanner is installed, for example, at the tip of the nozzle of the concrete spraying device 71.

[0076] The erector work vehicle 20A differs from the erector work vehicle 20 in that it has a construction control device 30A instead of a construction control device 30.

[0077] The construction control device 30A differs from the construction control device 30 in that it executes an automatic construction control process with advance confirmation, which will be described later, in accordance with a shoring automatic construction control program, but is the same in other respects. The automatic construction control process with advance confirmation differs from the above-mentioned automatic construction control process in that the unlined excavation surface advance confirmation process in step 40 is executed before step 1, as shown in Fig. 18, but is the same in other respects. The shoring automatic construction control program according to the modified example differs from the above-mentioned shoring automatic construction control program in that the unlined excavation surface advance confirmation process in step 40 is executed before step 1, but is the same in other respects. In the unlined excavation surface advance confirmation process, as shown in Fig. 17, the construction control device 30A outputs scan instruction data i11, which will be described later, to the three-dimensional scanner 110, and inputs scan data (also called "point cloud data") e11, which will be described later, from the three-dimensional scanner 110.

[0078] (Pre-check of excavation surface) Then, in the construction control device 30A, the CPU 31 executes the unlined excavation surface confirmation process according to the flowchart shown in Fig. 19. When the CPU 31 starts the unlined excavation surface confirmation process, the process proceeds to step 51 in Fig. 19, and outputs the scan instruction data i11 of the unlined excavation surface to the three-dimensional scanner 110 (see Fig. 17). The scan instruction data i11 of the unlined excavation surface is data that instructs the three-dimensional scanner 110 to generate point cloud data of the unlined excavation surface. The unlined excavation surface corresponds to the surface of the unlined part (unlined part) of the face inside the tunnel TN. When the three-dimensional scanner 110 operates according to the scan instruction data i11, point cloud data e11 is generated. Next, operation proceeds to step 52, where the construction control device 30A waits until the point cloud data e11 is input from the three-dimensional scanner 110 (see Figure 17), and once the point cloud data e11 is input from the three-dimensional scanner 110, processing proceeds to step 53, where the input point cloud data e11 is stored in the data memory unit 34.

[0079] Next, the process proceeds to step 54, where the CPU 31 generates unexcavated surface difference data using the point cloud data e11 and the unexcavated surface design data. The unexcavated surface design data is data corresponding to the design value of the unexcavated surface. The unexcavated surface difference data is data showing the difference between the point cloud data e11 and the unexcavated surface design data. The point cloud data e11 is data generated by three-dimensional measurement using the three-dimensional scanner 110, and is three-dimensional data corresponding to the actual uneven shape of the unexcavated surface. The unexcavated surface design data is three-dimensional data corresponding to the designed uneven shape of the unexcavated surface. Therefore, the unexcavated surface difference data is data showing the deviation between the actual measurement data regarding the unexcavated surface and the designed data. In the unexcavated surface advance confirmation process, the unexcavated surface difference data is generated so that it becomes positive when the surface is excavated deeper (toward the mountain, toward the back) than the design value (unexcavated surface design data), and becomes negative when the surface is excavated shallower.

[0080] Next, the process proceeds to step 55, where the CPU 31 determines whether the uncut surface difference data satisfies the automatic setup tolerance conditions. If the uncut surface difference data satisfies the automatic setup tolerance criteria (if the automatic setup tolerance conditions are met), the process proceeds to step 58, but if the automatic setup tolerance conditions are not met, the process proceeds to step 56. In step 58, a process is executed in which, upon satisfaction of the automatic setup tolerance conditions, a message informing the start of automatic setup is displayed on the liquid crystal display unit 35. Thereafter, the uncut surface advance confirmation process is terminated. Then, in FIG. 18, the process proceeds to step 1, and the automatic setup control process from step 1 onwards is executed.

[0081] The automatic erection tolerance standard means the standard when automatic erection of shoring by the automatic erection control process after step 1 is permitted. When the bare excavation surface difference data is positive, the bare excavation surface is formed by digging deeper (toward the mountain, toward the back) than the design value (bare excavation surface design data), but when the bare excavation surface difference data is negative, the bare excavation surface is formed at a position shallower (in front of the tunnel TN) than the design value (bare excavation surface design data). When the tunnel TN is excavated, blasting and excavation processing using large heavy machinery are performed. At that time, protrusions called "hits" made of rocks and the like may appear on the bare excavation surface after processing. When such protrusions appear on the bare excavation surface, depending on the size, shape, and location of the protrusions, the protrusions may become an obstacle when the shoring is erected. If this happens, when attempting to erect the shoring using the erector work vehicle 20A, the protrusion will come into contact with the hand 52a (a clamp not shown in detail) holding the shoring, thereby hindering the operation of the hand 52a, making it highly likely that automatic erection of the shoring will be difficult to achieve.

[0082] Therefore, the unlined excavation surface pre-check process uses the unlined excavation surface difference data to confirm in advance that automatic erection of shoring is permitted, and if such confirmation is made, executes data processing so that the automatic erection control process from step 1 onwards is executed. In the unlined excavation surface pre-check process, the CPU 31 executes operations as a pre-check means. By executing the unlined excavation surface pre-check process, it becomes possible to more reliably proceed with the automatic erection of shoring.

[0083] The unfinished excavation surface difference data reveals the deviation between the actual uneven shape of the unfinished excavation surface and the designed uneven shape of the unfinished excavation surface. The deviation may show a protrusion called "Atari", but may not, and the size, shape, and location of the deviation determine whether the automatic erection process is permitted or not. Therefore, in this embodiment, a reference value for when the automatic erection process is permitted is set in advance, and the data of the reference value is used to determine whether the automatic erection allowable standard is satisfied or not. When the excavation is advanced by a certain value or more than the design value simulated in advance (in this embodiment, the unfinished excavation surface difference data is +30 mm or more), it is considered that there is no risk of the hand 52a coming into contact with the unfinished excavation surface, so the data of the reference value is set to +30 mm (a value other than 30 mm may be used). Then, in step 55, it is determined whether the excavation surface difference data is plus 30 mm or more, and if the excavation surface difference data is plus 30 mm or more, it is determined that the automatic installation tolerance criteria are met and automatic installation is allowed. After execution of step 58, the excavation surface pre-check processing is terminated, and then processing proceeds to step 1 and a work vehicle measurement instruction is executed.

[0084] When the process proceeds to step 56, CPU 31 outputs removal processing instruction data. In response to this, for example, a message instructing the removal processing of the protrusion is displayed on liquid crystal display unit 35. After that, CPU 31 proceeds to step 57 and waits until the removal processing of the protrusion is completed.

[0085] On the other hand, after the operator has removed the protrusions using a machine called a breaker (not shown), if the operator performs an operation input indicating completion of the removal process in the erection control device 30A (for example, by clicking a removal process completion button displayed on the liquid crystal display unit 35), the process returns from step 57 to step 51, and the same process as above is repeated. In this way, steps 51 to 57 are repeated until the excavation surface difference data meets the automatic erection tolerance criteria, that is, until there are no obstacles to the automatic erection of the shoring. In this way, for example, when multiple protrusions called "hits" appear, steps 51 to 57 are repeated until all of them are removed, making it possible to more reliably proceed with the automatic erection of the shoring.

[0086] The above description is of the preferred embodiment of the present invention, and does not limit the present invention's device and method, and various modifications can be easily implemented. Furthermore, the present invention also includes devices or methods that are configured by appropriately combining the components, functions, features, or method steps in each embodiment. [Industrial Applicability]

[0087] By applying the present invention, it becomes possible to automatically erect steel supports when a total station is used to erect the supports. The present invention can be used in the fields of an automatic support erection control device, an automatic support erection control program, and an automatic support erection method. [Explanation of symbols]

[0088] 1,1A...automatic shoring construction system, 10...total station, 20,20A...erector work vehicle, 30,30A...automatic shoring construction control device, 31...CPU, 35...LCD display, 50...erector with sensor, 51...boom, 60...erector adjustment device, 95,96,97...target, 99,99A,99B...shoring, 110...three-dimensional scanner.

Claims

1. A shoring automatic erection control device used for automatic erection of steel shoring using an automatic tracking type total station, A vehicle measurement instruction means for instructing the total station to perform vehicle measurement on a vehicle target installed on an erector vehicle having an erector that grips the steel support and an erector adjustment device that adjusts the position and attitude of the erector; a temporary installation data generating means for generating temporary installation data corresponding to a temporary position where the steel support is to be installed, using work vehicle measurement data obtained by the total station performing the work vehicle measurement; An erection control means for operating the erector and the erector adjustment device so that the steel support is erected according to the temporary erection data; a shoring measurement instruction means for instructing the total station to perform shoring measurement of a shoring target installed on the steel shoring after the steel shoring is erected using the temporary erection data; An automatic support erection control device having a movement control means that operates the erector adjustment device to move the steel support until the actual support measurement data obtained by the total station performing the shoring measurement matches the design position data corresponding to the shoring target when the steel support is erected in the design position.

2. The method further includes a movement data generating means for generating shoring movement data for moving the steel shoring so as to be erected at the design position using the shoring actual measurement data and the design position data, The automatic support erection control device according to claim 1, wherein the movement control means operates the erector adjustment device in accordance with the support movement data to move the steel support so that it is erected at the designed position.

3. a correction data generating means for generating correction data for correcting the first shoring actual measurement data using the first shoring actual measurement data and the second shoring actual measurement data, where the shoring actual measurement data obtained by executing the shoring measurement when the steel shoring is gripped by the erector is defined as first shoring actual measurement data, and the shoring actual measurement data obtained by executing the shoring measurement when the steel shoring is not gripped by the erector is defined as second shoring actual measurement data; 2. The automatic support erection control device according to claim 1, further comprising: a corrected measurement data generating means for generating corrected measurement data by correcting the first support measurement data using the correction data.

4. 4. The automatic support erection control device according to claim 3, further comprising a correction control means for operating the correction data generating means and the corrected measured data generating means to generate the corrected measured data until the corrected measured data coincides with the design position data.

5. The automatic support erection control device according to claim 3, wherein the movement control means uses the corrected actual measurement data as the support actual measurement data, and moves the steel support until the corrected actual measurement data coincides with the design position data.

6. 2. The automatic support erection control device as described in claim 1, further comprising a display control means for displaying side by side the actual measured position of the steel support according to the support actual measurement data and the designed position of the steel support according to the designed position data.

7. The automatic support erection control device is used for automatic erection of the steel support using a three-dimensional scanner together with the automatic tracking type total station, A support automatic installation control device as described in any one of claims 1 to 6, further comprising a pre-confirmation means for activating the work vehicle measurement instruction means when unexcavated surface difference data showing the difference between the point cloud data generated by the three-dimensional scanner scanning the unexcavated surface and the unexcavated surface design data, which is the design value of the unexcavated surface, meets the automatic installation tolerance criteria for allowing the automatic installation of the steel support.

8. A shoring automatic erection control program that causes a computer to function as an automatic shoring erection control device used for automatic erection of steel shoring using an automatic tracking type total station, A vehicle measurement instruction means for instructing the total station to perform vehicle measurement on a vehicle target installed on an erector vehicle having an erector that grips the steel support and an erector adjustment device that adjusts the position and attitude of the erector; a temporary installation data generating means for generating temporary installation data corresponding to a temporary position where the steel support is to be installed, using work vehicle measurement data obtained by the total station performing the work vehicle measurement; An erection control means for operating the erector and the erector adjustment device so that the steel support is erected using the temporary erection data; a shoring measurement instruction means for instructing the total station to perform shoring measurement of a shoring target installed on the steel shoring after the steel shoring is erected according to the temporary erection data; An automatic support erection control program that functions as a movement control means that operates the erector adjustment device to move the steel support until the actual support measurement data obtained by the total station performing the support measurement matches the design position data corresponding to the support target when the steel support is erected in the design position.

9. The computer and further functioning as a movement data generating means for generating shoring movement data for moving the steel shoring so as to be erected at the design position using the shoring actual measurement data and the design position data. The automatic support erection control program of claim 8, wherein when functioning as the movement control means, the erector adjustment device is operated in accordance with the support movement data to move the steel support so that it is erected at the designed position.

10. The computer a correction data generating means for generating correction data for correcting the first shoring actual measurement data using the first shoring actual measurement data and the second shoring actual measurement data, where the shoring actual measurement data obtained by executing the shoring measurement when the steel shoring is gripped by the erector is defined as first shoring actual measurement data, and the shoring actual measurement data obtained by executing the shoring measurement when the steel shoring is not gripped by the erector is defined as second shoring actual measurement data; 9. The automatic support erection control program according to claim 8, further functioning as corrected measurement data generating means for generating corrected measurement data by correcting the first support measurement data using the correction data.

11. The automatic support erection control program as described in claim 10, further functioning as a correction control means for operating the correction data generating means and the corrected actual measurement data generating means to generate the corrected actual measurement data until the corrected actual measurement data coincides with the design position data.

12. The automatic shoring construction control device is used for the automatic construction of the steel shoring using a three-dimensional scanner together with the automatic tracking type total station, and the automatic shoring construction control program described in any one of claims 8 to 11 further functions as a pre-confirmation means for activating the work vehicle measurement instruction means when open-cut surface difference data showing the difference between the point cloud data generated by the three-dimensional scanner scanning the open-cut surface and the open-cut surface design data which is the design value of the open-cut surface satisfies the automatic construction tolerance standard for which the automatic construction of the steel shoring is permitted.

13. A method for automatically erecting steel supports using an automatic tracking total station, comprising: A work vehicle measurement instruction process for instructing the total station to perform work vehicle measurement of a work vehicle target installed on an erector work vehicle having an erector that grips the steel support and an erector adjustment device that adjusts the position and attitude of the erector; a temporary installation data generation process for generating temporary installation data corresponding to a temporary position where the steel support is to be installed, using work vehicle measurement data obtained by the total station performing the work vehicle measurement; An erection control process for operating the erector and the erector adjustment device so that the steel support is erected according to the temporary erection data; a shoring measurement instruction means for instructing the total station to perform shoring measurement of a shoring target installed on the steel shoring after the steel shoring is erected using the temporary erection data; and a movement control process for operating the erector adjustment device to move the steel shoring until the shoring actual measurement data obtained by the total station performing the shoring measurement matches the design position data corresponding to the shoring target when the steel shoring is erected in the design position.

14. The method further includes a movement data generation step of generating shoring movement data for moving the steel shoring so as to be erected at the design position using the shoring actual measurement data and the design position data, The automatic support erection control method according to claim 13, wherein the movement control process comprises operating the erector adjustment device in accordance with the support movement data to move the steel support so that it is erected at the designed position.

15. a correction data generating process for generating correction data for correcting the first shoring actual measurement data using the first shoring actual measurement data and the second shoring actual measurement data, where the shoring actual measurement data obtained by executing the shoring measurement when the steel shoring is gripped by the erector is defined as first shoring actual measurement data, and the shoring actual measurement data obtained by executing the shoring measurement when the steel shoring is not gripped by the erector is defined as second shoring actual measurement data; The method for controlling automatic support erection according to claim 13, further comprising a corrected measurement data generating step of generating corrected measurement data by correcting the first support measurement data using the correction data.

16. A method for controlling automatic support erection as described in claim 15, wherein the corrected measurement data generating means and the corrected measurement data generating means are operated to generate the corrected measurement data until the corrected measurement data coincides with the design position data.

Citation Information

Patent Citations

  • Steel support work building method and building system

    JP2019173393A

  • Support construction method and support construction system

    JP2021017790A

  • Timbering construction system

    JP2023037188A

  • Tunnel shoring installation method and installation device

    JP3381606B2

  • Shoring erection method and shoring erection system

    JP4559346B2