Liquefaction countermeasure structure against road

By installing a drainage path outside the roadbed to manage water pressure, the drainage path section effectively reduces liquefaction damage on roads, minimizing traffic disruption and construction time and cost.

JP2024168985APending Publication Date: 2024-12-05SHIMIZU CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023086137
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-25
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Conventional liquefaction countermeasures for roads are costly and disruptive, particularly on heavily trafficked roads, and fail to effectively manage water pressure under thin roadbeds, leading to damage such as sand blowing and upheaval.

Method used

A drainage path section is installed outside the roadbed in the width direction, connecting the liquefied ground beneath the roadbed to the outside in a water-permeable manner, allowing excess water to be drained away, reducing water pressure and preventing liquefaction damage.

Benefits of technology

This approach reduces liquefaction damage without disrupting traffic, lowers construction costs, and shortens the construction period by efficiently managing water pressure and sand blowing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168985000001_ABST
    Figure 2024168985000001_ABST
Patent Text Reader

Abstract

To reduce a liquefaction damage of a roadbed without performing traffic regulation of a roadway part by performing a countermeasure on only outside in a width direction of the roadway part, and can reduce the cost and a construction period for a liquefaction countermeasure.SOLUTION: There is provided a liquefaction countermeasure structure against a road for reducing sand boil to a road surface 20a when a liquefaction ground G is liquefied with respect to a roadbed 20 constructed on a surface layer part of the liquefaction ground G, wherein the roadbed 20 includes a roadway part 21, and a sidewalk part 22 which is provided along the roadway part 21 and is thinner than the roadway part 21, and the sidewalk part 22 includes a drain 30 for connecting the liquefaction ground G below the sidewalk part 22 and outside the roadbed 20 in a water conduction state.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a liquefaction prevention structure for roads. [Background technology]

[0002] Conventionally, when liquefaction occurs during an earthquake, roads are damaged, cracked, raised, subsided, or the road surface is covered with sand boils, requiring a lot of time and money to restore, which has a significant impact on citizens' lives and business activities. Therefore, suitable countermeasures are required, but since roads are laid out as a road network, the area requiring countermeasures is vast, and conventional countermeasures to prevent liquefaction are extremely expensive. In addition, since large heavy machinery is used for construction work, roads must be closed for long periods of time, making it difficult to apply to roads that are already in use.

[0003] As a simple countermeasure for this, a method is known in which grooves are provided at regular intervals under the pavement surface using small gravel or the like to act as a water-permeable layer that also acts as a filter layer that does not allow sand to pass through, allowing only water to overflow onto the ground surface and dissipate excess pore water pressure, thereby preventing damage, as shown in Patent Document 1. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 6041118 Summary of the Invention [Problem to be solved by the invention]

[0005] However, while conventional liquefaction countermeasures such as those shown in Patent Document 1 can be used in places such as parking lots where there is a certain degree of freedom in the placement of trenches, roads such as roadways require the strength of the roadbed to accommodate the traffic of heavy trucks. This makes it difficult to place the overflow area on the ground surface in an effective location. In addition, there is a problem that it is difficult to restrict traffic through construction work on roads with heavy traffic such as trunk roads.

[0006] In addition, while the damage caused by liquefaction in actual earthquakes to roadways is relatively minor, damage such as sand boiling, uplift, subsidence, and cracking of pavement is common in sidewalks. In roadways without sidewalks, damage occurred mostly in gutters and at the boundary between roadways and adjacent land (hereinafter referred to as "sidewalks, etc."). The reason why liquefaction damage is large in sidewalks, gutters of roadways without sidewalks, and the boundary between roadways and adjacent land (these are hereinafter referred to as "sidewalks, etc.") is that the roadbed is thinner in sidewalks, etc. than the roadway, or there is no roadbed and only thin topsoil or simple pavement, making the roadbed thinner than the roadway. Here, it is known that a water film is formed under the roadbed with low permeability during the dissipation process of excess pore water pressure caused by liquefaction. In other words, the water pressure of the water film is balanced with the weight of the ground above it (overburden pressure), so the water pressure of the water film under the roadbed of the roadway is greater than the water pressure under the roadbed of the sidewalk, etc. When the water in the water film formed under the roadbed of the roadway flows under the sidewalk, the water pressure under the roadbed of the sidewalk is affected by the large water pressure under the roadbed of the roadway, and water pressure greater than the weight of the roadbed of the sidewalk occurs. This high water pressure causes damage such as uplift of the sidewalk and subsidence due to reduction in ground volume caused by sand boiling, and the sand boiling generated on the sidewalk flows onto the roadway, causing the roadway to be covered in sand. Therefore, a construction method that can implement liquefaction countermeasures while reducing costs and construction time was required.

[0007] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a liquefaction prevention structure for roads that can reduce liquefaction damage to the roadbed without restricting traffic on the roadway by carrying out countermeasure work only on the outer side of the width of the roadway, thereby reducing the costs and construction time required for liquefaction countermeasures. [Means for solving the problem]

[0008] In order to achieve the above-mentioned objective, the liquefaction prevention structure for a road of the present invention is a liquefaction prevention structure for a road, which is a roadbed constructed on the surface of a liquefied ground, for reducing sand spraying onto the road surface when the liquefied ground liquefies, and is characterized in that the roadbed has at least an adjacent area to a roadway, and the roadbed has a drainage path section that connects the liquefied ground below the outer side of the width of the roadbed to the outside of the roadbed in a water-permeable manner.

[0009] In the liquefaction countermeasure structure for a road according to the present invention, a simple countermeasure such as providing a drainage path section that connects the liquefied ground below the outer side of the roadbed in the width direction to the outside of the roadbed in a water-permeable manner can reduce liquefaction damage to at least the roadbed including the roadway. In the present invention, the drainage path section is installed on the outer side of the roadbed in the width direction, and only the water under the roadbed including the roadway after liquefaction during an earthquake is drained to the outside of the roadbed through the drainage path section, thereby reducing the water pressure under the roadbed. Therefore, by quickly draining the water in the liquefied ground that rises toward the underside of the roadbed, the increase in water pressure under the roadbed can be reduced, thereby preventing sand boiling and uplift in the land adjacent to the roadbed, and maintaining the function of the roadbed after the earthquake and reducing liquefaction damage. In other words, the water in the liquefied ground after the earthquake collects toward the underside of the thin roadbed, and most of the water enters the drainage path section. Water that flows into the drainage path can be drained outside the roadbed through the drainage path, suppressing sand boiling and preventing liquefaction damage caused by loosening of the ground due to sand boiling.

[0010] In this way, with the present invention, if there is a sidewalk, no countermeasure work is required on the roadway, and even if there is no sidewalk, countermeasure work can be carried out only at the roadside, so there is no need to restrict traffic on the roadway, and the impact on traffic can be kept small even if the road is a main road. Furthermore, according to the present invention, since the countermeasure involves providing a drainage path section in the roadbed at the outer side in the width direction, the cost and construction period required for liquefaction countermeasures can be reduced.

[0011] In addition, in the liquefaction prevention structure for a road of the present invention, it is preferable that the roadbed is provided along the carriageway portion and has adjacent land that is thinner than the carriageway portion, and the drainage path portion connects the liquefied ground below the adjacent land to the outside including the road surface of the roadbed in a water-permeable manner.

[0012] In this case, the countermeasure involves providing a drainage route to adjacent land, such as sidewalks (sidewalks, gutters, boundaries with adjacent land, etc.), which are adjacent to the outside of the roadway in the width direction and are thinner than the roadway, thereby further reducing the costs and construction time required for liquefaction countermeasures.

[0013] In addition, in the liquefaction prevention structure for a road according to the present invention, it is preferable that the drainage path portion extends into the liquefied ground below the lower surface of the roadbed.

[0014] In this case, the water collection capacity of the drainage route section can be improved by increasing the area of ​​contact with the liquefied ground below the roadbed, and more water from the liquefied ground below the roadbed can be taken into the drainage route section more reliably. In addition, if the liquefied ground below the roadbed contains a layer with very low permeability, such as a clay layer, the drainage path can be extended and installed so that it reaches the sandy soil layer below the clay layer.

[0015] In addition, in the liquefaction prevention structure for roads of the present invention, it is preferable that the drainage path portion is a drain that connects the liquefied ground below the roadbed to the road surface of the roadbed in a manner that allows water to pass through, is permeable, and prevents the passage of sand.

[0016] With this configuration, water that has flowed into the drainage path can be drained to the road surface of the roadbed directly above the drainage path. In this case, the length of the drainage path can be minimized, and there is no need to pass water over a long distance, resulting in a simple structure, which simplifies construction as a liquefaction countermeasure and reduces the cost and construction period required for countermeasure work.

[0017] In addition, in the liquefaction prevention structure for roads of the present invention, it is preferable that the upper part of the drain is provided with a permeable cover that allows water that flows into the drain from the liquefied ground when liquefaction occurs to be drained to the road surface of the roadbed.

[0018] In this case, by providing a cover on the top of the drain, the top of the drain is not directly exposed to the road surface of the roadbed. Therefore, from the standpoint of ease of walking and aesthetics, for example, in the case of a roadbed with a sidewalk or the like beside the roadway, the water can be drained onto the paved surface of the sidewalk or the like.

[0019] In addition, in the liquefaction prevention structure for a road of the present invention, it is preferable that the drains are arranged at a position on the roadbed closer to the roadway portion, and are provided in multiples at predetermined intervals along the extension direction of the roadway portion.

[0020] In this case, since a plurality of drains are arranged at predetermined intervals on the roadbed, water from under the roadbed can be drained efficiently and reliably.

[0021] In addition, in the liquefaction prevention structure for roads of the present invention, the drainage path portion is a drainage pipe extending horizontally, at least a portion of which is located in the liquefied ground below the roadbed, and the drainage pipe is preferably arranged to allow water to enter from the liquefied ground, and water flowing within the pipe is drained outside the roadbed.

[0022] In this case, if drainage is difficult directly above the point where water enters the liquefied ground in the drainage path section, a drainage pipe is provided with part of it positioned within the liquefied ground so that water can enter, and the drainage pipe can be extended horizontally to a position in the roadbed where drainage is possible.

[0023] In addition, in the liquefaction prevention structure for roads of the present invention, the drainage route portion has a drain section at least a portion of which is located in the liquefied ground below the roadbed, and a drainage pipeline connected to the upper end of the drain section inside the roadbed and extending laterally, and it is preferable that the drainage pipeline is arranged to allow water to enter from the drain section, and that water flowing within the pipeline is drained outside the roadbed.

[0024] In this case, if drainage is difficult directly above the point in the drainage path where water has entered the liquefied ground, a drain section is provided, part of which is located within the liquefied ground and through which water can enter, and a drainage pipeline through which water can flow is further provided in the drainage section, so that the drainage pipeline can be extended horizontally to a position in the roadbed where drainage is possible, thereby enabling drainage.

[0025] In addition, it is preferable that the liquefaction prevention structure for a road according to the present invention has a gutter provided on the side of the carriageway portion of the roadbed, and the drainage path portion is formed by laying gravel material continuously from the liquefied ground below the carriageway portion to the road surface of the roadbed, so as to encase the lower part of the gutter.

[0026] In this case, even if there is a gutter on the side of the roadway, by forming a drainage path by laying gravel to wrap around the bottom of the gutter, water under the roadway can be drained outside the roadbed through the drainage path. In this case, the boundary between the roadway and the gutter is covered and protected by the drainage path made of gravel, which has the effect of reducing liquefaction damage at this boundary during an earthquake. Effect of the Invention

[0027] According to the liquefaction prevention structure for roads of the present invention, by carrying out countermeasure work only on the outer side of the width direction of the roadway, it is possible to reduce liquefaction damage to the roadbed without restricting traffic on the roadway, and to reduce the costs and construction time required for liquefaction countermeasures. [Brief description of the drawings]

[0028] [Figure 1]1 is a vertical cross-sectional view showing a liquefaction countermeasure structure according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a plan view of the liquefaction countermeasure structure shown in FIG. [Diagram 3] 13(a) and 13(b) are the results of an experiment to confirm the effect of drains in liquefaction prevention structures on roads, showing the case without drains. [Figure 4] 13(a) and 13(b) are the results of an experiment to confirm the effect of drains in liquefaction prevention structures on roads, showing the case with drains. [Diagram 5] FIG. 4 is a vertical cross-sectional view showing a liquefaction countermeasure structure according to a second embodiment of the present invention. [Figure 6] FIG. 6 is a plan view of the liquefaction countermeasure structure shown in FIG. 5. [Figure 7] FIG. 11 is a vertical cross-sectional view showing a liquefaction countermeasure structure according to a third embodiment of the present invention. [Figure 8] FIG. 8 is a plan view of the liquefaction countermeasure structure shown in FIG. 7. [Figure 9] FIG. 11 is a vertical cross-sectional view showing a liquefaction countermeasure structure according to a fourth embodiment of the present invention. [Figure 10] FIG. 10 is a plan view of the liquefaction countermeasure structure shown in FIG. [Figure 11] FIG. 11 is a vertical cross-sectional view showing a liquefaction countermeasure structure according to a fifth embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0029] Hereinafter, a liquefaction prevention structure for a road according to an embodiment of the present invention will be described with reference to the drawings.

[0030] (First embodiment) As shown in Figures 1 and 2, the liquefaction prevention structure 1 for a road in this embodiment is applied to a roadbed 20 constructed on the surface of liquefied ground G in the case where sand spouting onto the road surface 20a occurs when the liquefied ground G liquefies.

[0031] The roadbed 20 is laid over the entire surface of the liquefied ground G, and the roadbed surface is covered with paved surfaces 21A, 22A. The roadbed 20 comprises a roadway portion 21 and a sidewalk portion 22 (adjacent land) that is laid along the roadway portion 21 and is thinner than the roadway portion 21. The sidewalk portion 22 is laid on both the left and right sides of the roadway portion 21.

[0032] The roadway section 21 is formed by laminating multiple gravel layers, for example, made of gravel, and a paved surface 21A is formed on the surface layer. The sidewalk section 22 is formed by forming a paved surface 22A on the surface layer, for example, made of gravel. The paved surfaces 21A, 22A of the roadway section 21 and the sidewalk section 22 may each have the same specifications, for example, normal asphalt pavement or concrete pavement is used. As for the thickness of the roadbed 20, for example, the thickness H1 of the roadway section 21 is 900 mm, while the thickness H2 of the sidewalk section 22 is 200 mm. In this embodiment, the lower surface 21c of the roadway portion 21 is constructed at a position shallower than the groundwater level Wa.

[0033] The sidewalk section 22 is provided with a drain 30 (drainage path section) that connects the liquefied ground G below the sidewalk section 22 to the outside of the roadbed 20 in a water-permeable manner. The drain 30 extends vertically until it reaches the inside of the liquefied ground G below the lower surface 22c of the sidewalk section 22. In other words, the drain 30 connects the liquefied ground G below the sidewalk section 22 to the road surface 22a of the sidewalk section 22 in a water-permeable manner, is permeable, and prevents the passage of sand.

[0034] A water-permeable cover 31 is provided on the upper portion of the drain 30. The cover 31 allows water W that has flowed into the drain 30 from the liquefied ground G upon the occurrence of liquefaction to be drained onto the road surface 22a of the sidewalk portion 22.

[0035] 2, the drains 30 are disposed in a position on the sidewalk portion 22 closer to the roadway portion 21, and are provided at a predetermined interval L1 along the extension direction of the roadway portion 21. The interval L1 between the drains 30 is determined taking into consideration the width of the roadway portion 21 and the thickness of the liquefied ground G, and is, for example, about 5 to 15 m.

[0036] The drain 30 preferably has a diameter of, for example, 300 mm or more. The drain 30 is formed by laying permeable materials such as gravel and sandy gravel, and functions as a filter that restricts the passage of sand. The gravel constituting the drain 30 is, for example, crushed stone (such as No. 7 crushed stone) having a grain size of 2 to 5 mm, in order to reduce the gaps between the gravel in order to provide the above-mentioned filter function. To prevent clogging of the drain 30, small gravel may be packed in the range from the bottom to about 5 cm above.

[0037] The drain 30 is constructed by forming a hole 22b at a predetermined position on the sidewalk 22, which reaches the liquefied ground G below the sidewalk 22, and filling the excavated hole 22b with, for example, natural gravel. Note that crushed stone or various artificial permeable materials can also be used as the gravel as long as they provide equivalent permeability. For example, the permeability coefficient of the drain 30 needs to be greater than that of the liquefied ground G, which is the original ground, and it is preferable that the permeability coefficient is greater than that of the liquefied ground G by at least two orders of magnitude (100 times).

[0038] As described above, the drain 30 connects the liquefied ground G below the sidewalk section 22 with the road surface 22a of the sidewalk section 22, and serves to ensure a drainage path to the outside of the roadbed 20. Here, the water W in the liquefied ground G that has collected on the underside 21c of the roadway section 21 flows toward the underside 22c of the sidewalk section 22, which is shallower. That is, the water W (groundwater) that has risen in the liquefied ground G below the roadway section 21 and the sidewalk section 22 collects near the underside 22c of the sidewalk section 22, and the water W is taken into the drain 30, and only the water W passes through the drain 30 and is discharged to the road surface 22a.

[0039] As a method for constructing the liquefaction countermeasure structure 1 for the road described above, first, as shown in Fig. 1, a hole 22b is excavated that extends vertically to a predetermined position of a sidewalk portion 22 in a roadbed 20 laid on liquefied ground G and reaches the liquefied ground G below the sidewalk portion 22. At this time, the liquefied ground G below the sidewalk portion 22 is also excavated to a predetermined depth.

[0040] Next, a drain 30 is formed in the sidewalk portion 22 to connect the liquefied ground G under the sidewalk portion 22 to the road surface 22a in a water-permeable manner. Specifically, the drain 30 is formed by filling the excavated hole 22b with gravel, and the construction of the liquefaction countermeasure structure 1 is completed.

[0041] 3(a), (b) and 4(a), (b) show the results of an experiment to confirm the effect of the drain 30 of the liquefaction countermeasure structure 1 for a road according to this embodiment. In this experiment, the excess pore water pressure (kPa) in the ground and the vertical displacement (mm) of the ground surface were measured when a predetermined magnitude of earthquake motion was applied in two cases: CASE 1 (without drain), in which the drain 30 shown in this embodiment is not provided, and CASE 2 (with drain), in which the drain 30 is provided in the sidewalk section 22. The duration of the earthquake motion was set to 50 seconds. In CASE 2, a drain with a diameter of about 400 mm was provided in the sidewalk section to provide drainage performance.

[0042] Figures 3(a) and 4(a) show the measurement results for 1.5m below the roadway, 1.5m below the sidewalk, and 0.45m below the sidewalk, with the horizontal axis representing the time (s) from the start of the earthquake and the vertical axis representing the excess pore water pressure (kPa). Figures 3(b) and 4(b) show the measurement results for the roadway and sidewalk, with the horizontal axis representing the time (s) from the end of the earthquake and the vertical axis representing the ground surface vertical displacement (mm).

[0043] As shown in Figures 3(a) and (b), in CASE1, where there is no drain, the excess pore water pressure at a depth of 0.45 m in the sidewalk after the earthquake rose to exceed the water pressure at a deeper depth of 1.5 m. This shows that while the roadway slowly subsides after the earthquake, the sidewalk rises significantly due to the increased water pressure.

[0044] On the other hand, as shown in Figures 4(a) and (b), in CASE2, where drains were installed, the excess pore water pressure at a depth of 0.45 m in the sidewalk rose after the earthquake but did not exceed the water pressure at a depth of 1.5 m. In addition, the sidewalk did not rise significantly, and settlement was almost the same as that of the roadway, resulting in a smaller relative settlement between the two. The results of this experiment confirm that liquefaction damage to the entire road can be reduced by using drains to drain water from the sidewalks.

[0045] Next, the operation of the above-mentioned liquefaction countermeasure structure 1 for roads will be described in detail with reference to the drawings. In the liquefaction countermeasure structure 1 for a road according to this embodiment, a simple countermeasure such as providing a drain 30 on the outer side of the roadbed 20 in the width direction (here, the sidewalk portion 22 adjacent to the roadway portion 21) to connect the liquefied ground G below the sidewalk portion 22 to the outside of the roadbed 20 in a water-permeable manner can be performed to reduce liquefaction damage to the roadbed portion 21 and the sidewalk portion 22. In this embodiment, the drain 30 is installed in the sidewalk portion 22, which is thinner than the roadbed portion 21 on the outer side of the roadbed 20 in the width direction, and only the water W below the roadbed 20 consisting of the roadway portion 21 and the sidewalk portion 22 is drained to the outside of the roadbed 20 through the drain 30 after liquefaction during an earthquake, thereby reducing the water pressure below the roadbed 20. Therefore, by quickly draining the water in the liquefied ground G rising toward the underside of the roadbed 20, the increase in water pressure below the roadbed 20 is reduced, thereby preventing sand boiling and uplift of the sidewalk 22, and both the roadway 21 and the sidewalk 22 can maintain their post-earthquake functions and reduce liquefaction damage. In other words, since the water W in the liquefied ground G after the earthquake collects toward the underside 22c of the thin sidewalk 22, most of the water W enters the drain 30. The water W that flows into the drain 30 is then drained to the outside of the roadbed 20 through the drain 30, suppressing sand boiling and preventing liquefaction damage caused by loosening of the ground due to sand boiling.

[0046] In this manner, in this embodiment, if there is a sidewalk portion 22, no countermeasure work is required for the roadway portion 21, and even if there is a roadway without a sidewalk portion 22, countermeasure work can be carried out only at the roadway edge, so there is no need to impose traffic restrictions on the roadway portion 21, and the impact on traffic can be kept small even if the roadway is a main road. In addition, in this embodiment, countermeasure work involves providing drains 30 in the sidewalk portion 22, which is thinner than the roadway portion 21, which forms the roadbed 20 at the outer side in the width direction, so that the costs and construction period required for liquefaction countermeasures can be reduced.

[0047] In this embodiment, the drain 30 extends into the liquefied ground G below the lower surface 22c of the sidewalk portion 22. This increases the area of ​​the drain 30 in contact with the liquefied ground G below the sidewalk portion 22, thereby improving the water collection capacity of the drain 30, and allowing the drain 30 to take in more water W in the liquefied ground G below the sidewalk portion 22 reliably. In addition, in this embodiment, if the liquefied ground G below the sidewalk section 22 contains a layer with very low permeability, such as a clay layer, the drain 30 can be extended and installed so that it reaches the sandy soil layer below the clay layer.

[0048] In addition, in this embodiment, the water W that has flowed into the drain 30 can be drained onto the road surface of the sidewalk portion 22 directly above the drain 30. In this case, the path length of the drain 30 can be minimized, and there is no need to pass the water W over a long distance, resulting in a simple structure, which simplifies the construction of liquefaction countermeasures and reduces the costs and construction period required for countermeasure construction.

[0049] In addition, in this embodiment, by providing the cover 31 on the upper part of the drain 30, the upper part of the drain 30 is not directly exposed to the road surface 22a of the sidewalk section 22. Therefore, from the viewpoint of ease of walking and aesthetics, it is possible to drain water onto the paved surface 22A of the sidewalk section 22.

[0050] Furthermore, in this embodiment, the drains 30 are positioned at a position on the sidewalk section 22 closer to the roadway section 21, and are provided at multiple locations at predetermined intervals along the extension direction of the roadway section 21, so that water W from under the sidewalk section 22 can be drained efficiently and reliably.

[0051] As described above, in the liquefaction prevention structure 1 for roads in this embodiment, by carrying out countermeasure work only on the sidewalk section 22 located on the widthwise outside of the roadway section 21 and adjacent to the roadway section 21, it is possible to reduce liquefaction damage to the roadway section 21 and the sidewalk section 22 without restricting traffic on the roadway section 21, and it is possible to reduce the costs and construction period required for liquefaction countermeasures.

[0052] Next, another embodiment of the liquefaction prevention structure for roads of the present invention will be described with reference to the attached drawings. The same symbols will be used for components and parts that are the same or similar to those of the first embodiment described above, and their explanations will be omitted. Only configurations that differ from the first embodiment will be described.

[0053] Second embodiment 5 and 6, the liquefaction countermeasure structure 1A for a road according to the second embodiment is at least partially disposed in the liquefied ground G below the sidewalk portion 22 (adjacent land) and includes a drainage pipe 40 (drainage path portion) extending laterally along the roadway portion 21. The drainage pipe 40 includes an inlet 40a through which water W can enter from the liquefied ground G, and drains the water W that flows in from the liquefied ground G and flows inside the pipe outward from the roadbed 20.

[0054] The drain pipe 40 is provided at a position on the sidewalk portion 22 closer to the roadway portion 21. The drain pipe 40 has a rectangular cross-sectional shape in Fig. 5, but is not particularly limited thereto, and may have, for example, a circular cross-section.

[0055] The upper part of the drain pipe 40 is disposed within the sidewalk portion 22, and the central to lower part is disposed within the liquefied ground G below the sidewalk portion 22. The inlet 40a of the drain pipe 40 is located at the vertical center of the drain pipe 40, i.e., in the liquefied ground G. The drain pipe 40 has a drainage section that is connected to the outside of the roadbed 20 (not shown), and water W passing through the drain pipe 40 is drained to the outside of the roadbed 20 through the drainage section. The drain pipe 40 is installed by placing it in an excavation section in which the sidewalk portion 22 and the liquefied ground G have been excavated at a predetermined installation position, and then backfilling it.

[0056] The inlets 40a are provided on both the left and right side walls of the drainage pipe 40, and are arranged at a plurality of locations at a predetermined interval L2 in the extension direction of the drainage pipe 40. The interval L2 between the inlets 40a is determined in consideration of the width of the roadway portion 21 and the thickness of the liquefied ground G, and is, for example, about 5 to 15 m. Each inlet 40a is provided with a filter 41 that regulates the passage of sand contained in the water W flowing into the drainage pipe 40. This allows only the water W to pass through the drainage pipe 40 and be drained out of the roadbed 20. The inlets 40a are not limited to being provided on both the left and right side walls of the drainage pipe 40, and may be provided on either the left or right side wall.

[0057] In this way, in the liquefaction countermeasure structure 1A according to the second embodiment, when drainage is difficult directly above the point where water W has entered the liquefied ground G, as with the drain 30 shown in the first embodiment (see Figure 1), by providing a drainage pipe 40, part of which is positioned within the liquefied ground G and into which the water W can enter, the drainage pipe 40 can be extended horizontally to a position in the roadbed 20 where drainage is possible, thereby draining the water.

[0058] Third embodiment As shown in Figures 7 and 8, the drainage path section 50 of the liquefaction countermeasure structure 1B for a road according to the third embodiment has a drain section 51, at least a portion of which is located in the liquefied ground G below the sidewalk section 22 (adjacent land), and a drainage pipeline 52 connected to the upper end 51a of the drain section 51 inside the sidewalk section 22 and extending laterally.

[0059] The drain portion 51 extends vertically, with its upper end 51a located within the sidewalk portion 22 and its lower end 51b disposed so as to reach liquefied ground G below the lower surface 22c of the sidewalk portion 22. In other words, the drain portion 51 connects the liquefied ground G below the sidewalk portion 22 to the drainage pipe 52 buried within the sidewalk portion 22 in a water-permeable manner, and is permeable while preventing the passage of sand.

[0060] 8, the drainage portions 51 are disposed at a position on the sidewalk portion 22 closer to the roadway portion 21, and are provided at a predetermined interval L3 along the extension direction of the roadway portion 21. The interval L3 between the drainage portions 51 is determined taking into consideration the width of the roadway portion 21 and the thickness of the liquefied ground G, and is, for example, about 5 to 15 m.

[0061] The drain section 51 preferably has a diameter of 300 mm or more. The drain section 51 is formed by laying permeable materials such as gravel and sand, and has a filter function that regulates the passage of sand. The gravel constituting the drain section 51 is, for example, crushed stone (such as No. 7 crushed stone) having a grain size of 2 to 5 mm, in order to reduce the gaps between the gravel in order to provide the above-mentioned filter function. In order to prevent clogging of the drain section 51, for example, small gravel may be packed in a range from the bottom to about 5 cm above. Note that crushed stone and various artificial permeable materials can also be used as the gravel material as long as they provide the same permeability. For example, the permeability coefficient of the drain section 51 needs to be larger than that of the liquefied ground G, which is the original ground, and it is preferable that the permeability coefficient is larger than that of the liquefied ground G by about two orders of magnitude (100 times).

[0062] The drainage pipe 52 is provided so that water W can enter from the drain portion 51, and drains the water W flowing through the pipe to the outside of the roadbed 20. The drainage pipe 52 is entirely buried in the sidewalk portion 22, and is provided at a position of the sidewalk portion 22 closer to the roadway portion 21. The bottom surface 52a of the drainage pipe 52 is connected to the upper ends 51a of the multiple drain portions 51 so that water can pass through. That is, the connection portion of the drainage pipe 52 with the drain portion 51 becomes the inlet of the water W into the drainage pipe 52. The drainage pipe 52 has a rectangular cross-sectional shape in FIG. 7, but is not particularly limited thereto, and may have a circular cross-sectional shape, for example. The drainage pipe 52 has a drain portion connected to the outside of the roadbed 20 (not shown), and the water W passing through the drainage pipe 52 is drained to the outside of the roadbed 20 through the drain portion.

[0063] As described above, the drainage path section 50 communicates the liquefied ground G below the sidewalk section 22 with the outside of the roadbed 20, and serves to ensure a drainage path to the outside of the roadbed 20. The drainage path section 50 takes in the water W (groundwater) that has risen in the liquefied ground G below the roadway section 21 and the sidewalk section 22 and collects near the lower surface 22c of the sidewalk section 22 into the drain section 51 of the drainage path section 50, and passes only the water W from the drain section 51 through the drainage pipe 52 and discharges it outside the roadbed 20.

[0064] The drain section 51 and the drainage pipe 52 are formed and placed in a predetermined installation position in an excavation area where the sidewalk section 22 and the liquefied ground G have been excavated, and then installed by backfilling.

[0065] In the liquefaction countermeasure structure 1B of the third embodiment, when drainage is difficult directly above the point in the drainage path section 50 where water W in the liquefied ground G has entered, a drain section 51 is provided, part of which is located within the liquefied ground G and through which water can enter, and a drainage pipeline 52 through which water can pass is further provided in the drainage section 51, so that the drainage pipeline 52 can be extended horizontally to a position in the roadbed 20 where drainage is possible, thereby enabling drainage.

[0066] (Fourth embodiment) A liquefaction countermeasure structure 1C for a road according to a fourth embodiment shown in Figures 9 and 10 is applied to a roadway section 21 that does not have adjacent land such as a sidewalk and is adjacent to adjacent land 24 such as private land. That is, in the liquefaction countermeasure structure 1C of the fourth embodiment, the drainage path section is not provided in adjacent land 24 such as private land, but is provided at a position outside the width direction of the roadway section 21.

[0067] The drainage path section 50A of the liquefaction countermeasure structure 1C has the same configuration as the drainage path section 50 shown in Fig. 7 of the above-mentioned third embodiment. In the drainage path section 50A, a drain section 53 is installed at a position deeper than the thickness of the roadbed 20 at the road end 21d in the width direction of the roadway section 21, and the water W in the drain section 53 is guided to a drainage pipe 54 and drained. In other words, the drain section 53 is cast deeper than the lower surface 21c of the roadway section 21.

[0068] In this way, in the liquefaction countermeasure structure 1C according to the fourth embodiment, by providing the drainage section 53 at the road end 21d, water W can be drained just before it flows into the adjacent land 24, and therefore it is possible to obtain the same effect as the structure in which the liquefaction countermeasure is taken at the sidewalk section 22 (see FIG. 7) as in the liquefaction countermeasure structure 1B of the third embodiment described above. Here, the dotted line in FIG. 9 indicates the state in which the water W flows into the adjacent land 24 when the drainage path section 50A is not provided at the road end 21d. In addition, if a gutter or the like has already been laid at the road end 21d of the carriageway section 21, it is possible to utilize the existing gutter by casting the drain section 53 under the existing gutter.

[0069] Fifth embodiment 11, the liquefaction countermeasure structure 1D for a road according to the fifth embodiment includes a drainage path section 60 that is applied when a side gutter 23 is provided between a roadway section 21 and a sidewalk section 22 (adjacent land). A bottom surface 23a of the side gutter 23 is located deeper than a lower surface 21c of the roadway section 21.

[0070] The drainage path section 60 is formed by continuously laying gravel from the liquefied ground G below the roadway section 21 to the road surface 22a of the sidewalk section 22 so as to envelop the lower part of the side gutter 23. The drainage path section 60 includes a first gravel layer section 61 formed in the liquefied ground G so as to cover the lower part 23b of the side gutter 23, a second gravel layer section 62 formed in the liquefied ground G below the sidewalk section 22, and a drain section 63 connecting the second gravel layer section 62 and the road surface 22a of the sidewalk section 22 to allow water to pass through. The first gravel layer section 61, the second gravel layer section 62, and the drain section 63 are continuously connected to allow water to pass through.

[0071] At least a portion of the first gravel layer 61 is located in the liquefied ground G below the roadway portion 21. The second gravel layer 62 is formed in the liquefied ground G below the sidewalk portion 22, and is connected to the first gravel layer 61 and the drain portion 63. The drain portion 63 connects the second gravel layer 62 below the sidewalk portion 22 to the road surface 22a of the sidewalk portion 22 in a water-permeable manner, is permeable, and prevents sand from passing through.

[0072] In the liquefaction prevention structure 1D of the fifth embodiment, even if a gutter 23 is present on the side of the roadway portion 21, a drainage path portion 60 is formed by laying gravel material to surround the lower portion 23b of the gutter 23, so that water W under the roadway portion 21 can be drained outside the roadbed 20 through the drainage path portion 60.

[0073] In this case, the boundary between the roadway section 21 and the gutter 23 is covered and protected by the drainage path section 60 made of gravel, which has the effect of reducing liquefaction damage at this boundary during an earthquake.

[0074] The above describes embodiments of the liquefaction prevention structure and liquefaction prevention method for roads according to the present invention, but the present invention is not limited to the above embodiments and can be modified as appropriate without departing from the spirit of the present invention.

[0075] For example, the configuration of the drainage path portion of this embodiment (e.g., the height, diameter, cross-sectional shape, etc. of the drain 30) is appropriately set taking into consideration the thickness of the roadbed 20 (roadway portion 21, sidewalk portion 22), ground conditions, etc.

[0076] In addition, in the above embodiment, the adjacent land is the sidewalk portion 22, but it is not limited to the sidewalk portion 22, and may be adjacent land consisting of a passage or space that does not function as a sidewalk. The roadbed 20 only including the roadway portion 21 without including the adjacent land (sidewalk portion 22) may be the target. In other words, the roadbed 20 may be configured to have at least the roadway portion 21. When only the roadway portion 21 is the roadbed 20, the outer position in the width direction of the roadbed 20 is the outermost part of the roadway, such as the position of the side gutter of the roadway portion 21.

[0077] The outside of the roadbed 20 from which water is drained through the drainage path portion may be a portion including the road surface 20a of the roadbed 20.

[0078] In addition, the components in the above-described embodiments can be replaced with well-known components as appropriate without departing from the spirit of the present invention. [Explanation of symbols]

[0079] 1, 1A, 1B, 1C, 1D Liquefaction prevention structure 20 Roadbed 20a road surface 21 Roadway section 21a Road surface 21c Bottom side 22 Sidewalk (adjacent area) 22a Road surface 22b hole 22c Bottom 23 Gutter 30 Drain (drainage path) 31 Lid 40 Drain pipe (drainage path section) 40a Inlet 41 Filters 50, 50A, 60 Drainage path section 51, 53 Drain section 52, 54 Drainage pipe line 61 First Gravel Layer 62 Second Gravel Layer 63 Drain section G. Liquefied ground W water

Claims

1. A liquefaction countermeasure structure for a road to reduce sand spouting onto a road surface when a liquefied ground is liquefied, the structure being constructed on the surface of the liquefied ground, The roadbed includes at least a roadway portion, A liquefaction prevention structure for a road, comprising a drainage path section that connects the liquefied ground below the outer side of the roadbed in the width direction to the outside of the roadbed in a water-permeable manner.

2. The roadbed is provided along the roadway portion and includes an adjacent land having a thickness thinner than that of the roadway portion, The liquefaction prevention structure for a road according to claim 1 , wherein the drainage path portion connects the liquefied ground below the adjacent land to an outside of the roadbed in a water-permeable manner.

3. The liquefaction prevention structure for a road according to claim 1 or 2, wherein the drainage path portion extends into the liquefied ground below a lower surface of the roadbed.

4. The liquefaction prevention structure for a road as described in claim 1 or 2, wherein the drainage path portion is a drain that connects the liquefied ground below the roadbed to the road surface of the roadbed in a water-permeable manner, and that prevents the passage of sand.

5. The liquefaction prevention structure for a road as described in claim 4, wherein an upper portion of the drain is provided with a permeable cover that allows water that flows into the drain from the liquefied ground when liquefaction occurs to be drained to the road surface of the roadbed.

6. The liquefaction prevention structure for a road according to claim 4, wherein the drains are arranged at a position on the roadbed closer to the roadway portion, and are provided in a plurality at predetermined intervals along the extension direction of the roadway portion.

7. The drainage path portion is a drainage pipe that is at least partially disposed in the liquefied ground below the roadbed and extends laterally, The liquefaction countermeasure structure for a road according to claim 1 , wherein the drainage pipe is provided to allow water to infiltrate from the liquefied ground, and drains water flowing inside the pipe to the outside of the roadbed.

8. The drainage path portion has a drain portion at least a portion of which is disposed in the liquefied ground below the roadbed, and a drainage pipe line connected to an upper end of the drain portion inside the roadbed and extending laterally, 2. The liquefaction prevention structure for a road according to claim 1, wherein the drainage pipeline is provided so as to allow water to enter from the drain portion, and the water flowing through the pipeline is drained to the outside of the roadbed.

9. A side gutter is provided on a side portion of the roadway portion of the roadbed, The liquefaction prevention structure for a road as described in claim 1, wherein the drainage path portion is formed by laying gravel continuously from the liquefied ground below the roadway portion to the road surface of the roadbed, so as to wrap around the lower part of the gutter.

Citation Information

Patent Citations

  • Character processor

    JP1985041118A