Building and construction method of the same

By integrating a steel elongated member between the core material and soil cement, the pull-out resistance of soil-cement column-type continuous walls is enhanced, addressing cracking and groundwater issues while controlling costs.

JP2024169167APending Publication Date: 2024-12-05FUJITA CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023086409
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-25
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

In buildings with soil-cement column-type continuous walls, the pull-out resistance of the core material is insufficient when subjected to pulling forces due to permeable ground conditions, particularly near the lower end, leading to potential cracking and groundwater ingress.

Method used

A steel elongated member is joined to the core material, extending between the lower end of the core material and the soil cement, enhancing the peripheral surface friction force and preventing cracks, while maintaining construction costs.

Benefits of technology

The solution significantly increases the pull-out resistance of the soil-cement column-type continuous wall, preventing cracks and groundwater ingress, while reducing material and construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024169167000001_ABST
    Figure 2024169167000001_ABST
Patent Text Reader

Abstract

To provide a building where a soil cement column row type continuous wall is joined to a side wall of an underground part of the building which enhances extraction resistance force against extraction force acting on a core material from the building, and a construction method of the same.SOLUTION: There is provided a building 200 where at least a side wall 15 of an underground part 11 of a building 10 in a ground G is joined to a soil cement column row type continuous wall 20 provided around the building 10, wherein in the soil cement column row type continuous wall 20, a core material 40 is embedded in a soil cement 30, and a steel-made extension member 60 extending to a lower region 38 between a lower end 47 of the core material 40 and a lower end 35 of the soil cement 30 is joined to the core material 40.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a building and a construction method thereof. [Background technology]

[0002] Retaining walls include prefabricated sheet pile walls, such as parent pile horizontal sheet pile walls and steel sheet pile walls, and cast-in-place walls, such as column-row retaining walls and continuous underground walls. Column-row retaining walls include cast-in-place reinforced concrete column-row retaining walls, steel pipe column-row retaining walls, and soil cement column-row retaining walls (soil cement column-row continuous walls).

[0003] For example, while the above-mentioned soil cement diaphragm wall is a temporary structure, there is also a form in which the soil cement diaphragm wall is used as part of the foundation of a building, which is a permanent structure, by connecting it to the side wall of the underground part of the building, which is a permanent structure. In this way, by using the soil cement diaphragm wall not only as an earth retaining wall but also as part of the foundation of the permanent structure, the structure of the foundation of the permanent structure can be simplified, and for example, the amount of concrete and rebar in the foundation can be reduced, which can significantly reduce the construction cost. For example, Patent Document 1 proposes a method of attaching shear connectors or the like to the soil cement diaphragm wall when constructing the underground structure of a building after the construction of the soil cement diaphragm wall, and constructing the soil cement diaphragm wall and the underground structure of the building together.

[0004] Here, a specific configuration in which the above-mentioned soil cement diaphragm wall is used as part of the foundation of a building, which is a permanent structure, will be described with reference to Figures 5 and 6. Figure 5 is a vertical cross-sectional view showing an example of a building, and Figure 6 is a view taken along the line VI-VI in Figure 5.

[0005] The illustrated building 100 is constructed by joining the side walls 15 and base 17 of the underground section 11 of the building 10 in the ground G to a soil cement continuous column wall 20 constructed around the building 10. For example, a soil cement continuous column wall 20 having a rectangular frame shape in plan view is constructed around the side walls 15 of the underground section 11 of the building 10, which is rectangular in plan view, and the two are joined at multiple points. Fig. 5 shows only the side walls 15, base 17, and some of the columns 16 of the building 10.

[0006] The soil cement column-type continuous wall 20 is constructed by overlapping parts of the soil cement 30, which is circular in plan view, with a core material 40 made of H-shaped steel having a web 41, a first flange 42 on the building 10 side, and a second flange 43 on the opposite side to the building 10, embedded inside the soil cement 30 in the circular drilled hole G1 in plan view. Here, the core material 40 is generally inserted into the soil cement 30 so that the distance t1 between its bottom end 47 and the bottom end 35 of the soil cement 30 is about 1 m.

[0007] Of the core material 40 embedded in the soil cement 30, a first flange 42 on the upper building 10 side has multiple shear connectors 50 joined by welding or the like and protruding laterally, and the protruding shear connectors 50 are embedded in the side walls 15 and base plate 17 of the underground portion 11 to integrate the building 10 with the soil cement diaphragm-type continuous wall 20. The weight of the building 10 and the compressive force N1 generated when the building is displaced during an earthquake are transmitted from the building 10 to the core material 40 via the shear connectors 50.

[0008] A plurality of shear connectors 45 are joined by welding or the like below the web 41 of the core material 40, protrude laterally from the web 41, and are embedded inside the soil cement 30. The pushing force N1 transmitted to the core material 40 is transmitted to the soil cement 30 around the core material 40 via the tip and peripheral surface of the core material 40 and the shear connectors 45, and the pushing force N1 is transmitted from the soil cement 30 to the surrounding ground G via the peripheral friction force between the soil cement 30 and the surrounding ground G, thereby ensuring the bearing capacity of the soil cement column-type continuous wall 20. [Prior art documents] [Patent documents]

[0009] [Patent Document 1] Patent No. 4466418 Summary of the Invention [Problem to be solved by the invention]

[0010] In the case where the groundwater level is high, the soil cement continuous column wall 20 is expected to have a water-stopping effect, but when the ground near the bottom end of the core material 40 is permeable sandy ground or the like, measures are taken to prevent groundwater from flowing around in the X1 direction by extending only the soil cement 30 down to the impermeable layer or low permeable layer such as clay soil below. For example, as shown in Fig. 7, the soil cement 30 alone is extended down to the impermeable layer GA or the like below, thereby preventing groundwater from flowing around. Depending on the length of the core material 40 having the necessary strength as a retaining wall and the position of the impermeable layer GA, the length of the clearance t2 may reach about 10 to 20 m.

[0011] 7, if a pull-out force N2 acts on the core material 40 through the side wall 15 of the building 10, cracks C are likely to occur in the soil cement 30 at or near the bottom end 47 of the core material 40. Therefore, the peripheral friction force F1 between the soil cement 30 and the surrounding ground G in the range t3 from the bottom end of the side wall 15 (or the bottom end of the building 10) to the bottom end 47 of the core material 40 acts as a pull-out resistance force to resist the pull-out force N2 acting on the core material 40. In this case, if the pull-out force N2 is greater than the peripheral friction force F1, it is not possible to sufficiently resist the pull-out force N2.

[0012] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a building having an improved pull-out resistance to a pull-out force acting on the core material from the building, in which a soil cement prismatic continuous wall is joined to the side wall of the basement of the building, and a construction method thereof. [Means for solving the problem]

[0013] In order to achieve the above object, one aspect of the building according to the present invention is as follows: A building in which at least a side wall of an underground portion of a building in the ground is joined to a soil cement continuous column wall provided around the building, and the soil cement continuous column wall has a core material buried inside the soil cement, The core material is characterized in that a steel extension member is joined to the core material, extending into the lower region between the lower end of the core material and the lower end of the soil cement.

[0014] According to this embodiment, the core material is joined to a steel extension member extending to a lower region between its lower end and the lower end of the soil cement, so that when a pull-out force acts on the core material from the side wall of the building, the extension member suppresses or prevents the soil cement near the lower end of the core material from cracking. For example, the peripheral friction force between the soil cement and the surrounding ground in the range from the lower end of the core material to the lower end of the extension member can be expected as the pull-out resistance. As a result, in a building in which a soil cement column-type continuous wall is joined to the side wall of the basement of a building, the pull-out resistance against the pull-out force acting on the core material from the building can be increased. Furthermore, in increasing this pull-out resistance, for example, the length of the core material is not made longer than necessary to ensure the strength as an earth retaining wall, and the extension member is simply welded to the core material, so that the pull-out resistance of the soil cement column-type continuous wall can be increased while suppressing construction costs including material costs.

[0015] Here, "at least the side wall of the building" includes both the side wall and the base of the building, as well as the (underground) side wall of the building.

[0016] Another aspect of the building according to the present invention is The extending member is a shaft-shaped member.

[0017] According to this aspect, the extension member is a simple shaft-shaped member, so that the pull-out resistance of the soil cement prismatic continuous wall can be increased while further reducing construction costs including material costs. Here, the "shaft-shaped member" includes elongated linear members, elongated spiral members, etc.

[0018] Another aspect of the building according to the present invention is The shaft member is characterized in that it is a straight member.

[0019] According to the present embodiment, since the axial member is a straight-line member, when the extension member is attached below the core material and inserted into the soil cement, the resistance force acting on the extension member from the soil cement can be made as small as possible, thereby improving the workability of the soil cement column-type continuous wall, including the insertability of the core material, and increasing the vertical accuracy of the core material inserted into the soil cement.

[0020] Another aspect of the building according to the present invention is The shaft-shaped member is characterized in that it is a steel bar.

[0021] According to this embodiment, the shaft-shaped members are generally commercially available reinforcing bars, which can increase the pull-out resistance of the soil cement continuous prismatic wall while further reducing construction costs, including material costs. Here, the term "reinforcing bars" may include prestressed concrete (PC) steel bars in addition to deformed steel bars and round steel bars.

[0022] Another aspect of the building according to the present invention is The shaft-shaped member is characterized in that it is a shaped steel material.

[0023] According to this embodiment, since the shaft-shaped members are generally commercially available shaped steel materials, it is possible to increase the pull-out resistance of the soil cement diaphragm wall while further reducing construction costs, including material costs. Here, the "shaped steel material" may include flat steel as well as channel steel and angle steel.

[0024] Another aspect of the building according to the present invention is The extension length of the extension member downward from the lower end of the core material is designed so that the peripheral friction force between the soil cement and the surrounding ground in the range from the lower end of the side wall to the lower end of the extension member is at least greater than the pull-out force acting from the side wall to the core material.

[0025] According to this aspect, the extension length of the extension member downward from the lower end of the core material is designed so that the peripheral friction force between the soil cement and the surrounding ground in the range from the lower end of the side wall to the lower end of the extension member is equal to or greater than the pull-out force acting on the core material, resulting in a building having a soil cement column-type continuous wall equipped with a pull-out resistance force capable of resisting the pull-out force acting. Here, "so that the peripheral friction force is equal to or greater than the pull-out force acting on the core material" includes a method of designing the peripheral friction force to be equal to or greater than the pull-out force, a method of designing the peripheral friction force to be equal to or greater than the pull-out force multiplied by a safety factor, etc.

[0026] Another aspect of the building according to the present invention is A shear connector is joined to the core material, and the shear connector is embedded in the side wall of the underground portion, thereby joining the side wall and the soil cement column-type continuous wall.

[0027] According to this aspect, the shear connector provided above the core material is embedded in the side wall of the underground portion, and the side wall and the soil cement diaphragm wall are joined, so that the compressive load and pull-out load acting from the building can be effectively transmitted to the core material via the shear connector, and the soil cement diaphragm wall including the core material can bear both the compressive load and the pull-out load. Here, the shear connector includes a stud dowel, a burring shear connector, etc.

[0028] In addition, one aspect of the construction method for a building according to the present invention is to A method for constructing a building, in which at least a side wall of an underground portion of a building in the ground is joined to a soil cement column-type continuous wall provided around the building, Step A is to construct a soil cement column-type continuous wall by erecting a core material formed of an H-shaped steel having a first flange on the building side, a second flange on the opposite side to the building, and a web into the soil cement in the drilled hole; Step B: cutting the soil cement at the upper end of the soil cement diaphragm wall to expose a portion of the first flange, and joining a shear connector to the exposed portion of the first flange; and a step C of constructing at least the side wall of the building that abuts against the first flange and embedding the shear connector in the side wall to join the side wall of the underground portion and the soil cement column-type continuous wall to each other. In the step A, a steel extension member is joined to the core material, extending into the lower region between the lower end of the core material and the lower end of the soil cement.

[0029] According to this embodiment, by joining the steel extension member to the core material and extending into the lower region between its lower end and the lower end of the soil cement, when the extension member is attached to the lower part of the core material and inserted into the soil cement, the resistance force acting on the extension member from the soil cement can be minimized, which improves the workability of the soil cement column-type continuous wall including the insertability of the core material and increases the vertical accuracy of the core material inserted into the soil cement. This effect becomes even more remarkable when the extension member is a straight axial member such as a reinforcing bar. Effect of the Invention

[0030] As can be understood from the above explanation, according to the building and construction method of the present invention, for a building in which a soil cement column-type continuous wall is joined to the side wall of the basement of a building, it is possible to increase the pull-out resistance against the pull-out force acting on the core material from the building. [Brief description of the drawings]

[0031] [Figure 1]FIG. 2 is a vertical cross-sectional view showing an example of a building according to an embodiment, and is also a diagram illustrating step C of an example of a construction method for a building according to an embodiment. [Diagram 2] FIG. 2 is a view taken along the line II-II of FIG. [Diagram 3] FIG. 2 is a diagram illustrating step A of an example of a construction method for a building according to an embodiment. [Figure 4] FIG. 2 is a diagram illustrating step B of an example of a construction method for a building according to an embodiment. [Diagram 5] FIG. 1 is a vertical cross-sectional view showing an example of a conventional building. [Figure 6] 6 is a view taken along the line VI-VI in FIG. 5. [Figure 7] FIG. 11 is a vertical cross-sectional view showing another example of a conventional building, in which only the soil cement has been laid down to the impermeable layer below. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0032] Hereinafter, a building and a construction method thereof according to an embodiment will be described with reference to the accompanying drawings. In this specification and the drawings, substantially identical components are designated by the same reference numerals, and duplicated explanations may be omitted.

[0033] [Building according to the embodiment] First, an example of a building according to the embodiment will be described with reference to Figures 1 and 2. Here, Figure 1 is a vertical cross-sectional view showing an example of a building according to the embodiment, and Figure 2 is a view taken along the line II-II in Figure 1. Note that Figure 1 is also a view explaining step C of an example of a construction method for a building according to the embodiment, and will be referred to when describing the construction method in detail below.

[0034] The illustrated building 200 is constructed by joining the side walls 15 and base 17 of the underground section 11 of a building 10 located in the ground G to a soil cement continuous column wall 20 constructed around the building 10. For example, a soil cement continuous column wall 20 having a rectangular frame shape in plan view is constructed around the side walls 15 of the underground section 11 of the building 10, which is rectangular in plan view, and the two are joined at multiple points. Note that the building 10 has a variety of shapes in plan view, and the soil cement continuous column wall 20 is constructed in a frame shape that corresponds to the shape in plan view of the building 10.

[0035] The building 10 may be made of RC (Reinforced Concrete), S (Steel), SRC (Steel Reinforced Concrete), or a hybrid of these structures, and includes a variety of types of buildings, such as office buildings, apartment buildings, gymnasiums, shopping malls, and various public buildings. In the illustrated example below, a building will be described in which at least the side walls 15 and base 17 of the basement 11 are made of RC.

[0036] On the other hand, the soil cement continuous column wall 20 is constructed by overlapping parts of the soil cement 30, which is circular in plan view, with a core material 40 made of H-shaped steel embedded inside the soil cement 30 in the circular drilled hole G1 in plan view. Here, in addition to the H-shaped steel, steel sheet piles, secondary concrete products, etc. may be used as the core material.

[0037] The soil cement 30 is produced by mixing and stirring the earth and sand generated by excavating the ground G with cement milk discharged from the tip of a multi-shaft mixing auger or the like (not shown), and is constructed by inserting a core material 40 into the soil cement before it hardens.

[0038] The soil cement column-type continuous wall 20 in the illustrated example not only serves as a retaining wall when constructing the building 10, but also functions as the foundation of the building 10 after the building 10 is constructed by being joined to the underground portion 11 of the building 10.

[0039] The soil cement 30 in the illustrated example is constructed so that its lower end 35 is buried in the impermeable layer GA below the ground G, and because the soil cement 30 extends to the impermeable layer GA, groundwater is prevented from leaking around to the building 10 side (see Figure 7).

[0040] In contrast, the core material 40 has a length that satisfies the required strength as a retaining wall, and therefore, in the illustrated example, since the depth of the impermeable layer GA is deeper than the level of the lower end 47 of the core material 40, the length of the soil cement 30 is set longer than usual compared to the core material 40.

[0041] Of the core material 40 embedded in the soil cement 30, the first flange 42 on the upper building 10 side has multiple shear connectors 50 welded to it and protruding laterally, and the protruding shear connectors 50 are embedded in the side walls 15 and base 17 of the underground portion 11, thereby integrating the building 10 and the soil cement column-type continuous wall 20.

[0042] In the soil cement column-type continuous wall 20, a steel extension member 60 is joined to the lower part of the core material 40, which is embedded in the soil cement 30, and extends into the lower region 38 between the lower end 47 of the core material 40 and the lower end 35 of the soil cement 30.

[0043] The extension member 60 is a straight reinforcing bar (deformed steel bar, round steel bar), and in the illustrated example, as shown in Fig. 2, a total of six reinforcing bars 60 are welded to the outer circumferential surfaces of the first flange 42 and the second flange 43, two each, and two at the center position of the web 41. Here, the number and diameter of the reinforcing bars 60 joined to the core material 40 may be set in various ways depending on the required pull-out resistance force (pull-out resistance force added by the reinforcing bars).

[0044] In addition, instead of reinforcing bars, shaped steel materials such as channel steel, angle steel, flat steel, etc. may be used for the extension member 60.

[0045] Since the extension member 60 is made of reinforcing bars or structural steel materials, as in the illustrated example, the pull-out resistance of the soil cement column-type continuous wall 20 can be increased by the tensile resistance of the extension member 60 while keeping construction costs, including material costs, down.

[0046] In addition, by applying a straight extension member 60 as in the illustrated example, the resistance that the extension member 60 receives from the soil cement 30 when inserting the core material 40 equipped with the extension member 60 into the soil cement 30 can be made as small as possible, improving the insertability (workability) of the extension member 60 and thereby improving the installation accuracy of the core material 40.

[0047] Although a spiral reinforcing bar or the like may be used as the extension member 60, from the viewpoint of ease of insertion into the soil cement 30 described above, it is preferable that the extension member 60 be a straight member as in the illustrated example.

[0048] 1, the reinforcing bars 60 extend to the vicinity of the bottom end 35 of the soil cement 30 (for example, at a level close to about 1 m). In this way, multiple reinforcing bars 60 welded to the core material 40 are embedded in the lower region 38 between the bottom end 47 of the core material 40 and the bottom end 35 of the soil cement 30. When a pull-out force N2 acts on the core material 40 from the building 10, the tensile resistance of the multiple reinforcing bars 60 prevents cracks C (see FIG. 7) from occurring in the soil cement 30 near the bottom end 47 of the core material 40.

[0049] Therefore, the peripheral friction force F2 between the soil cement 30 and the surrounding ground G in the range (length t5) from the lower end of the side wall 15 (building 10) to the lower end of the extension member, the reinforcing bar 60, can be used as a pull-out resistance force that counters the pull-out force N2, and the pull-out resistance of the soil cement column-type continuous wall 20 can be made significantly greater than that in the range up to the lower end 47 of the core material 40 (length t3 shown in Figure 7).

[0050] [Construction method of a building according to the embodiment] Next, an example of a construction method for a building according to the embodiment will be described with reference to Fig. 3, Fig. 4, and Fig. 1. Here, Fig. 3 and Fig. 4 are diagrams for explaining steps A and B of the example of the construction method for a building according to the embodiment, respectively. As already described, Fig. 1 is a vertical cross-sectional view showing the example of a building according to the embodiment, and is also a diagram for explaining step C of the example of the construction method for a building according to the embodiment.

[0051] In a construction method for a building, first, prior to the construction of the building, a soil cement column-type continuous wall 20 having a rectangular frame shape in plan view, for example, is constructed around the periphery of the construction area of ​​the building as a retaining wall, as shown in FIG.

[0052] The construction method for the soil cement column-type continuous wall 20 can be the well-known SMW (Soil Mixing Wall) method, etc., and begins with the removal of underground obstacles, followed by the installation of a guide wall (not shown), mixing the soil cement, and then discharging the designed mix of cement slurry from the tip of an auger head of a multi-shaft auger machine or the like while drilling and mixing the slurry. After reaching a specified depth, the auger head is pulled up while repeatedly mixing the slurry, thereby creating soil cement 30 in the drilled hole G1.

[0053] Then, before the soil cement 30 hardens, the core material 40 is inserted into the soil cement 30 in the X1 direction and erected. As a wall construction procedure, a continuous method in which a first element is constructed, then a second element is constructed at an interval, and then the holes at both ends of the third element are constructed by overlapping the holes at one end of both the first element and the second element, or a combined method of pre-drilling, in which multiple holes are pre-drilled at intervals at positions where the holes of each element will follow, and then each element is constructed by overlapping the holes drilled pre-drilled, etc. can be applied.

[0054] When the core material 40 is erected, a plurality of axial, linear extension members 60 (reinforcing bars) are welded to the lower part of the core material 40.

[0055] In this way, since the extension member 60 attached below the core material 40 is a straight reinforcing bar, the resistance from the soil cement 30 acting on the extension member 60 when the core material 40 is inserted into the soil cement 30 can be made as small as possible, allowing for smooth insertion of the core material 40 equipped with the extension member 60. This improves the ease with which the core material 40 can be inserted into the soil cement 30, and also improves the insertion accuracy (above, process A).

[0056] Next, as shown in FIG. 4, the upper region 31 of the soil cement diaphragm wall 20 on the building side is cut away to expose a part of the first flange 42.

[0057] Next, a plurality of shear connectors 50 are welded to the exposed first flange 42 (this completes step B).

[0058] Next, as shown in FIG. 1, the side walls 15 and base plate 17 of the underground portion 11 of the building 10 that abut at least the first flange 42 are constructed, and a plurality of shear connectors 50 are embedded in the side walls 15 and base plate 17 to join the side walls 15 and base plate 17 of the underground portion 11 to the soil cement column-type continuous wall 20.

[0059] Thereafter, the entire building 10 is constructed, whereby the building 10 and the soil cement diaphragm wall 20 are joined together to form the structure 200 (this is the end of step C).

[0060] According to the construction method of the illustrated example, it is possible to construct a building 200 that is integrally provided with a soil cement prismatic continuous wall 20 that has high pull-out resistance to the pull-out force N2 acting from the building.

[0061] The present invention is not limited to the configurations shown here, and may be implemented in other embodiments in which other components are combined with the configurations and the like set forth in the above embodiments. In this regard, the present invention may be modified without departing from the spirit of the present invention, and may be appropriately determined according to the application form. [Explanation of symbols]

[0062] 10: Building 11: Underground 15: Side wall 16: Pillar 17: Bottom board 20: Soil-cement diaphragm wall 30: Soil cement 31: Upper area 38: Lower area 40: Core material (H-shaped steel) 41: Web 41a: Wide surface 42: First flange 43: Second flange 50: Shear connector 60: Extension members (shaft-shaped members, straight members, reinforcing bars) 200: Buildings G: Ground G1: Drilling GA: Impermeable layer N1: Push-in force N2: Pull-out force F1, F2: Circumferential friction force

Claims

1. A building in which at least a side wall of an underground portion of a building in the ground is joined to a soil cement continuous column wall provided around the building, and the soil cement continuous column wall has a core material buried inside the soil cement, A building, characterized in that a steel extension member is connected to the core material and extends into a lower area between the lower end of the core material and the lower end of the soil cement.

2. 2. The building of claim 1, wherein the extension member is a shaft member.

3. The building according to claim 2, wherein the shaft member is a straight member.

4. 4. The building according to claim 2 or 3, characterized in that the shaft-shaped member is a reinforcing bar.

5. 4. The building according to claim 2 or 3, characterized in that the shaft-shaped member is a shaped steel member.

6. A building as described in claim 1 or 2, characterized in that the extension length of the extension member downward from the lower end of the core material is designed so that the peripheral friction force between the soil cement and the surrounding ground in the range from the lower end of the side wall to the lower end of the extension member is at least greater than the pull-out force acting from the side wall to the core material.

7. 3. The building described in claim 1 or 2, characterized in that a shear connector is joined to the core material and buried in the side wall of the underground portion, thereby joining the side wall and the soil cement column-type continuous wall.

8. A method for constructing a building, in which at least a side wall of an underground portion of a building in the ground is joined to a soil cement column-type continuous wall provided around the building, Step A is to construct a soil cement column-type continuous wall by erecting a core member formed of an H-shaped steel having a first flange on the building side, a second flange on the opposite side to the building, and a web into the soil cement in the drilled hole; A process B includes cutting the soil cement at the upper end of the soil cement diaphragm wall to expose a portion of the first flange, and connecting a shear connector to the exposed portion of the first flange; and a step C of constructing at least the side wall of the building that abuts against the first flange and embedding the shear connector in the side wall to join the side wall of the underground portion and the soil cement column-type continuous wall to each other. A construction method for a building, characterized in that in step A, a steel extension member is joined to the core material, extending into the lower area between the lower end of the core material and the lower end of the soil cement.

Citation Information

Patent Citations

  • Soil-cement wall piles, soil-cement structure

    JP4466418B2