Drilling equipment and drilling method used for power tower foundations
The self-propelled modular drilling equipment addresses the challenge of low efficiency and high labor costs by enabling efficient movement and assembly of drilling units, improving drilling efficiency and working conditions in mountainous areas.
Patent Information
- Application Number
- JP2023501773
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2022-06-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Drilling equipment for power tower foundations in mountainous or hilly areas is large and heavy, making it difficult to move between multiple drilling holders and positions, resulting in low efficiency and high labor costs.
A self-propelled modular drilling equipment with a hydraulic drilling machine unit, air compressor group units, and a dust removal system, allowing for modular installation and travel between drilling holders, connected via multi-way connectors and wind pipes for efficient drilling operations.
The modular design enhances drilling efficiency, reduces labor intensity, and improves working conditions by allowing quick assembly and disassembly, facilitating movement and reducing the difficulty in transporting and relocating heavy equipment.
Smart Images

Figure 2024543752000001_ABST
Abstract
Description
[Technical field]
[0001] This application claims priority to Chinese patent applications filed on April 25, 2021, bearing application number 202110448905.5, and filed on April 25, 2021, bearing application number 202110450374.3, the entire contents of which are incorporated herein by reference.
[0002] The present application relates to the technical field of power tower foundation construction, for example, to a drilling equipment and a drilling method used for power tower foundation construction. [Background technology]
[0003] Power tower foundation construction is usually carried out in mountainous or hilly areas, and first a drilling cradle is erected, and then holes are drilled in the drilling cradle.
[0004] In the related technology, the volume and weight of drilling equipment for rock soil ground is large, and during the drilling process, it is necessary to move between multiple drilling supports and between multiple hole positions on the drilling support, which results in low drilling efficiency, high labor costs for moving the drilling equipment, and heavy manual labor intensity. Summary of the Invention
[0005] The present application provides drilling equipment and a drilling method that can solve the problems of low drilling efficiency and heavy labor intensity.
[0006] One embodiment of the present application provides a drilling equipment comprising: a hydraulic drilling machine unit that can travel between a plurality of drilling receivers and between a plurality of hole positions on the drilling receiver to perform drilling operations; a multi-way connector; a compressed air piping; a fixing area located between a plurality of the drilling receivers, the output compressed air joining in parallel through the multi-way connector and then transported to the hydraulic drilling machine unit through the compressed air piping; a plurality of air compressor group units; an air duct; a dust collection cover provided at the hole mouth in the ground at the hole position and a dust remover provided in the fixing area, the dust collection cover and the dust remover being connected via the air duct; and an operation console connected to the hydraulic drilling machine unit, the air compressor group unit, and the dust remover, respectively, for communication and control.
[0007] One embodiment of the present application is Based on the arrangement of the plurality of drilling cradles of the power tower foundation, determining a fastening area between the plurality of drilling cradles, and based on the distribution of the hole positions of the plurality of drilling holes in the drilling cradle, determining a travel route of a hydraulic drilling machine unit; Arranging a plurality of air compressor group units and dust removers in the adhesion area, and providing the hydraulic drilling machine unit on any one of the drilling cradles; Place an operation console according to line of sight needs, and connect the operation console to the hydraulic drilling machine unit, the air compressor group unit, and the dust remover, respectively; providing a dust collection cover at the opening of the first hole in the drilling support, and connecting the dust collection cover and the dust remover via an air pipe; Drilling a first hole position using the hydraulic drilling machine unit, and sequentially completing drilling of all the hole positions in the drilling cradle based on the travel route; determining whether it is the last drilling cradle or not, and if it is not the last drilling cradle, running the hydraulic drilling machine unit to the next drilling cradle until drilling of all the hole positions in all the drilling cradles is completed, providing a dust collection cover at the hole mouth position of the first hole position in the drilling cradle, and returning to the execution of connecting the dust collection cover and the dust remover via an air duct. A drilling method for use in power tower foundations is provided. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a schematic diagram of a modular distribution in a drilling receiving platform of a self-propelled modular drilling equipment according to one embodiment of the present application. [Diagram 2] 1 is a schematic diagram of the overall structure of a self-propelled modular drilling equipment according to one embodiment of the present application; [Diagram 3] 1 is a structural schematic diagram of a partial configuration of a hydraulic drilling machine unit in a self-propelled modular drilling equipment according to one embodiment of the present application. FIG. [Figure 4] 1 is a structural schematic diagram of a multi-way connector in a self-propelled modular drilling equipment according to one embodiment of the present application. [Diagram 5] 1 is a structural schematic diagram of a bridge in a self-propelled modular drilling equipment according to one embodiment of the present application. FIG. [Figure 6] FIG. 4 is an enlarged schematic diagram of region A in FIG. [Figure 7] 1 is a schematic diagram of a drill boom assembly module and a hydraulic drive module in a self-propelled modular drilling equipment according to one embodiment of the present application. FIG. [Figure 8A] FIG. 2 is a schematic diagram of the travel route of a hydraulic drilling machine unit in a drilling method used for a power tower foundation according to one embodiment of the present application. [Figure 8B] FIG. 2 is a schematic diagram of the travel route of a hydraulic drilling machine unit in a drilling method used for a power tower foundation according to one embodiment of the present application. [Figure 8C]FIG. 2 is a schematic diagram of the travel route of a hydraulic drilling machine unit in a drilling method used for a power tower foundation according to one embodiment of the present application. [Figure 8D] FIG. 2 is a schematic diagram of the travel route of a hydraulic drilling machine unit in a drilling method used for a power tower foundation according to one embodiment of the present application. [Figure 8E] FIG. 2 is a schematic diagram of the travel route of a hydraulic drilling machine unit in a drilling method used for a power tower foundation according to one embodiment of the present application. [Figure 8F] FIG. 2 is a schematic diagram of the travel route of a hydraulic drilling machine unit in a drilling method used for a power tower foundation according to one embodiment of the present application. [Figure 8G] FIG. 2 is a schematic diagram of the travel route of a hydraulic drilling machine unit in a drilling method used for a power tower foundation according to one embodiment of the present application. [Figure 9] 1 is a flowchart of a drilling method used for a power tower foundation according to one embodiment of the present application. [Figure 10] FIG. 2 is a schematic diagram of the drilling direction when performing drilling work on a drilling support base in a drilling method used for a power tower foundation in one embodiment of the present application. [Figure 11] 13 is a flowchart of a drilling method used for a power tower foundation according to another embodiment of the present application.
[0009] 100 ... drilling support, 200 ... hole position, 300 ... fixing area, 1...hydraulic drilling machine unit, 101...crawler mechanism, 102...bridge, 1021...horizontal beam, 1022...vertical beam, 1023...reinforcing plate, 1024...taper pin, 1025...taper boot, 1026...first connecting member; 103. swivel assembly, 1031...fixed part, 1032...rotating part, 1033...lock mechanism, 104...chassis, 105...drill boom, 106...adjusting rod, 107...telescopic rod, 108...drive mechanism, 109...drill rod, 110...hydraulic system module, 111...power system module, 2...Air compressor group unit, 201...Multi-way connector, 2011...Main input port, 2012...Main output port, 2013...Secondary input port, 2014...Mixing cavity, 2015...Oil mist port, 2016...Secondary input passage, 202...Compressed air piping, 203...Air compressor module, 204...Air compressor power module, 3...dust removal unit, 301...dust collection cover, 302...dust remover, 303...air duct, 4...Operation platform, 5...Oil mist lubricator, 6...Three-way joint, 601...Air intake port, 7...Support leg. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] In the description of this application, unless otherwise clearly specified and limited, the terms "connected", "connected" and "fixed" should be understood in a broad sense, for example, may be fixedly connected, detachably connected, or integrated, may be mechanically connected, may be electrically connected, may be directly connected, may be indirectly connected via an intermediate medium, may be internal communication between two elements, or may be an interaction relationship between two elements. A person skilled in the art can understand the specific meaning of the above terms in this application according to the specific situation.
[0011] In this application, unless otherwise expressly defined and limited, a first feature being "above" or "below" a second feature may include direct contact between the first and second features, or may include contact between the first and second features through another feature between them without direct contact. Furthermore, a first feature being "above," "upper," and "on the upper surface" of a second feature may include the first feature being directly above and diagonally above the second feature, or may simply indicate that the horizontal height of the first feature is higher than that of the second feature. A first feature being "below," "below," and "on the lower surface" of a second feature may include the first feature being directly below and diagonally below the second feature, or may simply indicate that the horizontal height of the first feature is lower than that of the second feature.
[0012] In the description of the present embodiment, the terms "upper", "lower", "right" and other orientations or positional relationships are based on the orientations or positional relationships shown in the drawings, and are merely for the purpose of facilitating the description and simplifying the operation, and do not indicate or imply that the described device or element has a specific orientation and must be configured and operated in a specific orientation, and therefore should not be understood as limiting the present application. In addition, the terms "first" and "second" are merely used to distinguish in the description and do not have any special meaning.
[0013] Example 1 This embodiment first provides a drilling equipment, which is a self-propelled modular drilling equipment, and as shown in Figures 1 and 2, includes a hydraulic drilling machine unit 1, an air compressor group unit 2, a dust removal unit 3, and an operation table 4, among which the hydraulic drilling machine unit 1 can travel between a plurality of drilling support tables 100 and between a plurality of hole positions 200 in the drilling support tables 100 to perform drilling work, and a plurality of air compressor group units 2 are provided, and the plurality of air compressor group units 2 are provided in a fixing area 300 located between the plurality of drilling support tables 100. The compressed air output from the multiple air compressor group units 2 is merged in parallel through a multi-way connector 201 and then transported to the hydraulic drilling machine unit 1 through compressed air piping 202. The dust removal unit 3 is equipped with a dust collection cover 301 and a dust remover 302, the dust collection cover 301 is installed at the hole mouth of the ground at the hole position 200, and the dust remover 302 is installed in the fixing area 300. The dust collection cover 301 and the dust remover 302 are connected via an air duct 303. The operation platform 4 is communicatively connected between the hydraulic drilling machine unit 1, the air compressor group unit 2, and the dust remover 302, respectively, for communication and control. In one embodiment, the operation platform 4 is connected to the hydraulic drive mechanism in the hydraulic drilling machine unit 1 to control the start and stop of the hydraulic drive mechanism, connected to the power mechanism in the air compressor group unit 2 to control the generation and output of compressed air, and connected to the drive mechanism of the dust remover 302 to control the start and stop of dust removal. Usually, the operation platform 4 is connected wirelessly or by a wired method, and in one embodiment, the operation platform 4 is connected by a wireless remote control method and can be remotely controlled. In this way, the operation platform 4 can be moved freely and operated by selecting an appropriate position according to the needs of the construction site, for example, placed at an optimal angle position to control the drilling operation of the drilling machine.
[0014] The self-propelled modular drilling equipment according to the present application is equipped with a dust removal unit 3, which prevents dust pollution at the drilling site and improves the working environment for workers. The dust remover 302 can be a cyclone type dust remover, which includes a cyclone bucket mounted on a dust remover holder, a filter element, a fan, a hydraulic motor, etc., and uses a hydraulic motor to drive the fan.
[0015] The self-propelled modular drilling equipment of the present application is provided in a modularized manner, so that the hydraulic drilling machine unit 1 installed independently on the drilling support stand 100 travels independently to drill holes, and the air compressor group unit 2 and the dust remover 302 are installed between the multiple drilling support stands 100. When the hydraulic drilling machine unit 1 travels to drill holes, the positions of the air compressor group unit 2 and the dust remover 302 are rationally arranged in advance and then kept immovable, thereby reducing the number of units and modules that need to be traveled and relocated each time drilling is performed, and the related Compared with the conventional technology in which the entire drilling equipment is placed on the drilling support 100, the modular drilling equipment of the present application is transported to a rock drilling site in mountainous areas or other areas with poor accessibility in the form of modular or separate parts, and the modules after dismantling and transporting are placed and installed at the pre-planned installation positions at the site, and connected by air pipe 303 or cable or wirelessly to construct the drilling equipment, which can realize rapid assembly, greatly improve the drilling efficiency, and reduce the manual labor intensity, particularly accelerating the movement efficiency between the drilling support 100. In this embodiment, the hydraulic drilling machine unit 1 and the air compressor group unit 2 are connected via compressed air piping 202, and the dust collecting cover 301 and the dust remover 302 in the dust removing unit 3 are connected via air pipe 303. The operating platform 4 is individually connected by wire or wirelessly to the hydraulic drilling machine unit 1, the air compressor group unit 2, and the dust remover 302, and each unit and module can be suspended and transported individually without being limited or restrained in its position. Each unit and module of the drilling equipment can be quickly attached and detached at the construction site, solving the problem of drilling equipment being difficult to transport due to its large volume and weight.
[0016] As shown in Figure 3, the hydraulic drilling machine unit 1 comprises a drilling machine chassis module, a drill boom assembly module, and a hydraulic drive module, the drilling machine chassis module comprises two crawler mechanisms 101, one bridge 102, and one swivel assembly 103, the two crawler mechanisms 101 are symmetrically arranged at both ends of the bridge 102, the swivel assembly 103 is rotatably connected to the bridge 102 and is located in the middle of the two crawler mechanisms 101, and the drill boom assembly module and the hydraulic drive module are respectively attached to the swivel assembly 103.
[0017] As shown in Fig. 3, the two crawler mechanisms 101 are configured as traveling mechanisms of the hydraulic drilling machine unit 1, and can travel on the drilling cradle 100 to drill holes at each hole position 200, and can also travel between the drilling cradles 100. Since the multiple hole positions 200 in the drilling cradle 100 are usually arranged in a circumferential direction, the provision of the swivel assembly 103 can realize the rotation of the drill boom assembly module and the rotation relative to the traveling of the crawler mechanism 101, and since the space of the drilling cradle 100 is limited, the rotation of the swivel assembly 103 further contributes to improving the rotation efficiency and faster switching between different hole positions 200.
[0018] In one embodiment, each air compressor group unit 2 comprises at least one air compressor module 203 and at least one air compressor power module 204 configured to drive the air compressor module 203 to generate and output compressed air.
[0019] In some embodiments, the air compressor module 203 and the air compressor power module 204 in each air compressor group unit 2 may be provided to be connected in a one-to-one correspondence, at least two air compressor power modules 204 may be connected to one air compressor module 203, and one air compressor power module 204 may drive a plurality of air compressor modules 203 to operate. In order to facilitate the lifting and transfer, in the first case, the air compressor module 203 and the air compressor power module 204 are fixed and attached to two different fixed frames, respectively, and the two fixed frames are removably connected between them. In one embodiment, the two fixed frames are connected by means of insertion positioning and The second and third cases adopt a mechanical lock connection method, and at least two air compressor power modules 204 are assembled and mounted on one fixed frame, and a plurality of air compressor modules 203 are assembled and mounted on one fixed frame, and the fixed frames are transported to the construction site and then assembled and mounted according to the objects to be driven, thereby improving the installation efficiency and the lifting efficiency. In one embodiment, the total weight of each fixed frame is usually not more than 200KG, and the top of the fixed frame is provided with a lifting material, which is more suitable for various different lifting methods such as human, livestock, ropeway and / or small swing-wing drone transportation. Here, in one embodiment, the air compressor module 203 adopts a screw air compressor, and the air compressor power module 204 adopts a V-type two-cylinder diesel engine, and the small high-speed diesel engine is used as the prime mover, which has higher power efficiency, better fuel safety, is suitable for outdoor forestry work, and is less likely to cause forest fires. During drilling work, multiple air compressor modules 203 are placed on the flat ground in the fixing area 300, arranged side by side and connected in parallel. The quantity of air compressor modules 203 can be determined based on the size of the drill hole required for the work and the power of the drilling equipment required.
[0020] In one embodiment, the self-propelled modular drilling equipment of the present application further comprises an oil mist lubricator 5 and a three-way joint 6, a first end of the three-way joint 6 is connected to a multi-way connector 201, a second end is connected to the output end of an air compressor module 203, and a third end is an air intake port 601, the oil mist lubricator 5 is connected between the air intake port 601 and an oil mist port 2015, and the oil mist port 2015 is provided on the multi-way connector 201.
[0021] FIG. 4 shows a schematic diagram of the structure of a multi-way connector 201, and the direction of the arrow in the drawing indicates the air flow direction. The multi-way connector 201 is provided between a plurality of air compressor modules 203 and a hydraulic impactor of the hydraulic drilling machine unit 1. The multi-way connector 201 has a cylindrical main body, and the main body is provided with a main passage for compressed air. Both ends of the main passage are a main input connection 2011 and a main output connection 2012 for compressed air, respectively. The main passage is provided with a plurality of secondary input connections 2013 sequentially along the axial direction, and the secondary input connection 2013 adjacent to the main input connection 2011 and the main input connection 2011 are connected to each other. The main passage between them is further provided with a mixing cavity 2014 having an inner diameter larger than that of the main passage, and the mixing cavity 2014 is provided with an oil mist port 2015. The main input port 2011 and the multiple secondary input ports 2013 are respectively connected to multiple air compressor modules 203, and the main output port 2012 is connected to an impactor. The first end of the three-way joint 6 is connected to the main input port 2011, the second end is connected to the mixing cavity 2014, and the third end is an air intake port 601. The oil mist lubricator 5 is connected between the air intake port 601 and the oil mist port 2015. The secondary input connection 2013 communicates with the main passage via a secondary input passage 2016, the inner diameter of which is smaller than that of the main passage, and the input direction of the compressed air in the secondary input passage 2016 and the input direction of the compressed air in the main passage form an angle B which is smaller than 90°, and in one embodiment, the angle B=30°. Two adjacent secondary input passages 2016 are spaced apart in the axial direction of the main passage and alternately arranged in the circumferential direction. The main input connection 2011 and the main output connection 2012 are each arranged coaxially with the main passage.The inner diameter of the main output port 2012 is larger than the inner diameter of the main passage, the inner diameter of the first end port of the three-way joint 6 is smaller than the inner diameter of the main passage, the inner diameter of the air intake port 601 is equal to the inner diameter of the oil mist port 2015, and a necking passage is provided between the oil mist port 2015 and the mixing cavity 2014, so that the oil mist mixture enters the mixing cavity 2014 under the action of negative pressure and easily forms turbulent flow in the mixing cavity 2014 to be thoroughly mixed with the compressed air, and the compressed air of the multiple paths enters the main passage through their respective secondary input passages 2016, so that the air flow in the secondary input passage 2016 has little interference with the compressed air in the main passage, and the pressure loss of the compressed air in the main passage that occurs in the main passage is reduced, making it easier to control the flow rate of the compressed air.
[0022] 3 and 6, a first mounting portion is provided at each end of the bridge 102, and the crawler mechanism 101 has a second mounting portion, and the first mounting portion and the second mounting portion are removably connected. The bridge 102 and the crawler mechanism 101 are removably connected to each other, which facilitates assembly after transfer and also makes removal efficient.
[0023] Of the first mounting portion and the second mounting portion, one is provided with a tapered pin 1024 and the other is provided with a tapered boot 1025, and the tapered pin 1024 and the tapered boot 1025 each have a central connecting hole, the tapered pin 1024 is drilled within the tapered boot 1025, and a first connecting material 1026 is attached within the two central connecting holes.
[0024] In some embodiments, in order to enhance the strength of the bridge 102 and reduce the weight of a single separate part, as shown in FIG. 5, the bridge 102 has at least two horizontal beams 1021 and two vertical beams 1022, the two horizontal beams 1021 are parallel to each other, the two vertical beams 1022 are parallel to each other, and the horizontal beams 1021 and the vertical beams 1022 are arranged perpendicularly, wherein, both ends of the horizontal beam 1021 are respectively provided with first mounting portions, and both ends of the vertical beam 1022 are respectively connected to the two horizontal beams 1021, and a reinforcing plate 1023 with a triangular structure is provided at the connection point, which effectively prevents deformation due to force applied between the horizontal beams 1021 and the vertical beams 1022.
[0025] In one embodiment, as shown in Figures 3 and 6, the central connection hole is a screw hole, the first connection member 1026 is a bolt material or a screw, and the first connection member 1026 is screwed into the central connection hole, which fixes the taper pin 1024 and the taper boot 1025 in the axial direction, and prevents the taper pin 1024 and the taper boot 1025 from coming off due to the ground being uneven and the fulcrum of the crawler rising and falling during the traveling period. In one embodiment, the taper pin 1024 and the taper boot 1025 method facilitates the realization of quick insertion and positioning, is easy to install and align holes, and can be centered when installed in a predetermined position, which can realize quick removal and improve the overall removal efficiency of the drilling equipment. The fitting connection method of the taper pin 1024 and the taper boot 1025 can also withstand the torsion when the crawler mechanisms 101 on both sides are not running synchronously.
[0026] In one embodiment, the drill boom assembly module includes a chassis 104, a drill boom 105, an adjustment rod 106, a telescopic rod 107, and a driving mechanism 108, the chassis 104 is fixedly connected to the swivel assembly 103 and can rotate according to the swivel assembly 103, a first end of the drill boom 105 is a fixed end, a second end of the drill boom 105 is an adjustable end, the fixed end is hinged to the chassis 104, a top end of the adjustment rod 106 is hinged to the adjustable end, a bottom end of the adjustment rod 106 is slidably connected to the chassis 104, a top end of the telescopic rod 107 is hinged to the adjustable end, and a bottom end of the telescopic rod 107 is hinged to the chassis 104, and the driving mechanism 108 can drive the telescopic movement of the telescopic rod 107.
[0027] 2 and 7, the driving mechanism 108 may be a single hydraulic driving mechanism or an actuator connected to the output end of a hydraulic driving module. The bottom end of the adjustment rod 106 is provided with a slider and slidably connected to the chassis 104, and when the adjustment rod 106 slides, the adjustment end of the drill boom 105 rotates relative to the fixed end, and the angle of the drill boom 105 can be continuously adjusted. The drill rod 109 is connected to one end of the drill boom 105, and the drill boom 105 drives the drill rod 109 to rotate at a certain angle, so that the drill bit on the drill rod 109 aligns with the hole position 200 and performs drilling. In one embodiment, the slider may be provided with a locking material to facilitate locking the slider to the chassis 104. As shown in Fig. 7, the dust collecting cover 301 is fitted to the drill rod 109, and the dust collecting cover 301 is placed at the mouth of the hole in the ground during construction. The impactor crushes the rocks by the impact of the drill bit, and the drilling is completed by the cooperation of the advancement and rotation of the drill rod 109 of the hydraulic drilling machine. During this process, the air discharged through the vent hole at the front end of the drill bit blows the generated rock debris out of the hole, and the dust collecting cover 301 installed at the position of the hole mouth and the dust collector 302 connected to the dust collecting cover 301 suck the rubble and rock debris removed by drilling into the dust collector 302, large particles are separated and fall, and the dust that is easy to scatter is filtered and collected. Here, the dust collection cover 301 is of a non-fixed type, and a guide ring is provided inside the dust collection cover 301 to ensure that the dust collection cover 301 is always positioned at the hole mouth without interfering with the discharge of debris from the hole, thereby ensuring the dust collection effect.
[0028] In one embodiment, the hydraulic drive module has at least three hydraulic output interfaces, each of which has a quick disconnect coupling, at least one hydraulic output interface is connected to two crawler mechanisms 101 to drive the travel of the two crawler mechanisms 101, at least one hydraulic output interface is connected to a drill boom assembly module to drive the drilling of a drill bit connected to the drill boom 105, and at least one hydraulic output interface is connected to a dust collector 302.
[0029] 2 and 7, the hydraulic drive module is used as a hydraulic drive force for drilling work of the drilling machine, dust removal fan, and crawler travel, and also serves as a counterweight for the drilling machine to stabilize the drilling machine and to facilitate transportation due to its large overall mass. The hydraulic drive module includes a hydraulic system module 110 and a power system module 111, the power system module 111 is provided near the drill boom 105 and is provided near the front, and the hydraulic system module 110 is provided near the rear, of which the front and rear refer to the left and right directions in FIG. 7. The hydraulic system module 110 is provided with at least three hydraulic output ports, and the power system module 111 is transmission-connected to the hydraulic system module 110, and the power system module 111 is configured to provide power to the hydraulic system module 110. The power system module 111 has a total weight of less than 200 kg, adopts a V-type two-cylinder diesel engine as a prime mover, and is equipped with an electric starter, an engine cooling system, and an engine starting, speed control, self-inspection and self-control system, and can be started and operated by being externally attached to a storage battery and a desail tank (bucket), and can provide power to the hydraulic system module 110. The hydraulic system module 110 is composed of a hydraulic oil pump, a driving pulley, a hydraulic oil tank, an air-cooled temperature controlled oil cooler, and a group of control valves, and provides hydraulic driving power to the drilling machine. The total weight is also less than 200 kg, and the power system module 111 and the hydraulic system module 110 are transmitted and connected by members such as a belt or a coupling. The hydraulic system module 110 is provided with a plurality of hydraulic output ports, one of which is connected to the dust collector 302 of the dust removal unit 3, and the other hydraulic output ports are selected to be connected to other equipment according to the situation on the site and are configured to drive other hydraulic equipment so that one hydraulic driving module can be used by multiple hydraulic equipment simultaneously. To ensure the expandability of the hydraulic output function, one hydraulic output port of the hydraulic system module 110 is connected to the drill boom assembly module to provide hydraulic driving force for the drilling work of the drill boom assembly module, and one hydraulic output port of the hydraulic system module 110 is connected to at least one of a hydraulic power generating electric welding machine, a hydraulic winch, and a hydraulic wrench.The hydraulic power generating electric welding machine can output AC power or DC power used for electric welding, and can be used for on-site electric welding, lighting, power tools, etc. The hydraulic winch hydraulically pulls the drilling machine when it goes up a steep slope to assist it in climbing the slope, and also serves as a safety rope to prevent the drilling machine from slipping down or overturning, so that one hydraulic drive module can be used simultaneously by multiple hydraulic devices, and the expansion function of the hydraulic system module 110 is enhanced, realizing one machine with multiple functions and multiple uses. The hydraulic output connection is provided with a quick coupling, which allows for quick connection and disconnection, and is simple and convenient.
[0030] In one embodiment, the pivot assembly 103 includes a fixed part 1031, a pivot part 1032, and a locking mechanism 1033, the pivot part 1032 is pivotally mounted on the fixed part 1031, the locking mechanism 1033 can unlock or lock the pivot part 1032 relative to the fixed part 1031, the fixed part 1031 is fixed to the bridge 102, and the pivot part 1032 is fixedly connected to the chassis 104. At ±180° rotation positions of the chassis 104, the locking mechanism 1033 is configured to lock and unlock the chassis 104 after it has been rotated to a predetermined position.
[0031] In one embodiment, the rotation center of the swivel assembly 103 is located at the center of the bridge 102, and the chassis 104 and the swivel assembly 103 are separable. The swivel assembly 103 can be brought to allow the chassis 104 to rotate continuously at any angle. In this embodiment, the fixed part 1031 is fixed to the bridge 102, the rotating part 1032 rotates relative to the fixed part 1031, and the locking mechanism 1033 is set to lock when rotated ±180° and ±90°, which facilitates the alignment of the drill bit and the hole position 200, and also reduces the site area to a certain extent and reduces the amount of work required for early excavation and flattening at the construction site. The locking mechanism 1033 can ensure stability during the drilling process.
[0032] In one embodiment, the self-propelled modular drilling equipment further includes a support mechanism, as shown in FIG. 7, the support mechanism includes a support base plate and support legs 7, the support base plate is fixedly attached to the chassis 104, the drill boom assembly module and the hydraulic drive module are placed above the support base plate, and multiple support legs 7 are provided, the multiple support legs 7 are spaced apart on the support base plate, and the support legs 7 can be supported on the drilling support base 100.
[0033] After the hydraulic drilling machine unit 1 moves to a predetermined position, in order to ensure that the drilling machine is held stable during the drilling process, the chassis 104 is rectangular and has support legs 7 at each of the four corners, and a total of four adjustable support legs 7 perform support, positioning and level adjustment. After this modular drilling device arrives at the construction site and is assembled, the air compressor group unit 2 and the dust removal unit 3 do not move, and only the hydraulic drilling machine unit 1 moves sequentially between the positions of the hole positions 200 of each drilling hole. After completing the drilling of one hole position 200, the impactor of the drilling machine is retreated and detached from the dust collection cover 301. The support legs 7 are raised, the crawler touches the ground and receives the load, and the self-sealing quick coupling of the hydraulic line driving the dust remover 302 is temporarily removed, and the forward, backward and cornering of the hydraulic drilling machine unit 1 are controlled by the remote control platform 4. When the next drilling position 200 is reached, the support leg 7 is lowered, and after positioning and hole alignment, the hydraulic line of the dust remover 302 is reconnected and drilling is started.
[0034] In some embodiments, four hole positions 200 are sequentially distributed on the drilling cradle 100, and are distributed at the four corner positions of the rectangular drilling cradle 100. The hydraulic drilling machine unit 1 is first suspended on the drilling cradle 100 and travels to the 1# hole position 200 to perform drilling. At this time, the support leg 7 is supported on the drilling cradle 100. After the drilling is completed, the support leg 7 is raised, the swivel assembly 3 is rotated 180° and locked, and the crawler mechanism 101 travels back to the diagonally opposite 2# hole position 200. After the hole is drilled, the support leg 7 is raised and the crawler mechanism 101 advances to the center of the drilling support 100, the support leg 7 is supported by the drilling support 100, the crawler mechanism 101 rotates 90° relative to the swivel assembly 3 and then stops, the support leg 7 is raised, the crawler mechanism 101 travels to the 3# hole position 200 to drill a hole, and after the hole is drilled, the support leg is raised and the crawler mechanism 101 retreats to the 4# hole position 200 to drill a hole. During the above hole drilling process, the support leg 7 and the crawler mechanism 101 work together to realize the rotation of the crawler mechanism 101 and the rotation of the chassis 104 above the swivel assembly 3, respectively, thereby solving the problem that the cornering area of the crawler mechanism 101 is large and cornering is difficult.
[0035] Example 2 Based on the self-propelled modular drilling equipment of the above-mentioned Example 1, this embodiment provides a drilling method used for power tower foundations. Referring to the flow shown in Figures 9 and 10, taking the construction of anchor rod holes for power tower foundations transmitting electricity in mountainous areas as an example, the drilling method includes:
[0036] In S1, based on the arrangement of the multiple drilling cradles 100 of the power tower foundation, the fixation area 300 between the multiple drilling cradles 100 is determined, and based on the distribution of the hole positions 200 of the multiple drilling holes in the drilling cradles 100, the travel route of the hydraulic drilling machine unit 1 is determined.
[0037] In S2, a plurality of air compressor group units 2 and dust remover 302 are arranged in the adhesion area 300, a hydraulic drilling machine unit 1 is provided on any one of the drilling support tables 100, an operation table 4 is placed according to line of sight needs, and communication is established between the operation table 4 and the hydraulic drilling machine unit 1, the air compressor group unit 2, and the dust remover 302.
[0038] In S3, a dust collection cover 301 is provided at the mouth of the first hole position 200 in the hole drilling support 100, and the dust collection cover 301 and the dust remover 302 are connected via an air duct 303.
[0039] In S4, the hydraulic drilling machine unit 1 drills the first hole position 200, and sequentially completes the drilling of all hole positions 200 in the drilling cradle 100 based on the travel route.
[0040] In S5, it is determined whether or not this is the last drilling cradle, and if the result is that it is not the last drilling cradle, the hydraulic drilling machine unit 1 is moved to the next drilling cradle 100 until drilling of all hole positions 200 in all drilling cradles 100 is completed, and the execution of S3 is returned to, and if the result is that this is the last drilling cradle, drilling of the hole positions in all drilling cradles is completed.
[0041] In one embodiment, the drilling method used in the power tower foundation adopts modularized drilling equipment, which is arranged rationally at the construction site, and only the hydraulic drilling machine unit 1 is installed on the drilling support 100 to perform drilling by self-propelling, which improves the flexibility of the drilling work, and the drilling support 100 is not restricted by the drilling equipment and can be built according to actual needs, which saves the construction cost. Other modules, such as the dust collector and multiple air compressor group units 2, do not move during the drilling work, and the operation platform 4 can be arranged and moved according to needs, which not only reduces the labor intensity of manually transporting the equipment, but also improves the construction efficiency.
[0042] Taking FIG. 1 as an example, in a square area of 10-15 meters wide which is the site of the construction site, four tower foundation cradles, A, B, C, and D, need to be cast. As shown in FIG. 8A-8G, a total of four anchor rod holes, 1#, 2#, 3#, and 4#, need to be drilled in each drilling cradle 100. The corresponding four hole positions 200 are sequentially arranged to be distributed in a square shape. The travel route of the hydraulic drilling machine unit 1 is as follows: the hydraulic drilling machine unit 1 first travels to the 1# hole position 200 to drill a hole, and then travels to the 1# hole position 200 to drill a hole. After completing the drilling of hole position 200, the swivel assembly 103 rotates 180 degrees and locks, and the hydraulic drilling machine unit 1 travels to hole position 3# 200 in the same straight line to drill a hole, and after completing the drilling of hole position 3# 200, the hydraulic drilling machine unit 1 travels to hole position 200 at 2# to drill a hole, and after completing the drilling of hole position 200 at 2#, the swivel assembly 103 rotates 180 degrees in the opposite direction, and the hydraulic drilling machine unit 1 travels to hole position 4# 200 to drill a hole.
[0043] According to the above travel route, the swivel assembly 103 only needs to rotate 180° in the forward and reverse directions twice, which reduces the number of rotations and locks it into position after rotation, improving the safety and reliability of the work; furthermore, it is convenient to operate and easy to control, which can improve the efficiency of drilling work and reduce the labor intensity of workers.
[0044] 1, in a case where four drilling cradles 100 are provided, the four drilling cradles 100 are arranged in a rectangle, and the fastening area 300 is provided at the center of the four drilling cradles 100 and is equidistant from each drilling cradle 100. The lengths of the air duct 303 and compressed air piping 202 between the hydraulic drilling machine unit 1 in the drilling cradle 100 and the air compressor group unit 2, dust remover 302, etc. in the fastening area 300 are consistent and do not need to be replaced, which saves construction costs, facilitates installation and removal, and improves construction efficiency.
[0045] In one embodiment, the operation platform 4 is disposed between the drilling support pedestal 100 on which the hydraulic drilling machine unit 1 is located and the fixing area 300. The operation platform 4 facilitates the simultaneous compatibility of the operating state of the hydraulic drilling machine unit 1 and the operating states of the dust collector 302 and the air compressor group unit 2, facilitating operation and control, and keeping the operator away from the noise of the equipment, which is likely to improve the working environment of the operator.
[0046] In one embodiment, in order to improve construction safety, when the hydraulic drilling machine unit 1 is traveling, the hydraulic drilling machine unit 1 is disconnected from the air compressor group unit 2 and the dust remover 302.
[0047] The height of the support leg 7 in the above embodiment is adjustable, and when the crawler mechanism 101 runs, the support leg 7 is in a raised state, and the support leg 7 can rotate synchronously with the rotating part 1032, and when the support leg 7 is in a supporting state, the crawler mechanism 101 can rotate relative to the rotating part 1032 according to the bridge 102 to realize cornering of the crawler mechanism 101.
[0048] In one embodiment, cornering of the crawler mechanism 101 usually requires a large space, and based on the limited space of the drilling support 100, in this embodiment, the support legs 7 and the swivel assembly 103 are linked together to realize the rotation of the crawler mechanism 101 to realize cornering, which can reduce the damage caused by the torque of the crawler mechanism 101 and improve the cornering efficiency. Specifically, in implementation, the support legs 7 and the crawler mechanism 101 need to be alternately supported on the ground and rotated and locked with respect to the fixed part 1031 and the rotating part 1032 of the swivel assembly 103, and accordingly, in order to improve the safety operability of the equipment, each rotation angle position needs to be provided with a corresponding locking mechanism 1033.
[0049] In the above embodiment, a detachable connection method is adopted between each module, which can realize quick installation and removal, and each individual module is fixed to a frame, and a suspending material is provided on the frame to facilitate suspension, specifically, the bridge 102 and the crawler mechanism 101 are detachably connected, the drill boom assembly module and the hydraulic drive module are detachably connected to the chassis 104, the chassis 104 and the rotating part 1032 are detachably connected, the dust cover 301 and the dust remover 302 are detachably connected through the air duct 303, and the multiple air compressor group units 2 are detachably connected to the hydraulic drilling machine unit 1 through the compressed air piping 202. For the specific detachable connection method, please refer to embodiment 1.
[0050] The third embodiment is a method for constructing a drilling support 100. Based on the above-mentioned self-propelled modular drilling equipment and drilling method, this embodiment provides a drilling support construction method. The basic drilling process of the anchor rod in the related art is to first drill the drilling support 100, and then perform the anchor rod drilling work (including marking positioning and drilling) on the drilling support 100. The drilling of the drilling support 100 must be completed before starting the anchor rod construction work. The drilling of the drilling support 100 in mountainous areas must be performed by manual drilling, and if a large rock mass is encountered, the drilling progress will be slowed down and the work efficiency will be reduced. After the drilling of the drilling support 100 is completed, the space of the drilling support 100 is small, so most drilling machines cannot be installed, and the commonly used down-the-hole drill is difficult to install and takes a long time to adjust the hole position.
[0051] Based on the self-propelled modular drilling equipment of the present application, S4 further includes the construction of the drilling support, and the construction of the drilling support is as follows: First, to provide drill hole protection for the anchor rod drilling, Next, marking and positioning the drilling base 100 based on the position of the drill hole of the anchor rod; This includes carrying out drilling work for the drilling cradle 100 using the hydraulic drilling machine unit 1, and finally manually digging and forming the drilling cradle 100.
[0052] In one embodiment, contrary to the basic construction method of anchor rod in the related art, the drilling cradle 100 in the present application performs the drilling work of the anchor rod, then performs the drilling of the drilling cradle 100, and then adopts the manual excavation, which has a high mechanization rate, high construction efficiency, easy positioning of the drilling work of the anchor rod, and high drilling accuracy. Here, the drill hole protection adopts a steel pipe or a PVC pipe to protect the drill hole. When the drilling work of the drilling cradle 100 for the anchor rod is performed, the drilling direction is as shown by the arrow direction in Figure 10, and the hydraulic drilling machine unit 1 drills holes in order, which makes it easy to perform the subsequent manual excavation.
Claims
1. A hydraulic drilling machine unit (1) capable of traveling between a plurality of drilling cradles (100) and between a plurality of hole positions (200) on the drilling cradles (100) to perform drilling operations; A multi-way connector (201); A compressed air pipe (202); a plurality of air compressor group units (2) provided in a fixing area (300) located between the plurality of drilling pedestals (100), the compressed air output of which is joined in parallel through the multi-way connector (201) and then transported to the hydraulic drilling machine unit (1) through the compressed air piping (202); A wind pipe (303); a dust collecting unit (3) including a dust collecting cover (301) provided at the hole opening in the ground of the hole position (200) and a dust remover (302) provided in the fixing area (300), the dust collecting cover (301) and the dust remover (302) being connected via the air duct (303); and an operation console (4) connected to each of the hydraulic drilling machine unit (1), the air compressor group unit (2), and the dust remover (302) for communication and control. Drilling equipment.
2. The hydraulic drilling machine unit (1) comprises a drilling machine chassis module, a drill boom assembly module and a hydraulic drive module, the drilling machine chassis module comprises two crawler mechanisms (101), one bridge (102) and one swivel assembly (103), the two crawler mechanisms (101) are symmetrically arranged on both ends of the bridge (102), the swivel assembly (103) is rotatably connected to the bridge (102) and is located in the middle of the two crawler mechanisms (101), and the drill boom assembly module and the hydraulic drive module are both attached to the swivel assembly (103); 2. The drilling equipment according to claim 1.
3. each said air compressor group unit (2) comprises at least one air compressor module (203) and at least one air compressor power module (204), said air compressor power module (204) configured to drive said air compressor module (203) to generate and output compressed air; 2. The drilling equipment according to claim 1.
4. The system further comprises an oil mist lubricator (5) and a three-way joint (6), the first end of which is connected to the multi-way connector (201), the second end of which is connected to an output end of one of the air compressor modules (203), and the third end of which is an air intake port (601), and the oil mist lubricator (5) is connected between the air intake port (601) and the oil mist port (2015) of the multi-way connector (201). The drilling equipment according to claim 3.
5. A first mounting portion is provided at each end of the bridge (102), and the crawler mechanism (101) has a second mounting portion, and the first mounting portion and the second mounting portion are removably connected. The drilling equipment according to claim 2.
6. One of the first mounting portion and the second mounting portion is provided with a tapered pin (1024) and the other is provided with a tapered boot (1025), the tapered pin (1024) and the tapered boot (1025) each have a central connection hole, the tapered pin (1024) is drilled in the tapered boot (1025), and a first connection material (1026) is attached in the two central connection holes. The drilling equipment according to claim 5.
7. The drill boom assembly module includes a chassis (104), a drill boom (105), an adjustment rod (106), a telescopic rod (107), and a drive mechanism (108), wherein the chassis (104) is fixedly connected to the swivel assembly (103) and is rotatable according to the swivel assembly (103), a first end of the drill boom (105) is a fixed end, a second end of the drill boom (105) is an adjustable end, and the fixed end is connected to the chassis (104). 4), a top end of the adjustment rod (106) is hinged to the adjustment end, and a bottom end of the adjustment rod (106) is slidably connected to the chassis (104), a top end of the telescopic rod (107) is hinged to the adjustment end, and a bottom end of the telescopic rod (107) is hinged to the chassis (104), and the drive mechanism (108) is configured to drive the telescopic movement of the telescopic rod (107). The drilling equipment according to claim 2.
8. The hydraulic drive module is provided with at least three hydraulic output interfaces, each of which is provided with a quick coupling, at least one of the hydraulic output interfaces is connected to two crawler mechanisms (101) for driving the travel of the two crawler mechanisms (101), at least one of the hydraulic output interfaces is connected to the drill boom assembly module for driving the drill bit of the drill boom (105) for drilling, and at least one of the hydraulic output interfaces is connected to the dust collector (302). The drilling equipment according to claim 7.
9. The pivot assembly (103) comprises a fixed part (1031), a pivot part (1032) and a locking mechanism (1033), the pivot part (1032) is pivotally mounted on the fixed part (1031), the locking mechanism (1033) can unlock or lock the pivot part (1032) relative to the fixed part (1031), the fixed part (1031) is fixed to the bridge (102), and the pivot part (1032) is fixedly connected to the chassis (104). The drilling equipment according to claim 7.
10. The drill boom assembly further includes a support mechanism, the support mechanism including a support base plate and support legs (7), the support base plate being fixedly attached to the chassis (104), the drill boom assembly module and the hydraulic drive module being placed on the support base plate, the support legs (7) being provided in a plurality of locations on the support base plate, the support legs (7) being spaced apart from one another, and the support legs (7) being capable of being supported by the drilling pedestal (100). The drilling equipment according to claim 7.
11. Based on the arrangement of the plurality of drilling cradles (100) of the power tower foundation, determining an adhesion area (300) between the plurality of drilling cradles (100), and based on the distribution of the hole positions (200) of the plurality of drilling holes in the drilling cradles (100), determining a travel route of a hydraulic drilling machine unit (1); Arranging a plurality of air compressor group units (2) and dust removers (302) in the adhesion area (300), and providing the hydraulic drilling machine unit (1) on any one of the drilling cradles (100); Placing an operation table (4) according to line of sight needs, and communicatively connecting the operation table (4) to the hydraulic drilling machine unit (1), the air compressor group unit (2), and the dust remover (302); providing a dust collection cover (301) at the opening of the first hole position (200) in the hole drilling support (100), and connecting the dust collection cover (301) and the dust remover (302) via an air pipe (303); Drilling the first hole position (200) using the hydraulic drilling machine unit (1) and sequentially completing the drilling of all the hole positions (200) in the drilling cradle (100) based on the travel route; determining whether it is the last drilling cradle or not, and if it is not the last drilling cradle, running the hydraulic drilling machine unit (1) to the next drilling cradle (100) until drilling of all the hole positions (200) in all the drilling cradles (100) is completed, and returning to the execution of the above-mentioned step of providing a dust collection cover (301) at the hole mouth position of the first hole position (200) in the drilling cradle (100) and connecting the dust collection cover (301) and the dust remover (302) via an air duct (303). A drilling method used for power tower foundations.
12. The hydraulic drilling machine unit (1) comprises two crawler mechanisms (101), a bridge (102), a drill boom assembly module, and a hydraulic drive module, the two crawler mechanisms (101) being symmetrically arranged on both ends of the bridge (102), the drill boom assembly module and the hydraulic drive module being fixed to the bridge (102), and the hydraulic drive module being configured to drive the travel of the crawler mechanisms (101). A drilling method used for the power tower foundation according to claim 1.
13. The hydraulic drilling machine unit (1) further comprises a swivel assembly (103), the swivel assembly (103) is rotatably connected to the bridge (102), and the swivel center of the swivel assembly (103) overlaps with the center of the bridge (102), the swivel assembly (103) comprises a fixed part (1031), a rotating part (1032), and a locking mechanism (1033), the rotating part (1032) is rotatably mounted on the fixed part (1031), the locking mechanism can unlock or lock the pivoting part (1032) relative to the fixed part (1031), the fixed part (1031) being connected to the bridge (102), the pivoting part (1032) being provided with the drill boom assembly module and the hydraulic drive module, the drill boom assembly module being pivotable relative to the bridge (102) for alignment with the hole position (200); A drilling method used for the power tower foundation according to claim 12.
14. The drilling support table (100) is provided with a total of four hole positions (200) of 1#, 2#, 3#, and 4#, and the four hole positions (200) are sequentially arranged so as to be distributed in a quadrangle. The travel route of the hydraulic drilling machine unit (1) is as follows: the hydraulic drilling machine unit (1) first travels to the hole position (200) of 1# to perform drilling, and after completing the drilling of the hole position (200) of 1#, the rotating assembly (103) rotates 180° and locks, and the hydraulic drilling machine unit (1) travels to the hole position (200) of 1# to perform drilling. The pressure drilling machine unit (1) travels to the 3rd # hole position (200) on the same straight line to perform drilling, and after completing the drilling of the 3rd # hole position (200), the hydraulic drilling machine unit (1) travels to the 2nd # hole position (200) to perform drilling, and after completing the drilling of the 2nd # hole position (200), the swivel assembly (103) rotates 180° in the opposite direction, and the hydraulic drilling machine unit (1) travels to the 4th # hole position (200) to perform drilling. A drilling method used for the power tower foundation according to claim 13.
15. The drilling pedestals (100) are provided in four pieces, the four drilling pedestals (100) are arranged in a rectangle, and the fastening area (300) is provided at the center positions of the four drilling pedestals (100) and is equidistant from each of the drilling pedestals (100). A drilling method used for the power tower foundation according to claim 11.
16. The operation table (4) is arranged between the drilling cradle (100) on which the hydraulic drilling machine unit (1) is located and the fixing area (300). A drilling method used for the power tower foundation according to claim 11.
17. When the hydraulic drilling machine unit (1) is traveling, the hydraulic drilling machine unit (1) is in a disconnected state from the air compressor group unit (2) and the dust remover (302), respectively. A drilling method used for the power tower foundation according to claim 11.
18. A support leg (7) is provided on the rotating part (1032) of the rotating assembly (103), and the support legs (7) are provided in a plurality of positions, the support legs (7) are provided at intervals, and the support legs (7) are configured to be supported by the drilling support base (100). A drilling method used for the power tower foundation according to claim 13.
19. the height of the support leg (7) is adjustable, and when the crawler mechanism (101) travels, the support leg (7) is in a raised state, and the support leg (7) is rotatable in synchronization with the rotating part (1032), and when the support leg (7) is in a supporting state, the crawler mechanism (101) is rotatable relative to the rotating part (1032) in accordance with the bridge (102) to realize cornering of the crawler mechanism (101); A drilling method used for the power tower foundation according to claim 18.
20. The above-mentioned method includes drilling the first hole position (200) by the hydraulic drilling machine unit (1) and then sequentially completing the drilling of all the hole positions (200) in the drilling cradle (100) based on the travel route. providing drill hole protection for said drilling; Marking and positioning the drilling cradle (100) based on the position of the drill hole of the anchor rod; Carrying out drilling work on the drilling cradle (100) using a hydraulic drilling machine unit (1); and forming the drilling cradle (100) by artificially digging. A drilling method used for the power tower foundation according to claim 11.
