Driftwood capture fence installation structure
The driftwood trapping fence installation on an impermeable dam's concrete base with steel columns addresses support and corrosion issues, facilitating easy, economical, and durable driftwood capture.
Patent Information
- Application Number
- JP2024003187U
- Authority / Receiving Office
- JP · JP
- Patent Type
- Utility models
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-11-21
- Estimated Expiration
- 2034-09-25
AI Technical Summary
Existing driftwood trapping technologies face issues with insufficient ground support, risk of corrosion, and high installation complexity and cost, particularly when installed on impermeable dams.
A driftwood trapping fence installation structure that integrates a concrete base on the upstream wall of an impermeable dam, with steel column members erected on this base, ensuring stable and corrosion-resistant installation without requiring large-scale dam modifications.
The structure allows for easy, economical, and durable driftwood trapping with improved stability and reduced risk of corrosion, enabling efficient driftwood capture and removal.
Smart Images

Figure 0003249208000001_ABST
Abstract
Description
[Technical field]
[0001] This invention belongs to the technical field of a structure in which a driftwood capture fence made of steel pillar members is installed on the upstream side of an impermeable dam (hereinafter sometimes simply referred to as a "dam") that is constructed in the cross direction of a river for the purposes of erosion control, forestry conservation, etc. The dam in question may be either an existing one or a new one. [Background technology]
[0002] In light of recent driftwood disasters, the establishment of new driftwood capture facilities is desired from the perspective of disaster prevention and mitigation. However, the number of suitable sites for constructing facilities is decreasing, and as a result, there is a demand for improving the dams to make effective use of them (improving their functionality), such as by adding a driftwood capture function to the dams. For example, one possible means of improving an existing impermeable dam to add driftwood capture functionality is to cut or raise the height of the dam, but it has been pointed out that such a technique has the drawback of requiring large-scale work.
[0003] In recent years, technologies have been disclosed that can introduce capture bodies (driftwood capture fences) to dams without the need for the large-scale work mentioned above, such as Patent Document 1 which discloses a technology for installing a capture body on the sediment bed upstream of a dam, and Patent Document 2 which discloses a technology for installing a steel capture body directly on the upstream wall of a dam. According to Patent Documents 1 and 2, the capture body (driftwood capture fence) can be installed without the need for large-scale work such as cutting into or raising the dam, thereby reducing the cost and time required for construction. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2017-072020 A [Patent Document 2] JP 2020-112027 A Summary of the Invention [Problem to be solved by the invention]
[0005] The technology disclosed in Patent Document 1 has a structure in which a capture body (driftwood capture fence) is erected on a foundation (concrete) that is laid as a base on a layer of sediment. As a result, there is concern that the capture body (driftwood capture fence) may become unstable or even tip over due to insufficient bearing capacity of the ground (floor surface) or scouring of the ground due to flooding, and there is room for improvement. The technology disclosed in Patent Document 2 leaves room for improvement, as there are concerns that when installed on a dam filled with sand, the durability of the steel trap (driftwood trap fence) may decrease and even break due to corrosion of the steel material caused by flooding in the excavated area. In addition, when installing a steel trap directly on an existing impermeable dam, high manufacturing precision is required in the factory and high installation precision is required during construction, which makes both manufacturing and construction complicated, increasing both time (construction period) and costs.
[0006] The present invention was devised in consideration of the problems in the background art described above, and its object is to provide a driftwood capture fence installation structure which not only does not require large-scale work such as cutting out or raising the impermeable dam, but also allows a driftwood capture fence (multiple steel pillar members) to be installed easily and reliably in a stable state, and there is no risk of steel corrosion due to flooding, making it economical, easy to install, stable, and durable. [Means for solving the problem]
[0007] As a means for solving the above problems, the installation structure of a driftwood capture fence according to the invention described in claim 1 is an installation structure of a driftwood capture fence for an impermeable dam, The impermeable dam is characterized in that a base concrete is integrally formed on the upstream wall surface of the water passage section, and a plurality of steel pillar members that constitute the driftwood capture fence are erected on the base concrete.
[0008] The device of claim 2 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, the top height of the base concrete is set to be equal to or lower than the bottom height of the water passage section.
[0009] The device of claim 3 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, the top of the base concrete is horizontal.
[0010] The device of claim 4 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, the top width of the base concrete is set to a width dimension capable of supporting one or more steel column members provided in the upstream front direction of the water passage section of the impermeable dam, and two or more steel column members provided in the upstream front direction of both sleeve sections of the impermeable dam.
[0011] The device of claim 5 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, the steel pillar members are installed with a spacing between each other set to the smaller of either 1 / 2 of the maximum or average length of driftwood expected to flow downstream, or 3.0 m.
[0012] The device of claim 6 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, the top width of the base concrete is set to 2.0 m or more.
[0013] The device of claim 7 is characterized in that, in the driftwood capture fence installation structure described in claim 1, the steel pillar member consists of at least one driftwood capture support pole.
[0014] The device of claim 8 is characterized in that, in the installation structure of the driftwood capture fence described in claim 7, the steel pillar member consists of the single driftwood capture support post and a downstream support diagonal member.
[0015] The device of claim 9 is characterized in that, in the installation structure of the driftwood capture fence described in claim 7 or 8, the distance between the sleeve of the impermeable dam and the driftwood capture post is set to the smaller of either 1 / 2 of the maximum or average length of driftwood expected to flow downstream, or 3.0 m.
[0016] The device of claim 10 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, the height of the driftwood capture fence is set to be equal to or higher than the water passage height of the water passage section.
[0017] The device of claim 11 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, the steel pillar members are aligned and installed side by side in a row on the base concrete by anchor fixing method or post embedding method.
[0018] The invention of claim 12 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, the base concrete is formed in a rectangular or triangular shape with the top surface horizontal when viewed from the side.
[0019] The invention according to claim 13 is the driftwood trapping fence installation structure according to claim 1, wherein the base concrete has a compressive strength of 18N / mm 2 The present invention is characterized in that it is constructed as described above.
[0020] The device of claim 14 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, the impermeable dam is a newly constructed structure or an existing structure.
[0021] The device of claim 15 is characterized in that, in the installation structure of the driftwood capture fence described in claim 1, all or part of the adjacent steel pillar members are connected by horizontal connecting members.
[0022] The device of claim 16 is characterized in that, in the installation structure of the driftwood capture fence described in claim 15, the horizontal connecting members are provided at a height equal to the expected depth of the water that will flow downstream. Effect of the Invention
[0023] The driftwood capture fence installation structure of the present invention provides the following advantageous effects. (1) This method can be realized without the need for large-scale work such as cutting out or raising the dam, making it extremely easy to construct and economical. (2) A concrete foundation is constructed on the upstream wall of the water passage in the dam, and a driftwood capture fence (multiple steel pillar members) can be stably and securely installed in the open space above it. This has the advantages of excellent workability and a high degree of freedom in design, and also makes it easy to remove driftwood after it has been captured. (3) Even if the driftwood trap is filled with sand, the structure can separate the driftwood trap (multiple steel pole members) from the base concrete, so there is no risk of the steel of the driftwood trap corroding due to flooding. Therefore, the durability of the driftwood trap can be maintained, and it is highly durable and economical. (4) In summary, it is possible to realize an installation structure for a driftwood capture fence that is economical, easy to construct, stable, and durable. [Brief description of the drawings]
[0024] [Figure 1] FIG. 1 is a perspective view showing a first embodiment of the driftwood capture fence installation structure according to the present invention. [Diagram 2] FIG. 2 is a left side view of FIG. [Diagram 3] FIG. 2 is a front view of FIG. [Figure 4] FIG. 2 is a plan view of FIG. [Diagram 5] FIG. 11 is a perspective view showing a second embodiment of the driftwood capture fence installation structure according to the present invention. [Figure 6] FIG. 6 is a left side view of FIG. 5. [Figure 7] FIG. 6 is a front view of FIG. 5. [Figure 8] FIG. 6 is a plan view of FIG. 5. [Figure 9] FIG. 11 is a perspective view showing a third embodiment of the driftwood capture fence installation structure according to the present invention. [Figure 10]FIG. 11 is a perspective view showing a fourth embodiment of the driftwood capture fence installation structure according to the present invention. [Figure 11] FIG. 5 is a perspective view showing a fifth embodiment of the driftwood capture fence installation structure of the present invention. [Figure 12] FIG. 11 is a perspective view showing a sixth embodiment of the driftwood capture fence installation structure according to the present invention. [Figure 13] FIG. 11 is a perspective view showing variations of foundation concrete. [Figure 14] FIG. 14 is a left side view of FIG. 13. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] This invention is based on the technical idea that by constructing a base concrete on the upstream wall of the water passage section of an impermeable dam, it is possible to freely and reliably install a driftwood capture fence (multiple steel pillar members) in an open space in a stable manner without cutting out or raising the dam. Hereinafter, an embodiment of the driftwood capture fence installation structure according to the present invention will be described with reference to the drawings. EXAMPLES
[0026] 1 to 4 show an installation structure of a driftwood trapping fence according to a first embodiment. The installation structure of the driftwood capture fence in the illustrated example is an installation structure of a driftwood capture fence 1 on an impermeable dam 10, and is characterized in that a base concrete 9 is integrally provided on the upstream wall portion 12 of the water passage portion 11 of the dam 10, and a plurality of steel pillar members 2 that constitute the driftwood capture fence 1 are erected on the base concrete 9. The top height of the concrete foundation 9 is set approximately horizontally at the same height as (or lower than) the bottom height of the water passage portion 11 so that FIG. 2 is easy to understand. The top width of the concrete foundation 9 is set to a width dimension capable of supporting one or more steel column members 2 provided on the upstream wall portion 12 of the water passage portion 11 of the dam 10 and two or more steel column members 2 provided on the upstream wall portions 12 of both sleeve portions 13 of the dam 10, specifically, a width dimension appropriate for capturing driftwood flowing down the widthwise end of the river (for example, approximately 11 m or more). Incidentally, the reference numeral 11a in the figure indicates the sleeve openings that constitute both ends of the water passage portion 11.
[0027] The concrete base 9 in this embodiment is formed in a triangular shape with a horizontal top surface when viewed from the side, so that Fig. 2 is easy to understand. However, the shape of the concrete base 9 is not limited to this, and it can of course be formed in a rectangular shape with a horizontal top surface when viewed from the side, as shown in Figs. 13 and 14. What is important is that the structure be such that the steel pillar members 2 constituting the driftwood capture fence 1 can be stably installed at a position that ensures a required distance from the dam 10. Incidentally, the concrete base 9 has a compressive strength of 18 N / mm 2 It is preferable to construct the above. The same technical idea applies to the following Examples 2 to 4.
[0028] Each of the multiple steel pillar members 2 (five in the illustrated example) that make up the driftwood capture fence 1 consists of a single driftwood capture post 2 of the same shape and size erected vertically, and is installed with an interval between them that is less than half the maximum or average length of driftwood expected to flow downstream, or 3.0 m, whichever is smaller (usually about 2.0 to 3.0 m), and is aligned in a row so that they match when viewed from the side (see Figure 2). In addition, the distance (shortest distance) between the water passage section 11 and sleeve section 13 of the dam 10 and the steel pillar member 2 of the driftwood capture fence 1 is set to the smaller of either 1 / 2 the maximum or average length of driftwood expected to flow downstream, or 3.0 m (usually around 2.0 to 3.0 m). Incidentally, it is preferable that the steel pipe used for the steel pole member (driftwood capture pole) 2 has a diameter (φ) of about 20 to 50 cm and a wall thickness of about 8 to 16 mm. The same technical idea is applied to the following Examples 2 to 4.
[0029] The height (trapping fence height) of the driftwood trapping fence 1 (steel pillar member 2) is set to be equal to or higher than the water passage height of the water passage portion 11, and is usually set to a height of about 2.0 to 3.0 m in many cases. The water passage height refers to the top of the end opening 11a so that Fig. 3 can be easily understood. Incidentally, the steel column member 2 in this embodiment is fixed by placing the base plate 8 provided at its lower end on a predetermined portion of the foundation concrete 9 and driving an anchor bolt into the base. However, it can also be fixed by a pillar embedding method in which the foot of the steel column member 2 is embedded (embedded) in the foundation concrete 9, as shown in Figure 11.
[0030] When constructing a new driftwood capture fence with the above-described configuration, the installation structure is constructed by simultaneously constructing the dam 10 and the concrete base 9 together, and erecting multiple (five in the illustrated example) steel pillar members 2 that constitute the driftwood capture fence 1 at designated locations on the concrete base 9 using anchor fixing or post embedding methods. When constructing a new concrete foundation 9 on an existing dam 10, rebars for constructing the concrete foundation 9 are placed in the upstream wall surface 12 of the water passage section 11 of the dam 10, and a formwork for constructing the concrete foundation 9 is formed, concrete is poured into the formwork, and after curing, the formwork is removed to construct the concrete foundation 9. Thereafter, the multiple steel pillar members 2 (five in the illustrated example) that constitute the driftwood capture fence 1 are erected at predetermined positions on the concrete foundation 9 by anchor fixing or post embedding. Prior to the construction of the insert bars, surface treatment of the concrete joints to be poured and excavation of the floor of the construction area for pouring concrete when the upstream side of the dam 10 is filled with sand may be carried out as necessary. Also, when work at height is required, measures such as erecting scaffolding may be taken as necessary. In this way, the dam 10 according to the present invention can be implemented in both new and existing structures.
[0031] Therefore, the above-mentioned driftwood capture fence installation structure can be realized without the need for large-scale work such as cutting out or raising the dam 10, making it extremely easy to install and economical. In addition, a concrete foundation 9 is constructed on the upstream wall surface 12 of the water passage section 11 of the dam 10, and the driftwood capture fence 1 (multiple steel pillar members 2) can be stably and securely installed in the open space above it. This has the advantages of excellent workability and a high degree of freedom in design, as well as allowing smooth removal work after driftwood has been captured. Furthermore, even if the driftwood trapping fence 1 (several steel pillar members 2) is filled with sand, the concrete foundation 9 can be used to isolate the driftwood trapping fence 1, eliminating the risk of the steel material of the driftwood trapping fence 1 corroding due to flooding. This allows the durability of the driftwood trapping fence 1 to be maintained, making it highly durable and economical. EXAMPLES
[0032] 5 to 8 show an installation structure of a driftwood trapping fence according to a second embodiment. The installation structure of the driftwood capture fence according to this embodiment 2 is different from that of the above-mentioned embodiment 1 in that the steel pillar member 2 is provided with one downstream support diagonal member 2a attached to the one driftwood capture pole 2. The same members as those in the above-mentioned embodiment 1 are given the same reference numerals and their explanation will be omitted as appropriate. Specifically, the downstream support diagonal member 2a is connected to the middle part of the driftwood capture post 2 by a joining means such as welding in an attitude inclined downward from the upstream side to the downstream side, and overall is formed into an approximately T-shape with its legs opening in the direction of the river flow.
[0033] Therefore, the installation structure of the driftwood capture fence in this Example 2, like the above Example 1, can be realized without the need for large-scale work such as cutting out or raising the dam 10, and the driftwood capture fence 1 (multiple steel pillar members 2) can be installed stably and securely in the open space on the base concrete 9. Even when the base concrete 9 is filled with sand, the structure still provides a barrier between the driftwood capture fence 1 (multiple steel pillar members 2) and the base concrete 9, so that it still provides the same effects as the above Example 1 (see paragraph
[0031] above). In addition, the steel pillar member 2 is implemented in a structure in which one downstream support diagonal member 2a is attached to one driftwood capture support 2, so that it is possible to realize a steel pillar member 2 with higher strength, rigidity, and durability than the steel pillar member 2 according to the above-mentioned embodiment 1, and thus a driftwood capture fence 1. Incidentally, the steel pillar member 2 (driftwood capture support 2, downstream support diagonal member 2a) according to this embodiment is implemented in an anchor fixing method in which the base plate 8 provided at the lower end thereof is placed on a predetermined portion of the foundation concrete 9 and fixed by driving an anchor bolt, but it can also be implemented in a pillar embedding method in which the foot of the steel pillar member 2 is embedded (rooted) in the foundation concrete 9 as shown in Fig. 12. EXAMPLES
[0034] FIG. 9 shows an installation structure of a driftwood trapping fence according to the third embodiment. The installation structure of the driftwood capture fence according to this embodiment 3 is different from that of the above-mentioned embodiment 1 in that all (or part) of the adjacent steel pillar members 2 are connected by horizontal tie members 4. Members similar to those in the above-mentioned embodiment 1 are given the same reference numerals and their explanation will be omitted as appropriate. In this embodiment 3, the horizontal connecting material 4 is made of a steel pipe (round steel pipe) thinner than the steel pillar member 2, and is configured to connect the vertical middle parts of adjacent steel pillar members (driftwood capture supports) 2 approximately horizontally.
[0035] Therefore, the installation structure of the driftwood capture fence in this Example 3, like the above Example 1, can be realized without the need for large-scale work such as cutting out or raising the dam 10, and the driftwood capture fence 1 (multiple steel pillar members 2) can be installed stably and securely in the open space on the base concrete 9. Even when the base concrete 9 is filled with sand, the structure still provides a barrier between the driftwood capture fence 1 (multiple steel pillar members 2) and the base concrete 9, so that it still provides the same effects as the above Example 1 (see paragraph
[0031] ). In addition, since adjacent steel column members 2 are connected by horizontal ties 4, the capture performance can be improved compared to the steel column members 2 according to the first embodiment. In addition, it is preferable to install the horizontal ties 4 at a height equivalent to the expected depth of the water flowing downstream, as this will allow for more effective capture. EXAMPLES
[0036] FIG. 10 shows an installation structure of a driftwood trapping fence according to the fourth embodiment. The installation structure of the driftwood capture fence according to this embodiment 4 is different from that of the above-mentioned embodiment 2 in that all (or part) of the adjacent steel pillar members 2 are connected by horizontal tie members 4. Members similar to those in the above-mentioned embodiment 2 are given the same reference numerals and their explanation will be omitted as appropriate.
[0037] Therefore, the installation structure of the driftwood capture fence in this Example 4, like the above Example 2, can be realized without the need for large-scale work such as cutting out or raising the dam 10, and the driftwood capture fence 1 (multiple steel pillar members 2) can be installed stably and securely in the open space on the base concrete 9. Even when the base concrete 9 is filled with sand, the structure still provides a barrier between the driftwood capture fence 1 (multiple steel pillar members 2) and the base concrete 9, so that it still has the same effect as the above Example 2 (see paragraph
[0031] ). In addition, since adjacent steel column members 2 are connected by horizontal ties 4, the capture performance can be improved compared to the steel column members 2 according to the second embodiment. In addition, more effective capture can be achieved by installing the horizontal ties 4 at a height equivalent to the expected depth of the water flowing downstream.
[0038] Although the above-mentioned first to fourth embodiments have been described based on the drawings, it should be noted that the present invention is not limited to the illustrated examples, and includes the range of design modifications and application variations that are normally made by those skilled in the art, within the scope of the technical concept thereof. For example, in the dam 10 according to Examples 1 to 4, the bottom width of the water passage portion 11 is about 5 m, and the width of the end opening 11a is about 1 m, but of course the design can be changed appropriately depending on the structural design. The width of the foundation concrete 9 is often 10 to 20 m in the width direction of the river, but of course the design can be changed appropriately depending on the structural design. Moreover, the steel column members 2 according to Examples 1 to 4 are implemented using round steel pipes, but they may also be configured using square steel pipes or H-shaped steel pipes. The number and size of the steel pillar members 2 used are of course not limited to the above, and the design can be modified as appropriate based on the expected length of driftwood, the scale of the dam 10, the width of the water passage section 11, the characteristics of the river during flooding (expected water level, expected flow rate, width of driftwood flowing down), and simulation of driftwood capture using image analysis, etc. Although the sleeve portion 13 of the dam according to the first to fourth embodiments forms a sleeve slope, the present invention is not limited to this and can also be applied to a dam without a sleeve slope. [Explanation of symbols]
[0039] 1. Driftwood trap 2 Steel pillar components (driftwood capture pillars) 2a Downstream supporting diagonal member 4 Horizontal tie material 8 Base Plate 9. Foundation Concrete 10 Impermeable dam 11 Water passage section 11a Sleeve edge 12 Upstream wall 13 Sleeves U Upstream D Downstream side
Claims
1. A structure for installing a driftwood capture fence on an impermeable dam, A driftwood capture fence installation structure, characterized in that a base concrete is integrally formed on the upstream wall surface of the water passage section of the impermeable dam, and a plurality of steel pillar members that constitute the driftwood capture fence are erected on the base concrete.
2. 2. The driftwood capture fence installation structure according to claim 1, wherein the top height of the base concrete is set equal to or lower than the bottom height of the water passage section.
3. 2. The driftwood capture fence installation structure according to claim 1, wherein the top of the base concrete is horizontal.
4. The installation structure of a driftwood capture fence described in claim 1, characterized in that the top width of the base concrete is set to a width dimension capable of supporting one or more steel column members provided in the upstream front direction of the water passage section of the impermeable dam, and two or more steel column members provided in the upstream front direction of both sleeve sections of the impermeable dam.
5. The installation structure of a driftwood capture fence described in claim 4, characterized in that the steel pillar members are installed with a spacing between them set to the smaller of either 1 / 2 of the maximum or average length of driftwood expected to flow downstream, or 3.0 m.
6. 2. The driftwood capture fence installation structure according to claim 1, wherein the top width of the concrete foundation is set to 2.0 m or more.
7. 2. The driftwood capture fence installation structure according to claim 1, wherein the steel pillar member comprises at least one driftwood capture support pole.
8. The driftwood capture fence installation structure according to claim 7, characterized in that the steel pillar member consists of the one driftwood capture support pole and a downstream support diagonal member.
9. A driftwood capture fence installation structure as described in claim 7 or 8, characterized in that the distance between the sleeve of the impermeable dam and the driftwood capture post is set to the smaller of either 1 / 2 of the maximum or average length of driftwood expected to flow downstream, or 3.0 m.
10. 2. The driftwood capture fence installation structure according to claim 1, wherein the height of the driftwood capture fence is set to be equal to or higher than the water passage height of the water passage portion.
11. 2. The driftwood capture fence installation structure according to claim 1, wherein the steel pillar members are aligned and arranged side by side in a row in the base concrete by an anchor fixing method or a post embedding method.
12. 2. The driftwood capture fence installation structure according to claim 1, wherein the base concrete is formed in a rectangular or triangular shape with a horizontal top surface when viewed from the side.
13. The foundation concrete has a compressive strength of 18 N / mm 2 2. A driftwood capture fence installation structure as described in claim 1, characterized in that it is constructed as described above.
14. 2. The driftwood capture fence installation structure according to claim 1, wherein the impermeable dam is a newly constructed structure or an existing structure.
15. 2. The driftwood capture fence installation structure according to claim 1, wherein all or part of the adjacent steel pillar members are connected by horizontal ties.
16. The driftwood capture fence installation structure according to claim 15, characterized in that the horizontal connecting members are provided at a height equivalent to the expected depth of water flowing downstream.
Citation Information
Patent Citations
Installation method of capturing body and weir structure
JP2017072020A
Dam
JP2020112027A
Cited By
Dam structure
JP7879568B1