Influencing factors extraction device

The influencing factor extraction device aids in predicting and identifying construction-related damage by analyzing construction methods and conditions, facilitating proactive prevention and accurate post-damage analysis.

JP3249347UActive Publication Date: 2024-12-05CHUO KENTETSU CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2024002826U
Authority / Receiving Office
JP · JP
Patent Type
Utility models
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-12-05
Estimated Expiration
2034-08-23

AI Technical Summary

Technical Problem

Existing methods struggle to accurately determine and predict construction-related damage to buildings, particularly due to factors like ground subsidence and vibrations, without prior surveys, and lack standardized methods for identifying the causes of such damage.

Method used

An influencing factor extraction device that selects and analyzes potential construction methods, conditions, and ground conditions to identify factors that may cause damage, using a control device, input device, display device, and external storage to extract and present influencing factors.

Benefits of technology

Enables the prediction and identification of construction-related damage factors, allowing for proactive measures to prevent damage and accurate post-damage analysis, reducing time and cost associated with damage assessment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0003249347000001_ABST
    Figure 0003249347000001_ABST
Patent Text Reader

Abstract

An influencing factor extraction device is provided that extracts influencing factors that cause damage to construction work. [Solution] The influence factor extraction device 10 of the embodiment is an influence factor extraction device that extracts influence factors from a predetermined number of influence factors for construction work that are likely to affect the occurrence of damage at a construction site or damage to buildings in the vicinity of the construction site, and is equipped with a selection unit S11 that allows the user to select a construction method for the construction work for which influence factors are to be extracted, a condition input unit S12 that allows the user to input conditions for the construction work corresponding to the selected construction method, a factor extraction unit S13 that extracts influence factors from the predetermined number of influence factors based on the conditions that are likely to cause damage to buildings in the vicinity of the construction site, and a presentation unit S14 that presents the extracted influence factors.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an influencing factor extraction device. [Background technology]

[0002] Damage to buildings caused by construction work is generally assessed by comparing the results with preliminary survey data carried out before construction begins, but not all construction work involves preliminary surveys. In addition, when a prior survey is not conducted, there is no established method for assessing damage, so it takes a lot of time and money to resolve the problem. Although there are earthquake resistance diagnostic systems that can quantitatively assess earthquake damage, it is difficult to apply them to damage caused by ground subsidence or vibrations due to construction work.

[0003] On the other hand, even in cases where a preliminary survey has been carried out, damage to buildings can occur due to various factors such as aging, so there are problems in distinguishing between these and damage caused by construction work, and because each building is different, even if similar ground movements occur, the damage caused varies from building to building, making it impossible to uniformly assess the damage, etc. These judgments have so far relied heavily on the experience of the survey engineers, leading to variations and many problems in terms of appropriate and fair damage assessment.

[0004] Here, in order to objectively judge building damage caused by construction work without relying on the experience of the surveying engineers, it is effective to first divide the building damage into two cases: whether it is caused by ground movement or construction vibrations, and then further divide each of these into two cases: the side that causes it (construction impact) and the side that is affected (building damage), for a total of four cases. Therefore, the present applicant has proposed an "influence analysis device" in Patent Document 1 for one of the above four cases, ie, the influence of ground movement on construction work.

[0005] This impact analysis device makes it possible to "analyze the extent of the impact that civil engineering (construction) works have on the surrounding area in a rational manner, easily, quickly and at low cost without requiring specialized knowledge." [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Utility Model Registration No. 3057775 [Patent Document 2] Utility Model Registration No. 3189906 Summary of the Invention [Problem to be solved by the invention]

[0007] Incidentally, excavation and vibrations during construction work can cause damage to surrounding buildings, such as subsidence and cracks (such problems are called "business losses"). In such cases, damage caused by the construction work will be judged by comparing it with pre-construction surveys, but there are many cases where a pre-construction survey has not been conducted, or where, even if one has been conducted, it is difficult to distinguish it from changes over time, making a judgment.

[0008] Ideally, these issues should be predicted in advance and preventative measures considered, but in many cases construction work was carried out without any damage, so there was little consideration given to the possibility of damage occurring in advance.

[0009] Furthermore, there was no standardized method for determining whether or not such consideration was necessary, so even cases in which damage should have been anticipated in advance were overlooked, without it being clear where the factors that could cause damage lay.

[0010] On the other hand, when actual damage occurs or when a report of damage is received and a causal relationship to the construction work in question is determined, it is necessary to know which part of the construction work in question was the cause of the damage, but even here no standardized and effective method for doing this has been found.

[0011] Therefore, the purpose of this invention is to provide an influencing factor extraction device that can extract influencing factors that cause damage during construction work prior to construction work, prevent the occurrence of damage, and easily grasp the causes even if damage does occur. [Means for solving the problem]

[0012] In order to solve the above problems, the influence factor extraction device of the embodiment is an influence factor extraction device that extracts influence factors that may affect the occurrence of damage at a construction site or damage to buildings in the vicinity of a construction site from a predetermined number of influence factors for construction work, and is equipped with a selection unit that allows a user to select a construction method for the construction work that is the subject of influence factor extraction, a condition input unit that allows a user to input conditions for the construction work corresponding to the selected construction method, a factor extraction unit that extracts influence factors that may affect the occurrence of damage to buildings in the vicinity of the construction site from the predetermined number of influence factors based on the conditions, and a presentation unit that presents the extracted influence factors. Effect of the Invention

[0013] According to this invention, in general construction work such as water supply and sewerage systems and building construction, it is possible to extract influencing factors taking into account the construction content and ground conditions using easily available information. [Brief description of the drawings]

[0014] [Figure 1] Figure 1 is a block diagram showing the outline of the construction damage impact assessment system. [Diagram 2] FIG. 2 is a block diagram showing the schematic configuration of the influencing factor extraction device. [Diagram 3] FIG. 3 shows a processing sequence of the construction damage impact study system according to the embodiment. [Figure 4] FIG. 4 is an explanatory diagram of an example of a data input / extraction result display screen for extracting influencing factors when the construction method is cut and cover construction. [Diagram 5] FIG. 5 is an explanatory diagram of an example of an influencing factor extraction table in which the retaining wall type corresponds to a parent pile horizontal sheet pile. [Figure 6]FIG. 6 is an explanatory diagram of an example of an influencing factor extraction table corresponding to a lightweight steel sheet pile as an earth retaining type. [Figure 7] FIG. 7 is a diagram illustrating an example of an influencing factor extraction table in which the retaining wall type corresponds to a steel sheet pile. [Figure 8] FIG. 8 is an explanatory diagram of an example of an influencing factor extraction table in which the retaining wall type corresponds to a liner plate. [Figure 9] FIG. 9 is an explanatory diagram of an example of an influencing factor extraction table corresponding to the retaining wall type SMW. [Figure 10] FIG. 10 is an explanatory diagram of an example of an influencing factor extraction table in which the retaining wall type corresponds to a continuous underground diaphragm wall. [Figure 11] FIG. 11 is an explanatory diagram of an example of an influencing factor extraction table in which the retaining wall type corresponds to unlined excavation. [Figure 12] FIG. 12 is an explanatory diagram of an example of the input / extraction result screen when the construction method is shield tunneling construction. [Figure 13] FIG. 13 is an explanatory diagram of an example of an influencing factor extraction table when the construction method is shield tunneling construction. [Figure 14] FIG. 14 is an explanatory diagram of an example of the input / extraction result display screen when the construction method is banking work. [Figure 15] FIG. 15 is an explanatory diagram of an example of an influencing factor extraction table when the construction method is banking work. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Figure 1 is a block diagram showing the outline of the construction damage impact assessment system. The construction damage impact review system 100 comprises an impact factor extraction device 10, an impact analysis device 20, a building damage assessment device 30, a construction damage case database 40, a construction damage precedent database 50, and a communication network 60.

[0016] The influence factor extraction device 10 extracts influence factors that may cause damage at the construction site or damage to buildings in the vicinity of the construction site from a predetermined number of influence factors based on the input construction details, ground conditions, etc. More specifically, the influence factor extraction device 10 extracts and presents influence factors that may cause damage at the construction site or damage to buildings near the construction site from a predetermined number of influence factors based on the construction method of the selected construction work for which influence factors are to be extracted and the input conditions of the construction work (environmental conditions and work content).

[0017] The influence analysis device 20 analyzes the influence (the extent of influence of the amount of subsidence, the amount of vibration, etc.) on the actual construction work for each of the influence factors extracted by the influence factor extraction device 10. The building damage assessment device 30 assesses actual building damage based on the analysis results of the influence analysis device 20.

[0018] The construction work damage case database 40 provides information on construction work damage cases to a verifier when verifying the influencing factors extracted by the influencing factor extraction device 10. The construction damage precedent database 50 provides the verifier with information on construction damage precedents when verifying the influencing factors extracted by the influencing factor extraction device 10.

[0019] The communication network 60 communicatively connects the influence factor extraction device 10, the influence analysis device 20, the building damage determination device 30, the construction damage case database 40, and the construction damage precedent database 50.

[0020] FIG. 2 is a block diagram showing the schematic configuration of the influencing factor extraction device. The influencing factor extraction device 10 includes a control device 11 , an input device 12 , a display device 13 , an external storage device 14 , and an output device 15 .

[0021] The control device 11 is configured as a normal personal computer equipped with an MPU 11A, a ROM 11B, a RAM 11C, an input / output interface unit 11D, a communication interface unit 11E, and a communication bus 11F, and controls the entire influencing factor extraction device 10 in accordance with an influencing factor extraction program deployed on RAM 10C, and performs the extraction process of the influencing factors.

[0022] In this case, the external storage device 14 has multiple influencing factor extraction tables stored in advance for extracting influencing factors, and the control device 11 extracts influencing factors by referring to the corresponding influencing factor extraction table based on the input influencing factor extraction data.

[0023] The input device 12 is configured as a keyboard, tablet, mouse, voice input device, etc., and is used to input various types of information. The display device 13 is configured as a liquid crystal display or the like, and displays various input instructions, the results of influencing factor extraction, and the like.

[0024] The external storage device 14 is configured as a semiconductor memory device such as a USB memory or a solid state drive (SSD), a hard disk device, or the like, and stores various types of information in a non-volatile manner. The output device 15 is configured as a laser printer, an inkjet printer, or the like, and outputs the input state by the input device 12, the influencing factor extraction results, and the like as printouts or various files.

[0025] In the above configuration, the control device 11, the input device 12, and the output device 15 cooperate to function as a condition input section and a selection section. The control device 11 functions as a factor extraction unit that extracts, based on conditions, from a predetermined number of influencing factors, influencing factors that may cause damage at the construction site or damage to buildings in the vicinity of the construction site.

[0026] The output device 15 functions as a presentation unit that presents the extracted influencing factors. The external storage device 14 functions as a table storage unit that stores a plurality of influencing factor extraction tables.

[0027] Next, the operation of the embodiment will be described. FIG. 3 shows a processing sequence of the construction damage impact study system according to the embodiment. First, the influencing factor extraction device 10 displays a selection / influencing factor extraction data input screen on the display device 13, and allows the user to select a construction method (step S11).

[0028] In this embodiment, cut-and-cover construction, shield tunneling construction, or embankment construction can be selected. On the actual selection / condition input screen, the construction method is selected by selecting a tab.

[0029] When the construction method is selected, the control device 11 displays a data input / extraction result display screen for influencing factor extraction on the display screen of the display device 13. In response to this, the operator inputs data for extracting influencing factors for the selected construction method (step S12).

[0030] As a result, the control device 11 extracts influence factors by referring to the corresponding influence factor extraction table from the external storage device 14 based on the input influence factor extraction data (step S13). Then, the control device 11 presents the extraction result on a data input / extraction result display screen for influencing factor extraction (step S14).

[0031] Here, the input of data for influencing factor extraction, the extraction of influencing factors, and the presentation of the results of the influencing factor extraction will be described in detail.

[0032] [Results of extracting influential factors in open cut construction] First, an example of the presentation of the extraction result (step S14) in the case where the construction method is cut and cover construction will be described. FIG. 4 is an explanatory diagram of an example of a data input / extraction result display screen for extracting influencing factors when the construction method is cut and cover construction. The data input / extraction result display screen DS1 when the construction method is cut-and-cover construction is broadly divided into a basic information input area AR1 for data input, an extraction result display area AR2, an annotation display area AR3, and a construction method tab selection area AR4.

[0033] In the basic information input area AR1 of the data input / extraction result display screen DS1, numerical values ​​are entered, items are selected, or a YES / NO input is made to indicate whether or not the location conditions, excavation conditions, ground conditions, and drainage conditions of the construction site for which influence factors are to be extracted are applicable.

[0034] When the construction method is cut and cover construction, the location condition is input as the distance between the excavation point and the building in the example of Figure 4. Specifically, in the example of Figure 4, 7m is input. In addition, the excavation conditions that require input include excavation depth, excavation width, type of retaining soil, length of retaining soil, whether or not to erect supports (cut beams), and backfilling method. In the example of Figure 4, the type of retaining wall can be selected from, for example, parent pile cross sheet pile, lightweight steel sheet pile, steel sheet pile, liner plate, SMW (soil cement continuous wall), continuous underground wall, open excavation, and no retaining wall.

[0035] As ground conditions, the input of information on the ground related to groundwater, information on the ground in the excavated portion, and information on the ground in the penetration portion is required. As for information on groundwater, in the example of Figure 4, the input of information on the presence or absence of a consolidated layer below the groundwater level and the presence or absence of sandy soil in the excavation area below the groundwater level is required. Here, a consolidated layer refers to a clayey soil layer with an N-value of 2 or less. The N-value here is a value that indicates the strength of the ground calculated by a boring survey, and corresponds to the number of times a hammer needs to fall to drive a sampler 30 cm in a standard penetration test. The standard penetration test is a test in which a 63.5 kg drop hammer is allowed to freely fall from a height of 75 cm to penetrate the sampler.

[0036] Information about the ground in the excavation area, such as whether it is soft or not, whether there is an organic soil layer, and whether the ground is of good quality, is required to be input. Here, soft ground refers to, for example, clayey soil with an N value of 4 or less, or sandy soil with an N value of 9 or less (the same applies below).

[0037] Moreover, organic soil refers to, for example, humus soil, peat, and organic soil. Furthermore, good quality ground refers to, for example, clayey soil with an N value of 10 or more, or sandy soil with an N value of 30 or more.

[0038] Information about the ground at the root entry point, such as whether the ground is of good quality and whether there is a sufficient impermeable layer, is required to be entered. Here, a sufficiently impermeable layer refers to, for example, a clayey soil layer having a thickness of 1 m or more.

[0039] As drainage conditions, input is required as to whether or not to implement well points (forced drainage) and whether or not there are any unclosed retaining walls.

[0040] The extraction result display area AR2 is an extraction result display area in which the extracted and unextracted influencing factors among the predetermined influencing factors are clearly displayed. Here, the specified influencing factors to be extracted when the construction method is cut-and-cover construction are retaining soil deformation, loosening of supports, insufficient rolling compaction, retaining soil extraction, and consolidation settlement. Earth retaining deformation literally refers to the deformation of an earth retaining wall due to deformation of sheet piles, etc. Loosening of shoring refers to a condition in which loosening occurs in shoring, which is a temporary structure that supports an earth retaining wall, in an earth retaining structure that prevents the surrounding ground from collapsing when excavating the ground and prevents buildings from collapsing. In addition, insufficient compaction refers to a state in which the work of compacting (compacting) an excavated area using a roller or other tool when backfilling it is insufficient. Retaining wall extraction refers to the extraction of sheet piles such as steel sheet piles. Consolidation settlement is a type of land subsidence that occurs when a long-term load is applied to the soil that makes up the ground, causing the water between the soil particles to be discharged and the ground to sink.

[0041] In the example in Figure 4, retaining wall deformation and loosening of supports, indicated by circles, were extracted as influencing factors, while insufficient compaction, retaining wall removal, and consolidation settlement, indicated by crosses, were not extracted as influencing factors.

[0042] Next, we will explain the influencing factor extraction table corresponding to the retaining wall type. First, we will explain the influence factor extraction table for retaining wall types corresponding to parent piles and cross sheet piles. FIG. 5 is an explanatory diagram of an example of an influencing factor extraction table in which the retaining wall type corresponds to a parent pile horizontal sheet pile. The influencing factor extraction table TB11 in Figure 5 shows, for the specified influencing factors when the construction method is cut-and-cover construction and the type of retaining soil used is parent pile cross sheet piles, whether each of the following factors is excluded from the influencing factors, extracted as an influencing factor, or not involved as another influencing factor: retaining soil deformation, support loosening, insufficient compaction, (retaining soil) pull-out, and consolidation settlement.

[0043] In the following explanation of the influencing factor extraction table, items marked with a circle or a double circle in the influencing factor extraction table indicate that the category in question may be an influencing factor. Also, the subscript of the number next to the double circle indicates that the combination of items marked with the same number will result in the extraction of an influencing factor.

[0044] An item marked with an X sign indicates that if it applies, it is excluded from the influencing factors, and if it does not apply, it may be an influencing factor. Also, the subscript of the number next to the X sign indicates that the combination of categories marked with the same number is excluded from the extraction of influencing factors. Shaded items are items that are not involved as influencing factors (non-involving items), that is, they are not subject to extraction of influencing factors.

[0045] The specific details will be explained below. [Earth retaining deformation] First, when the influencing factor to be extracted is retaining wall deformation, as shown by an X in the category of retaining wall length Y1 in the excavation conditions, if the distance X from the excavation site (retaining wall position) to the building is 1.5 times or more the retaining wall length Y1, it will be excluded from the influencing factor extraction.

[0046] In addition, if the influencing factor to be extracted is retaining deformation, and the excavation conditions section has the selection item for shoring (cut beam) selected as "Yes for shoring," the ground conditions section has the selection item for excavation section selected as "Good quality ground," and the ground conditions section has the selection item for root section selected as "Good quality ground," then this is shown to be excluded from the influencing factors to be extracted, as indicated by three "X1" marks.

[0047] [Loosening of support structure] In addition, if the influencing factor to be extracted is loosening of the support, as shown by the cross in the category of retaining length Y1 in the excavation conditions, if the distance X from the excavation point (retaining position) to the building is 1.5 times or more the retaining length Y1, it will be excluded from the influencing factor extraction. Naturally, in the case of loosening of shoring, if "no shoring" is selected as the excavation condition, it will be excluded from the extraction of influencing factors, as indicated by the cross.

[0048] Furthermore, if the influencing factor to be extracted is loosening of the support, as indicated by the three x1 marks, if the input item for the excavation width category in the excavation conditions is "excavation width B<3.0m", the selection item for the excavation section category in the ground conditions is "good quality ground", and the selection item for the root penetration section category in the ground conditions is "good quality ground", then this will be excluded from the influencing factors to be extracted.

[0049] [Insufficient compaction] In addition, if the influencing factor to be extracted is insufficient compaction, and in the excavation conditions, the distance X from the excavation point (retaining wall position) to the building is 1.5 times or more the retaining wall length Y1, as shown by the cross, it will be excluded from the influencing factor extraction. In addition, if the influencing factor to be extracted is insufficient compaction, and liquefied treated soil is selected in the backfill classification under the excavation conditions, it will be excluded from the influencing factor extraction targets, as shown by the cross. In addition, if the influencing factor to be extracted is insufficient compaction, if the item "sufficient compaction" is selected in the backfilling category of excavation conditions, it will naturally be excluded from the influencing factor extraction, as shown by the "X" mark.

[0050] In addition, when the influencing factor to be extracted is insufficient compaction, the influencing factor will be extracted regardless of whether the item "without shoring" or "with shoring" is selected in the shoring (beam) category of the excavation conditions, as shown by the circle. Similarly, if the influencing factor to be extracted is insufficient compaction, when "Other" is selected in the backfilling category of excavation conditions, this will be indicated as an influencing factor to be extracted, as shown by the circle.

[0051] [Extraction] In addition, when the influencing factor to be extracted is extraction, retained soil is excluded as an influencing factor in either case of retention or extraction, and all items other than retained soil are blacked out, and other items are not involved as influencing factors.

[0052] [Consolidation settlement] If the influencing factor to be extracted is consolidation settlement, and the item "consolidated layer deeper than the groundwater level" is selected in the groundwater classification of ground conditions, and the item "there is a sandy soil layer in the excavation area deeper than the groundwater level" is selected in the groundwater classification of ground conditions, then this indicates that the influencing factor will be extracted, as shown by the two ◎1 marks.

[0053] In addition, if the influencing factor to be extracted is consolidation settlement, the item of the consolidation layer deeper than the groundwater level is selected in the groundwater category of ground conditions, and if it is selected in the well implementation category of drainage and spring water conditions, this indicates that it will be a target for extraction of influencing factors, as shown by the two ◎2 marks.

[0054] Next, the influence factor extraction table corresponding to the retaining wall type of lightweight steel sheet pile will be described. FIG. 6 is an explanatory diagram of an example of an influencing factor extraction table corresponding to a lightweight steel sheet pile as an earth retaining type. The influencing factor extraction table TB12 in Figure 6 shows, for the specified influencing factors when the construction method is cut-and-cover construction and the retaining wall type is lightweight steel sheet pile, whether each of the following factors is excluded from the influencing factors, extracted as an influencing factor, or not involved as another influencing factor: retaining wall deformation, loosening of support, insufficient rolling compaction, (retaining wall) pull-out, and consolidation settlement.

[0055] The specific details will be explained below. [Earth retaining deformation] First, when the influencing factor to be extracted is retaining wall deformation, as shown by an X in the category of retaining wall length Y1 in the excavation conditions, if the distance X from the excavation site (retaining wall position) to the building is 1.5 times or more the retaining wall length Y1, it will be excluded from the influencing factor extraction.

[0056] In addition, if the influencing factor to be extracted is retaining deformation, and the excavation conditions section has the selection item for shoring (cut beam) selected as "Yes for shoring," the ground conditions section has the selection item for excavation section selected as "Good quality ground," and the ground conditions section has the selection item for root section selected as "Good quality ground," then this is shown to be excluded from the influencing factors to be extracted, as indicated by three "X1" marks.

[0057] [Loosening of support structure] In addition, if the influencing factor to be extracted is loosening of the support, as shown by the cross in the category of retaining length Y1 in the excavation conditions, if the distance X from the excavation point (retaining position) to the building is 1.5 times or more the retaining length Y1, it will be excluded from the influencing factor extraction. Naturally, in the case of loosening of shoring, if "no shoring" is selected as the excavation condition, it will be excluded from the extraction of influencing factors, as indicated by the cross.

[0058] Furthermore, if the influencing factor to be extracted is loosening of the support, as indicated by the three x1 marks, if the input item for the excavation width category in the excavation conditions is "excavation width B<3.0m", the selection item for the excavation section category in the ground conditions is "good quality ground", and the selection item for the root penetration section category in the ground conditions is "good quality ground", then this will be excluded from the influencing factors to be extracted.

[0059] [Insufficient compaction] In addition, if the influencing factor to be extracted is insufficient compaction, and the distance X from the building in the excavation conditions for the retaining length Y1 is 1.5 times or more the retaining length Y1, as shown by the cross, it will be excluded from the influencing factor extraction.

[0060] In addition, if the influencing factor to be extracted is insufficient compaction, and liquefied treated soil is selected in the backfill classification under the excavation conditions, it will be excluded from the influencing factor extraction targets, as shown by the cross.

[0061] In addition, if the influencing factor to be extracted is insufficient compaction, if the item "sufficient compaction" is selected in the backfilling category of excavation conditions, it will naturally be excluded from the influencing factor extraction, as shown by the "X" mark.

[0062] In addition, when the influencing factor to be extracted is insufficient compaction, the influencing factor will be extracted regardless of whether the item "without shoring" or "with shoring" is selected in the shoring (beam) category of the excavation conditions, as shown by the circle.

[0063] Similarly, if the influencing factor to be extracted is insufficient compaction, when "Other" is selected in the backfilling category of excavation conditions, this will be indicated as an influencing factor to be extracted, as shown by the circle.

[0064] [Extraction] If the influencing factor to be extracted is extraction, when the “retained soil” item is selected in the “retained soil” category of excavation conditions, as indicated by an “X” mark, it will be excluded from the influencing factor extraction targets.

[0065] Similarly, if the influencing factor to be extracted is extraction, as shown by an X in the category of the excavation condition earth retaining length Y1, if the distance X from the excavation site (earth retaining position) to the building is 1.5 times or more the earth retaining length Y1, it will be excluded from the influencing factor extraction.

[0066] In addition, if the influencing factor to be extracted is extraction, when the extraction item is selected in the category of retained soil in the excavation conditions, it is indicated by a circle that it will be a target for extraction of influencing factors.

[0067] [Consolidation settlement] If the influencing factor to be extracted is consolidation settlement, and the item "consolidated layer deeper than the groundwater level" is selected in the groundwater classification of ground conditions, and the item "there is a sandy soil layer in the excavation area deeper than the groundwater level" is selected in the groundwater classification of ground conditions, then this indicates that the influencing factor will be extracted, as shown by the two ◎1 marks.

[0068] In addition, if the influencing factor to be extracted is consolidation settlement, if the item "consolidated layer deeper than the groundwater level" is selected in the groundwater classification of ground conditions, and if the item "well implementation" is selected in the drainage and spring water conditions classification, this indicates that the influencing factor will be extracted, as shown by the two ◎2 marks.

[0069] Next, the influence factor extraction table in which the retaining wall type corresponds to a steel sheet pile will be described. FIG. 7 is a diagram illustrating an example of an influencing factor extraction table in which the retaining wall type corresponds to a steel sheet pile. The influencing factor extraction table TB13 in Figure 7 shows, for the specified influencing factors when the construction method is cut-and-cover construction and the retaining wall type is steel sheet pile, whether each of the following factors is excluded from the influencing factors, extracted as an influencing factor, or not involved as another influencing factor: retaining wall deformation, loosening of support, insufficient rolling compaction, (retaining wall) pull-out, and consolidation settlement.

[0070] The specific details will be explained below. [Earth retaining deformation] First, when the influencing factor to be extracted is retaining wall deformation, as shown by an X in the category of retaining wall length Y1 in the excavation conditions, if the distance X from the excavation site (retaining wall position) to the building is 1.5 times or more the retaining wall length Y1, it will be excluded from the influencing factor extraction.

[0071] In addition, if the influencing factor to be extracted is retaining deformation, and the excavation conditions section has the selection item for shoring (cut beam) selected as "Yes for shoring," the ground conditions section has the selection item for excavation section selected as "Good quality ground," and the ground conditions section has the selection item for root section selected as "Good quality ground," then this is shown to be excluded from the influencing factors to be extracted, as indicated by three "X1" marks.

[0072] [Loosening of support structure] In addition, if the influencing factor to be extracted is loosening of the support, as shown by the cross in the category of retaining length Y1 in the excavation conditions, if the distance X from the excavation point (retaining position) to the building is 1.5 times or more the retaining length Y1, it will be excluded from the influencing factor extraction.

[0073] Naturally, in the case of loosening of shoring, if "no shoring" is selected as the excavation condition, it will be excluded from the extraction of influencing factors, as indicated by the cross.

[0074] Furthermore, if the influencing factor to be extracted is loosening of the support, as indicated by the three x1 marks, if the input item for the excavation width category in the excavation conditions is "excavation width B<3.0m", the selection item for the excavation section category in the ground conditions is "good quality ground", and the selection item for the root penetration section category in the ground conditions is "good quality ground", then this will be excluded from the influencing factors to be extracted.

[0075] [Insufficient compaction] In addition, if the influencing factor to be extracted is insufficient compaction, and the distance X from the building in the excavation conditions for the retaining length Y1 is 1.5 times or more the retaining length Y1, as shown by the cross, it will be excluded from the influencing factor extraction.

[0076] In addition, if the influencing factor to be extracted is insufficient compaction, and liquefied treated soil is selected in the backfill classification under the excavation conditions, it will be excluded from the influencing factor extraction targets, as shown by the cross.

[0077] In addition, if the influencing factor to be extracted is insufficient compaction, if the item "sufficient compaction" is selected in the backfilling category of excavation conditions, it will naturally be excluded from the influencing factor extraction, as shown by the "X" mark.

[0078] In addition, when the influencing factor to be extracted is insufficient compaction, the influencing factor will be extracted regardless of whether the item "without shoring" or "with shoring" is selected in the shoring (beam) category of the excavation conditions, as shown by the circle. Similarly, if the influencing factor to be extracted is insufficient compaction, when "Other" is selected in the backfilling category of excavation conditions, this will be indicated as an influencing factor to be extracted, as shown by the circle.

[0079] [Extraction] If the influencing factor to be extracted is extraction, when the “retained soil” item is selected in the “retained soil” category of excavation conditions, as shown by the “X” mark, it will be excluded from the influencing factor extraction.

[0080] Similarly, if the influencing factor to be extracted is extraction, as shown by an X in the category of the excavation condition earth retaining length Y1, if the distance X from the excavation site (earth retaining position) to the building is 1.5 times or more the earth retaining length Y1, it will be excluded from the influencing factor extraction.

[0081] In addition, if the influencing factor to be extracted is extraction, when the extraction item is selected in the category of retained soil in the excavation conditions, it is indicated by a circle that it will be a target for extraction of influencing factors.

[0082] [Consolidation settlement] If the influencing factor to be extracted is consolidation settlement, when the item "consolidated layer deeper than the groundwater level" is selected in the groundwater classification of ground conditions, and when the item "sandy soil in the excavation area deeper than the groundwater level" is selected in the groundwater classification of ground conditions, this indicates that the influencing factor will be extracted, as shown by the two ◎1 marks.

[0083] In addition, if the influencing factor to be extracted is consolidation settlement, the item "consolidated layer deeper than the groundwater level" is selected in the groundwater category of ground conditions, the item "sufficient impermeable layer" is selected in the root penetration category of ground conditions, and the item "well implementation" is selected in the drainage and spring water conditions category, as shown by the three ◎2 marks, this indicates that the influencing factors will be extracted.

[0084] Next, we will explain the influencing factor extraction table where the retaining wall type corresponds to a liner plate. FIG. 8 is an explanatory diagram of an example of an influencing factor extraction table in which the retaining wall type corresponds to a liner plate. The influencing factor extraction table TB14 in Figure 8 shows, for the specified influencing factors when the construction method is cut-and-cover construction and the retaining wall type is a liner plate, whether each of the specified influencing factors, namely, retaining wall deformation, support loosening, insufficient compaction, (retaining wall) pull-out, and consolidation settlement, is excluded from the influencing factors, extracted as an influencing factor, or is not involved as another influencing factor.

[0085] The specific details will be explained below. [Earth retaining deformation] First, when the influencing factor to be extracted is retaining wall deformation, as shown by an X in the category of retaining wall length Y1 in the excavation conditions, if the distance X from the excavation site (retaining wall position) to the building is 1.5 times or more the retaining wall length Y1, it will be excluded from the influencing factor extraction.

[0086] In addition, if the influencing factor to be extracted is retaining deformation, and the excavation conditions section has the selection item for shoring (cut beam) selected as "Yes for shoring," the ground conditions section has the selection item for excavation section selected as "Good quality ground," and the ground conditions section has the selection item for root section selected as "Good quality ground," then this is shown to be excluded from the influencing factors to be extracted, as indicated by three "X1" marks.

[0087] [Loosening of support structure] In addition, if the influencing factor to be extracted is loosening of the support, as shown by the cross in the category of retaining length Y1 in the excavation conditions, if the distance X from the excavation point (retaining position) to the building is 1.5 times or more the retaining length Y1, it will be excluded from the influencing factor extraction. Naturally, in the case of loosening of shoring, if "no shoring (strut)" is selected as the excavation conditions, it will be excluded from the extraction of influencing factors, as indicated by the "x" mark.

[0088] Furthermore, if the influencing factor to be extracted is loosening of the shoring, as indicated by the three x1 marks, if the excavation conditions section in the shoring (cut beam) category has the selection item "Present shoring (cut beam)", the ground conditions section in the excavation section has the selection item "Good quality ground", and the ground conditions section in the root section has the selection item "Good quality ground", then this will be excluded from the influencing factors to be extracted.

[0089] [Insufficient compaction] In addition, if the influencing factor to be extracted is insufficient compaction, and the distance X from the building in the excavation conditions for the retaining length Y1 is 1.5 times or more the retaining length Y1, as shown by the cross, it will be excluded from the influencing factor extraction. In addition, if the influencing factor to be extracted is insufficient compaction, and liquefied treated soil is selected in the backfill classification under the excavation conditions, it will be excluded from the influencing factor extraction targets, as shown by the cross. In addition, if the influencing factor to be extracted is insufficient compaction, if the item "sufficient compaction" is selected in the backfilling category of excavation conditions, it will naturally be excluded from the influencing factor extraction, as shown by the "X" mark.

[0090] In addition, when the influencing factor to be extracted is insufficient compaction, the influencing factor will be extracted regardless of whether the item "without shoring" or "with shoring" is selected in the shoring (beam) category of the excavation conditions, as shown by the circle. Similarly, if the influencing factor to be extracted is insufficient compaction, when "Other" is selected in the backfilling category of excavation conditions, this will be indicated as an influencing factor to be extracted, as shown by the circle.

[0091] [Extraction] In addition, when the influencing factor to be extracted is extraction, if the retained soil is left behind, it is excluded as an influencing factor, and all other items are blacked out, and other items are not involved as influencing factors.

[0092] [Consolidation settlement] If the influencing factor to be extracted is consolidation settlement, when the item "consolidated layer deeper than the groundwater level" is selected in the groundwater classification of ground conditions, and when the item "sandy soil in the excavation area deeper than the groundwater level" is selected in the groundwater classification of ground conditions, this indicates that the influencing factor will be extracted, as shown by the two ◎1 marks.

[0093] In addition, if the influencing factor to be extracted is consolidation settlement, if the item "consolidated layer deeper than the groundwater level" is selected in the groundwater classification of ground conditions, and if the item "well implementation" is selected in the drainage and spring water conditions classification, this indicates that the influencing factor will be extracted, as shown by the two ◎2 marks.

[0094] Next, the influencing factor extraction table corresponding to the retaining wall type SMW will be described. FIG. 9 is an explanatory diagram of an example of an influencing factor extraction table corresponding to the retaining wall type SMW. The influencing factor extraction table TB15 in Figure 9 shows, for the specified influencing factors when the construction method is cut-and-cover construction and the retaining wall type is SMW, whether each of the following factors is excluded from the influencing factors, extracted as an influencing factor, or not involved as another influencing factor: retaining wall deformation, loosening of supports, insufficient rolling compaction, (retaining wall) pull-out, and consolidation settlement.

[0095] The specific details will be explained below. [Earth retaining deformation] First, when the influencing factor to be extracted is retaining deformation, as shown by an X in the category of retaining length Y1 in the excavation conditions, if the distance X from the building is 1.5 times or more the retaining length Y1, it will be excluded from the influencing factor extraction.

[0096] In addition, if the influencing factor to be extracted is retaining deformation, and the excavation conditions have the option "Presence of shoring (cut beam)", the ground conditions have the option "Good quality ground", and the ground conditions have the option "Good quality ground" for the root penetration section, then this is shown in three places with a "X" mark, and is excluded from the influencing factors to be extracted.

[0097] [Loosening of support structure] In addition, if the influencing factor to be extracted is loosening of the support, as shown by the cross in the category of retaining length Y1 in the excavation conditions, if the distance X from the excavation point (retaining position) to the building is 1.5 times or more the retaining length Y1, it will be excluded from the influencing factor extraction. Naturally, in the case of loosening of shoring, if "no shoring (bracing beam)" is selected as the excavation condition, it will be excluded from the extraction of influencing factors, as shown by the "x" mark.

[0098] Furthermore, if the influencing factor to be extracted is loosening of the support, as indicated by the three x1 marks, if the input item for the excavation width category in the excavation conditions is "excavation width B<3.0m", the selection item for the excavation section category in the ground conditions is "good quality ground", and the selection item for the root penetration section category in the ground conditions is "good quality ground", then this will be excluded from the influencing factors to be extracted.

[0099] [Insufficient compaction] In addition, if the influencing factor to be extracted is insufficient compaction, and in the excavation conditions, the distance X from the excavation point (retaining wall position) to the building is 1.5 times or more the retaining wall length Y1, as shown by the cross, it will be excluded from the influencing factor extraction. In addition, if the influencing factor to be extracted is insufficient compaction, and liquefied treated soil is selected in the backfill classification under the excavation conditions, it will be excluded from the influencing factor extraction targets, as shown by the cross. In addition, if the influencing factor to be extracted is insufficient compaction, if the item "sufficient compaction" is selected in the backfilling category of excavation conditions, it will naturally be excluded from the influencing factor extraction, as shown by the "X" mark.

[0100] In addition, when the influencing factor to be extracted is insufficient compaction, the influencing factor will be extracted regardless of whether the item "without shoring" or "with shoring" is selected in the shoring (beam) category of the excavation conditions, as shown by the circle. Similarly, if the influencing factor to be extracted is insufficient compaction, when "Other" is selected in the backfilling category of excavation conditions, this will be indicated as an influencing factor to be extracted, as shown by the circle.

[0101] [Extraction] Furthermore, when the influencing factor of the extraction target is withdrawal, all items are shaded in and are not involved as influencing factors.

[0102] [Consolidation settlement] If the influencing factor to be extracted is consolidation settlement, then in the groundwater category of ground conditions, the item "consolidated layer deeper than the groundwater level" is selected, in the excavation category of ground conditions, the item "presence of organic soil layer" is selected, and in the drainage and spring water conditions category, the item "presence of non-closure" is selected. This indicates that the influencing factor will be extracted, as shown by the three ◎1 marks.

[0103] In addition, if the influencing factor to be extracted is consolidation settlement, the item "consolidated layer deeper than the groundwater level" is selected in the groundwater category of ground conditions, the item "sufficient impermeable layer" is selected in the root penetration category of ground conditions, and the item "well implementation" is selected in the drainage and spring water conditions category, as shown by the three ◎2 marks, this indicates that the influencing factors will be extracted.

[0104] Next, the influence factor extraction table for the retaining wall type corresponding to the continuous underground wall will be described. FIG. 10 is an explanatory diagram of an example of an influencing factor extraction table in which the retaining wall type corresponds to a continuous underground diaphragm wall. The influencing factor extraction table TB16 in Figure 10 shows, for the specified influencing factors when the construction method is cut-and-cover construction and the retaining wall type is a continuous underground wall, whether each of the following factors is excluded from the influencing factors, extracted as an influencing factor, or not involved as another influencing factor: retaining deformation, loosening of supports, insufficient compaction, (retaining) pull-out, and consolidation settlement.

[0105] The specific details will be explained below. [Earth retaining deformation] First, when the influencing factor to be extracted is retaining wall deformation, as shown by an X in the category of retaining wall length Y1 in the excavation conditions, if the distance X from the excavation site (retaining wall position) to the building is 1.5 times or more the retaining wall length Y1, it will be excluded from the influencing factor extraction.

[0106] In addition, if the influencing factor to be extracted is retaining deformation, and the excavation conditions section has the selection item for shoring (cut beam) selected as "Yes for shoring," the ground conditions section has the selection item for excavation section selected as "Good quality ground," and the ground conditions section has the selection item for root section selected as "Good quality ground," then this is shown to be excluded from the influencing factors to be extracted, as indicated by three "X1" marks.

[0107] [Loosening of support structure] In addition, if the influencing factor to be extracted is loosening of the support, as shown by the cross in the category of retaining length Y1 in the excavation conditions, if the distance X from the excavation point (retaining position) to the building is 1.5 times or more the retaining length Y1, it will be excluded from the influencing factor extraction. Naturally, in the case of loosening of shoring, if "no shoring (strut)" is selected as the excavation conditions, it will be excluded from the extraction of influencing factors, as indicated by the "x" mark.

[0108] Furthermore, if the influencing factor to be extracted is loosening of the support, as indicated by the three x1 marks, if the input item for the excavation width category in the excavation conditions is "excavation width B<3.0m", the selection item for the excavation section category in the ground conditions is "good quality ground", and the selection item for the root penetration section category in the ground conditions is "good quality ground", then this will be excluded from the influencing factors to be extracted.

[0109] [Insufficient compaction] In addition, if the influencing factor to be extracted is insufficient compaction, and the distance X from the building in the excavation conditions for the retaining length Y1 is 1.5 times or more the retaining length Y1, as shown by the cross, it will be excluded from the influencing factor extraction. In addition, if the influencing factor to be extracted is insufficient compaction, and liquefied treated soil is selected in the backfill classification under the excavation conditions, it will be excluded from the influencing factor extraction targets, as shown by the cross. In addition, if the influencing factor to be extracted is insufficient compaction, if the item "sufficient compaction" is selected in the backfilling category of excavation conditions, it will naturally be excluded from the influencing factor extraction, as shown by the "X" mark.

[0110] In addition, when the influencing factor to be extracted is insufficient compaction, the influencing factor will be extracted regardless of whether the item "without shoring" or "with shoring" is selected in the shoring (beam) category of the excavation conditions, as shown by the circle. Similarly, if the influencing factor to be extracted is insufficient compaction, when "Other" is selected in the backfilling category of excavation conditions, this will be indicated as an influencing factor to be extracted, as shown by the circle.

[0111] [Extraction] Furthermore, when the influencing factor of the extraction target is withdrawal, all items are shaded in and are not involved as influencing factors.

[0112] [Consolidation settlement] If the influencing factor to be extracted is consolidation settlement, if the item "consolidated layer deeper than the groundwater level" is selected in the groundwater classification of ground conditions, and if the item "non-closure" is selected in the classification of drainage and spring conditions, then this indicates that the influencing factor will be extracted, as shown by the two ◎1 marks.

[0113] In addition, if the influencing factor to be extracted is consolidation settlement, the item "consolidated layer deeper than the groundwater level" is selected in the groundwater category of ground conditions, the item "sufficient impermeable layer" is selected in the root penetration category of ground conditions, and the item "well implementation" is selected in the drainage and spring water conditions category, as shown by the three ◎2 marks, this indicates that the influencing factors will be extracted.

[0114] Next, the influencing factor extraction table corresponding to the retaining wall type of unlined excavation will be described. FIG. 11 is an explanatory diagram of an example of an influencing factor extraction table in which the retaining wall type corresponds to unlined excavation. The influencing factor extraction table TB17 in Figure 11 shows, for the specified influencing factors when the construction method is open cut construction and the retaining wall type is unlined excavation, whether each of the specified influencing factors, namely retaining wall deformation, support loosening, insufficient compaction, (retaining wall) pull-out, and consolidation settlement, is excluded from the influencing factors, extracted as an influencing factor, or is not involved as another influencing factor.

[0115] The specific details will be explained below. [Earth retaining deformation] When the influencing factor to be extracted is earth retaining deformation, all items are filled in and it is not considered to be an influencing factor.

[0116] [Loosening of support structure] Furthermore, if the influencing factor to be extracted is loosening of shoring, all items are blacked out, meaning that they are not involved as influencing factors.

[0117] [Insufficient compaction] In addition, if the influencing factor to be extracted is insufficient compaction, and the excavation conditions are classified as excavation depth Y2, and the distance X from the building is 1.5 times or more the excavation depth Y2, then this will be excluded from the influencing factor extraction, as indicated by the cross.

[0118] In addition, if the influencing factor to be extracted is insufficient compaction, and liquefied treated soil is selected in the backfill classification under the excavation conditions, it will be excluded from the influencing factor extraction targets, as shown by the cross.

[0119] In addition, if the influencing factor to be extracted is insufficient compaction, if the item "sufficient compaction" is selected in the backfilling category of excavation conditions, it will naturally be excluded from the influencing factor extraction, as shown by the "X" mark. In addition, if the influencing factor to be extracted is insufficient compaction, when "Other" is selected in the backfilling category of excavation conditions, it will be subject to extraction of influencing factors, as indicated by the circle.

[0120] In addition, if the influencing factor to be extracted is insufficient compaction, and the item for good quality ground is selected in the excavation section classification of ground conditions, this will be excluded from the influencing factors to be extracted, as shown by the cross mark.

[0121] [Extraction] Furthermore, when the influencing factor of the extraction target is withdrawal, all items are shaded in and are not involved as influencing factors.

[0122] [Consolidation settlement] If the influencing factor to be extracted is consolidation settlement, and the item "consolidated layer deeper than the groundwater level" is selected in the groundwater classification of ground conditions, and the item "the excavation area deeper than the groundwater level is sandy soil" is selected in the groundwater classification of ground conditions, then this indicates that the influencing factor will be extracted, as shown by the two ◎1 marks.

[0123] [Results of extracting influential factors in shield tunneling construction] Next, an example of the presentation of the extraction result (step S14) in the case where the construction method is shield tunneling will be described. FIG. 12 is an explanatory diagram of an example of the input / extraction result screen when the construction method is shield tunneling construction. The data input / extraction result display screen DS2 when the construction method is shield tunneling construction is broadly divided into a basic information input area AR1 for data input, an extraction result display area AR2, an annotation display area AR3, and a construction method tab selection area AR4.

[0124] In the basic information input area AR1 of the data input / extraction result display screen DS2, numerical values ​​are input, items are selected, or a YES / NO input is made to indicate whether or not the location conditions, excavation conditions, and ground conditions of the construction site for which influence factors are to be extracted are applicable.

[0125] When the construction method is shield tunneling, the location condition is entered as the distance between the excavation point and the building in the example of Figure 12. Specifically, in the example of Figure 12, 40m is entered. In addition, the excavation conditions that require input include the machine outer diameter, whether it is a closed type excavator or not, whether it is pressurized type or not, whether there is a possibility of over-driving or over-intake, whether it is a linked type excavator or not, the void thickness, whether over-excavation is performed or not, and the backfill injection method (either simultaneous injection, immediate injection, or post-injection).

[0126] In addition, as ground conditions, information on the thickness of the soil overburden, whether or not excavation will be performed in a consolidated layer, whether or not there is a consolidated layer deeper than the groundwater level, and whether or not there is a possibility of segment deformation due to earth pressure is required to be input.

[0127] In the extraction result display area AR2, among the predetermined influence factors, the extracted influence factors and the non-extracted influence factors are clearly displayed. Here, the specified influencing factors when the construction method is shield tunneling are excavation deformation, tail void, segment deformation, and consolidation settlement. Excavation deformation refers to deformation of the ground itself caused by excavation. A tail void is a cavity that occurs during shield tunneling. Segment deformation refers to the deformation of segments, which are tunnel lining components made of precast concrete used in shield construction. Consolidation settlement is a type of land subsidence that occurs when a long-term load is applied to the soil that makes up the ground, causing the water between the soil particles to be discharged and the ground to sink.

[0128] In the example of Figure 12, excavation deformation, tail void, segment deformation, and consolidation settlement, which are indicated by circles, were all extracted as influencing factors, and none of them were extracted as influencing factors, which are indicated by crosses.

[0129] Next, an example of the presentation of the extraction result (step S14) in the case where the construction method is shield tunneling will be described. FIG. 13 is an explanatory diagram of an example of an influencing factor extraction table when the construction method is shield tunneling construction.

[0130] The influencing factor extraction table TB21 in Figure 13 shows that the construction method is shield tunneling construction, and for each of excavation deformation, tail void, segment deformation, and consolidation settlement, it shows whether they are excluded from the influencing factors, extracted as influencing factors, or not involved as other influencing factors.

[0131] The specific details will be explained below. [Excavation deformation] When the influencing factor to be extracted is excavation deformation, the machine outer diameter D item of the excavation conditions and the soil covering thickness H item of the ground conditions are extracted as influencing factors under specified conditions. Specifically, if the distance from the excavation site to the building is X, the items indicated by the two circles (1) are extracted as influencing factors if they satisfy the following formula. X≦1.5×(machine outer diameter D+soil covering thickness H)

[0132] In addition, when the influencing factor to be extracted is excavation deformation, the excavation conditions indicated by the three circle marks (2) (enclosed excavator items, pressurized type items, and over-thrust / excessive intake items) are extracted as influencing factors, except when the excavator is an enclosed excavator, a pressurized type, and there is no possibility of over-thrust / excessive intake.

[0133] [Tail Void] When the influencing factor to be extracted is a tail void, the machine outer diameter D item of the excavation conditions and the soil overburden thickness H item of the ground conditions are extracted as influencing factors under specified conditions. Specifically, if the distance from the excavation site to the building is X, the items indicated by the two circles (1) are extracted as influencing factors if they satisfy the following formula. X≦1.5×(machine outer diameter D+soil covering thickness H)

[0134] In addition, if the influencing factor to be extracted is a tail void, and the excavation conditions shown with the three circles (3) are void thickness δ>0, or there is over-excavation, and the backfill injection method is other than the simultaneous injection method, it will be excluded from the influencing factors, and in all other cases it will be extracted as an influencing factor.

[0135] [Segment Transform] When the influencing factor to be extracted is segment deformation, if there is no possibility of segment deformation due to earth pressure as a ground condition, as indicated by an x ​​mark, it is excluded from the influencing factors. In addition, when the influencing factor to be extracted is segment deformation, the machine outer diameter D item of the excavation conditions and the soil covering thickness H item of the ground conditions are extracted as influencing factors under specified conditions. Specifically, if the distance from the excavation site to the building is X, the items indicated by the two circles (1) are extracted as influencing factors if they satisfy the following formula. X≦1.5×(machine outer diameter D+soil covering thickness H)

[0136] [Consolidation settlement] In addition, when the influencing factor to be extracted is consolidation settlement, as shown by the two circle 4 marks, if the excavation condition item is a closed-type excavator and the ground condition item is a consolidated layer deeper than the groundwater level, it will be extracted as an influencing factor. In addition, when the influencing factor to be extracted is consolidation settlement, as shown by the two circle 5 marks, it is extracted as an influencing factor when the excavation condition item is an articulated excavator and the ground condition item is excavation through a consolidated layer.

[0137] [Results of extracting influential factors in embankment construction] Next, an example of the presentation of the extraction result (step S14) in the case where the construction method is banking work will be described. FIG. 14 is an explanatory diagram of an example of the input / extraction result display screen when the construction method is banking work. The data input / extraction result display screen DS3 when the construction method is embankment work is broadly divided into a basic information input area AR1 for data input, an extraction result display area AR2, an annotation display area AR3, and a construction method tab selection area AR4. In the basic information input area AR1 of the data input / extraction result display screen DS1, numerical values ​​are input, items are selected, or a YES / NO input is made to indicate whether or not the location conditions, embankment conditions, and ground conditions of the construction site for which influence factors are to be extracted are applicable.

[0138] When the construction method is embankment construction, the location condition is input as the distance from the end of the embankment to the building in the example of Fig. 14. Specifically, in the example of Fig. 14, 3m is input. In addition, as embankment conditions, the embankment height (m) and embankment width (m) must be entered. In addition, as ground conditions, information on the presence or absence of a consolidated layer, whether the thickness of the consolidated layer is 0.5 m or more, information on the depth of the bottom of the consolidated layer, and information on the presence or absence of soft ground other than the consolidated layer are required to be entered.

[0139] Here, a consolidated layer refers to a clayey soil layer with an N value of 2 or less. In addition, soft ground refers to, for example, clayey soil with an N value of 4 or less, or sandy soil with an N value of 9 or less.

[0140] The extraction result display area AR2 is an extraction result display area in which the extracted and unextracted influencing factors among the predetermined influencing factors are clearly displayed. Here, the predetermined influencing factors to be extracted when the construction method is banking work are consolidation settlement and shear deformation. Consolidation settlement is a type of land subsidence that occurs when a long-term load is applied to the soil that makes up the ground, causing the water between the soil particles to be discharged and the ground to sink. Shear deformation is a phenomenon in which soil deforms due to shear stress generated when it is subjected to an external force, causing the soil to slide along a surface and break.

[0141] In the example of Figure 14, consolidation settlement, indicated by a circle, was extracted as an influencing factor, while shear deformation, indicated by an X, was not extracted as an influencing factor.

[0142] Next, the influencing factor extraction table when the construction method is banking work will be described. FIG. 15 is an explanatory diagram of an example of an influencing factor extraction table when the construction method is banking work.

[0143] The influencing factor extraction table TB31 in FIG. 15 indicates that the construction method is banking work, and that for each of consolidation settlement and shear deformation, whether they are extracted as influencing factors or whether they are not involved as other influencing factors.

[0144] The specific details will be explained below. [Consolidation settlement] When the influencing factor to be extracted is consolidation settlement, as shown by the two x1 marks, the embankment height H item in the embankment conditions and the embankment width B item in the embankment conditions are excluded as influencing factors under specified conditions. Specifically, if the embankment height H<0.5m or the embankment width B<3.0m, it is excluded from the influencing factors, and in all other cases it is considered an influencing factor due to other conditions.

[0145] In addition, when the influencing factor to be extracted is consolidation settlement, as shown by the four circle marks (2), if there is a consolidation layer in the ground conditions and the bottom depth of the consolidation layer is 0.5 m or more thick, it will be extracted as an influencing factor under specified conditions.

[0146] Specifically, if the distance from the end of the embankment to the building L < the depth of the bottom of the consolidated layer with a thickness of 0.5 m or more D x 2.0 is satisfied, it will be extracted as an influencing factor, and in any other case, it will be excluded from the influencing factors.

[0147] Shear Deformation When the influencing factor to be extracted is shear deformation, as shown by the two x1 marks, the embankment height H item in the embankment conditions and the embankment width B item in the cutting conditions are excluded as influencing factors under specified conditions. Specifically, if the embankment height H<0.5m or the embankment width B<3.0m, it is excluded from the influencing factors, and in all other cases it is considered an influencing factor due to other conditions.

[0148] In addition, when the influencing factor to be extracted is shear deformation, as shown by the circle 3 mark, if it satisfies the cross 1 mark, there is soft ground other than the consolidated layer, and the distance from the end of the embankment to the building is L < the width of the embankment B, it will be extracted as an influencing factor, and in all other cases it will be excluded from the influencing factors.

[0149] Next, in the case where the construction method involves vibration construction, the influencing factors can be easily extracted by using the "influence analysis device" of the applicant's utility model registration no. 3057775, so only an outline will be given here. According to the above-mentioned impact analysis device, the vibrations that will occur are shown by specifying the work to be performed for each piece of heavy equipment used. This can be used to extract and identify the factors that could be influencing the vibration work (what type of heavy equipment is used and what type of work is being performed that could be influencing factors).

[0150] As described above, when the extraction results of the influencing factors corresponding to the selected construction method are presented (step S14), the operator verifies the extraction results as necessary (step S15).

[0151] In this verification, the operator refers to the construction work damage case database 40 or the construction work damage precedent database 50 to perform the verification. First, the verification using the construction damage case database 40 will be described.

[0152] The construction damage case database 40 is a database of past construction damage cases that have been collected. Then, for the influencing factors extracted in the extraction process of step S14, for example, by inputting the conditions of the target construction among the influencing factors or each item and instructing a search, similar cases with similar conditions (for example, construction method, conditions during construction corresponding to the data for extracting influencing factors, etc.) are searched for. The registered damage cases will be displayed.

[0153] Therefore, based on the displayed damage cases, the damage situation of construction damage caused by factors similar to the impact factors extracted in the extraction process of step S14 is checked to verify whether the extracted impact factors are correct.

[0154] Next, the verification using the construction damage precedent database 50 will be described. The construction damage precedent database 50 is a precedent database that specializes in collecting construction damage.

[0155] Therefore, for the impact factors extracted in the extraction process of step S14, the operator inputs, for example, the conditions of the target construction work among the impact factors or each item, and when a search is instructed, a search is performed for similar cases with similar conditions (for example, construction method, conditions during construction corresponding to the data for extracting impact factors, etc.), and the operator confirms the content of disputes and issues in lawsuits regarding construction damage caused by factors similar to the impact factors extracted in the extraction process of step S14, and verifies whether the extracted impact factors are correct.

[0156] If, as a result of the verification in step S15, an influencing factor that is presumed to be correct is extracted as the extraction result in step S14, the influencing factor extraction device 10 stores the extracted influencing factor as it is as the verification result and outputs it to the influence analysis device 20 (step S16).

[0157] On the other hand, if the verification result of step S15 indicates that any of the extracted influencing factors should not have been extracted as an influencing factor as the extraction result in step S14, the influencing factor extraction device 10 will store only the influencing factors excluding the influencing factor for which the verification result indicated that it should not have been extracted as the influencing factor as the verification result, and output them to the influence analysis device 20 (step S16).

[0158] The impact analysis device 20 performs an impact analysis by factor based on the verification results from the impact factor extraction device 10 (step S21), and outputs the effects of subsidence and vibration of buildings, etc. near the construction site to the building damage assessment device 30 (step S22).

[0159] As a result, the building damage assessment device 30 performs building damage assessment based on the extracted and notified influencing factors (step S31).

[0160] As described above, according to this embodiment, by simply inputting information that can be easily entered for each construction project, it is possible to extract influencing factors with high accuracy, and it is possible to predict the occurrence of damage due to construction work and avoid the occurrence of damage, and even in the unlikely event that damage actually occurs, it is possible to easily estimate the cause by extracting the influencing factors after the occurrence, and it is also possible to take subsequent measures. In other words, the influence factor extraction device of this embodiment can be effectively used before, during, or after construction work, making it possible to reduce damage caused by construction work. [Explanation of symbols]

[0161] 10 Influence factor extraction device 11 Control device 11A MPU 11B ROM 11C RAM 11D Input / Output Interface Section 11E Communication Interface Section 11F Communication Bus 12 Input Devices 13 Display device 14 External storage device 15 Output Devices 20 Impact analysis device 30 Building damage assessment device 40 Database of construction damage cases 50 Construction Work Damage Case Law Database 60 Communication Network 100 Construction Damage Impact Assessment System AR1 Basic information input area AR2 extraction result display area AR3 Annotation display area AR4 Construction Method Tab Selection Area DS1~DS3 Extraction result display screen TB11~TB17, TB21, TB31 Influence factor extraction table

Claims

1. An impact factor extraction device for extracting impact factors that may affect the occurrence of damage at a construction site or damage to buildings in the vicinity of a construction site from among a plurality of predetermined impact factors, A selection unit for selecting a construction method of a construction work for which influence factors are to be extracted; A condition input unit for inputting conditions of the construction work corresponding to the selected construction method; a factor extraction unit that extracts, from the plurality of predetermined influencing factors based on the conditions, influencing factors that may cause damage to buildings near the construction site; a presentation unit that presents the extracted influencing factors; An influencing factor extraction device comprising:

2. The selection unit selects one of open cut construction, shield / jacking construction, and embankment construction as the construction method, The influencing factor extraction device according to claim 1.

3. The condition input unit inputs at least one of location conditions, construction conditions, ground conditions, and drainage conditions. The influencing factor extraction device according to claim 1 .

4. When the construction method is the open cut construction, the location conditions, the excavation conditions as the construction conditions, the ground conditions, and the drainage conditions are input from the condition input unit. The influencing factor extraction device according to claim 3 .

5. The location conditions include a distance from an excavation site to a building where the building damage is expected to occur; The influencing factor extraction device according to claim 4.

6. The construction conditions are excavation conditions, and include at least one of the following: excavation depth, excavation width, type of retaining soil, length of retaining soil, presence or absence of support work, and backfilling method; The influencing factor extraction device according to claim 4.

7. The type of the retaining wall includes at least one of a parent pile horizontal sheet pile, a lightweight steel sheet pile, a steel sheet pile, a liner plate, a SMW or a continuous underground wall, and an unlined excavation, The influencing factor extraction device according to claim 6.

8. The ground conditions include at least one of information regarding the presence or absence of groundwater, information regarding the ground condition of the excavation portion, and information regarding the ground condition of the penetration portion; The drainage conditions include at least one of information on whether or not forced drainage is performed and information on whether or not there is an unclosed portion of the retaining wall. The influencing factor extraction device according to claim 4.

9. When the construction method is the open cut construction, the predetermined influencing factors include at least one of the following: soil deformation, loosening of supports, insufficient rolling, extraction and consolidation settlement; The influencing factor extraction device according to claim 2 .

10. When the construction method is the shield / jacking construction, the location conditions, the excavation conditions as the construction conditions, and the ground conditions are input from the condition input unit. The influencing factor extraction device according to claim 3 .

11. The location condition is the distance from the excavation site to a building where the building damage is expected to occur, The influencing factor extraction device according to claim 10.

12. The construction conditions are excavation conditions, including the outer diameter of the machine, whether it is a closed type excavator, whether it is a pressurized type, whether there is a possibility of over-driving or over-intake, whether it is a connected type excavator, void thickness, whether to perform over-digging, and backfill injection method. The influencing factor extraction device according to claim 10.

13. The ground conditions include information on the thickness of the soil cover, whether or not to excavate in a compacted layer, whether or not there is a compacted layer deeper than the groundwater level, and whether or not there is a possibility of segment deformation due to earth pressure. The influencing factor extraction device according to claim 10.

14. When the construction method is the shield / jacking construction, the predetermined influencing factors include at least one of excavation deformation, tail void, segment deformation and consolidation settlement, The influencing factor extraction device according to claim 2 .

15. When the construction method is the embankment work, the location conditions, the embankment conditions as the construction conditions, and the ground conditions are input from the condition input unit. The influencing factor extraction device according to claim 3 .

16. The location condition is the distance from the end of the embankment to the building where the building damage is expected to occur, The influencing factor extraction device according to claim 15.

17. The construction conditions are embankment conditions, and are the values ​​of embankment height or embankment width. The influencing factor extraction device according to claim 15.

18. The ground conditions include information on the presence or absence of a consolidated layer, whether the thickness of the consolidated layer is a predetermined thickness or more, the bottom depth of the consolidated layer, and the presence or absence of soft ground other than the consolidated layer. The influencing factor extraction device according to claim 15.

19. When the construction method is the embankment construction, the predetermined influencing factor includes at least one of consolidation settlement or shear deformation, The influencing factor extraction device according to claim 2 .

20. the factor extraction unit, when extracting influence factors that may cause damage at the construction site or damage to buildings in the vicinity of the construction site from the predetermined plurality of influence factors based on the conditions, excludes influence factors that cannot be influence factors and extracts the remaining influence factors as influence factors that may cause damage at the construction site or damage to buildings in the vicinity of the construction site; The influencing factor extraction device according to any one of claims 1 to 19.

21. an influence factor extraction table that indicates a correspondence relationship between a plurality of predetermined influence factors and the conditions of the construction work; The factor extraction unit refers to the conditions and the influencing factor extraction table to extract the factors as influencing factors that may cause damage at the construction site or damage to buildings in the vicinity of the construction site. The influencing factor extraction device according to any one of claims 1 to 19.

22. The influencing factor extraction table is provided for each type of retaining wall when the construction method is the cut-and-cover construction. The influencing factor extraction device according to claim 21.

23. A table storage unit is provided for storing a plurality of the influencing factor extraction tables. The influencing factor extraction device according to claim 21.

Citation Information

Patent Citations

  • Influence analysis device

    JP3057775U

  • Building Damage Detection Device

    JP3189906U